gM GENERAL NOTES
gC�
a 1 All work shall be in accordance with the City of Renton Standards Specifications and
these plans.
The locations of features shown are approximate and shall be verified in the field by
Q_ 2' the contractor as necessary.
®„ 3 Install all street lighting materials shown on the plans, except where noted. All materials
shall be new and of the best available grade or quality, except where noted.
Z 4.
The contractor shall submit a request to the City of Renton for materials approval at
r Q the earliest possible date.
D n
0 Z 5. All work shall be consistent with utility agency requirements. The contractor shall contact
� all pertinent utility agencies 48 hours before commencing work and shall coordinate the
n work with the utilities throughout the project.
z Q
_J Z 6 The contractor shall be responsible for any damage to existing utilities. The contractor
shall notify the affected utility company and the City immediately upon damage.
1 J
7 The contractor shall notify the City of Renton Field Inspection Division (277 -5570) for
inspection purposes, 24 hours before commencing work. No work shall be covered until
it has been examined by the engineer.
S. All conduit shall be PVC Schedule 40 unless noted otherwise.
All conduit cover shall be 24 inches.
ENCHMARK f
• `o 7c ! /. -�.� -ter ....% ; .:,� � -i�_se
NE 1/4,
SW 1/4, SEC.4, TWP.23N.9 RGE.5E.9
W.M.
CONDUCTOR
CONSTRUCTION NOTES
LEGEND
V
Install new flat lens cobra head IOOW HPS, 240V. Medium Cutoff Type III
/ f
TYPE I JUNCTION BOX
U P4
Distribution on 25' Davit Pole with 6' arm- Also install WSDOT Type I
®
TYPE 11 JUNCTION BOX
(Schedule 40)
Junction Box (See Standard Plan J -11o) and pod foundation.
LUMINAIRE AND POLE
IF ff�f #1
Install photocell on luminaire #2_
®
SERVICE CABINET
OService
Cables (3 - #2's) and Conduit (2' Schedule 40) shall connect from
---CONDUIT
3
2"
Service Cabinet to nearest Puget Energy power source_
A2
WIRE NOTE
4O
Install Service Cabinet at Sta- 3 +14, 22± L
O
CONSTRUCTION NOTE
2"
2 - #8 AWG (USE -XLP)
—
R.O.W.
4
Remove existing iuminaire-
Photocell
Z IN POWER POLE
Q ELEV = 396.33
I [ I I I
— CURB 3 +00
i
r O
WIRING SCHEDULE
RUN
CONDUIT
CONDUCTOR
��csxu-
NO.
CL
100 amps
/ f
—
U P4
2 - #8 AWG (USE -XLP)
Lighting
15 amps
(Schedule 40)
CE
2
IF ff�f #1
2 - #8 AWG (USE -XLP)
,q u
A
(Schedule 80)
3
2"
2 - #8 AWG (USE -XLP)
Lighting
A
(Schedule 40)
1 - #8 Bare Ground
Ground
4
2"
2 - #8 AWG (USE -XLP)
Lighting
A
(Schedule 40)
i
r O
WIRING SCHEDULE
RUN
CONDUIT
CONDUCTOR
COMMENTS
NO.
SIZE
100 amps
—
—
2"
2 - #8 AWG (USE -XLP)
Lighting
15 amps
(Schedule 40)
A -1
2
2"
2 - #8 AWG (USE -XLP)
Lighting
A
(Schedule 80)
A -1
3
2"
2 - #8 AWG (USE -XLP)
Lighting
A
(Schedule 40)
1 - #8 Bare Ground
Ground
4
2"
2 - #8 AWG (USE -XLP)
Lighting
A
(Schedule 40)
3 - #10 (USE -XLP)
Photocell
1- 8 Bore Ground
Ground
2"
2"
OPEN
2 #8 AWG (USE -XLP)
Spare
Lighting
(Schedule 40)
3 - #10 (USE -XLP)
Photocell
� I
13 12
- ! j
- -- ------ - - - - -- -- - - - --
\ — — — — - - -- - --
s
10 0 10 20
SCALE IN FEET
10VE
,0 7
V4
1 \ r
t CURB
LU
LLJ
--- Y - - - -- - - - - - -- ------ - - - - --
W
l�ct
W
o J J
1 2 I I I
CONTACTOR CABINET
SERVICE &
CIRCUIT No-
MAIN
BREAKER
BRANCH
BREAKER
CONTACTOR
COMMENTS
Service
100 amps
—
—
SERVICE CABINET
# 0022
A- 1/240V
—
15 amps
30 amps
A -1
POLE SCHEDULE
POLE
NO_
I POLE
I.D. #
POLE
LOCATION
POLE IMOUNTING
OFFSET
HEIGHT
ARM
LENGTH
CIRCUIT
NO.
COMMENT
1
21106
1 +50
15' LT
25'
6'
A -1
2
2111B
3 +22
32' LT
25'
6'
A -1
3
21126
4 +57
22' RT
25
6'
A -1
4
21136
5 +73
65' LT
25'
6'
A -1
d �
T-17,3401
CD ; T -27 :1`k 0 -/
RECOMMENDED
FOR APPROVAL
BY .
BY$aegX/ y7
BY
T
M
1 ' 4
00
c�
1 x-
i
G
a
a
8
NE 1/4,
S 1/4, JEV.T. TWi e23Nss RGE.5E.y
ii
CONDUCTOR
CONSTRUCTION NOTES
GENERAL NOTES
ch
_ rn
BREAKER
.1f
1 All work shall be in accordance with the City of Renton Standards Specifications and
Distribution on 25' Davit Pole with 6' arm. Also install WSDOT Type I
®
TYPE 11 JUNCTION BOX
these plans.
CL
Lighting
2
The locations of features shown are approximate and shall be verified in the field by
2" the contractor as necessary.
Install luminoire
¢--�
LUMtNAtRE AND POLE
2"
(Schedule 40)
photocell on #2.
®
SERVICE CABINET
3 Install all street lighting materials shown on the plans, except where noted. All materials
Service Cables (3 - #2's) and Conduit (2' Schedule 40) shall connect from
- --
CONDUIT
shall be new and of the best available grade or quality, except where noted.
Service Cabinet to nearest Puget Energy power source_
A2
ZQ
4 The contractor shall submit a request to the City of Renton for materials approval at
Install Service Cabinet at Sta. 3 +14, 22t L
\3J
J
the earliest possible date-
Remove existing luminaire.
- - --
r)
b
z
5 All work shall be consistent with utility agency requirements. The contractor shall contact
O
all pertinent utility agencies 48 hours before commencing work and shall coordinate the
0
t-
work with the utilities throughout the project.
Z
g
Q
Z
The contractor shall be responsible for any damage to existing utilities. The contractor
6.
shall notify the affected utility company and the City immediately upon damage.
Y
�
7 The contractor shall notify the City of Renton Field Inspection Division (277 -5570) for
inspection purposes, 24 hours before commencing work. No work shall be covered until
it has been examined by the engineer.
8 All conduit shall be PVC Schedule 40 unless noted otherwise.
9 All conduit cover shall be 24 inches. ,
o
ENCHMARK
NE 1/4,
S 1/4, JEV.T. TWi e23Nss RGE.5E.y
W.M.
CONDUCTOR
CONSTRUCTION NOTES
LEGEND
�l
Install new flat lens cobra head 1OOW HPS, 24OV, Medium Cutoff Type III
BREAKER
TYPE I JUNCTION BOX
2"
(Schedule 40)
Distribution on 25' Davit Pole with 6' arm. Also install WSDOT Type I
®
TYPE 11 JUNCTION BOX
2"
(Schedule 80)
Junction Box (See Standard Pion J -11o) and pod foundation.
Lighting
2
2"
(Schedule 40)
Install luminoire
¢--�
LUMtNAtRE AND POLE
2"
(Schedule 40)
photocell on #2.
®
SERVICE CABINET
3
Service Cables (3 - #2's) and Conduit (2' Schedule 40) shall connect from
- --
CONDUIT
6'
Service Cabinet to nearest Puget Energy power source_
A2
WIRE NOTE
4O
Install Service Cabinet at Sta. 3 +14, 22t L
\3J
CONSTRUCTION NOTE
6'
Remove existing luminaire.
- - --
R.O.W.
®� y._ IN POWER POLE / ; --
3 ELEV = 396.33�sbd /' 3
1 r c
t I I I
t I I i t
I 18 1 I€
1 i
3
5 2
4 13 12
CURB 3 +00
E-�
6 /
#1 /
O i
a /a
w d \ �.
o
m
f
z
0
e N
w
a �
Z
a
wz
F z z
4o 1
W
3
of
to
Qy
Or
a
WIRING SCHEDULE
RUN
CONDUIT
CONDUCTOR
COMMENTS
NO.
SIZE
BREAKER
I
BREAKER
Al
2"
(Schedule 40)
2 -¢f8 AWG (USE -XLP)
Lighting
J�Aq�
2
2"
(Schedule 80)
2 -#8 AWG (USE -XLP)
Lighting
2
2"
(Schedule 40)
2 -- AWG (USE -XLP)
1 -#8 Bare Ground
Ground
Ground
A
2"
(Schedule 40)
2 - #8 AWG (USE -XLP)
3- 10 (USE -XLP)
1 -8 Bare Ground
Lighting J
Photocell
Ground
3
2"
2"
(Schedule 40)
OPEN
2#8 AWG (USE -XLP)
3 -#10 (t)SE -XLP)
Spore
Lighting
Photocell
10 0 10 20
SCALE IN FEET
1 \
ni
4 CURB
- - - - - ; - ---- - - - - - - - ------ - - - - -- `
W
} w
`n
}
w
y �
` J
CONTACTOR CABINET
SERVICE &
MAIN
BRANCH
CONTACTOR
COMMENTS
CIRCUIT No_
BREAKER
I
BREAKER
1
21108
Service
100 amps
—
—
SERVICE CABINET
2
21116
3 +22
it 0022
A- 1/240)
—
15 amps
30 amps
3
POLE SCHEDULE -
POLE
NO.
POLE
I.D. IF
POLE
LOCATION
POLE
OFFSET
MOUNTING
HEIGHT
ARM
LENGTH
CIRCUIT
NO-
COMMENT
1
21108
1 +50
15' LT
25'
6'
A -1
2
21116
3 +22
32' LT
25'
6'
A -1
3
21126
4 +57
22' RT
25'
6'
A -1
4
21138
5 +73
65' LT
25'
6'
A- i
i