Loading...
HomeMy WebLinkAboutzT-1724Setlow 0 MENIMM 1111MILM 12M mom FT-10M mom erA OA OA 0A OB OB OB OB Head 7 Head 10 Head II Head 14 Head 8 Head 9 Head 12 Head 13 IGNAL SEQUENCE CHART z = I" OA 2- *8 (Service) 0B r o u- L. Lz 3 oc 4 To 3 at Ch To B IV2" OA 12 - #12 I t A Arm 6 -*12 IR R 0 A R 2 G A 20-A14 (It terconnect ) R R A R 3 R R vP Cn .... v c ._ E G A o R R 4 R R ,.. c w m t o tL R R a IQ *Q a c _. 7,14 W DW DW De DW 8,9 DW DW W De DW 10011 W OW DW De DW 12213 DW DW W De DW —�. - -s* o4 M -�T . r -- 44 - -� 4 '%..- W Z Illuminated Sign 1W Head 2 on Head 3 Illuminated Sign OB Head 4 CD�00000�86999999990B08B000BBB80BBB00008999�9BB00� 8" R 8" A O HEADS I, 4 8" R 8" A mm SIGNAL HEA 01 HEADS 293 DONT WALK HEADS 71 8, 9,10, 1 1,12,13 a 14 OeIW C. Bennett Traffic Engineer WIRING SCHEDULE I" Conduit 2- *8 (Service) 21/2" Conduit c A" Conduit 2- *8, 24 -*12 2" Conduit 18 - *12 IV2" Conduit 12 - #12 Steel Signal Pole 12-#12 Aerial Mast Arm 6 -*12 Aerial Mast 0 11/4" Conduit 6 - -*12 h" Conduit 20-A14 (It terconnect ) 3 cn N d13 _ c ,CP � C5 C5 M c ,a vP Cn .... v c ._ E E O v a U) .. v c ._ E c 9 o U — c o 0 c = a, Q � Co 0 _ o. 4 Co 0 _ a W 'a N = a m E o U c° ,d m ,.. c w m v[ �[ tL LL. IQ a IQ *Q a c _. CD�00000�86999999990B08B000BBB80BBB00008999�9BB00� 8" R 8" A O HEADS I, 4 8" R 8" A mm SIGNAL HEA 01 HEADS 293 DONT WALK HEADS 71 8, 9,10, 1 1,12,13 a 14 OeIW C. Bennett Traffic Engineer GENERAL NOTES IU Exact Location of Signal Poles, Junction Boxes, Control Cabinet and Conduit Runs to be Staked in the Field by the Engineer. Splices Shall be Made in the Pole Mounted Junction Boxes Only. 3� Back Plates and Tunnel Visors Required on all Signa 1 Heads KLLEVIE 9 ROLL 1917 CONSTRUCTION NOTES Q Install Controller Cabinet and Equipment (See Special Provisions. 2 Install Concrete Junction Box ( Type 1 ) 3 Install .Service Connection on Pole (Type 1) 4 Install Steel Traffic Signal Pole W/34' Mast Arm, Two Signal Heads and One Illuminated Sign. 5 Install 10' Aluminum Signal Pole with 2 Pedestrian Signals (oA and oB ) 6 Install 2 Pedestrian Signals (oA and oB) Mount on New Street Light Pole. Wire Through Pole. O Install 2 Pedestrian Signals (oA and oB ) Mount on New Traffic Signal Poles. Wire Through Pole. Q Install Pole Mounted Junction Box ( Type B) 5 INTERCONNECT TO 4TH 8 LOGAN 4 �L TWA= 2 CITY OF RENTON PROPOSED IMPROVEMENTS R 3 R D ST 8 N.4rNST. TRAFFIC SIGNAL DETAILS WASHINGTON LOGAN AVE. N. TO SUNSET BLVD. N. FR 0 -60 U) Q J J L 'J D S T. 12 - - - - N. 4TH ST. 3 ��B 4 Ir3A 0 9 Z W a Q D ..J 8\ /2 I "•20 Cr-6745 Irk INTERCONNECT TO 4TH 8 PARK IV p - "o G , 00 00. 7a2 t w u 7141 1� of -1 scmoMEo AN 2 2 9 13 4 a lzo N , WIRING SCHEDULE I" Conduit 2- *8 (Service) 21/2" Conduit 2 - *8, 6 - 412 A" Conduit 2- *8, 24 -*12 2" Conduit 18 - *12 IV2" Conduit 12 - #12 Steel Signal Pole 12-#12 Aerial Mast Arm 6 -*12 Aerial Mast Arm 4 -:#12 11/4" Conduit 6 - -*12 h" Conduit 20-A14 (It terconnect ) GENERAL NOTES IU Exact Location of Signal Poles, Junction Boxes, Control Cabinet and Conduit Runs to be Staked in the Field by the Engineer. Splices Shall be Made in the Pole Mounted Junction Boxes Only. 3� Back Plates and Tunnel Visors Required on all Signa 1 Heads KLLEVIE 9 ROLL 1917 CONSTRUCTION NOTES Q Install Controller Cabinet and Equipment (See Special Provisions. 2 Install Concrete Junction Box ( Type 1 ) 3 Install .Service Connection on Pole (Type 1) 4 Install Steel Traffic Signal Pole W/34' Mast Arm, Two Signal Heads and One Illuminated Sign. 5 Install 10' Aluminum Signal Pole with 2 Pedestrian Signals (oA and oB ) 6 Install 2 Pedestrian Signals (oA and oB) Mount on New Street Light Pole. Wire Through Pole. O Install 2 Pedestrian Signals (oA and oB ) Mount on New Traffic Signal Poles. Wire Through Pole. Q Install Pole Mounted Junction Box ( Type B) 5 INTERCONNECT TO 4TH 8 LOGAN 4 �L TWA= 2 CITY OF RENTON PROPOSED IMPROVEMENTS R 3 R D ST 8 N.4rNST. TRAFFIC SIGNAL DETAILS WASHINGTON LOGAN AVE. N. TO SUNSET BLVD. N. FR 0 -60 U) Q J J L 'J D S T. 12 - - - - N. 4TH ST. 3 ��B 4 Ir3A 0 9 Z W a Q D ..J 8\ /2 I "•20 Cr-6745 Irk INTERCONNECT TO 4TH 8 PARK IV p - "o G , 00 00. 7a2 t w u 7141 1� of -1 scmoMEo AN 2 2 9 13 4 a lzo N , Head 2 a�. —7t @-w NW %W Head 3 Illuminated Head 4 Sign Install Con Z Q OA Q N t Install Stei r.. O CP �� 2 — M c V o _ — m 'pr cn a (n �`- Through P 8O 10AIu. gO I c A IR aa A co 2 G m a a u- �. R �► a�. —7t @-w NW %W Head 3 Illuminated Head 4 Sign 0 B l WP%g _j 013 Head 5 Illuminated Head 6 Sign CD�DDDOGDA99999BA9ABABB000AA�B0BD0�AADODA99AABBB90 GNAL SEQUENCE CHART Install Con Z Q OA Q O O t Install Stei r.. O CP �� 2 0 E ° c m _ o _ — am -- 'pr cn a (n �`- Through P 0 B l WP%g _j 013 Head 5 Illuminated Head 6 Sign CD�DDDOGDA99999BA9ABABB000AA�B0BD0�AADODA99AABBB90 GNAL SEQUENCE CHART Install Con Z Q OA Q O B t Install Stei 3 g. VEB To 3 Chg. To c v E' = ac Mount on �`- Through P 8O 10AIu. gO I G A IR RI A R 2 G A R RI A R 3 R R G A R R- 4 R R t AI R R 5 R R I IG Al R R 6 R RI If Al R I R 7,14 W DW De IDW 139 DW DWI W FDW De IDW 10011 W DW DW De DW 12,1 DW DW DIIINI De DW ""�♦ jam— '-7 ~- _,� z - ♦` 1AW - -Wj 1 _ �-► -•� oc 304 �4a • kI • /? jar 8'' R 8" A 70 0 HEADS 4a6 8" R 8" A no SIGNAL HEADS 0 HEADS. I,2,3a5 CL 6 & C� C� C WIRING SCHEDULE DONT WALK I I" Conduit 2- #8 ( Service) 5 1112'Conduit 12 - #12 HEADS 6 Steel Signal Pole 12-#12 798,99109 lit 12,13 Ek 7 Aerial Most Arm 6-#12 14 8 Aerial Mast Arm 4- #12 ® 11/4" Conduit 6 -#12 0 Steel Signal Pole 10-#12 I I 2" Conduit 16 - #12 02'Conduit 2 - *8 ,28 -#12 IV' Conduit 10-#12 Aluminum Light Pole 6-#12 5 1 �2" Conduit 20- *14(lnterconnect) GENERAL NOTES �j Exact Location of Signal Poles, Junction Boxes, Control Cabinet and Conduit Runs to be Staked in the Field by the Engineer O Splices Shall be Made in the Pole Mounted Junction Boxes Only. OBack Plates and Tunnel Visors Required on all Signal Hoods. cot Oj Install Con Special Pry Q Install on Q Install Ser, 4O Install Stei Arm and 1 6O Install 2 P Mount on Through P O7 Install 2 F Mount on Through P 8O Install Pole gO Install Step Arm, Two Sign. Z Uj Q 1 PH 1 f F."- ww.Ml to 0 CITY OF RENTON I "s 20' Cs. PROPOSED IMPROVEMENTS 13 N. 3 R Ek No 4TH ST � � �, � ST DNbort C. eenAen TRAFFIC �� Trafc E inner SIGNAL DETAILS _ , , � . "� eEU.evuE w" s "'NaTON LO G A N AVE, N. TO SUNSET BLVD. N. c 6�4s E. �c FO AN 2 t 02#6c ' FtO L L 1 917 F I;t t . 062 .. ST. FROM r0 RY ST. FROM TORY 1 �I N '-C 4