Loading...
HomeMy WebLinkAboutzS-0496SetAar= - 91Y�$ iz I I' ) o C 4 �a4 � � V �• m OZ 6 GENERAL NOTES 1. ALL WORKMANSHIP AND MATERIALS SHALL Be IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON ..:. . -. - - - UTILITY DEPARTMENT AND THE LATESF EDITION OF THE WSDOT /APIlA STANDARDS AND SPECIFICATIONS. A SET OF APPROVED PLANS MALL BE KEPT ON 3ITB AT A"L TIMES DUPING CONSTRUCTION. 2. THE HOURS OF WORE WITH THE STREET RIGNT- OF-WAY SHALL BE LIWIT�. TO &SOAKTO '3 =50 PMO1 WSI K NII OTHERWISE APPROVED IN WI BY 19E DWARTMdMT OF -UBLIC MORES AT ..... - ....... 235 -2635. ALL STREET AND LAWS CLASIUM, PARTIAL OR FULL, SWJZ BE APPROVED BY THE DEPARTMENT OF PUBLIC MORES 24 MOURS IN ADVANCE. 3. THE LOCATION DIP EXISTING UTILMRRC AS SHOIM ON THE PLANS ARE N�CTR�..U�Ft�iz� »nis APPROX'ZHATE. BASED ON FIELD SURVEYS AND RAIWARCM OF AS -MILT µpTE•. Cot•aNNsG�fc�t,l 's0 a�m.w 6 t`CS>.�: i PLANS PROVIDED. BY 1918 CITY OF.RENTON. THE ACTUAL LOCATIONS, ELEVATIONS AND DEPTHS OF EXISTING UTILITIES SHALL BE FIRM r -IP.1P iga Y`s �� INd�'Ip,i.Ty,•bgTtr.r� -t , a �. VERIFIED BY THE CONTRACTOR TO AVOID DISTURBANCE OR DAMAGE Lod. Nerr!G*) GF T►'4K. 6:7.H3T. �kJS4'TA.IG`1 DURING CONS!TRU(TIOM. 6 S, M. H �' 1 ��. —__�. _ REPAIRS SN4Au.9E rM[5% AS wECC3SARY, ANO 50. af-iz REPAt W� 4!V 1E MADE 4. PRIOR 10-CONSTRUCTION, THE CONTRACTOR SMALL BE RESPONSIBLE c1T•( REVIEW AND, BLSPeGTtoN SO `M}roar a ti0 LFIYCA6E TYi-F-- FOR THE NOTIFICATION OF ALL UTILITY COMPANIES (MATER, / SANITARY SMM, STORK S II NATURAL GAS, POWER, TELEPHONE, CONOmCN RESULTS DOW4 STREAM FROMI WW%4 -r- CATV, ZM*) TO VERIFY THE EXISTENCE AND ACTUAL LOCATION OF 'S -fE*.. oi-oo_ REPAIRS SEAN -SE MAM PRIOR TO USE OF 1)W NEW SEWER MATT S1.5 PA K .r 2 UTILITIES. THE CONTRACTOR SHAW. CALL ONE -CALL FOR LOCATIONS Mott. Ir l �45� � +r S' � (1- 800 -424- 5555) .. fOtJNiGLZ 4. - twvn = a T Y P ='p M.4i. - �G13�"4 S. A PR8OOK 4RQCTION CONFERENCE IS RNpD1BHD PRIOR TO ANY r•r d �INV6iLT e.`iev. poetoiG -cv OONSTRDCTTOW. A MINIMUN OF FIVE - IkT},ti7lG DAYS NOTICE IS ` c- wuc- �toh -s OuPaoRT axr.Ar. SS MME i` Rso0Ih8D FOR SCHJwULING. PRIOR TO sciLwLING THE PRBCON, A m m ` \� ., FiReo Va0kirRYtaL&A%t ' t d PERMIT ZWOIMATWN SKEET MUST BE SUPP..itm TO TIE UTILITY a t� R M ENGINEER'S OFFICE. 24 HOCK NOTICE WILL BE REQUIRED PRIOR \� ` .w6 ` °�, Ally ��We0.Tra•G Mw1NTwe \�_ _v- Lv` L_- 000 v b. THE SANITARY SEWER MAIM SEH1Lf. BE TIi4':ED AND INSPECTED IN � ACCORDAMCB WITH THE CITY STANDARDS PRIOR TO ACCEP'PAIN:r. r•» o +bq�o�.g_ `. a+aaa `"• _ - 7. IT SHALL BE THE CONTRACTORS RESPONSIBl:+M TO SECURE ALL / ro ..` Loh o�4io 8" �"' 1w a '+ w: NECESSARY PERMITS PRIDE TO STARTING CONS"- 200TION. V 'I� +oo++a � /` - �.`.•,�,, opo +�o�...... � �' `."". \4 �<: �'i. �4 N"1 ". t•10h,1• �2�.. ,y . _-t-; S. INSPECTION WILL BE ACCOMPLISHED BY "M CITY OF MOM. IT SHALL BE THE CONTRACTOR'S REF•K*#SIBMITY TO NOTIFY THE / �\ ff +prq.o,+ ♦ i s .S" 1:w■ � UTILITY DEPARTMENT 24 HOURS IN " MFAMCE OF CONSTRUCTION. THE ��'"" w "w �� 3' / ` F �' a . a p � •& CONTRACTOR SHALL KEEP AS -BUILT ORMINGS. 9. ASPHALT AND CONCRETE PAVEMENT SHALL bE SAWCWT Tl� A MINIMUM `� \ �_ o I Mqo *5 LF ooNFOOU.�. to noeon. —�sFt /_ `` 3�I SIDEWALKS, CURBS, GUTTERS, AND DEPTH OF 2 INCHES. ALL SURFACE COW MM, PAVEMENT, =VSVMY APPROACHES SHALL BE SAWCUT TO A MINIMUM DEPTH OF TWO .-MIRS, OR ROOM TO THE � \ _ � ! �77 - NEAREST JOINT. \ ` 10. ANY RHV'OIONS TO SHE APPROVED P!.ANS WJST BE RdVI*WED AND `` _"""'I"+s..ca .. -. =— - 4•.w _._ - APPROVED BY THE CITY OF RENTOW PRIOR TO IMPLEMEWTATIOW IN �,�_ ��° ""` . "� • m ^�"• w""�_'j°�d /,/°�^,",r�_/]1_'� --. _ "o• — ,�'_ _ _ _ . _ THE FIELD. 11. ALL SANITARY SEWER PIPING SHALL EE SCHEDULE 80, PVC PIPE, CONFORMING TO THE .APPROPRIATE ASTW STANDARDS ALL JOINTS AND —^ _ / • \w r n iAtY tiivvitJ PIPE CONNECTIONS SHALL BE SOLVENT WELDED JOINTS. ALL + \ \\ kWBRiNANSBIP AND NATERIAS SHALL BE IN ACCORRNINCE WITH THE MFMUFACTURER'S SPECIFICATIONS. . ♦ V ti f1- ec.rlo.a aca P.wn "�� \ S.S. M. H. '+#3 12. ALL CONNECTIONS OF PVC PIPS TO MANHOLES SHALL BE MADE BY l♦ M•. / 1.10 NK PP1N0 USING .NON SHRINK EPDXYQtiOL1T. +< S:ta- tai-lo - 0 LT IN51De= 13. THE CONTRACTOR SNALTU INSTAL., REPLACE, OR RXIOCATE ALI, NOTE: THIS CONSTRUCTION IS IN AN AQUIFER PROTECTION AREA L 7FIi7J1 50-""'°--- +-104A SIGNS, AS SHOWN ON THE PLANES OR AS AFFECTED BY CONSTRUCTION, CONSTRUCTION TECHNIQUES USED SHALL PREVENT CONTAMINANTS PER THE CITY'S STANDARD DETAILS. (PETROLEUM PRODUCTS AND OTHER HAZARDOUS MATERIALS) FROM ENTERING THE AQUIFER. . -14. A -1 "- -MINIMUM ASPHALT CONCRETE - OVMT.AV-- ARAT.T. -RV PT.1f'Pn nu a _ .. -- -_ - _._,._..- .,- .._.._._._.._ ... ... ., __ ..._.. ....._.. _......_. __..._. .__.._.__ -- _ ...__.. _. KUKER- RANKEN INC. y'eeOil' ACA: (s.+1d -'0' cf' .. . �ETAt I:. -SET ,3 la. _ ............... O$ 'S�PC.0 QE HIGgH Y�f�J..1� MA+iw! 'fY�t" GF l"II°.e. Z Z: l ` b*�• �. -„1.l I 9 - Y Z J c.` �w l�• --4o t�2lZD V�ctcrat- Flow# hRQM ;1-44 FOR: RoRIM • BY APPR. DATE DWA.] AJR I . - AJR...... _....�:t��. A 1= y :NTON UB(JC WORKS EWER EXTEAl31CIN NINE: AVE N V., THWEST; No .: .. 5lIEET . _...... ..._ RI 5/20/89 i QF3 i ..:_. 17L7 ..:. . -. - - - TIN. .... ..... - ....... _ Ilo a �n N�CTR�..U�Ft�iz� »nis r 'E I,IXA�Va.1°� ems._ Flow# hRQM ;1-44 FOR: RoRIM • BY APPR. DATE DWA.] AJR I . - AJR...... _....�:t��. A 1= y :NTON UB(JC WORKS EWER EXTEAl31CIN NINE: AVE N V., THWEST; No .: .. 5lIEET . _...... ..._ RI 5/20/89 i QF3 Z_ MORflsR F1LLEr -1e Gv "MIN• / SS MH #2 fi Tvr e = -48" r�1-s >\ 11 `kk T MOt- -1 - -\Z h,o CPE¢w- -t•sbi � .. 1 C�— hrf ®ga Z� MN � � d ...s, eeNYNN'008NNYeBNN�N•.�. In on �NeN _ // // 4--3 rsf w ............. ' .Ne �roN+�. N. 3 / f5 ppi RA. / 1 P51 AA4b nerG J _ _. -_�- �i • , \ OY�j' IIV ��. .. S.�H - -- Zq•;� /Ea EX. MH TORE QET,E'RNl/ - 1} /N T/!E F /E<D 5Y THE C/_- rY Or RENTON , SANITARY MANHOLE Final Joint must be sa+i -cut Saw -Cut or lire drill 2" min. Asphalt Existing Asphalt underlying concrete Concrete Concrete ----,,L -- _ -_ - -- Existing -- 6 1z �♦ygr�; min _ Cement Concrete Cement Concrete ilt - - -- - - -- — °o "- min- Crushed Surfacing Conc. shall be' C.l. A (314) - - Top Course Portland Cem. Conc. Con- Compacted Crushed. Rock forming to Sect. 6 -02.3. 1 Backfill EXISTING ASPHALT CONCRETE OVER CEMENT CONCRETE Final Joint — Asphalt Concrete (3" min.) must be saw cut rep lacemert patch to be 1 thicker jhan previously existed Existing Asphalt I... 6 ":Min. Crushed Surfacing Concrete 6" Top Course Compacted Crushed Rock Backfill SU,.45 ReQ9 E¢1FYNG �- pvPG EXISTING ASPHALT CONCRETE OVER PREPARED GRADE M T�. ersl..v + e + 18 I'l..n.) Replace- Final Jolnt=musT 4 =�"e,�.. ment patch to be 1' picker than be saw -cut previously existed. Existing -Cement)- Concrete Pavement 6" Min. Crushed Surfacing Top Course Compacted Crushed Rock Conc. shalt be .Cl A (3/4) Backfill Portland Cem. Colic. Conforming to Sect- 6- 02.3._ EXISTING CEMENT CONCRETE OVER PREPARED GRADE 1. See Sections 7 -18 and 2 -09 for Patc!dng and Backfilling Specifications. 2. All trenches in roadway areas shall be backfilled and pzcched with temporary asphalt at the end of each work day, unless permission is granted to, do otherwise by the .City Engineer and City Traffic Engineer. 3. All temporary patches on trenches shall be permanently patched within 2 weeks of completion of work within the roadway area. 4. Sawcnts on concrete pavements shall be made no more than one -half the depth of the.existing slab. Tj. /i7EMOVED ) PAVEMENT PATCHING DETAILS 54° DIA STANDARD MANHOLE • OPEN END FOR OVERFLOW --7 AND MAINTENANCE --8° SCHEDSD PVC TEE �1YES!T EPDXY GROUT INTO MH / f n •: / - S SCHEDULE 80 PVC SEWER MAIN UT PIPE 'n STRAIGHT EDGE FOR •a� SOLID JOINT :?T ANGLE PIPE STRAP & .BLOCKING SHALL BE HOT DIP GALVANIZED AND ASPHALT COATED MAXIMUM Y -0" SEPARATION -- L ED aVC.PIPE L LENGTH !AS. REQUIRED CONSTRUCT MANHOLE CHANNEL TO .J SMOOTH TRANSITION TO PVC o- ANCHOR TO MH WALL W/ 1/2° X 3 STAINLiSS. STEEL. EXPANSION /. •,e BOLTS O 4 PLACES (TYP.) a a , 90 SCHEDULE RO PVC SEND pf wAS.. [s CEMENT CONCRETE BLOCKING ♦ -116 �/ a CITY OF RENTON DROP STRUCTURE Iv r.s. ` DEPARTMENT OF PUBLIC WORKS NE 3RD STREET SEWER EXTENSION The FROM I -405 TO BLAINE AVE. N.W. p Z ci..reFR�NTnN AR , ? ✓� 8/3o/E5 FOR:FIORILLO NORTHWEST, INC. Rykels Engineering. Group Inc. - 1 Rev�z¢to oa.a r.H ,AQ q� B/25/ 9 DRN. ENGR. CA APPROVED SLE SATE SHEET Consulting Engineers - Civli, Municipal, Subdivisions 28301 183rd Ave SE • Kent, WA 98042•(206) 631 -6598 NO. REVISION BY APPA - -' DATE DMA AJR. AJR /89 3. OF 4,1 GAST'INra- OLYt.Al FOR/. X MSJ 30 D /TOR ECIUAL 5F_c DETAIL 5:1.4 "MIN. r — - 2A° -.•I Q x 24 ADJU5TMEWT 4 ''ONE MORTAR JOINT VN2�LE 2'T05'z ¢,, rJl{, r i _ co FRECAST 5EC;rl STEP-5 -5/ STEPS S1.14LL 6E INCLUDED ED 4V "4 N z 1. 5TEF5 TO 13E !Y4 DEF'ORi✓1ED 1544, GALVAKRZED WC-TY 5TEF5 OR FOUAL 2 5l ARE TO 15E IIJ RACE E1=F01�f MN 5EC ION5 MAX. PIPE SIZE- 21 "LD. A{?E IIJSIALLED. 5. CA5TIl TO 6E OLYMPIC FOUNDRY MH 50 M LADDER -5TD. ALUMWUM OR CaALVA1JIZED STEEL. MW W D/T 02 EQUAL. SEE DETAIL 5.1.4 - CONGRErE 5WELF 4. MAIJODLE SECTIOAJ5 TO 6E OF FFE- 10FDRCED PREG45T COfJCREfE 5. OPENING SHOULD BE ON DOWNSTREAM SIDE. —�-� PRECAST t�SE SPG710L1 OR CAST )CI FI I- SANITARY SHALLOW MANHOLE TYPE,AII IV , S. SANITARY MANHOLE Final Joint must be sa+i -cut Saw -Cut or lire drill 2" min. Asphalt Existing Asphalt underlying concrete Concrete Concrete ----,,L -- _ -_ - -- Existing -- 6 1z �♦ygr�; min _ Cement Concrete Cement Concrete ilt - - -- - - -- — °o "- min- Crushed Surfacing Conc. shall be' C.l. A (314) - - Top Course Portland Cem. Conc. Con- Compacted Crushed. Rock forming to Sect. 6 -02.3. 1 Backfill EXISTING ASPHALT CONCRETE OVER CEMENT CONCRETE Final Joint — Asphalt Concrete (3" min.) must be saw cut rep lacemert patch to be 1 thicker jhan previously existed Existing Asphalt I... 6 ":Min. Crushed Surfacing Concrete 6" Top Course Compacted Crushed Rock Backfill SU,.45 ReQ9 E¢1FYNG �- pvPG EXISTING ASPHALT CONCRETE OVER PREPARED GRADE M T�. ersl..v + e + 18 I'l..n.) Replace- Final Jolnt=musT 4 =�"e,�.. ment patch to be 1' picker than be saw -cut previously existed. Existing -Cement)- Concrete Pavement 6" Min. Crushed Surfacing Top Course Compacted Crushed Rock Conc. shalt be .Cl A (3/4) Backfill Portland Cem. Colic. Conforming to Sect- 6- 02.3._ EXISTING CEMENT CONCRETE OVER PREPARED GRADE 1. See Sections 7 -18 and 2 -09 for Patc!dng and Backfilling Specifications. 2. All trenches in roadway areas shall be backfilled and pzcched with temporary asphalt at the end of each work day, unless permission is granted to, do otherwise by the .City Engineer and City Traffic Engineer. 3. All temporary patches on trenches shall be permanently patched within 2 weeks of completion of work within the roadway area. 4. Sawcnts on concrete pavements shall be made no more than one -half the depth of the.existing slab. Tj. /i7EMOVED ) PAVEMENT PATCHING DETAILS 54° DIA STANDARD MANHOLE • OPEN END FOR OVERFLOW --7 AND MAINTENANCE --8° SCHEDSD PVC TEE �1YES!T EPDXY GROUT INTO MH / f n •: / - S SCHEDULE 80 PVC SEWER MAIN UT PIPE 'n STRAIGHT EDGE FOR •a� SOLID JOINT :?T ANGLE PIPE STRAP & .BLOCKING SHALL BE HOT DIP GALVANIZED AND ASPHALT COATED MAXIMUM Y -0" SEPARATION -- L ED aVC.PIPE L LENGTH !AS. REQUIRED CONSTRUCT MANHOLE CHANNEL TO .J SMOOTH TRANSITION TO PVC o- ANCHOR TO MH WALL W/ 1/2° X 3 STAINLiSS. STEEL. EXPANSION /. •,e BOLTS O 4 PLACES (TYP.) a a , 90 SCHEDULE RO PVC SEND pf wAS.. [s CEMENT CONCRETE BLOCKING ♦ -116 �/ a CITY OF RENTON DROP STRUCTURE Iv r.s. ` DEPARTMENT OF PUBLIC WORKS NE 3RD STREET SEWER EXTENSION The FROM I -405 TO BLAINE AVE. N.W. p Z ci..reFR�NTnN AR , ? ✓� 8/3o/E5 FOR:FIORILLO NORTHWEST, INC. Rykels Engineering. Group Inc. - 1 Rev�z¢to oa.a r.H ,AQ q� B/25/ 9 DRN. ENGR. CA APPROVED SLE SATE SHEET Consulting Engineers - Civli, Municipal, Subdivisions 28301 183rd Ave SE • Kent, WA 98042•(206) 631 -6598 NO. REVISION BY APPA - -' DATE DMA AJR. AJR /89 3. OF I I if i I I i I I I do W� NO8V r W d z z° I II jl Y i I.4 o ri i i II I� o N a F - W Y J OOOY O d Z Z GENERAL NOTES 1. ALL WORKMANSHIP AND MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE WSDOT /APWA STANDARDS AND SPECIFICATIONS. A SET OF APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION. 2. THE HOURS OF WORK WITH THE STREET RIGHT -OF -WAY SHALL BE LIMITED TO 8:'-AMTO 3:30 PMON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2635. ALL STREET AND LANE CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. 3. THE LOCATION OF EXISTING UTILITIES AS SHOWN ON THE PLANS ARE APPROXIMATE, BASED ON FIELD SURVEYS AND RESEARCH OF AS -BUILT NOTE �/y,.IN�.GTION TO 1lST. .�.N ITPJZ�1 PLANS PROVIDED BY THE CITY OF RENTON. THE ACTUAL LOCATIONS,= EY\IE{z IS SUE3IELT To THE Tv ELEVATIONS AND DEPTHS OF EXISTING UTILITIES SHALL BE FIELD - INGTI�,T�STINGa , $A�,1� VERIFIED BY THE CONTRACTOR TO AVOID DISTURBANCE OR DAMAGE UaS -q`o) OF THE EXIST. tl \TA1zY DURING CONSTRUCTION. S�WEt? Sr ST rc.M. ; M.H. # REPAIRS SHALL BE MADE AS NECESSARY, AND UNDER — gTi�.3 } \Z- 4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE CITY REVIEW AND INSPEC710N, SO TI-',ATANO LEAKF_ e Z -453 M.H F_ FOR THE NOTIFICATION OF ALL UTILITY COMPANIES (WATER, CONDITION RESULTS DO-N STREAM FROM MANHOL .STA, 0+70 cam. M H 2 SANITARY SEWER, STORM SEWER, NATURAL GAS, POWER, TELEPHONE, REPAIRS SI4ALL-BE MADE PR FOR TO 055 ,0 F THE NEW SEW IN 5 ER MA CATV, ETC) TO VERIFY THE EXISTENCE AND ACTUAL LOCATION OF STA. O +oo q;- -5 UTILITIES. THE CONTRACTOR SHALL CALL ONE-CALL FOR LOCATIONS i"bN. IIJ C-�SC- GoNN -� To �xtS�. �N. T`iPG S•'��� M.H \ (1 -800- 424 -5555) . 5. A PRECONSTRUCTION CONFERENCE IS REQUIRED PRIOR TO ANY ,� , b INVEJ2_T E��.v. PLIO� To 1 ' � � cOt�1sT �U L'T IOM �" su PP ORr EXIST. 55 MM CONSTRUCTION. A MINIMUM OF FIVE WORKING DAYS NOTICE IS °° °° A5 REaD DURINU CONS REQUIRED FOR SCHEDULING. PRIOR TO SCHEDULING THE PRECON, A V _ \i'`� FIELD VERIFY C�ExaR PERMIT INFORMATION SHEET MUST BE SUPPLIED TO THE UTILITY z \ \ Pa\oci -ro corosr- g,� i S�vacnr EXIST Mwi..� n ENGINEER'S OFFICE. 24 HOUR NOTICE WILL BE REQUIRED PRIOR —�\ sUl°14�LT vzcIST. RE4a - TO STARTING NEW CONSTRUCTION. ` ` Cs I b tx17UNca -."T. �.. y��� _ 6. THE SANITARY SEWER MAIN SHALL BE TESTED AND INSPECTED IN °�[ / IIIIIIYIIIII.IIII.z�_ -'`I `zq.•sd ACCORDANCE WITH THE CITY STANDARDS PRIOR TO ACCEPTANCE. 11 '0 °�' — 7. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO. SECURE ALL 1j1j11111 i.... _ 11 MECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. ' /v 1111111 A / � •11...1. \f.. ce �. 8. INSPECTION WILL BE ACCOMPLISHED BY THE CITY OF RENTON. IT 1 \E -INTO GLPy .11111 PIi�E Sc( S -Ia. iJ�W KL�T TOP t� \ �_.. 11111111111111] SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE 3iFy, I0 "SD, �,g, ST/>• 4+-�� l .- UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF CONSTRUCTION. THE 4 +ts \\� \ \� ° `b �_ W _ - e . , / CONTRACTOR SHALL KEEP AS -BUILT DRAWINGS. nOj � \�N 1 111 1 9.. ASPHALT AND CONCRETE PAVEMENT SHALL BE SAWCUT TO A MINIMUM DEPTH OF 2 INCHES. ALL SURFACE CONCRETE, PAVEMENT, SIDEWALKS, CURBS, GUTTERS, AND DRIVEWAY APPROACHES SHALL BE SAN UT A MINIMUM DEPTH OF TWO INCHES, OR REMOVED TO THE NEAREST JOINT. .10. ANYREVISIONS. TO THE APPROVED PLANS MUST BE REVIEWED AND -.max E- -- == - - -- APPROVED By THE CITY OF RENTON PRIOR TO I 4�° MPLEMENTATION. IN ems* \wl THE FIELD. 11. _ ALL SANITARY SEWER PIPING SHALL BE SCHEDULE 80, PVC PIPE, ° "-\ A-4 - 3 GT \ CONFORMING TO THE APPROPRIATE ASTM STANDARDS, ALL JOINTS AND PIPE CONNECTIONS SHALL BE SOLVENT WELDED JOINTS. ALL „a WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS. -... t4�OpNer Fwnp cA\ 12. ALL CONNECTIONS OF PVC PIPE TO MANHOLES SHALL BE MADE BY USING NON SHRINK EFOXY GROLLT. 13. THE CONTRACTOR SHALL INSTALL, REPLACE, OR RELOCATE ALL NOTE: THIS CONSTRUCTION IS IN AN AQUIFER PROTECTION AREA SIGNS, AS SHOWN ON THE PLANS OR AS AFFECTED BY CONSTRUCTION,. CONSTRUCTION TECHNIQUES USED SHALL PREVENT CONTAMINANTS PER THE CITY'S STANDARD DETAILS. - (PETROLEUM PRODUCTS AND OTHER HAZARDOUS MATERIALS) FROM - - - - - ENTERING THE AQUIFER. .__. 14. A 1" NINIMUM ASPHALT CONCRETE OVERLAY SHALL BE PLACED ON A _ _ :: .:O tO�o :: :: C +-off! :I:: : Z - MINIMUM OF 1/2 OF THE EXISTING. ROADWAY ON NE 3RD ST. THE ... .. ... ---- ... . -... .... .APPLICANT SHALL COORDINATE SEWER: :INSTALLATION ON BLAINE AVE - - -- -- -- WITH THE CONTRACTOR FOR THE CITY OVERLAY PROJECT. IF THE - - ..... -.. ......... _ - :.. SEWER IS INSTALLED AFTER CITY CONTRACTOR HAS PLACED - - ,.r .....:..... .OVERLAY:,.:...THE..APP'LICAN,T .SHALL PLACE A. -.I' MIN. OVERLAY FOR THE _:._- ...:._:...:_ __...)?i_2... _ .. . . ...:... .. ..:. -. .- .. ... ............................. .... ... ... ._.._. ._ .:..:. 1 ... ,.......FULL- WIDTH - OF BLAINE AVE, WITHIN THE LIMITS OF THIS. .' ....... .. ...... .:::: .... :: ::..:. .....:: :.. oa 9 �°HpuE PROJECT. �z�F. Gr=vi .. 15. EFFLUENT FLOW RATE FROM THE PROPOSED SITE SHALL NOT EXCEED . .. :.... .: .. ...... 50. GPM. .. ... ..... .: .. ... ...... .. ... ......_......._.. -. 16. THE INTERIOR OF THE MANHOLES SHALL BE SEALED WITH TWO (2) ::: .. -: : - COATS OF KOPPERS $ITUMASTLC HO 300 -M, OR APPROVED EQUAL. .............. 1Q... S- tA.4i�4 m—° i f � '1;+181I1� W TOP OF GU�ES � \°te !i/il�l) i Y A 2 4 crb\ o' l " =40 �b21Zo KUKER- RANKEN INC. I Y f f I I I A I f i f Y I I I A I_ Y _ _ I — i i �► I I i I 1 1 I I I I I I ]C 1 11N �l / �CLGr�YJNCZ LLN�NOWN \`a.\c. PC. � - SEa OET \� LEFT o^v 1 �NTON S1AN"'s �' i 11�t.1 TOP OF GU�ES � \°te !i/il�l) i Y A 2 4 crb\ o' l " =40 �b21Zo KUKER- RANKEN INC. I Y f f I I I A I f i f Y I I I A I_ Y _ _ I — i i �► I I i I 1 1 I I I I I I ]C 1 I Wzs J 8 d O Z Z s4 p.b.� 11�T �a M To EI,IST. Cabs_�c - SL.ot� Tc> bs. M.H 3 VI +50 - sB � Gl11GV� bC.'T0. \ rL- ZGo 3. °14' s.s. tom. H •< s ' ETA /0 +00 -2,3' LT. YPE Z -40" M.H. Ind \ ��� � •�:, � �� �� ' F" -0 3 : � ,- ............. .. .. ssxesf�� ..........u.Mn..i.: S. W. u..\�\. ..i..i\ .iiiBi... .....•.- -� rA C> V-1. . ... ... ua•... o � G VE -2.1FV GL 4 ""� a KUKEH- KANKtN INC. 3 •e�• H • _ (VEX F- F C— � �NIG,M Pp,Ec�cy1�E �i^.S IWalhl T`IP� � -4�" M•H h .7 55 MH or 2- STA +1 _e'LT 'TYPE' s-48" MH :-- 3 pJ L ike IL \ - n/n OR,C EX,cY1N OVp� \tJU �.G/ X)!. M3-"Fl //XI/f l.P2 .N/ /E ro EX.MM TORE DETERM/ /N THE F/EAD BY THE C /TY OF RENTOA/ �'- —10,F Z_-ZS'LT 4 1 G OPEN END FOR OVER I , v����� ��� ��� 1 I'\ — z� AND MAINTENANCE 4,1 7 XMIN. —IZ "MAX. GASTIW�- OLYMPIC FDkY.' #MW L EGUAL 24" 5EE DE TAIL &. 1.4 . 9d a ADJU5TMENT 4'M IN. GUNE N 1 ~' MORTAR JOINTS V6JZlA6l E 2'705_ 4 "MIN. co PRECAST SECTIoiJ STEFS- 5 /WDEFORMED 6AR 5TEP5 514ALL DE INCLUDED 1 -i Z AY MAX. PIPE SIZE -ZI" I.D. LADDER -5TD. ALUMINUM OR GAL\/AN IZED `STEEL . CONCRETE 5I-IELF MORTAR FILLET- ' PRECAST E 55E SECTIOt_I 1 O2 CAST HJ PUCE M R.I. SANITARY MANHOLE TYPICAL DETAIL K=_. . C� �S= I. sTEFS To PEE e4 °4, DEFORMFID DAR GALVANIZED 5AFETf 5 P-F5 OR 156AJAL 2 5 P5 ARE TO 15E IN PLACE DMDIRE MN SECTIONS ARE IIJ5TALL.ED. 5 CA5T1HG TO 5E OL`M1PIG FOUNDRY( MH W WHi! MW W D/T OR EQUAL. 5EE DETAIL 5.1.4 4. MAWIAOLE SECTIOM5T015E OF REINFORCED PRECAST CONCRETE. D. OPEMNG S14OULD BE ON DOWNSTREAM SIDE _ SANITARY SHALLOW MANHOLE TYPEW ,, S. PIPE STRAP k BLOCKING SHALL BE HOT DIP GALVANIZED AND ASPHALT COATED CONSTRUCT MANHOLE CHANNEL TO SMOOTH TRANSITION TO PVC C6 Final Joint must be saw -cut Saw -Cut or line drill 2" min. Asphalt Existing Asphalt - underlying concrete Concrete Concrete_ -- - -_ Existing-­_-, �6„ 'i *' -I L_ C`" �rq 4�;;? min Cement Concrete Cement Concrete i=: _ ( V. - - 6 "- min. Crushed Surfacing Conc. shall be Cl. A -(3/4) - Top Course Portland Cem. Conc. Con- Compacted Crushed Rock forming to Sect. 6 -02.3. Backfill EXISTING ASPHALT CONCRETE UVER CEI4ENT CUWCRETE Final Joint Asphalt Concrete ( -3" min.) must be-saw-cut replacement patch to be _ 1" thicker than previously -- " -_ _ "- existed. Existing Asphalt � ��� 6" Min. Crushed Surfacing Concrete Fes=- Top Course Compacted Crushed Rock Backfill EXISTING ASPHALT CONCRETE OVER PREPARED GRADE Final Joint. must Cement Concrete (B" Min.) Replace - be saw -cut ment patch to be 1" thicker than - - previously existed. Existing Cement Concrete Pavement _6" Min. Crushed Surfacing Top Course Compacted Crushed Rock Conc. shall be Cl. A (3/4)- Backfill Portland Cem. Conc. Conforming _ to Sect. 6 -02.3. EXISTING CEMENT CONCRETE OVER PREPARED GRADE 1. See Sections 7 -18 and 2 -09 for Patching and Backfillin6 Specifications. 2. All trenches in roadway areas shall be backfilled and patched with temporary asphalt at the end of each work day, unless permission is granted todo otherwise by the City Engineer and City Traffic Engineer. 3. All temporary patches on trenches shall be permanently patched within 2 weeks of completion of work within the roadway area. �4. Saw carts on concrete pavements shall be made no more than one -half the depth of the. existing slab. 5. lRcmo ✓EV ) PAVEMENT PATCHING DETAILS N.T 54' DIA STANDARD MANHOLE _8' SCHED 80 PVC TEE WL)M7 WE= EPDXY GROUT INTO MH I//-- L_ "' SCHEDULE 80 PVC SEWER MAIN UT PIPE '.n STRAIGHT EDGE FOR •• SOLID JOINT AT ANGLE MAXIMUM 2' -0' SEPARATION SCHEDULE 80 PVC PIPE 6D LENGTH AS REQUIRED a ANCHOR TO MH WALL W/ 1/2' X 3' STAINLESS STEEL EXPANSION 'A' BOLTS O 4 PLACES (TYP.) a 90 - SCHEDULE 80 PVC BEND CEMENT CONCRETE. BLOCKING Ev �=7// DROP STRUCTURE s o�EW J. a % r v�► t►�,�*Q/e /es I, I I Al I I I I -1 I I A AM A I A I I, 1A I I I IA I I I I I Al