Loading...
HomeMy WebLinkAboutT-308801I= °to =� ------------------------------ -I I I I CONSTRUCTION NOTES LEGEND GENERAL NOTES 01 ROUTE NEW CONDUIT AND CONDUCTORS TO EXISTING JUNCTION BOX PER WIRING SCHEDULE. � TYPE M –C –III H.P.S. LUMINAIRE, ARM 1_ A PORTION OF THE BROOKEFIELD I STREET LIGHTING SYSTEM IS SHOWN ON THIS PLAN. AND ALUMINUM DAVIT STYLE POLE NSTAW AND TERMINATE NEW CONDUCTORS INSIDE AND SERVICE CABINET #0078 ON SPARE CIRCUIT N0. 2. THE LOCATIONS OF THE SYSTEM COMPONENTS SHOWN ARE DESIGN LOCATIONS FOR THE c� SYSTEM WHICH HAS NOT YET BEEN CONSTRUCTED. THESE LOCATONS SHOULD BE POLE SCHEDULE CONSIDERED APPROXIMATE AND ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY. � LIGHT BASE AND JUNCTION BOX WITH CONCRETE PAD POLE NO ao I POLE I LAMP OFFSET WATTAGE J M 2 I PORTION OF N.E. 1/4 OF N.W. 1/4 OF N.E. 1/4 OF SEC. 10, TWP. 23 N., RGE. 5 E., W.M. CONDUCTORS 2243E I HOQUTAM AVL_ N.E. j 7 =61 22' RT. 200 M –C –III 30' 8' EX. 2 2 22248 j N.E. 11TH C -. 1 0 +55 2Q5' RT. 100 M –C –III 25' 8' EX. 2 3 zz 20.5' RT. N.E. 11TH CT. M –C –II! 25' 8' EX. 2 4 22301 N -E- 11TH Cl- 3 " 91 I 1 CO M –C –III I 25' 8' EX. 2 5 1 2234B N.E. 11TH CT. 5 +42 35.7' RT. 100 M –C –!II 25' 2, t --�-- _ z I 3 4 � f z - - - -- — — — — — — — — �� J I Ip 1 a g Z I g L _ � _ _ _ ,_ -10 11 Liz sc 0 0 o� Q — � z ` I o / u 3 BROOKEFIELD II PLAT. T 3 N88 °1413" W 2 BROOKEFIELD !PLAT 631.48 i 2 I i m I , 1 I ( i ° r° _ I I �al w E I I I I - I w p I= °to =� ------------------------------ -I I I I CONSTRUCTION NOTES LEGEND GENERAL NOTES 01 ROUTE NEW CONDUIT AND CONDUCTORS TO EXISTING JUNCTION BOX PER WIRING SCHEDULE. � TYPE M –C –III H.P.S. LUMINAIRE, ARM 1_ A PORTION OF THE BROOKEFIELD I STREET LIGHTING SYSTEM IS SHOWN ON THIS PLAN. AND ALUMINUM DAVIT STYLE POLE NSTAW AND TERMINATE NEW CONDUCTORS INSIDE AND SERVICE CABINET #0078 ON SPARE CIRCUIT N0. 2. THE LOCATIONS OF THE SYSTEM COMPONENTS SHOWN ARE DESIGN LOCATIONS FOR THE c� SYSTEM WHICH HAS NOT YET BEEN CONSTRUCTED. THESE LOCATONS SHOULD BE POLE SCHEDULE CONSIDERED APPROXIMATE AND ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY. � LIGHT BASE AND JUNCTION BOX WITH CONCRETE PAD POLE NO POLE POLE ID NO STREET LOCATOON I POLE I LAMP OFFSET WATTAGE DISTRIBUTION MOUNTING HEIGHT MAST ARM CIRCUIT N0 CONDUCTORS 2243E I HOQUTAM AVL_ N.E. j 7 =61 22' RT. 200 M –C –III 30' 8' EX. 2 2 22248 j N.E. 11TH C -. 1 0 +55 2Q5' RT. 100 M –C –III 25' 8' EX. 2 3 2226B N.E. 11TH CT- i 2 +26 20.5' RT. 100 M –C –II! 25' 8' EX. 2 4 22301 N -E- 11TH Cl- 3 " 91 20,5' R T. 1 CO M –C –III I 25' 8' EX. 2 5 1 2234B N.E. 11TH CT. 5 +42 35.7' RT. 100 M –C –!II 25' 8' EX. 2 2. THE EXISTING TIMBER UTILITY POLE LOCATED WITHIN THE SITE ACCESS INTERSECTION IS ' I PROPOSED TO BE RELOCATED_ IF NECESSARY, THE POLE SHALL BE REPLACED WITH A — — — — PVC CONDUIT (SEE WIRING SCHEDULE) LONGER POLE TO ENSURE A MINIMUM OF TEN FEET OF CLEARANCE FROM LIGHT STANDARD CONDUCTORS REMARKS NO. 1 TO ANY POWER CONDUCTOR, INCLUDING THE NEUTRAL CONDUCTOR. LIGHT STANDARD B TYPE 1 JUNCTION BOX WITH CONCRETE PAD NO. 1 SHALL NOT BE INSTALLED UNTIL THE UTILITY POLE IS RELOCATED AND THE REQUIRED 1:5' PVC (SCHEDULE 40) , CLEARANCE CAN BE MET. 2 1.5” PVC (SCHEDULE 80) SPARE FOR FUTURE, INSTALL PULL WIRE WIRE NOTE 3. THE DRIVEWAYS FOR LOTS 7, 8, 10 AND 11 WILL BE ADJUSTED TO PROVIDE TEN FEET OF 0 0 10 20< 40 CLEARANCE FROM THE EDGE OF THE DRIVEWAY TO THE ADJACENT LIGHT STANDARD. O CONSTRUCTION NOTE WIRING SCHEDULE �T►y RECOMMENDED FOR APPROVAL �- $GANNED.NIIR 29 --9 19 31, - V, ' I RUN NO. CONDUIT CONDUCTORS REMARKS BY�� DATE ws BY DATE BY DATE � - EHERMAN - H ,� „� TRAFFIC ENGINEERING Po�Rec STE0.Ea \24.� ru SS1oLEN� If-16-03 15324 Southeast 133rd Court, Renton, Washington 98059 EXPIRES 01/31/0 425-277-1740 425- 277- 1740te1. 425-277-5718 fax hte @comcast.net 1 1:5' PVC (SCHEDULE 40) 2 – #8, 1 – #8 GREEN 2 1.5” PVC (SCHEDULE 80) SPARE FOR FUTURE, INSTALL PULL WIRE 0 3 EX_ 1.5" PVC 2 – #8, 1 – #8 GREEN EX. 3 – #8, 3 – #12 REMAIN $GANNED.NIIR 29 --9 19 31, - V,