Loading...
HomeMy WebLinkAboutzT-1892SetSECTION 29, TOWNSHIP 23 N., RANGE 5 E., W.M. t I c# 22 '., 21 I 20 � I I - - - - - y 19 MM AVE. S. 1 2 ♦ I I 18 27 26 ♦ #fl \ 2 . I 8 I \ 17 \\ I ! I 15 I II i I I 9 i I I #(Da33a 14 8+76.76 I I II ! I I i I 13 LLI \ \ lk MAIN AVE. S. J ' + MATCH LINE STA. 6+,-;Z — — I c0 (SEE TFIIS SBEFsi) � 8 � \1 wll� I �I 29 3 IIs E LIP,?r I ►� i► �s���- fsS323 2A -# 1 �, m�: a t 0&- - - ,. 6+00 3 -_ 1 ! ') 3+60.61 END PVY'i. I S. WELLS ST. lil it lu i I A j I I A I B I I 1 R=-R C N fteAUt.4E. ' NO. RENSION i BY AF t PT 14+53.02 -- i 16 \ 4 '&Z4 e Z # 10 +4ss3 #�a40 a W N L� 30 I eWN 14 +9e, I a 4 v I 24' Rr 31 P5 F. TFtPtisrown _ DETENTION II TRACT 01 I II ,w I I II ED co i ° I II III -I II o � ! (SEE THIS SHEET) GRAPHIC SCALE MATCH LINE STA. 6 +22 20 0 10 20 40 80 CITY OF RENTON ( IN FEET) DEPARTMENT OF PUBLIC WORKS 1 inch = 20 ft. ENGINEER: STREET LIGHTING PLAN JAEGER ENGINEERING O'CONNOR PLAT 9419 South 204th Place DESIGNED: JJd DATE: 8/96 FlLE NAME J9608 Kent, WA. 98031 DRAYM: DGL - — - eo /5/97 Phone No. (206) 850 -0934 CHECKED: JJJ SCALE: 1' =20' - oa.m PA- DATE Fax No. (206) 727 -5320 APPROVED: SHEET: 13 OF: 13 cc): T- iJ�_ I ROLL 159 Eli m o � N —� w� Ilv 14 MATCH L-PN F STA. 16+50 WIRING SCHEDULE rr 13cr13j RUri s Maur ICONOV'TOR MILT 40)1 2-e 8 ANC (USE -XLP) I + 12 00'1 1 2-98 AITG (USE-XLP) I Ltghlln9 t 2 1 -T Oroand) I 1 1t 2' I . — 40) 1 2-08 AMC (`USE XLP) 5- (trlE -Ap) i 32 TT -- - -- 2- 8 AW ((USE AP) -4-010( lJlE -XLP) I 1 -e8 Mrs Oreerso t Lighting %oto"l ground Z P \(x++eetee 4g)i OPEN (Pull ) Spare 34TH 51'. !G !U.li 1d�+t�i8 28 121"+- 25' S' r e SECTION 29, TOWNSHIP 23 N., RANG 5 E., W.M. CONSTRUCTION NOTES �J Inrt:°: �,W not lens 000ro head IOOW MPS. 240V, Medium Cutoff Type iII Distribution an 29' Dank Pale with 6' arm. Also Install NSOOT Type I Junction Box (Sal Standard Pion J -11o) and foundation pad. Pale sholl maintain 10' minimum Clearance to any driveway. Install photocell an IuminOMe tmstae Service Cabinet oncl Ca ,no.f Num6trs ( 4� Service Coble* (3 -#4's) and Conduit (2' Schedule 80) shall connect from Service Cabinet to neorest Puget Sound Power dt Light power source. ►Pots 5C"EZ[ Ut E WIRING SCHEDULE PC*-,- t. a * RUri s Maur ICONOV'TOR COMMENTS 40)1 2-e 8 ANC (USE -XLP) Lighting 00'1 1 2-98 AITG (USE-XLP) I Ltghlln9 �_ I(91x1MMS..4G)1 2 1 -T Oroand) ground 2' I . — 40) 1 2-08 AMC (`USE XLP) 5- (trlE -Ap) i Ugnting Phatoow 2' 1 �(MfteoMe 40) 2- 8 AW ((USE AP) -4-010( lJlE -XLP) I 1 -e8 Mrs Oreerso t Lighting %oto"l ground Z P \(x++eetee 4g)i OPEN (Pull ) Spare CONSTRUCTION NOTES �J Inrt:°: �,W not lens 000ro head IOOW MPS. 240V, Medium Cutoff Type iII Distribution an 29' Dank Pale with 6' arm. Also Install NSOOT Type I Junction Box (Sal Standard Pion J -11o) and foundation pad. Pale sholl maintain 10' minimum Clearance to any driveway. Install photocell an IuminOMe tmstae Service Cabinet oncl Ca ,no.f Num6trs ( 4� Service Coble* (3 -#4's) and Conduit (2' Schedule 80) shall connect from Service Cabinet to neorest Puget Sound Power dt Light power source. ►Pots 5C"EZ[ Ut E Pace PC*-,- t. a * fbt- Mr-- I MOUNT I-M N;Y-% e.E.h� "flan{ hip. 150 ArAPs SERV Icy I tpszl B 1-ttn0 2.4' LT 25' BRA^C 4 BgkQ, 440 A. CO. ----TDR C.ohtT-Ac,TDR CRBetasr C : 100 AMP SEi 1C-E '2 (0823 B 6+55 24' LT 20 8' 34TH 51'. a (x640 B Ito +23 28 121"+- 25' S' 6 -3 MAIrJ we-s- 4 &641 B 1-7+ee ?-A'Lr 25' 8' 6 -3 MAIW ANe.t3. 5 ln64Z 5 14tlto 56 P5't 25' S' C-1 f�-T 36/84 PROP. LINE to (x6446 20-48 2A' Rr 25' S' C -1 S. 351" Sr. 1 10646 B 22+ 12 24' Rr 2B' 9' C-? S. 35T" pr, 6 /0641 5 23 +5f0 2A' Kr 25' S' C -Z S. 8S"' Sr. `T (x633 B 0+15 24` 1-'T 25' 8' 6 -2 3. 34- sT- /D 106245 14+88 24' Rr 25' S' B -I MAIIJ AVe.. s. it 6625 B 13+40. 24' LT 25' °u' 8 -1 MJ31N NVP-. S. IZ (p824 B 1145 24' Rr. 25' S' 8 -1 MAIL-, P�eIE. S. Cow&r -,rn 2 C&®NN[ETS 100 AMPS SERVICE CoDJTI MR CABIK[er A: rARCUIr A -1 - 20 A. SSA i,4C*i BREAKER (ChBI W BT N0. CD 13) 40 A. (20i,1TACTOR GOUT P,CT0R CAy81 NET' S: 150 ArAPs SERV Icy r-tRCt>l: - 15-1 , 00 A. ' ; rt ---R, 40 A- cotirrACTOR CIRCUIT 5-2' ZO A. BRAT ACH IBRKK, 40 A- C ---TOR l:-i9 W tr 6-3'- 20 A �CA51WI-T N0.00M ) BRA^C 4 BgkQ, 440 A. CO. ----TDR C.ohtT-Ac,TDR CRBetasr C : 100 AMP SEi 1C-E CIRCUtr C- i : • 2O A. 13PII-NC-H BRk*R, 40 A. Ccf rrACTOR GtRctriT C--Z: 210A PRATiCH BRKR, 40A. Cot,l -7 .;MR (CABtNEI T NO. C015) 1 r 1 I u I ROLLA 59 GENERAL NOTES 1. All work Shoff be in accordance with the City of Renton Standard Plane and Specifications and these plans. 2. Unto" otherwise noted, the laccailon Of eatured shown are approximate and the exact location will bs e.cao;im,ad by the Engineer in the.fieid. 3. InatCll all street lighting materials shown on the plans, except where noted. All materials shall be new and of the beet available grade or quality. 4. The contractor shall submit a request to the City of Renton for materials approval at the surliest , 1 0 dote. S. All work alto" be ofe" lstent with utility agency requirements. The contractor sholl contact ail pertinent utility agencies 48 hours before commencing work and shall coordinate the work w" t`.°.'- utilities 11-- iy°,out the project. 6. The contractor 911011 be responsible for any damage to existing utilities. The contractor shall notify the affected utility company and the City immediately upon damage. ' 7. The Contractor Shoff notify the City of Renton Mold Inspection Dh4sian (277 -6970) for Inspeo4len parpoe % 24 hours before Commencing work. No work shall be covered unto it has been examined by the Engineer. 8. All conduit shall be PVC Schedule 40 unless noted otherwise. V. Ax conduit cover shall be 24 inches. C0; 7-I&19-?Oz LEGEND ® TYPE I UNCTION BOX ® TYPE II ,AJNCTiON BOX �- LUMINAIRE AND POLE ® SERVICE CABINET CONDUIT -a MIRE NOTE !U� CONSTRUCTION NOTE -�� R.O.M. i s A z 4o� m tip !I Ve✓ N 4, N