Loading...
HomeMy WebLinkAboutT-318704N. ab r;. I too� 00 r �- a U 0 0 o� to ' ¢ a I7 J N ¢ __j � � N U O ry z Cf) z —.I z O i— z ._._.1 ,E W-N c c: rn c p, 00 c� 0 � e ° a Q w a 0 .. 0 0 z I I I 10 T , 1 WIRE SCHEDULE . •- ,� p CLv RACEWAY CONDUIT SIZE C-) .'-. LLL_ c N � 00 LE PHOTOMETRICS CITY OF IRE RE NT N 1201240V CIRCUIT 1 �--_ W :6 w as 2" SCH40 2 CIRCUIT 2 o' o C 15 = a� ,E W-N c c: rn c p, 00 c� 0 � e ° a Q w a 0 .. 0 0 z I I I 10 T , 1 WIRE SCHEDULE 0 NO RACEWAY CONDUIT SIZE ILLUM 8 POWER jf2 EQUIP. GROUND 08 PHOTOCELL #14 100 PHOTOMETRICS CITY OF IRE RE NT N 1201240V CIRCUIT 1 5 +24.5 1 2" SCH40 2 CIRCUIT 2 1 15 2 2 " SCH80 2 22.5' LT 1 30 3 2' SCH40 2 3 1 3 4 2 SCH80 2 100W 1 3 4 " SCH40 8 +40.0 3 14' 1 BREAKER SCHEDULE S VC > ____ SERVICE dr CIRCUITS AMAIN BREAKER AMPS BRANCH BREAKER AMPS CONTACTOR AMPS COMMENT SERVICE 100 PHOTOMETRICS CITY OF IRE RE NT N 1201240V CIRCUIT 1 5 +24.5 15 30 240V CIRCUIT 2 M -C -111 15 30 240V SPARE CIRCUIT 3 22.5' LT 15 30 240V SPARE SEE SHEET IL5 FOR POLE CHART, GENERAL NOTES, CONSTRUCTION NOTES, WIRING DIAGRAM, AND BREAKER SCHEDULE. POLE SCHEDULE LUM. POLE NO. ROAD STATION POLE M0UNT ING CIRCUIT WATTAGE PHOTOMETRICS CITY OF IRE RE NT N 1 144TH 5 +24.5 22.5' LT 14' 1 100W M -C -111 40538 2 5TH 2 +50.5 22.5' LT 14 1 100W M -C -Ill 40468 3 144TH 7 +05.0 22.5' RT 14' 1 100W M -C -Ill 40488 4 144TH 8 +40.0 22.5' LT 14' 1 100W M -C -Ill 4055B 5 5TH 1+15.5 22.5' RT 14' 1 100W M -C -III 40578 6 5TH 4+18.5 22.5' RT 14' 1 100W M -C -Ill 4059B GENERAL NOTES I 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY _ I DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS. A SET OF APPROVED PLANS SHALL BE KEPT ON -SITE AT ALL TIMES DURING CONSTRUCTION. 1 2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SHALL BE - _ - - - - _ r----- ---- ----—- -� - I 2 + I 4 - _ LIMITED TO 8:30 AM TO 3:30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT I i ( 235 -2635. ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE I I I I I 1 ( 1 I APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN I I I I I I I I I ADVANCE. THE POLICE DEPARTMENT, FIRE DEPARTMENT, AND 911 I I I I I I I SHALL BE NOTIFIED 24 HOURS IN ADVANCE. 3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY I I I I I I I I THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR I I I I I I I DISTURBANCE. FOR UTILITY LOCATE CALL 48 -HOUR LOCATORS, I 1 I I 1- 800 - 424 -5555. 4. A PRECONSTRUCTIQN CONFERENCE AND A 24 HOUR NOTICE SHALL BE I I ( I I REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY ! I I ! 3 I I PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT 2 SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. 5. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS N , METHODS AND I I 5 I I SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND I 1 I I ( I 3 OTHERS ON THE CONSTRUCTION SITE. Eil- I I 4i I I i I I ( I .�-'' ( 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN 5 I Li 3 I CJ I j I I STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY 6 2 L -- -- -- - - -- -'' I I i CONSTRUCTION. Q _ , 1 I I 7. PLANS APPROVED BY THE DIRECTOR OF PUBLIC WORKS SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS. SVC I I I I I I 8. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE CKT 1 I I n I I WHENEVER CONSTRUCTION IS IN PROGRESS. 3 2 -- #8'S (TYP.) I + 00 I I 9. ALL UTILITY TRENCHES SHALL BE BACKFILLED AND COMPACTED TO 1 3 I IN I 1 I I 95X MAXIMUM DRY DENSITY MODIFIED PROCTOR. I \ I I I I I i � I ' I I i l I I CONSTRUCTION NOTES INSTALL LUMEC Z14 LUMINAIRE, 100WATT HPS M -C -Ill, ON 14' LUMEC Z14 POLE PER THE POLE SCHEDULE THIS SHEET, CITY OF RENTON STANDARD PLANS SHEET 3, AND DETAILS SHEET 4. I I rn I I 2 INSTALL CITY OF RENTON STANDARD SERVICE CABINET, #0086, PER THE DETAIL, SHEET 3. LEGEND I I I I I I I I POWER 3 N CO NECTION POINT. COORDINATE WITH PSE. I I I ( I � TYPE 1 JUNCTION BOX I i � LUMINAIRE POLE N I I I I CONDUIT /CONDUCTOR ! I I I I ® ELECTRICAL SERVICE CABINET fin I I I I 0 CONSTRUCTION NOTE LUMINAIRE POLE NUMBER _ _ - 1 I pNER T -- -- — — — -- -- _ i 4 ! ��o,......., CHECK FOR COMPLIANCE WIRE NOTE 0 20 40 _ - __ - „ _ , _ J s n _... _ � � o� Wgs�'ti.���� TO CI STANDARDS AL 1 40 TRANSPORTATION ENGINEERING NORTHWEST, LLC ; �, " _ DATE z' n " n I in PO BOX 65254 0� • :• �F 35635 , ; • DATE S SEATTLE, WA 98155 �`s•..��,stE�;.: (425) 806 9236 S,, ONA t E�'„ 1 _ 4 DATE EXPIRES 12/20/05, ScMMEO MAY 012006 0 r ; T• ?1 X? 0 c. ,FFt 2 NNI