Loading...
HomeMy WebLinkAboutzT-2723Seto I 8 ry YY R W 00 z �E �W ~_ LJ d a U �c no �o c =v --E IN ` cd CL LEGEND TYPE M —C —III H.P.S. LUMINAIRE, ARM AND ALUMINUM DAVIT STYLE POLE �W � CONCRETE PAD LIGHT BASE AND J y TYPE 1 JUNCTION BOX --- - - - --- PVC CONDUIT (SEE WIRING SCHEDULE) ® TYPE 1 JUNCTION BOX WITH 9 J3 _o CONCRETE PAD WIRE NOTE a a a O CONSTRUCTION NOTE Z 0 Ln x WIRING SCHEDULE RUN POLE ID NO. POLE LOCATION NO. CONDUIT CONDUCTORS 1, 1.5" PVC (SCHEDULE 40) 2 — #8 PAD ELEVATION 1.5" PVC (SCHEDULE 40) 2 — #8, 1 — #8 BARE 1 EXISTING 1.5" PVC (SCHEDULE 80) 1 2 — #8 CONSTRUCTION NOTES OROUTE CONDUIT INTO JUNCTION BOX INSTALLED BY OTHERS AND SPLICE TO ILLUMINATION CIRCUIT INSTALLED BY OTHERS. 20 INSTALL INDIVIDUAL JUNCTION BOX AT END OF EXISTING ROAD CROSSING CONDUIT. II 40 0 40 80 sccle feet POLE SCHEDULE POLE NO. POLE ID NO. POLE LOCATION POLE OFFSET CIRCUIT NO. LAMP WATTAGE LAMP DISTRIBUTION TYPE TYPE MOUNTING HEIGHT MAST ARM PAD ELEVATION J —BOX END (NORTH) LUMINAIRE END (SOUTH) 1 2545F 6 +81 28.5' LT. * 250 HPS M —C —III 35' 8' 138.0 138 O___ 2 1 2543F 8 +36 28.5' LT. * 250 HPS M —C —III 35' 8' 136.0 135.9 3 2541F 9 +89 285 LT. * 250 HPS M —C —III 35' 8' 133.7 133.6 4 9539F 11 +42 28.5' LT. * 250 HPS M —C —III 35' 8' 131.2 131.0 5 2537F 12 +95 28.5' LT. * 250 HPS M —C —III 35' 8' 122.5 1 122.3 6 2535E 1 1 +25 23' RT. * 250 HPS M —C —III 35' 8' i 111.2 EAST 110.1 (WESTI * CIRCUIT IS AN EXTENSION OF EXISTING CIRCUIT TO BE CONSTRUCTED BY THE PROPERTY TO THE NORTH ON THE EAST SIDE OF TALBOT RD. Tr d1l k 1724 3 ol ,® "-%W -w - TRANSPORTATION PLANNING & ENGINEERING, INC. 2 ' -' ­2TH A VENUE NOR Tri AS -, S,, TE 5EL' E ✓UE v ASNiNG'OJ 98004 -E'_. (425) 455 -5320 F4 425) 453­18C APPRCjVE:.. crIV' of ssnleom BY ; rc,- , qT S9 H. , 9pTdALJ mam m sj s/pumwc Wmw mar G ov A PROVED 1 15 U I A e e /- P�NST£4P�1{W� �Fp`ECfS9ERa9`� D.H. Nei 0 -'2 -98 pipp /L h!.u41 6Y 4jej" DATE�'/�q� SSIONniE�� 2 -12-55 SfoNni£N� >Aawe D. ✓L. i F055—Es 9/6/99 Imam 9/15/00 D.H.E. on LL I ma c m y � 'y �0 �n Z 0 Q It N Z ` W JQ Z Q Q 0 QO N Or O m u-- Z Y. O Q 3 Q z n w I— LLd DD a O i E �N C �f G rn C aL � a' i� s �e o O tr J F- O Ed Of No -.w. ?7 ?3 A PORTION OF THE SW 1/4 OF THE SE 4 OF SECTION 31 TOWNSHIP 23 NORTH RANGE 5 EAST -BEGIN FULL 2 WAY TURN STRIPING STA 3 +22.36 -BAKE MARKERS -TURN MARKERS -t u M IUKN u L CONTINUE TURN LANE TAPER -BEGIN TURN LANE TAPER 1.1 MARKERS MARKERS -BEGIN CENTER STRIPING STA 5+42.36 o -END BIKE LANE STRIPING �a �� c �. -K� ° NFfl II 18612 o��SSNNAIE LENG\��� EXPIRES: MAY 6, 1999 Z 0 N Z F m z a J Q IQ- I 0 r r r M LL 0 r 0 r M 0 Lij N z O a 3 Li N 0 O M LLI !n H QN W K d Ir W 0 O z Q M 97 -18 N TALBOT ROAD S. N PROJECT NO. 0 0 TLR + — DRAWN BY s �'. b o 02 -03 -99 ui ISSUE DATE .. .'s.....: -.: : A J SHEET REVISION RENSIONS: XX -XX -XX o PACIFIC E I�GINEERING DESIGN INC.' C!V!L ENGINEERING AND PLANNING CONSULTANTS SCANNED SEP 13 2002 ROLL FR 4�47 1N o Z Or- o N Z J JQ m i a Q T r U Qo 02 0 Z `c 30 � a U . a d s€ ;E C N p a� o Z O N_ (t% -J9 REVISIONS : XX -XX -XX 4 A PORTION OF THE SW 1/4 OF THE SE 1/4 OF SECTION 31, TOWNSHIP 23 NORTH, RANGE 5 EAST O TALBOT ROAD S. S o T - ?7 ?303 J EXPIRES: MAY 6, 195 Z 0 2 m Z a J Q � I 0 3 0 W Q N 0 0 N o � Y N LL W W� 0 0 IL M � B N U a 3Qa X 310 W Wa w U .Z o � W N®E 97 -18 PRO.IFr.T NO. DRAWN BY 02 -03 -99 ISSUE DATE SHEET REVISION Q o rn r I v O N 0 3 I, i fA w O O LLI s Ir a Of 0 0 Q L PACIFIcENGINEERING DESIGN INC. CIVIL ENGINEERING AND PLANNING CONSULTANTS SCANNED SEP 13 2002 4 77 V R 44's M U) CJ GENERAL NOTES a_ 1. ALL PAVEMENT MARKING WORK AND MATERIAL SHALL CONFORM TO THE STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION (SEC. 8 -22 & 9 -21), a LASTEST EDITION, EXCEPT AS NOTED. 0 2. ALL PAVEMENT MARKINGS SHALL CONFORM TO THE CURRENT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) m AS ADOPTED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION ( WSDOT). 3. FOR STRIPING DETAILS AND RAISED PAVEMENT MARKER (RPM) PLACEMENT, REFER TO WSDOT STANDARD PLANS H -3 & H3A SHEETS 1 & 2. 4, FOR CROSSWALK LAYOUT & DETAILS REFERENCE THE CURRENT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) SECTION 38 -15, FIGURE 3 -14. 5, FOR TRAFFIC ARROW PLACEMENT AND DETAILS REFER TO WSDOT STANDARD z PLANS H -3A AND H -5C. O S. ALL STRIPE SHALL BE PAINT, EXCEPT AS NOTED. _D T 7. ALL STATIONS AND OFFSETS REFERENCES THE ROAD CONSTRUCTION CENTERLINE. B. REMOVE EXISTING PAVEMENT MARKINGS FROM STA. 126 +44.69 TO STA, 141 +75. „eo. (t, -,7.-# REVISIONS : XX -XX -XX 4" WIDE PAINT STRIPE (WHITE) 4" WHITE TYPE 'I' LINE MARKERS 4" WHITE TYPE 'Ile LINE MARKERS (REEL) LANE LINE 8" (0.67) 8" WIDE PAINT STRIPE (WHITE) �I I 4" WHITE TYPE T LINE MARKERS 3.0' 4" WHITE TYPE 'Ile LINE MARKERS (REEL) 24.0' kr SPEED LIMIT 25 MPH 200' O.C. SPEED I= 30 -35 MPH — 25W O.C. SPEED LIMIT 40 -45 MPH — 300' O.C. NUMBER OF 2 - WAY LEFT TURN ARROWS APPROACH LINE LENGTH ARROW LOCATIONS 50'-125' 2 ARROWS (20" BACK & END OF APPROACH LINE) NUMBER AND LOCATIONS OF ARROWS RO.25' R0.50' 2.50' R0.33' O 3.00' CYCLE SYMBOL WHITE 24" STOP LINE 4" WIDE PAINT STRIPE (YELLOW) 4" WIDE PAINT STRIPE (YELLOW) 4" (0.17') .-Ir I yellow and red (� 15.0` (v 9.0' o ^ _ o ►I —�i Fes--- 3.0' oO 4.00 4" WIDE PAINT STRIPE (YELLOW) Q Z a t,.i � N �o O 0 Z m STA. # 4" WIDE PAINT STRIPE (YELLOW) 4" YELLOW TYPE 'd' LINE MARKERS ? 4" YELLOW TYPE 'lid' LINE MARKERS LQ Q i (REEL) 0 IL TWO -WAY LEFT TURN LANE GENERAL NOTES a_ 1. ALL PAVEMENT MARKING WORK AND MATERIAL SHALL CONFORM TO THE STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION (SEC. 8 -22 & 9 -21), a LASTEST EDITION, EXCEPT AS NOTED. 0 2. ALL PAVEMENT MARKINGS SHALL CONFORM TO THE CURRENT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) m AS ADOPTED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION ( WSDOT). 3. FOR STRIPING DETAILS AND RAISED PAVEMENT MARKER (RPM) PLACEMENT, REFER TO WSDOT STANDARD PLANS H -3 & H3A SHEETS 1 & 2. 4, FOR CROSSWALK LAYOUT & DETAILS REFERENCE THE CURRENT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) SECTION 38 -15, FIGURE 3 -14. 5, FOR TRAFFIC ARROW PLACEMENT AND DETAILS REFER TO WSDOT STANDARD z PLANS H -3A AND H -5C. O S. ALL STRIPE SHALL BE PAINT, EXCEPT AS NOTED. _D T 7. ALL STATIONS AND OFFSETS REFERENCES THE ROAD CONSTRUCTION CENTERLINE. B. REMOVE EXISTING PAVEMENT MARKINGS FROM STA. 126 +44.69 TO STA, 141 +75. „eo. (t, -,7.-# REVISIONS : XX -XX -XX 4" WIDE PAINT STRIPE (WHITE) 4" WHITE TYPE 'I' LINE MARKERS 4" WHITE TYPE 'Ile LINE MARKERS (REEL) LANE LINE 8" (0.67) 8" WIDE PAINT STRIPE (WHITE) �I I 4" WHITE TYPE T LINE MARKERS 3.0' 4" WHITE TYPE 'Ile LINE MARKERS (REEL) 24.0' kr SPEED LIMIT 25 MPH 200' O.C. SPEED I= 30 -35 MPH — 25W O.C. SPEED LIMIT 40 -45 MPH — 300' O.C. NUMBER OF 2 - WAY LEFT TURN ARROWS APPROACH LINE LENGTH ARROW LOCATIONS 50'-125' 2 ARROWS (20" BACK & END OF APPROACH LINE) NUMBER AND LOCATIONS OF ARROWS RO.25' R0.50' 2.50' R0.33' O 3.00' CYCLE SYMBOL WHITE 24" STOP LINE 4" WIDE PAINT STRIPE (YELLOW) WHITE - 4" �I 4" (0.17') .-Ir I yellow and red — I 4" YELLOW TYPE 'I' LINE MARKERS 4" YELLOW TYPE 'lid' LINE MARKERS (REEL.) o 0 I 30.0' I Z LL Y C 4.00 00 o- c DOUBLE YELLOW CENTER LINE Z a t,.i {- a'a W �o _ s€ =d FI = STA. # 4" WIDE PAINT STRIPE (YELLOW) o 4F, 0 w i o • — 00 1 4" WIDE PAINT STRIPE (YELLOW) 4" YELLOW TYPE 'd' LINE MARKERS O CN 4" YELLOW TYPE 'lid' LINE MARKERS (REFL) II NUMBER OF 2 - WAY LEFT TURN ARROWS LOCATION GENERAL NOTES a_ 1. ALL PAVEMENT MARKING WORK AND MATERIAL SHALL CONFORM TO THE STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION (SEC. 8 -22 & 9 -21), a LASTEST EDITION, EXCEPT AS NOTED. 0 2. ALL PAVEMENT MARKINGS SHALL CONFORM TO THE CURRENT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) m AS ADOPTED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION ( WSDOT). 3. FOR STRIPING DETAILS AND RAISED PAVEMENT MARKER (RPM) PLACEMENT, REFER TO WSDOT STANDARD PLANS H -3 & H3A SHEETS 1 & 2. 4, FOR CROSSWALK LAYOUT & DETAILS REFERENCE THE CURRENT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) SECTION 38 -15, FIGURE 3 -14. 5, FOR TRAFFIC ARROW PLACEMENT AND DETAILS REFER TO WSDOT STANDARD z PLANS H -3A AND H -5C. O S. ALL STRIPE SHALL BE PAINT, EXCEPT AS NOTED. _D T 7. ALL STATIONS AND OFFSETS REFERENCES THE ROAD CONSTRUCTION CENTERLINE. B. REMOVE EXISTING PAVEMENT MARKINGS FROM STA. 126 +44.69 TO STA, 141 +75. „eo. (t, -,7.-# REVISIONS : XX -XX -XX 4" WIDE PAINT STRIPE (WHITE) 4" WHITE TYPE 'I' LINE MARKERS 4" WHITE TYPE 'Ile LINE MARKERS (REEL) LANE LINE 8" (0.67) 8" WIDE PAINT STRIPE (WHITE) �I I 4" WHITE TYPE T LINE MARKERS 3.0' 4" WHITE TYPE 'Ile LINE MARKERS (REEL) 24.0' kr SPEED LIMIT 25 MPH 200' O.C. SPEED I= 30 -35 MPH — 25W O.C. SPEED LIMIT 40 -45 MPH — 300' O.C. NUMBER OF 2 - WAY LEFT TURN ARROWS APPROACH LINE LENGTH ARROW LOCATIONS 50'-125' 2 ARROWS (20" BACK & END OF APPROACH LINE) NUMBER AND LOCATIONS OF ARROWS RO.25' R0.50' 2.50' R0.33' O 3.00' CYCLE SYMBOL WHITE 24" STOP LINE TYPE 2a WHITE - 4" �I TYPE 2c yellow and red EDGE OF ROAD LINE yellow and yellow A + + A B B TYPE 1 4.00 TYPE 2 0.7' I— 0.08, 0.7' r 0.08' 20.00' J4.00'L 4.00'L RAISED PAVEMENT MARKERS (RPM) RPM TYPE 2 RAISED FACE COLORS TYPE 2a wite and red TYPE 2c yellow and red TYPE 2d yellow and yellow TYPE 2e white one side only TYPE 2f yellow one side only 3.00' \.50' L_ M N M R =2.25 I 3.17' 1.00' T -?7 ?304 (EXPIRES: MAY 6, 1999 1 1 0 N 2 J Q Q m Q Q 0 0 Q 3 0 W N IN G h Q mmW W 0 LL 0 } U W ;aN W d Wj j w U 0�H I LL 97 -18 PROJECT NO. TLR DRAWN BY 02 -03 -99 ISSUE DATE SHEET REVISION M i 7 3 W J w to o o K) w LLIv) Y o_ 0 0 0 r1 NMI o PACIFIC ENGINEERING DESIGN INC. ° CIVIL ENGINEERING AND PLANNING CONSULTANTS C 0 ; T- a 2= ? °A SCANNED SEP 13 2002 a =7 77 I< ■ ■ �►