Loading...
HomeMy WebLinkAboutT-289401PORTION OF -SE V. 5 -1-W ®. 23 N. RGE. 5 E. W. M. 6 =7J4i' o COULON ESTATES ul XiSTING 250 WATT LIPS M -S —II LUMINAIRE ON ALUMINUM 'A\/IT STYLE POLE AT 35' MOUNTING HEIGHT \° 1 ELEVATION OF NEUTRAL WIRE AT EXISTING 0 j \U, LITY POLE IS APPROX. 46' ABOVE GRADE �0 CI,," 0 Z W CD � \I �I I SCALE: 1 " = 20 0 10 22..0, 40 I ®� POLE SCHEDULE POLE POLE NC. ID NO- POLE LOCATION POLE OFFSET I LAMP WATTAGE DISTRIBUTION MOUNTING HEIGHT MAST ARM CIRCUIT N0. CONSTRUCTION NOTES _ 2965C 27 +50 20.5' RT. 150 M -C -III 25' 1 6' 1 f 2 ! 29h7C I 29+00 I 25' -R T. I 150 M -C -III 7.5' 6' 1 WIRING M RU. C. c3 ND uIT CONDUCTORS REMARKS PVC (SCHEDULE 40) 2-#8, 1- #10 GREEN 5" PVC (SCHEDULE 40) PULLCORD FOR FUTURE VC (SCHEDULE 80) j 2--#8, 1 - #10 GREEN 4 1 17x. i.� �- EX. 2 - - #8, 1 - #10 GREEN OROUTE CONDUIT TO EXISTING JUNCTION BOX. INSTALL CONDUCTORS PER WIRING SCHEDULE. SPLICE NEW CONDUCTORS TO EXISTING CONDUCTORS IN EXISTING JUNCTION BOX. 0 COORDINATE WITH PUGET SOUND ENERGY FOR RE" "OVAL OF EXISTING LUMINAIRE AND MAST ARM ON EXISTING UTILITY POLE. 2 ELEVATION OF NEUTRAL WIRE AT EXISTING UTILITY POLE IS APPROX. 32' ABOVE GRADE TYPE M -C -Ili H.P.S. LUMINAIRE, ARM AND ALUMINUM DAVIT STYLE POLE LIGHT BASE AND JUNCTION BOX WITH CONCRETE PAD - - - PVC CONDUIT (SEE WIRING SCHEDULE) ® TYPE 1 JUNCTION BOX WITH CONCRETE PAD Z� WIRE NOTE 0 CONSTRUCTION NOTE 1 irrdrwru P\ pf WAS Ian �•` -V WA TRANSPORTATION PLANNING 19615 30770 & ENGINEERING, INC. p R !� P� R �- �' f01 Si ERf, v ONAL ENC°� -��-o� ess /ONAL C 2223-1127H AVENUE NORTHEAST, SUITE 101 BE' LEVUE, WASHINGTON 98004 E %FIRES s /s /o1 EXPIRES o1 /ai /o1 -� TEL.. (425) 455 -5320 FAX (425) 453 -;)759