Loading...
HomeMy WebLinkAboutzW-0469SetI V L'9 7590 2 +/6.5 TEE(MJxFV 1 5'g4YD FPl A %£)4SLY(mJ)' l 6" AfTE YAC VE IfL 1 M4 211 -N "C.Z ✓ALYE BD,VIC 1115 Z -G'ONC yYR GUA.FP M573 / - 6 "C /. NIPPLE lLENG%l A5 M..; -.5,57- .q14^ T/E POPE / M 7 jvQUSr e�oe,r,N4 /- 8 ab" ,PEDOCER(SEB,MI)< LeeY pN0 SO IfM _ /- /O "T6E"IOz /O"x8`(M.TxFLG7:, Y.9!V< TAPP/NA IFLx,H,T) TH.P//fT 3.Z M MIMI f Z /O SLEE!/Es KrlA1 r Z- 2 "56CT /ONS0FD.Z /0 " TyfruST xmel v . Z- lO"SLEEYES N.✓xN/✓ Z -Z' SECT /ON,5 OF D/. /0" 7_1' -t ,^ n/ SEC. 20, TWP. 41N. R.M. X Po1+ ' CONNECT TD EX /ST. � l //i i 1. All work materials shall be in conformance with the standards and 't i 6 specifications of the City of Renton Utility Department and APWA Standards ` r and Specifications, 1977 edition. 2, All locations of existing utilities shown arc approximate, and it shall be the contractors responsibility to verify the true and correct / location so as to avoid damage or disturbance. l/ 3. Water Main Pipe - J All water main pipe to be cement lined cast iron pipe conforming to ASA ?" 5ZON061 � m,61 Y Spec's A21.6 -1570 and /or A21.8 -1970, Class 22, (pipe); A21.1 (pipe I V L'9 7590 2 +/6.5 TEE(MJxFV 1 5'g4YD FPl A %£)4SLY(mJ)' l 6" AfTE YAC VE IfL 1 M4 211 -N "C.Z ✓ALYE BD,VIC 1115 Z -G'ONC yYR GUA.FP M573 / - 6 "C /. NIPPLE lLENG%l A5 M..; -.5,57- .q14^ T/E POPE / M 7 jvQUSr e�oe,r,N4 /- 8 ab" ,PEDOCER(SEB,MI)< LeeY pN0 SO IfM _ /- /O "T6E"IOz /O"x8`(M.TxFLG7:, Y.9!V< TAPP/NA IFLx,H,T) TH.P//fT 3.Z M MIMI f Z /O SLEE!/Es KrlA1 r Z- 2 "56CT /ONS0FD.Z /0 " TyfruST xmel v . Z- lO"SLEEYES N.✓xN/✓ Z -Z' SECT /ON,5 OF D/. /0" 7_1' -t ,^ n/ SEC. 20, TWP. 41N. R.M. X Po1+ ' Renton. All necessary excavation and materials to be supplied by the i contractor and be on -cite prior to City notification. dSB.S ssy n: 0 ' it. Inspection will be accomplished by a representative of the City of j A" B rE Ren ton . It shall be the contractors responsibility to notify the Utility B /+9Txo- Z!C7el �`*-, �" - Department 24 hours in advance of backfilling all construction. T =9�`�A Fj ✓A.F- �'y ✓. 12. Contractor to provide plugs and temporary blow-off assemblies for °r ��✓ testing and purity acceptance prior to final tie -in. '(� S 1_. i 0 �A',9 Q. 2 � Y �_ 9A�C..ar � � /r ✓? /J WY V MR1J t.4fAr 1rYO.l'A. f / /OJ.1:.f /, "� 5r;a� /airy i :.I IIII�I�I I�.I�f �l�l�l�ldl�l' I !I�I'i'I!I'I'I'I'I'I'i`I!I'I'.i I'.I'.I.I�Iq.I.'I�I i.I,Iilii"I'I'I'�'I'I i i� r r ✓�� Ek 0y \tai A 'a y wN FrF�. rat . X 1`0 -BR` ti t3y� h" La y 0 »p °PVS1reaGO A a Cs /ONL Eti -1N,ad0d GROUP FOLAInc. 19707 44th Avenue West 1, nnivood, Wamhr+p+on 98036 " 206 775-458 DRAWN BY R. M N, CHECKED BY "_ff APPROVED BY W- 469 PEK C /TY WATER PLANS rI FFAR," PARK DIVISION AM J W_ 469 OF XfNTON Wly. ",/ ✓OB N0. 76 -S GENERAL N47E.5' 1. All work materials shall be in conformance with the standards and 't specifications of the City of Renton Utility Department and APWA Standards and Specifications, 1977 edition. 2, All locations of existing utilities shown arc approximate, and it shall be the contractors responsibility to verify the true and correct / location so as to avoid damage or disturbance. 3. Water Main Pipe - 00WN All water main pipe to be cement lined cast iron pipe conforming to ASA ?" 5ZON061 � m,61 Y Spec's A21.6 -1570 and /or A21.8 -1970, Class 22, (pipe); A21.1 (pipe strength); and A21.4 -1964 (lining E scaling). The pipe will be push -on or mechanical joint. Bedding to be Class C. "// BL OCA' /N,6 B Alternate pipe- /// All water main pipe to be cement Itned ductile iron pipe conforming to ASA Spec's A21.51 -1971, Class 52, Grade 60 -42 -10 (pipe), A21.4 -1964 )lining £ sealing). Pipe joints to be push-on or mechanical joint bedding to be Class C. ' 4. All fittings to be cast iron, Class 250, conforming to ASA Spec. A21.10 -1977. Fitting joints to be flanged or mechanical joints. 5. All water main to maintain a minimum cover of 36 Inches below finish _ -� ' grade. Where utility conflicts occur, water mains are to be lowered to clear. 9a " 6, All water mains shall be pressure tested and disinfected in accordance with the specifications of the City of Renton and the Washington State Health Dept. All pressure testing shall be done in the presence of a representative of the City of Renton. All mains to be sterilized prior to placing lines into service. 7. A preconstruction conference and twenty-four hour notice will he req- uired prior to starting new construction. 8. It shall be the contractor's responsibility to secure all necessary ' permits prior to starting construction. 9• Installation of corporate stops, '•iator services, lines and meters to ..,, be accomplished by the City of Renton. a A" L t 10. All connection to existing mains to be accomplished by the City of ' Renton. All necessary excavation and materials to be supplied by the i contractor and be on -cite prior to City notification. dSB.S ssy n: 0 ' it. Inspection will be accomplished by a representative of the City of j A" B rE Ren ton . It shall be the contractors responsibility to notify the Utility B /+9Txo- Z!C7el �`*-, �" - Department 24 hours in advance of backfilling all construction. T =9�`�A Fj ✓A.F- �'y ✓. 12. Contractor to provide plugs and temporary blow-off assemblies for °r ��✓ testing and purity acceptance prior to final tie -in. '(� S 1_. i 0 �A',9 Q. 2 � Y �_ 9A�C..ar � � /r ✓? /J WY V MR1J t.4fAr 1rYO.l'A. f / /OJ.1:.f /, "� 5r;a� /airy i :.I IIII�I�I I�.I�f �l�l�l�ldl�l' I !I�I'i'I!I'I'I'I'I'I'i`I!I'I'.i I'.I'.I.I�Iq.I.'I�I i.I,Iilii"I'I'I'�'I'I i i� r r ✓�� Ek 0y \tai A 'a y wN FrF�. rat . X 1`0 -BR` ti t3y� h" La y 0 »p °PVS1reaGO A a Cs /ONL Eti -1N,ad0d GROUP FOLAInc. 19707 44th Avenue West 1, nnivood, Wamhr+p+on 98036 " 206 775-458 DRAWN BY R. M N, CHECKED BY "_ff APPROVED BY W- 469 PEK C /TY WATER PLANS rI FFAR," PARK DIVISION AM J W_ 469 OF XfNTON Wly. ",/ ✓OB N0. 76 -S 3°lFFAAIY PAU D!VIsloAl N0.3 w- x¢69