HomeMy WebLinkAboutzS-2198SetSIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED
PROFESSIONAL SURVEYOR.
11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS
WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 18 INCHES,
THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE
COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE
PIPE OR TO THE SIDE OF THE TRENCH MATERIALS. HOT MIX PATCH SHALL BE
PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT
STANDARDS.
13. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S.
14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO
THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION
AFTER THE COMPLETION OF CONSTRUCTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH SECTION 7- 02.3(1) OF THE _CURRENT STATE OF
WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF
THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED
BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE
WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING
SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE.
16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED
ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50.
17. IN UN- IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18
INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL
DIRECTIONS TO MATCH PAVING.
wwp -27- 298
SIDE SEWER SERVICE DETAIL
24 "x 6" FRAME AND LIP
PER DRAWING BR29.
W' MAX.
NOTES:
1. STEPS TO BE 3/4" 0 /DEFORMED BAR GALVANIZED SAFTEY STEPS OR EQUAL
2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTIONS ARE INSTALLED
3. CASTING TO BE OLYMPIC FOUNDRY MH30 WITH MH30 D/T OR EQUAL. PER DWG. BR29
4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE
5. OPENING SHOULD BE ON DOWNSTREAM SIDE.
SANITARY SHALLOW MANHOLE
CEML
COLS;
BELO
2 -3'
VICINITY MAP
MANHOLES REQUIRE STABILIZATION
IN CONSTRUCT70N AREA PRIOR TO
INSTALLATION OF FINISH SURFACE.
rE
HARDWARE CLOTH
COMPLETELY
STING AND
STANDARD CONSTRUCTION DETAIL
WIRE MESH REINFORCED COLLAR
(N IS)
MPS ewr� ¢�n¢�vi
iv Qs
�6
y
1
�+
z 1
z
L
[ (r f 7 ( f I I I I I f I I A I
20 19 18 17 18 15 14 13 12 11 10 9 8 7 6 MI RO OX 0 f3 42 8 6 7 8 9 10 11 12 13 14 15 16 17 18 19
R146-. -
PORTIN OF THE SW
114 OF SECTION 17, TOWNSHIP 23 N., RANGE 5 E., W.M.
SANITARY SEWER NOTES & SPECIFI CA TIONS
I
PROPERTY LINE
1.
ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND
SIDE SEWER MAIN TO Ij' BUILDING SEWER
SPECIFICATIONS OF THE CITY OF RENTON UT! /TY DEPARTMENT AND THE LATEST
•
EDITION OF THE WSDT/APWA STANDARDS AND SPECIFICATIONS.
I
� Z , FUTURE
2.
THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SHALL BE LIMITED TO 8:30
6" SEWER PIPE 6•0' I BLDG SEWER
A.M. TO 3:30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY
THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES,
`�-6" SIDE OUTLET TEE z;
2'X4" STUD SERVICE 4ARKER
PARTIAL, OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24
HOURS IN ADVANCE. THE POLICE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24
I PAINT UPPER PORTION WHITE
HOURS IN ADVANCE.
2 AND STENCIL ON SIDE WORD o
"SEWER" WITH 3" HIGH
J.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICAT701vS
BLACK LETTERS.
FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE
6~ SIDE SEWER & BUILDING SEWER
CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND
CITY OF RENTON STANDARD SPECIFICATIONS
PI-AN
4.
ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL
BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE 7RUE AND CORRECT
6 SIDE SEWER T
NOT E
LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE.
NC MIX
CONCRETE 60' ALLOWABLE MAX SIDE SEWER SHALL HAVE A
CO
BLOCKING FOR CAST OR MIN /MUM 5' COVER AT PROPERTY
5.
A PRE- CONSTRUCTION CONFERENCE AND A 24 HOURS NOTICE SHALL BE REQUIRED
UC77LE IRON PIPE. LINE OR 3 -5' LOWER THAN THE
PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S
TO STARTING
6 MIN - - q5' MAX LOWEST HOUSE ELEVAPON, WHICH -
EVER IS LOWER.
RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR
25 `MIN Q
�
CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF
Tz.1
6 hllN HORIZONTAL
THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
24 HOURS IN ADVANCE OF BACKFILL ALL
6° SIDE OUTLET TEE W
N077FY THE UTILITY DEPARTMENT
SEWER MAIN
CONSTRUCTION.
SEWER MAIN
?
�EXIS77NG
CWa SLOWNG ANGLE f6" SIDE SEWER
6.
CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF
Of TEE AT MAIN OM? ZS�
CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE
ELEVATION ��
CONSTRUCTION SI TE.
TO BE INSTALLED
J( AT CONNEC77ON
7.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE
�O��O NOTE
AND ANY RELATED PERMITS PRIOR TO ANY CONSTRUC770N.
C.�
VE VO MAKE TAP THROUGH CAST IRON
$.
PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE
ALL OTHER PLANS.
P�G�6 SADDLE SECURED TO SEWER MAIN
GCE WITH STAINLESS STEEL BANDS
NEW SIDE
PRECEDENCE OVER
C� WHEN CONNECTING
9.
A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
Z25�' SEWERS TO EXISTING MAIN.
CONSTRUCTION IS IN PROGRESS.
MAN sLOPE TAL VITRIFIED CLAY, PLAIN &
10.
THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT
REINFORCED CONCRETE,
TYPICAL SIDE SEWER Cl PIPE SEWER MAINS ARE TO
DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND
ELEVATION BE CORE DRILLED.
SIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED
PROFESSIONAL SURVEYOR.
11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS
WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 18 INCHES,
THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE
COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE
PIPE OR TO THE SIDE OF THE TRENCH MATERIALS. HOT MIX PATCH SHALL BE
PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT
STANDARDS.
13. DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S.
14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO
THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION
AFTER THE COMPLETION OF CONSTRUCTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH SECTION 7- 02.3(1) OF THE _CURRENT STATE OF
WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF
THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED
BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE
WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING
SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE.
16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED
ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50.
17. IN UN- IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18
INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL
DIRECTIONS TO MATCH PAVING.
wwp -27- 298
SIDE SEWER SERVICE DETAIL
24 "x 6" FRAME AND LIP
PER DRAWING BR29.
W' MAX.
NOTES:
1. STEPS TO BE 3/4" 0 /DEFORMED BAR GALVANIZED SAFTEY STEPS OR EQUAL
2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTIONS ARE INSTALLED
3. CASTING TO BE OLYMPIC FOUNDRY MH30 WITH MH30 D/T OR EQUAL. PER DWG. BR29
4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE
5. OPENING SHOULD BE ON DOWNSTREAM SIDE.
SANITARY SHALLOW MANHOLE
CEML
COLS;
BELO
2 -3'
VICINITY MAP
MANHOLES REQUIRE STABILIZATION
IN CONSTRUCT70N AREA PRIOR TO
INSTALLATION OF FINISH SURFACE.
rE
HARDWARE CLOTH
COMPLETELY
STING AND
STANDARD CONSTRUCTION DETAIL
WIRE MESH REINFORCED COLLAR
(N IS)
MPS ewr� ¢�n¢�vi
iv Qs
�6
y
1
�+
z 1
z
L
[ (r f 7 ( f I I I I I f I I A I
20 19 18 17 18 15 14 13 12 11 10 9 8 7 6 MI RO OX 0 f3 42 8 6 7 8 9 10 11 12 13 14 15 16 17 18 19
R146-. -
IF. H, , w� A PORTION OF THE SW-1 /4 OF SECTION 17, TOWNSHIP 23N., RANGE 5E., W.M.
/ 20LF 6 "0 PVC
II I SSMH `# 1 - 54" SHALLOW MH SS SERVICE STUB
EX CB TYPE 1 II I STA: +04.26, 5. O' LT.
RIM EL. = 326.14 II / 25 CAPPED AND MARKED I
RIM EL. = 330.
I.E. = 320.94 !N, OUT I II I I /
PER SIDE SEWER DETAIL
ILD OVER EX Pl}'E ti SHT I OF 2
RIM ELM= 327.22 II AINTAIN EX. SE �� EX. HOUSE
I.E. = 317.20 I �I- I I SERVICE SSMH. , �2 54" ALLOW MH,
L I W/ SOLID L0 _C141� LID 7 STA: L. 34 5.00 LT.
FF = 343.75 I
� HIM EL. � 343.50 11
$ II I I ? I I WOOD I.E. = 33B. 18 `V
FENCE i W W/ SOLID VOCKING Ll�
CONC. BLOCK RETAIVING WALL \� A7/ U ��
FENCE I II hi I GA''� � Nv: BACKFILLED P`
II T W RESTORE WALL TO P ESENT CONDITION
k ! 7• AFTER SEWER C N RUCTION & BACKFILL U
S I� T UTILI POLE i ry O g
FND 1/2" REBAR / B.BB — 4 `
X36 W c 33 /i ..�3 / — 343.12 / CONC. HEDGE
PAD FND 1/2' REBAR
ORNAMENTAL I I / NE PROP. COR.
TREES 0-1-00
53 II - 2 LF "� PVC SS S 6.0� __�,/ 6
I - � _47-±_00 ham— 348 - -f 2+00 — — 4L - -3 3+40.08 k
7�_— DRTf/EWWA�' — — �k�
- J�
332 It t� t1w� ® __ j 20� F "O PVC y/ - __ - - - - -- /Z
332
I I I f o1L - - - - -- _---- - -S_SJ S RVICE STUB - - - -- �� //
u n = OX IN __
-G ED1 A MAPkff.
b // / -��
52
334 PER SIDE SEWER DETA _ J
SST I1OF 2
r
III I N Q I I / EX. CB TYPE l 344 -- \ \\ 5���
_o RIM = 329.51 \ 3�
336 III z z I % / 1.E1328.11 ��-- f HOUSE UNDER
a ` I , LOT 39 CONSTRUCTION
EX CB RIM E 34P3.87 I II a II��
I.E. = 342.47 12" — IN, W. 33
I.E. = 341.92 - 6" OUT NE. kI I �/ 0+00 1+00 2 +00
............... ............................
II x
SCALE- 1 20'
BENCHMARK: CITY OF RENTON # 258
LEAD AND TACK AT THE INTERSECTION
OF THE BACK OF WALKS AT THE SW.
CORNER OF BEACON AVE. S. AND HIGH
A VE. S. ELEV. = 355.40
3+00
................... ............................... 350
340I II I I I / PROPOSED BACKFILL BEHIND F ``
EX. BLOCK # ;1 54" SHALLOW.. MH EX. PROFILE OVER MAINTAIN MIN.
4L.COVER..........
\ •. / /i SSMH :...PROPOSED...SS--PIPE ...........
EX. CS — TYPE I �I �i STA: O+D4.26; S:OD LT OVER SEWER PIPE_
RIM EL = 344.24 II / RIM EL 330.25
I.E. = 9.74 12" — IN. 342 _ EX. PROFILE CENTERLINE
I. E. 339.74 — 12 OUT E. k6i/ Is E. = 323.24 OF 20' EASEMENT
II II 5/ BUILD OVER EX .-w PIPE �. _ 340
%X. ; EX. CONC, . r.. ..... _.� CB TY I i // 340 i1r1AfN�AIA EX SEiUER BLOCK :WALL
Rl EL. = 345.74 344 SERVICE
/ W ' SOLID LOCKING LID :
LE 341.24 92�OUT / /
- ... ... .. ... . .... .....
/ .. ...s....... ............. .............. �.....
i
is
WASTEWATER lJTTy
EX. SSMH 6 O
//
RIM EC. = 34 97 / —
II II '
I. E. 333.17 T T
/ — — ............................... _ ........ ss _....... _...... 330
330 E..sro2 74 F a' 0 _.... SSMH # 2 54" SHALLOW MH
w w w STA: 2+55.56, 5:00' LT.
��•'9 \ II III / / �
RIM EL. 343. SD ...............
................:. .......... .. ........... ............................... .. _ .. l: L:...._....338:.1.8.. ..
... .. Sm24198
o II III E. WA326.41 SOLID:: LOCKING LID
Wj�
EX 8 "323.57E INCASE SEWER WITH 12" CONCRETE CLASS "C" FL
y I I
I.E. EXTEND 10' DITHER SIDL- OF CROSSING 1a-
32
Q ................... ............ANC / INSTALL :2....ELA-STOME -RIC- OR'--ETHAFOAM -PAD ......................... 320
BETWEEN WATERMAIN AND CONCRETE. w $
O: N: O: h: N: N� co: 0). cp: o>� C I�: �: N: r�
• N: n: raj: raj �' �: Vim: �: V`�iEXGROUND ELEVATIONSo..
// DATUM ELEV r7_ n r7 �: ro: �: �: �: "): �: "�: "�: "): �: to: r). �: EASEMENT CENTER S meat
315.0 M ry b ro cp ro o o N N EX GROUND ELEVATIONS %zz /se
N � � PROPOSED PIPE CTR.
M M M rn n M M
0 +00 1 +00 2 +00
,PROFILE CENTERLINE OF EASEMENT
WWP- 271/98
3+00
d
b�
4z N
si -1
°x N
Os0
L
a d gi I I i I d I i A I I I i I I I I I IA I I I I i AI
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 I R 0 0 X 6 7 8 9 10 11 12 13 14 15 16 17 18 19
R 46