HomeMy WebLinkAboutT-300301m
Y
�n
I
{
i
a
i
Q
4
e
4
r
M
g
e
%,, -o WA 1,-"
4c
11399 q-
''
AL
EXPIRES 1/2/
46 1
WM POPP ASSOCIATES
Transportation Engineers / Planners
14 --400 BLDG * *206 * 14400 BEL --RED RD
BELLEVUE, WA. 98007 (425) 401 -1030
4+00 � smear
_ 6+00 • 7.00
in I *Vf2,,
NILE AVE NE
#2 W W_ W__ —W in " _. - I _.
�r ' r -5
.:T Gr UGr r dGf T G _ C u '
so
SD
5'
\� 4 - - ♦ --------------------- - - - - -- -------- - - - - -- -� ------ - - -___ ____- '- - - - -�b -
I 3 I
pI SP , t :------ - - - - --
3
; +
—
J
2 � ► _ � j , I � � � t --t f �
i
SS
r 1
r
i
i
i
Ii
FtID L L . �,11..,. r
{
9 1
1'. 1
�1
i
FR 4- '75
POLE SCHEDULE
RUN
CONDUIT
POLE
POLE
POLE
MAST
LEGEND
a
POLE
POLE
STATION
OFFSET
HEIGHT
TYPE 1 JUNCTION BOX (EXISTING)
LUMINAIRE TYPE
CIRCUIT
4 TYPE 2 JUNCTION BOX (EXISTING)
NO.
iZ TYPE I JUNCTION BOX (NEW)
(FEET)
Q TYPE 2 JUNCTION BOX (NEW)
(FEET)
�I LUMINAIRE (EXISTING OR BY OTHERS)
Z--►
LUMINAIRE (NEW)
W
New Ground
3
t EXISTING SERVICE CABINET
2 – #8 AWG (USE –XLP)
New Lighting on Circuit A -1
Z
– – – – -- CONDUIT (BY OTHERS)
� m Z
— — CONDUIT (NEW)
O L.L.
Q
A WIRE NOTE
U W —
22 R
Z Z 11-"
d
CONSTRUCTION NOTE
Q w Z
- - ---- R.O.W.
m a :2
0 20' 40'
J J
SCALE. 1 = 20
Z J
SHOWN ON Z)LAN
2
GENERAL NOTES
3 +62
NILE
1. ALL WORK SHALL BE IN ACCORDANCE WITH THE CITY OF RENTON
30
STANDARDS SPECIFICATIONS AND THESE PLANS.
150W, HPS, MC3
2. THE LOCATIONS OF FEATURES SHOWN ARE APPROXIMATE AND SHALL
EXISTING
0
BE VERIFIED IN THE FIELD BY THE CONTRACTOR AS NECESSARY.
o
23 R
of
I-E
3. INSTALL ALL STREET LIGHTING MATERIALS SHOWN ON THE PLANS,
O � E
EXCEPT WHERE NOTED_ ALL MATERIALS SHALL BE NEW AND OF
3$
THE BEST AVAILABLE GRADE OR QUALITY, EXCEPT WHERE NOTED.
Z 4 H
as
22 +82
4TH PL
W 4.
THE CONTRACTOR SHALL SUBMIT A REQUEST TO THE CITY OF RENTON
8
FOR MATERIALS APPROVAL AT THE EARLIEST POSSIBLE DATE.
A -1
EXISTING
.auk av E
5. ALL WORK SHALL BE CONSISTENT WITH UTILITY AGENCY REQUIREMENTS.
' �
THE CONTRACTOR SHALL CONTACT ALL PERTINENT UTILITY AGENCIES
30
48 HOURS BEFORE COMMENCING WORK AND SHALL COORDINATE THE
--` c v1
Co
o C
WORK WITH THE UTILITIES THROUGHOUT THE PROJECT.
a�
6
2657C
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING
21.5 R
30
UTILITIES. THE CONTRACTOR SHALL NOTIFY THE AFFECTED UTILITY
150W, HPS, MC3
COMPANY AND THE CITY IMMEDIATELY UPON DAMAGE.
' z ,
7. THE CONTRACTOR SHALL NOTIFY THE CITY OF RENTON FIELD INSPECTION
°=
DIVISION (430 -7203) FOR INSPECTION PURPOSES, 24 HOURS BEFORE
COMMENCING WORK. NO WORK SHALL BE COVERED UNTIL IT HAS BEEN
EXAMINED BY THE ENGINEER.
o
N
8. ALL CONDUIT SHALL BE PVC SCHEDULE 40 UNLESS NOTED OTHERWISE.
�:
9. ALL CONDUIT COVER SHALL BE 24 INCHES.
10. ALL OVERHEAD UTILITIES AND POWER AS SHOWN ON NILE AVE NE WILL
BE RELOCATED TO PROPERTY LINE BY PSE /POTELCO. PLAN DIMENSIONS
DIMENSIONS INDICATE A 10 –FOOT CLEAR DISTANCE BETWEEN STREET LIGHT
POLE AND PRIMARY SERVICE LINES CAN BE MET WITH UTILITY POLE LOCATED
.,
ON R/W LINE AND MINIMUM SAG HEIGHT OF PRIMARY SERVICE LINES IS 38 FEET.
CONSTRUCTION NOTES
1 INSTALL NEW FLAT LENS COBRA HEAD 150W HPS, 240V, MEDIUM CUTOFF
a
°d
TYPE III DISTRIBUTION ON 30' DAVIT POLE WITH 6' ARM. ALSO INSTALL
WSDOT TYPE I JUNCTION BOX (SEE STANDARD PLAN JR -36) AND PAD
FOUNDATION. SEE POLE SCHEDULE. CENTER OF POLE SHALL BE LOCATED
3.5' BACK FROM FACE OF CURB.
2 REMOVE 7'x3'x4" CONCRETE PAD (FOR LUMINAIRE AND JUNCTION BOX).
REMOVE EXISTING TYPE 1 JUNCTION BOX AND REPLACE WITH TYPE 2 JUNCTION
BOX IN NEW CONCRETE PAD. INSTALL NEW CONDUIT RUN TO NORTH AS SHOWN
ON THIS PLAN. SPLICE NEW WIRE RUN (RUN #2) TO EXISTING CIRCUIT A -1.
3 IF SERVICE CABINET IS OPERATIONAL .(TO BE CONSTRUCTED BY MADISON'S
LANDING) AT TIME WHEN THIS PROJECT IS UNDER CONSTRUCTION, COORDINATE
WITH CITY TO POWER --OFF SYSTEM.
%,, -o WA 1,-"
4c
11399 q-
''
AL
EXPIRES 1/2/
46 1
WM POPP ASSOCIATES
Transportation Engineers / Planners
14 --400 BLDG * *206 * 14400 BEL --RED RD
BELLEVUE, WA. 98007 (425) 401 -1030
4+00 � smear
_ 6+00 • 7.00
in I *Vf2,,
NILE AVE NE
#2 W W_ W__ —W in " _. - I _.
�r ' r -5
.:T Gr UGr r dGf T G _ C u '
so
SD
5'
\� 4 - - ♦ --------------------- - - - - -- -------- - - - - -- -� ------ - - -___ ____- '- - - - -�b -
I 3 I
pI SP , t :------ - - - - --
3
; +
—
J
2 � ► _ � j , I � � � t --t f �
i
SS
r 1
r
i
i
i
Ii
FtID L L . �,11..,. r
{
9 1
1'. 1
�1
i
FR 4- '75
POLE SCHEDULE
RUN
CONDUIT
POLE
POLE
r 1
r
i
i
i
Ii
FtID L L . �,11..,. r
{
9 1
1'. 1
�1
i
FR 4- '75
POLE SCHEDULE
RUN
CONDUIT
POLE
POLE
POLE
MAST
POLE
POLE
STATION
OFFSET
HEIGHT
ARM
LUMINAIRE TYPE
CIRCUIT
COMMENTS
NO.
1. D. #
(FEET)
(FEET)
(FEET)
(FEET)
NO.
1 – #8 Bare Ground
New Ground
3
2"
2 – #8 AWG (USE –XLP)
New Lighting on Circuit A -1
(Schedule 40)
1 – #8 Bare Ground
New Ground
1
2651 C
2 +10
NILE
22 R
30
6
150W, HPS, MC3
A -1
EXISTING POL= NOT
SHOWN ON Z)LAN
2
2653C
3 +62
NILE
22 R
30
6
150W, HPS, MC3
A -1
EXISTING
3
2652B
21+12
4TH PL
23 R
25
8
100W2 HPS, MC3
A -1
EXISTING
4
2654B
22 +82
4TH PL
23 R
25
8
100W, HPS, MC3
A -1
EXISTING
5
2655C
5 +00
21.5 R
30
6
150W, HPS, MC3
A -1
NEW TO BE INSTALLED)
)
6
2657C
6 +45
21.5 R
30
6
150W, HPS, MC3
A -1
NEW TO BE INSTALLED)
)
r
WIRING SCHEDULE
RUN
CONDUIT
CONDUCTOR
COMMENTS
N0.
SIZE
1
EXISTING 2"
2–#8 AWG (USE –XLP)
1 – Bare Ground
ExistinListing Lighting Circuit A -1
#8
Ground
2
2"
2 – #8 AWG (USE –XLP)
New Lighting
(Schedule 80)
1 – #8 Bare Ground
New Ground
3
2"
2 – #8 AWG (USE –XLP)
New Lighting on Circuit A -1
(Schedule 40)
1 – #8 Bare Ground
New Ground
1
RECOMMENDED
CALL BEFORE YOU DIG FOR APPROV,
1-800-424-5555 BY f 20 F.- Ca.
BY -oL-- mot,...
BY �.
G1
7 0 / SCANNED NOV - 7 2003
a 4
0