Loading...
HomeMy WebLinkAboutzT-2734Setx ix I N¢ a �o pf Q V a C+ 1 ® x 9 S 9 a gM GENERAL NOTES gC� a 1 All work shall be in accordance with the City of Renton Standards Specifications and these plans. The locations of features shown are approximate and shall be verified in the field by Q_ 2' the contractor as necessary. ®„ 3 Install all street lighting materials shown on the plans, except where noted. All materials shall be new and of the best available grade or quality, except where noted. Z 4. The contractor shall submit a request to the City of Renton for materials approval at r Q the earliest possible date. D n 0 Z 5. All work shall be consistent with utility agency requirements. The contractor shall contact � all pertinent utility agencies 48 hours before commencing work and shall coordinate the n work with the utilities throughout the project. z Q _J Z 6 The contractor shall be responsible for any damage to existing utilities. The contractor shall notify the affected utility company and the City immediately upon damage. 1 J 7 The contractor shall notify the City of Renton Field Inspection Division (277 -5570) for inspection purposes, 24 hours before commencing work. No work shall be covered until it has been examined by the engineer. S. All conduit shall be PVC Schedule 40 unless noted otherwise. All conduit cover shall be 24 inches. ENCHMARK f • `o 7c ! /. -�.� -ter ....% ; .:,� � -i�_se NE 1/4, SW 1/4, SEC.4, TWP.23N.9 RGE.5E.9 W.M. CONDUCTOR CONSTRUCTION NOTES LEGEND V Install new flat lens cobra head IOOW HPS, 240V. Medium Cutoff Type III / f TYPE I JUNCTION BOX U P4 Distribution on 25' Davit Pole with 6' arm- Also install WSDOT Type I ® TYPE 11 JUNCTION BOX (Schedule 40) Junction Box (See Standard Plan J -11o) and pod foundation. LUMINAIRE AND POLE IF ff�f #1 Install photocell on luminaire #2_ ® SERVICE CABINET OService Cables (3 - #2's) and Conduit (2' Schedule 40) shall connect from ---CONDUIT 3 2" Service Cabinet to nearest Puget Energy power source_ A2 WIRE NOTE 4O Install Service Cabinet at Sta- 3 +14, 22± L O CONSTRUCTION NOTE 2" 2 - #8 AWG (USE -XLP) — R.O.W. 4 Remove existing iuminaire- Photocell Z IN POWER POLE Q ELEV = 396.33 I [ I I I — CURB 3 +00 i r O WIRING SCHEDULE RUN CONDUIT CONDUCTOR ��csxu- NO. CL 100 amps / f — U P4 2 - #8 AWG (USE -XLP) Lighting 15 amps (Schedule 40) CE 2 IF ff�f #1 2 - #8 AWG (USE -XLP) ,q u A (Schedule 80) 3 2" 2 - #8 AWG (USE -XLP) Lighting A (Schedule 40) 1 - #8 Bare Ground Ground 4 2" 2 - #8 AWG (USE -XLP) Lighting A (Schedule 40) i r O WIRING SCHEDULE RUN CONDUIT CONDUCTOR COMMENTS NO. SIZE 100 amps — — 2" 2 - #8 AWG (USE -XLP) Lighting 15 amps (Schedule 40) A -1 2 2" 2 - #8 AWG (USE -XLP) Lighting A (Schedule 80) A -1 3 2" 2 - #8 AWG (USE -XLP) Lighting A (Schedule 40) 1 - #8 Bare Ground Ground 4 2" 2 - #8 AWG (USE -XLP) Lighting A (Schedule 40) 3 - #10 (USE -XLP) Photocell 1- 8 Bore Ground Ground 2" 2" OPEN 2 #8 AWG (USE -XLP) Spare Lighting (Schedule 40) 3 - #10 (USE -XLP) Photocell � I 13 12 - ! j - -- ------ - - - - -- -- - - - -- \ — — — — - - -- - -- s 10 0 10 20 SCALE IN FEET 10VE ,0 7 V4 1 \ r t CURB LU LLJ --- Y - - - -- - - - - - -- ------ - - - - -- W l�ct W o J J 1 2 I I I CONTACTOR CABINET SERVICE & CIRCUIT No- MAIN BREAKER BRANCH BREAKER CONTACTOR COMMENTS Service 100 amps — — SERVICE CABINET # 0022 A- 1/240V — 15 amps 30 amps A -1 POLE SCHEDULE POLE NO_ I POLE I.D. # POLE LOCATION POLE IMOUNTING OFFSET HEIGHT ARM LENGTH CIRCUIT NO. COMMENT 1 21106 1 +50 15' LT 25' 6' A -1 2 2111B 3 +22 32' LT 25' 6' A -1 3 21126 4 +57 22' RT 25 6' A -1 4 21136 5 +73 65' LT 25' 6' A -1 d � T-17,3401 CD ; T -27 :1`k 0 -/ RECOMMENDED FOR APPROVAL BY . BY$aegX/ y7 BY T M 1 ' 4 00 c� 1 x- i G a a 8 NE 1/4, S 1/4, JEV.T. TWi e23Nss RGE.5E.y ii CONDUCTOR CONSTRUCTION NOTES GENERAL NOTES ch _ rn BREAKER .1f 1 All work shall be in accordance with the City of Renton Standards Specifications and Distribution on 25' Davit Pole with 6' arm. Also install WSDOT Type I ® TYPE 11 JUNCTION BOX these plans. CL Lighting 2 The locations of features shown are approximate and shall be verified in the field by 2" the contractor as necessary. Install luminoire ¢--� LUMtNAtRE AND POLE 2" (Schedule 40) photocell on #2. ® SERVICE CABINET 3 Install all street lighting materials shown on the plans, except where noted. All materials Service Cables (3 - #2's) and Conduit (2' Schedule 40) shall connect from - -- CONDUIT shall be new and of the best available grade or quality, except where noted. Service Cabinet to nearest Puget Energy power source_ A2 ZQ 4 The contractor shall submit a request to the City of Renton for materials approval at Install Service Cabinet at Sta. 3 +14, 22t L \3J J the earliest possible date- Remove existing luminaire. - - -- r) b z 5 All work shall be consistent with utility agency requirements. The contractor shall contact O all pertinent utility agencies 48 hours before commencing work and shall coordinate the 0 t- work with the utilities throughout the project. Z g Q Z The contractor shall be responsible for any damage to existing utilities. The contractor 6. shall notify the affected utility company and the City immediately upon damage. Y � 7 The contractor shall notify the City of Renton Field Inspection Division (277 -5570) for inspection purposes, 24 hours before commencing work. No work shall be covered until it has been examined by the engineer. 8 All conduit shall be PVC Schedule 40 unless noted otherwise. 9 All conduit cover shall be 24 inches. , o ENCHMARK NE 1/4, S 1/4, JEV.T. TWi e23Nss RGE.5E.y W.M. CONDUCTOR CONSTRUCTION NOTES LEGEND �l Install new flat lens cobra head 1OOW HPS, 24OV, Medium Cutoff Type III BREAKER TYPE I JUNCTION BOX 2" (Schedule 40) Distribution on 25' Davit Pole with 6' arm. Also install WSDOT Type I ® TYPE 11 JUNCTION BOX 2" (Schedule 80) Junction Box (See Standard Pion J -11o) and pod foundation. Lighting 2 2" (Schedule 40) Install luminoire ¢--� LUMtNAtRE AND POLE 2" (Schedule 40) photocell on #2. ® SERVICE CABINET 3 Service Cables (3 - #2's) and Conduit (2' Schedule 40) shall connect from - -- CONDUIT 6' Service Cabinet to nearest Puget Energy power source_ A2 WIRE NOTE 4O Install Service Cabinet at Sta. 3 +14, 22t L \3J CONSTRUCTION NOTE 6' Remove existing luminaire. - - -- R.O.W. ®� y._ IN POWER POLE / ; -- 3 ELEV = 396.33�sbd /' 3 1 r c t I I I t I I i t I 18 1 I€ 1 i 3 5 2 4 13 12 CURB 3 +00 E-� 6 / #1 / O i a /a w d \ �. o m f z 0 e N w a � Z a wz F z z 4o 1 W 3 of to Qy Or a WIRING SCHEDULE RUN CONDUIT CONDUCTOR COMMENTS NO. SIZE BREAKER I BREAKER Al 2" (Schedule 40) 2 -¢f8 AWG (USE -XLP) Lighting J�Aq� 2 2" (Schedule 80) 2 -#8 AWG (USE -XLP) Lighting 2 2" (Schedule 40) 2 -- AWG (USE -XLP) 1 -#8 Bare Ground Ground Ground A 2" (Schedule 40) 2 - #8 AWG (USE -XLP) 3- 10 (USE -XLP) 1 -8 Bare Ground Lighting J Photocell Ground 3 2" 2" (Schedule 40) OPEN 2#8 AWG (USE -XLP) 3 -#10 (t)SE -XLP) Spore Lighting Photocell 10 0 10 20 SCALE IN FEET 1 \ ni 4 CURB - - - - - ; - ---- - - - - - - - ------ - - - - -- ` W } w `n } w y � ` J CONTACTOR CABINET SERVICE & MAIN BRANCH CONTACTOR COMMENTS CIRCUIT No_ BREAKER I BREAKER 1 21108 Service 100 amps — — SERVICE CABINET 2 21116 3 +22 it 0022 A- 1/240) — 15 amps 30 amps 3 POLE SCHEDULE - POLE NO. POLE I.D. IF POLE LOCATION POLE OFFSET MOUNTING HEIGHT ARM LENGTH CIRCUIT NO- COMMENT 1 21108 1 +50 15' LT 25' 6' A -1 2 21116 3 +22 32' LT 25' 6' A -1 3 21126 4 +57 22' RT 25' 6' A -1 4 21138 5 +73 65' LT 25' 6' A- i i SCANNED OCT - 81999 413. T- z73uer W, j 273�i e f SCANNED N0 -) 1998 T�