Loading...
HomeMy WebLinkAboutT-295201T 2 UI TURN ARROW A PORTION OF SW 1/4, SEC.3, T.23N, R.5E, W.M. I 1 I � NOTES` LEGEND CHANNELIZATION NOTES: i I I I 1. ALL RELOCATED EXISTING SIGNS SHALL BE I I MOUNTED TO NEW POSTS. - -i' SIGN RELOCATION LINE O 1 INSTALL CONTINUOUS DOUBLE YELLOW CENTER z I 2. SEE DUVALL PROJECT PLAN H013.1 FOR SIGN IDENTIFICATION LINE LINE, PER CITY OF RENTON SD PLAN SP H001. I ' I TYPICAL STRIPING ON DUVALL AVE. b EXISTING SIGN & POST ALL I L O S DT PLAN SP 0 002 LINE PER CITY OF RENTON i I I 3. SEE DUVALL PROJECT PLAN H013.2 FOR F PROPOSED SIGN &POST TYPICAL STRIPING ON 3 -LANE SIDE STREET. XX PROPOSED SIGN INSTALLATION NOTE O INSTALL LANE LINE, PER CITY OF RENTON SD 4. SEIr DUVALL PROJECT PLAN H013.3 FOR PLAN SP H002. I TYPICAL STRIPING ON 2 -LANE SIDE STREET. 0 SIGN RELOCATION NOTE r OINSTALL WHITE PAINTED WIDE LINE, PER WSDOT ' I I L X -) SIGN REMOVAL NOTE STD PLAN M- 20.10 -00. r I 5. SEE DUVALL PROJECT PLAN H013.4 FOR I W r I TYPICAL STOP BAR STRIPING. OINSTALL TWO -WAY LEFT TURN LANE LINE, PER I U I � g I P 6. EDGE OF SIGN SHALL BE AT LEAST 24" FROM CITY OF RENTON SD PLAN SP H001. EL I FACE OF CURB. O6 INSTALL PLASTIC TWO -WAY LEFT TURN TRAFFIC I - � C STA 11 +25.9 ARROWS, PER CITY OF RENTON STD PLAN SP � f` 1A 7. GROUND /SIDEWALK CLEARANCE FROM BOTTOM H006 AND H008. I� o STRIPI NG OF SIGN SHALL BE AT LEAST 7' -0 ". I O7 INSTALL TYPE 2L OR 2R PLASTIC TURN ARROWS, L V"E7ND I PER CITY OF RENTON STD PLAN SP H002 AND H008. I OS INSTALL WHITE. PAINTED BICYCLE LANE SYMBOL AND TRAFFIC ARROW PER CITY OF RENTON STD PLAN SP H009.2. INSTALL 18" STOP LINE, PER CITY OF RENTON i STD PLAN SP H008. , $ T ,yam' • I 8 B ST 179+ 4.4 I } I t; a ; ;; I C•; I 11 INSTALL PLASTIC WIDE LINE PER WSDOT STD BIKE SYM804 c;tiT _ I 1 I F`: ;•y I PLAN M- 20.10 -00. E STOR 1.02 I I 12 INSTALL RAISED PAVEMENT MARKER DOUBLE C STA 10 +51.0 fia I . R SE }.07TH Pl 1.03 STOP BAR: I '`" G; YELLOW ISLAND W /CROSSHATCHING PER CITY OF RENTON STD PLAN SP H008 SUBSTITUTING dUVAL 11 AVE NE .04 BEGIN STRIPING i;`:., ;.;.;,; • ,:: RAISED PAVEMENT MARKER SPACING FOR PAINT i LINE. 4 I C STA 10 +51.0 1.b (711 1 I + 1 1.11 15 INSTALL WHITE SKIP BIKE LANE LINE. 3 -7 1. z 12.0 LT I I I �ij I PER DUVALL PROJECT PLAN H013.5 \ 14 -4 117' 1.05 M2 -; I BEGIN STRIPING 2- M1 -601 f- O B STA 179 +31.5 15 1.01 END TAPER R7 -9 t BEGIN PROJECT B STA .8 S 178+46.5 ; 1 BEGIN END ND ST STRIPII 179 +00 ' R -50' . n Q I I 1.08 1.12 SE 107TH ST I . C -UNE I W a 1.13 DEAD END N - =- -- - - - -1- -- -� N,-= -� -- e -- E- Q rA 179 +72.1 ' B STA 180 +70.5 1n ' C j STRIPING BEGIN STRIPING 1 4) m 8 -UNE ' B STA 180 +51.6 B STA 181 +02.0 8 6 STA 182 +00.0 i W BEGIN STRIPING END BEGIN STRIPING BIKE SYMBOL 3 I Z 180+00 .;; •.•:.;.•.•...•.•.•.,,...,.,.... _,. - -I-- -� - -i i ,•: - ..181 +00F - - - - - -- `a - - -- '182 +00 + - - - - -- - - -- 1 -�-I �b - -I DUVALL AVE: NE ..S,..•.::.•.:•:- ............° ..,,..... ...............,. ......:,,.......,........1¢ STA GIN STRIPING STA .182 +14.0 END BEGIN STRIPING 5 6 CENTER IN LANE ' B STA 180 +94.5 8 4 TWLT 'ARROWS .... �}I \,� -I-J 12 BIKE SYMBOL O - - - - -- T - -r - - - "174 BSTA 178 +46.0 B STA 179 +31.5 B STA 179 +84.7 BEGIN STRIPING I „ BEGIN STRIPING STOP BAR 10 , 1 1.15) R2 -1 B STA 183+01.0 I END STRIPING 8 4a G 1.16�D11 -1 BIKE SYMBOL �L U '� -;1 O in/ B S11 178+86.0 O /j1ii7(I. END (STRIPING TURN ARROW i` ';'• I -- �l, r B ST 178 +74.4 7 t:C I ii I I L J7 CENTER IN LANE TURN ARROW {, + 20 0 20 40 scale feet F ,`' " "' "` "• 333019TH AVENUE SOUTH CALL 48 HOURS. m FEDERAL WAY, WASHINGTON BEFORE YOU DIG BERGER ARAM 98003 -2600 1- 800 - 424 -5555 ° " e ' " E ° ' " VOICE: (206)431 -2300 pis zms 4, zGar -t King County FAX: (206)431 -2250 NO. Last Sa,ed an Ou M 107078 Ot 70•JSAN by AanaPiaaa RN- a l 1LtlfIFAP Mr- 04- 0711C4071dFyr1! %p/0%dFg � • ! ARM �JSG REVISION BY DATE APPR PPPO jsG r INRaOMI�l•1M- 1 761 01C 1N0M DATUM F Itlf l7[ SU' AL ICMMW,Y KEY PLAN •y CITY OF DUVALL AVE NE / COAL CREEK PARKWAY SE 3/21/08 UNTON RECONSTRUCTION ,n •ng /Building/Public Works Dept. SE 107TH PLACE TO NEWCASTLE CITY LIMITS proved For Constru5 -rr CHANNELIZATION PLAN CH 1 ,ert M. Hanson P _ / n„ t,. SHEET 1