HomeMy WebLinkAboutT-288208x
4
'I
0
� (n
Q J
� Q
W I--
J W
D Q
O
CD W 0
Z U Q
O Q
W Q
Z U�
_ (n
U- J
� Z
C�
W C/' I Y
Q
J
v o
G
00
$Q
C
�E
0
Sy Q i
Y�
p$R
d�
t pp
€ Y7
_Q3RA
R4�E
u
Y
U Y V
I
�D
0( i j„% ,� 1 " NIPPLE
B1 B2 g3 13 d B6 B9 B11 I )
b B10
a a
_ _ a b C
I - - - -- C7 (V
- - - -- - - - - -- o a
LEGEND
1
I
a. Vehicle Signal Head
I b. Sign F I O F
c. Stree*. Name Sign r or
VERTICAL CLEARANCE d. Pre -Empt Detector H h H b
e. Deleted _
MI IMUM: 16' -6" f. Luminaire
MAXIMUM: 18' -6" g, Pedestrian Signal Head I 2 9 9 G
h. Cabinet I
I i. Pedestrian Push Button Assembly o
j. Hondhole H h H o N
I 2 I
1 0
LIMITS OF VERTICAL CLEARANCE REQUIREMENT I I I I
00
2'-0"
)
ROADWAY MIN. IF
TYPE II TYPE III TYPE IV TYPE V CURB OR EDGE OF SHOULDER
MAST ARM COMBINATION LIGHTING STRAIN POLE COMBINATION LIGHTING
SIGNAL STANDARD AND MAST ARM STANDARD AND STRAIN TYPE SD
SIGNAL STANDARD POLE STANDARD SPECIAL DESIGN STANDARD
FOUNDATION DEPTH TABLE
Allowable Lateral
Foundation
XYZ (Cubic feet)
Bearing Pressure
Type
Type II, III and SD mastorm standards.
600
900
1,200
1,500
1,900
2,300
sf
WINDLOAD AREAS (FT) 2 X)(Y
5 11 A C HA, o
�E I O 0 4
3' RD.
10'
10'
1 1'
1 1 '
13'
15'
1,000
3' SO.
8'
8'
9'
9'
10'
11'
3' RD 3' SQ 4' RD
4' RD.
8'
8'
9'
9'
10'
11'
3' RD.
8'
8'
9'
11'
13'
15'
1,500
3' SO.
7'
7'
7'
8'
8'
9'
8.0
4' RD.
7'
7'
7'
8'
8'
9'
DEGREES CLOCKWISE
FROM OFFSET LINE
3' RD.
6'
E'
7'
11'
13'
15'
2,500
3' SQ.
6'
6'
6'
6'
7'
7'
POLE ORIENTATION AND ATTACHMENT POINT DETAIL
4' RD.
6'
6'
6' 1
6'
7'
7'
Ihis table is based on a phi value of 26 degrees. For double mostarm standards,
use the larger XYZ value for foundation depth selection.
rn •CLOCKWISE FROM NB MASTARM ATTACHMENT POINT.
w
..CLOCKWISE FROM EB MASTARM ATTACHMENT POINT.
I j �
SUMMATION OF NET AND EB WIND LOADS USED SINCE ANGLE BETWEEN MASTARMS IS LESS THAN 90'.
+`•`TEMPORARY SIGNAL HEAD DURING STAGE i CONSTRUCTION.
7 &-(to,-aft
-w2l
SEE CITY OF RENTON STANDARD PLANS, PAGES
J022, J023, AND J029 FOR FOUNDATION DETAILS.
CHECK FOR COMPLIANCE
?Aof Syy �� TO CITY STANDARDS
- .(= _- DATE S_3b9)
�•. 9f. 3563 DATE
FS :C�STER:Ci
9 /ONAI EN I _ DATE.
I TT
EXPIRES 12/20,/01 1 j
NOTES
STD'
FIELD LOCATION
Ol
MOUNTING COUPLING INSTALLED
SIGNAL MAST ARM
DATA
AT OFFSET DISTANCE INDICATED
POLE ATTACHMENT POINT ANGLES (deg)
cL O C K W I S£ T
REMARKS
IN CHART.
WINDLOAD AREAS (FT) 2 X)(Y
5 11 A C HA, o
�E I O 0 4
POLE
PL ZP F R M T Q
Go
ARM(Fi)
ALTERNATE NOTE 1
TYPICAL
0 a 9
TYPE
Al A2
FOR TYPE N MOUNT ONLY
SIGNAL ARM
Q
D E1 E2 F G1 G2 H 11 2
3' RD 3' SQ 4' RD
DRILL 1" HOLE IN MAST ARM AND
ATTACHMENT POINT
ToTAL(FT) a
INSTALL PLASTIC SPLIT BUSHING
N
0' 180.
ALL HANDHOLES
AT 1800
FOR CABLE ENTRANCE.
22.0
-
10.5
OFIELD
INSTALLED.
POE LE RIENTA ION
-
O� -
-
8.0
9._'
-
11.6
-
-
0
ANY T" NIPPLE NOT USED FOR
DEGREES CLOCKWISE
FROM OFFSET LINE
11.0
C O
-
OPTICOM DETECTOR WILL HAVE A
TO 0' POINT
RO�Owar
BASE PLATE
-
270
METAL PLUG INSTALLED.
-
LOCATION STATION
POLE ORIENTATION AND ATTACHMENT POINT DETAIL
rn •CLOCKWISE FROM NB MASTARM ATTACHMENT POINT.
w
..CLOCKWISE FROM EB MASTARM ATTACHMENT POINT.
I j �
SUMMATION OF NET AND EB WIND LOADS USED SINCE ANGLE BETWEEN MASTARMS IS LESS THAN 90'.
+`•`TEMPORARY SIGNAL HEAD DURING STAGE i CONSTRUCTION.
7 &-(to,-aft
-w2l
SEE CITY OF RENTON STANDARD PLANS, PAGES
J022, J023, AND J029 FOR FOUNDATION DETAILS.
CHECK FOR COMPLIANCE
?Aof Syy �� TO CITY STANDARDS
- .(= _- DATE S_3b9)
�•. 9f. 3563 DATE
FS :C�STER:Ci
9 /ONAI EN I _ DATE.
I TT
EXPIRES 12/20,/01 1 j
SIGNAL STANDARD DETAIL CHART
STD'
FIELD LOCATION
MOUNTING
SIGNAL MAST ARM
DATA
LUM.
POLE ATTACHMENT POINT ANGLES (deg)
FOUNDATION
REMARKS
OFFSET DISTANCES (FT) (Z) (POLE CL TO ATTACHMENT POINT)
WINDLOAD AREAS (FT) 2 X)(Y
(x)(Y)(Z)
POLE
HEIGHT(FT)
ARM(Fi)
DEPTHS(FT)
STATION OFFSET LT RT P.O.A.
TYPE
Al A2
B1 B2 B3 B4 B5 B6 B7 B9 B10 B11
Bt B2 B3 B4 B6 B7 I B9 B10 B11
C
D E1 E2 F G1 G2 H 11 2
3' RD 3' SQ 4' RD
ToTAL(FT) a
N
18
22.0
-
10.5
-
16.0
-
-
-
-
8.0
9._'
-
11.6
-
-
-
-
-
11.0
420
-
0
-
150
-
-
270
-
-
FOUNDATION DEPTHS BASED ON AN ALLOWABLE BEARING
AR
O
LK WASH BLVD
35.5 FT
X
0
SD
-
PRESSURE OF 1000PSA REFER TO THE MARCH 2007
17 +59.0
160_
-
10
S
8
GEOTECHNICAL REPORT FROM CEOTECH CONSULTANTS, INC.
EB
18
9.5
-
-
-
-
-
-
-
-
4.5
17.6
-
-
-
-
-
_
-
-
11.0
-
-
58`
-
-
-
-
-
-
FOR METHODS WHEN PEAT OR GROUND WATER ARE
TOTAL-580-1
ENCOUNTERED.
OLK
WASH BLVD
36.0 FT
X
-
PS
-
18 +27.0
FOUNDATION DEPTHS BASED ON AN ALLOWABLE BEARING PRESSURE OF
3
DELETED
1DOOM. REFER TO THE MARCH 29, 2001 GEOTECHNICAL REPORT FROM
FROM GEOTECH CONSU LTANTS, INC. FOR METHODS WHEN PEAT OR GROUND
WATER ARE ENCOUNTERED.
O
LK WASH BLVD
38.0 FT
X
0
III
18
40
36.5
-
25.5
-
31.0
-
-
-
20.0
5.0
9.3
-
9.3
-
-
-
-
4.0
11.0
825
10
0
0
-
-
90
180
135
-
270
17 +03.0
I
10
8
8
se
18
13.0
-
5.0
-
9.0
-
-
-
-
-
9.3
-
9.3
-
-
-
-
-
-
170
-
-
270'*
-
-
-
-
-
-
FOUNDATION DEPTHS BASED ON AN ALLOWABLE BEARING
SOUTHPORT BLVD
25.0 FT
X
0
SD
40
I
74
13
70
10
PRESSURE OF 1000PSF. REFER TO THE MARCH 29, 2001
1+41.0
EB
18
42.0
-
34.0
-
24.0
29.5
44.5 ""
18.5
-
-
9.3
-
9.3
-
9.3
9.3
9.3
-
-
1,570
0
0
-
-
-
-
135
-
-
GEOTECHNICAL REPORT FROM GEOTECH CONSULTANTS, INC.
FOR METHODS WHEN PEAT OR GROUND WATER ARE
ENCOUNTERED.
SOUTHPORT BLVD
21.0 FT
X
-
PS
-
-
-
-
-
-
-
-
1+85.0
SOUTHPORT BLVD
35.5 FT
X
-
PS
-
-
-
-
1+82.5
O
SOUTHPORT BLVD
44.5 FT
X
-
PS
-
-
-
-
1+66.0
SOUTHPORT BLVD
40.5 FT
X
-
PS
-
-
-
-
1 +12.0
10
0
SOUTHPORT
56.5 FT
X
-
UPOLER
-
40
-
-
-
-
-
-
-
-
-
-
-
-
-
OBLVD
-
-
-
-
-
-
-
12
0
-
-
-
270
-
-
0
rn •CLOCKWISE FROM NB MASTARM ATTACHMENT POINT.
w
..CLOCKWISE FROM EB MASTARM ATTACHMENT POINT.
I j �
SUMMATION OF NET AND EB WIND LOADS USED SINCE ANGLE BETWEEN MASTARMS IS LESS THAN 90'.
+`•`TEMPORARY SIGNAL HEAD DURING STAGE i CONSTRUCTION.
7 &-(to,-aft
-w2l
SEE CITY OF RENTON STANDARD PLANS, PAGES
J022, J023, AND J029 FOR FOUNDATION DETAILS.
CHECK FOR COMPLIANCE
?Aof Syy �� TO CITY STANDARDS
- .(= _- DATE S_3b9)
�•. 9f. 3563 DATE
FS :C�STER:Ci
9 /ONAI EN I _ DATE.
I TT
EXPIRES 12/20,/01 1 j