Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutzS-2766Set<1J O
� N
n
N
M
I�o
8 Y
v
_j
o
af U)
Q
O t
U�
z
Ld d
(f) ED
LLJ
fh
N
3
0
O
Q�L
Lf)�
LLJ
>
A
3
N
U)j �
°
0
_x
_0
Q
W
z
a�
�
- wo
a--
m o
s oZ °y
5 E
E- � nw
F+1 d
�E
_E
� O N
a�
s
n � "
W y��
Hs
z
0
- w
m
� o
i
0
� z
w w#b a 27 -,2?A$
CITY OF RENTON
THUNDER HILLS SANITARY-SEWER PIPELINE
ACCESS ROAD REPAIRS
NW1 /4 8c SW1 /4 SECTION 20, TOWNSHIP 23 NORTH, RANGE 5 EAST
V
l
L9
/14
US
i
Y O
Wu
\N T�
SIT LOCATION
1-405
- � -- _ APPROXIMATE LOCATION
Q
OF ACCESS ROAD AND
THUNDER HILLS STREAM
a r- _ C u ✓
X ,
` -r
krj
SCALE 1 " = 1000'
INDEX TO DRAWINGS
G1 COVER SHEET
G2 SYMBOLS AND ABBREVIATIONS
G3 GENERAL AND PROJECT NOTES
C1 STA 1 +00 TO STA 6 +50
C2 STA 6 +50 TO STA 12 +25
C3 STA 12 +25 TO STA 18 +00
C4 STA 18 +00 TO STA 24 +50
C5 MISCELLANEOUS DETAILS, SHEET 1
C6 MISCELLANEOUS DETAILS, SHEET 2
C7 MISCELLANEOUS DETAILS, SHEET 3
C8 MISCELLANEOUS DETAILS, SHEET 4
C9 WATERMAIN RELOCATION
S1 STRUCTURAL DETAILS AND NOTES
5- ?76b0/
I�
Gry
SCANNED SEP 13 2002
I
1�
+� V
I a
s
a
ABBREVIATIONS
Try o n w ��r�T T!+ ��T Tai AB ANCHOR BOLT ELL ELBOW MAINT MAINTENANCE RM ROOM
TOPOGRAPHIC & MISCELLANEOUS U 11LI 1 T S TIVIBOLS AC ASPHALTIC CONCRETE, ACRE EMBD EMBEDDED MAS MASONRY RP RADIUS POINT, REFERENCE POINT
I� N T ACP ASBESTOS CEMENT PIPE EMER EMERGENCY MAIL MATERIAL RPM REVOLUTIONS PER MINUTE
` AGG AGGREGATE ENGR ENGINEER MAX MAXIMUM RR RAILROAD
to _ - CENTERLINE ® EXISTING GAS METER
u AL ALUMINUM EQ EQUAL MB MAILBOX RT RIGHT
'a s
Vff ALT ALTERNATE EQUIP EQUIPMENT MCC MOTOR CONTROL CENTER R/W RIGHT OF WAY
-- PROPERTY LINE OR R/W 111 EXISTING GAS VALVE ALUM ALUMINUM EQUIV EQUIVALENT MCU MASTER CONTROL UNIT
N EASEMENT LINE o EXISTING UTILITY POLE ANC ANCHOR ESMT EASEMENT MECH MECHANICAL 5 SOUTH, SLOPE, SANITARY SEWER
---- - - - --- APPROX APPROXIMATELY) EST ESTIMATE MFG MANUFACTURED SCFM STANDARD CUBIC FEET PER MINUTE
LLJ APWA AMERICAN PUBLIC WORKS ASSOCIATION EVC END VERTICAL CURVE MFR MANUFACTURER SCH SCHEDULE
JN-1 ��� BREAK LINE .� EXISTING UTILITY POLE ANCHOR ASPH ASPHALT EW EACH WAY MG MILLION GALLONS SO STORM DRAIN
a
L,I W ASSY ASSEMBLY EXCL EXCLUDING MGD MILLION GALLONS PER DAY SE SOUTHEAST
>� (1 I~-j pJ EXISTING STRUCTURE �� STREET LIGHT ATB ASPHALT TREATED BASE EXIST EXISTING MG/L MILLIGRAMS PER LITER SEC SECOND
(n z AVAR AIR VACUUM & AIR RELEASE VALVE EXT EXTERIOR MGR MANAGER SECT SECTION
1-� PROPOSED STRUCTURE EXISTING TELEPHONE RISER
Z 0 AUTO AUTOMATIC MH MANHOLE SF SQUARE FEET
w O o - EXISTING FENCE D MAIL BOX AUX AUXILIARY F FAHRENHEIT, FACE, FAN MHHW MEAN HIGH HIGH WATER SHT SHEET
r AVE AVENUE FF FINISH FLOOR MI MILE SIM SIMILAR
Q z AWWA AMERICAN WATER WORKS ASSOCIATION FAB FABRICATE(D), FABRICATION MIC MONUMENT IN CASE SL SLOPE, SLEEVE
W w - >• --w-�- PROPOSED FENCE �g EXISTING RIP RAP F/F FACE TO FACE MIN MINIMUM, MINUTE SPEC SPECIFICATIONS
V) L W A A BF BUTTERFLY VALVE FH FIRE HYDRANT MISC MISCELLANEOUS SID SQUARE
�-- a� ��50� EXISTING CONTOUR LINE PROPOSED RIP RAP
m I- BLDG BUILDING FIN GR FINISHED GRADE MJ MECHANICAL JOINT SS STAINLESS STEEL., SANITARY SEWER
Q
< QO m W t5p -\ PROPOSED CONTOUR LINE �O EXISTING ROCKERY BLK BLOCK FL FLANGE, FLOWLJNE ML MEAN LO ST STREET
BM BEAM, BENCHMARK FM FORCE MAIN MLLW MEAN LOWER LOW WATER STA STATION
Q 80 BLOW OFF FO FIBER OPTIC MLW MEAN LOW WATER STD STANDARD
Z ¢ �� EXISTING SLOPE oO0 PROPOSED ROCKERY BOD BIOCHEMICAL OXYGEN DEMAND FPM FEET PER MINUTE MOC MIDDLE OF CURVE STL STEEL
(f) (f) EXISTING DITCH OR EDGE OF WATER IT EXISTING SIGN BOT BOTTOM FPS FEET PER SECOND MON MONUMENT STOR STORAGE
(10 g — "'— BRG BEARING FRP FIBERGLASS REINFORCED PIPE MPH MILES PER HOUR STRUCT STRUCTURAL
(n Ld J BRK BREAK FT FEET, FOOT MSL MEAN SEA LEVEL SUPERV SUPERVISOR
J 0 PROPOSED DITCH OR EDGE OF WATER T PROPOSED SIGN BST BITUMINOUS SURFACE TREATMENT FTG FOOTING SUPT SUPPORT
J U m N BTU BRITISH THERMAL UNIT FLIT FUTURE N NORTH SW SOUTHWEST
= Q OHT OVERHEAD TELEPHONE LINE TREE (CONIFER) BULKHDS BULKHEADS N/A NON APPLICABLE SY SQUARE YARD
U UGT UNDERGROUND TELEPHONE LINE EXISTING TREE (DECIDUOUS) G GUTTER, GAS NE NORTHEAST SYM SYMMETRICAL
L,J CB CATCH BASIN GA GAGE NEG NEGATIVE
C TO C CENTER TO CENTER GAL GALLON NIC NOT IN CONTRACT T TOP
IZ —OHTV— OVERHEAD N LINE 0- EXISTING YARD LIGHT CF CUBIC FEET GALV GALVANIZED NO NUMBER TAN TANGENT
:D CFH CUBIC FEET PER HOUR GO GUARD NS NOT SPECIFIED T & M TIME & MATERIALS
45.63 CFM CUBIC FEET PER MINUTE GEN GENERAL
S —UGN— UNDERGROUND N LINE /— SPOT ELEVATION AT POINT SHOWN TUTS NOT TO SCALE TB TOP OF BANK
~ CFS CUBIC FEET PER SECOND GIP GALVANIZED IRON PIPE NT WT NET WEIGHT TBM TEMPORARY BENCHMARK
—G— GAS LINE 45.63 SPOT ELEVATION AT DECIMAL POINT CI CAST IRON GL GLULAM NW NORTHWEST IC TOP OF CURB
OHP OVERHEAD POWER LINE TC45.63 TOP OF CURB ELEVATION CIP CAST IRON PIPE GPD GALLONS PER DAY TFR TRANSFORMER
CJ CONSTRUCTION JOINT GPM GALLONS PER MINUTE 02 OXYGEN THD'D THREADED
a G� GUTTER ELEVATION OC ON CENTERS THK THICK
n... CL CENTERLINE, CLASS GR GRADE, GRAVEL
ry a —UGP— UNDERGROUND POWER LINE CL2 CHLORINE GIRD GROUND OD OUTSIDE DIAMETER, OUTSIDE DIMENSION THRU THROUGH
EDGE OF TREES OR BRUSH CMP CORRUGATED METAL PIPE GRTG GRATING OH OVERHEAD, OVERHANG TOC TOP OF CONCRETE
EXISTING GUARDRAIL CMU CONCRETE MASONRY UNIT GV GATE VALVE OHP OVERHEAD POWER LINE TOP TOP OF PIPE
Q
3E NATURAL GROUND CO CLEANOUT GYP GYPSUM OPT OPTIONAL TRM TRANSMITTER
PROPOSED GUARDRAIL 0 CO2 CARBON DIOXIDE ORIG ORIGINAL TRN TRANSDUCER
9w CONCRETE COMB COMBINATION HDPE HIGH DENSITY POLYETHYLENE OZ OUNCE TYP TYPICAL
�a CONC CONCRETE, CONCENTRIC HH HAND HOLE TWP TOWNSHIP
WET AREA CONT CONTINUOUS HOR HORIZONTAL P POST, PER, POWER
E CONST CONSTRUCTION HP HIGH PRESSURE, HIGH POINT, HORSEPOWER PC POINT OF CURVATURE UBC UNIFORM BUILDING CODE
a CRIB CRIBBING HT HEIGHT PE PLAIN END UG UNDERGROUND
o E WATER SYMBOLS SANITARY /STORM SEWER SYMBOLS CS COMBINED SEWER HTR HEATER PERF PERFORATED UGP UNDERGROUND POWER LINE
-E CTR CENTER H/V HEATING AND VENTILATING PH PHASE UUD UTILITY LOCAL IMPROVEMENT DISTRICT
FJ CULV CULVERT HVAC HEATING, VENTILATING, AND AIR CONDITIONING PI POINT OF INTERSECTION U/P UTILITY POLE
—1N— EXISTING WATERLINE FM EXISTING FORCE MAIN CV CHECK VALVE HW HIGH WATER PK PEAK USGS UNITED STATES GEOLOGICAL SURVEY
o T CY /DAY CUBIC YARD PER DAY HWY HIGHWAY PL PROPERTY LINE
air PROPOSED WATERLINE PROPOSED FORCE MAIN CYL CYLINDER HYD HYDRANT PNEU PNEUMATIC VAR VARIES
HZ HERTZ (CYCLES PER SECOND) PP POWER POLE VC VERTICAL CURVE
C EXISTING CAP /PLUG S EXISTING SANITARY SEWER D DITCH PRES PRESSURE VCP VITRIFIED CLAY PIPE
=— DET DETAIL ID INSIDE DIAMETER PRV PRESSURE REGULATING VALVE VERT(S) VERTICAL(S)
L PROPOSED CAP /PLUG PROPOSED SANITARY SEWER DI DUCTILE IRON IE INVERT ELEVATION PS PUBLIC SEWER VF VERTICAL FOOT
CIA DIAMETER IN INCH PSF POUNDS PER SQUARE FOOT VOL VOLUME
EXISTING COUPLING SO EXISTING STORM DRAIN DIAG DIAGRAM INCL INCLUDING PSIA POUNDS PER SQUARE INCH ABSOLUTE VPI VERTICAL POINT OF INTERSECTION _
DIFF DIFFERENTIAL INSUL INSULATE(D), INSULATION PSIG POUNDS PER SQUARE INCH GAGE VSS VOLATILE SUSPENDED SOLIDS
u PROPOSED COUPLING PROPOSED STORM DRAIN DIM DIMENSION INV INVERT PT POINT, POINT OF TANGENCY
DIST DISTRICT IRRG IRRIGATION PUD PUBLIC UTILITY DISTRICT W WEST, WATER
EXISTING REDUCER CS EXISTING COMBINED SEWER DN DOWN PVC POLYVINYL CHLORIDE W/ WITH
DNR DEPARTMENT OF NATURAL RESOURCES K KIP (1,000 POUNDS) PM POINT OF VERTICAL INTERSECTION W/O WITHOUT
PROPOSED REDUCER o EXISTING SANITARY SEWER CLEAN OUT DR DRIVEWAY KV KILOVOLT PVT PAVEMENT WD WATER DISTRICT
DO DISSOLVED OXYGEN KVA KILOVOLT AMPERE WM WATER MAIN, WATER METER. WIRE MESH
PROPOSED THRUST BLOCK • PROPOSED SANITARY SEWER CLEAN OUT DWG(S) DRAWING(S) KW KILOWATT OTY QUANTITY WS WATER SURFACE
`-N WT WEIGHT
® EXISTING WATER METER O EXISTING SANITARY SEWER MANHOLE E EAST LB POUND(S) R RADIUS, RANGE WWF WELDED WIRE FABRIC
EA EXHAUST AIR, EACH LC LENGTH OF CURVE RAD RADIUS WWM WELDED WIRE MESH
® PROPOSED WATER METER PROPOSED SANITARY SEWER MANHOLE ECC ECCENTRIC LEV LEVEL RCP REINFORCED CONCRETE PIPE
EFF EFFLUENT LF LINEAL FOOT(FEET) RECEPT RECEPTIONIST YD YARD
Yy EXISTING FIRE HYDRANT ❑ EXISTING STORM DRAIN CATCH BASIN EL ELEVATION (ELEV) LIFT LEFT RECIRC RECIRCULATION YR YEAR
ELECT ELECTRICAL LG LONG RECP RECEPTACLE
w PROPOSED FIRE HYDRANT ■ PROPOSED STORM DRAIN CATCH BASIN LID LOCAL IMPROVEMENT DISTRICT RED REDUCE(R) # NUMBER, POUNDS
LS LUMP SUM REF REFERENCE & AND
a I EXISTING FLANGE JOINT REG REGULATOR
EXISTING STORM DRAIN CULVERT LT LEFT a AT
LTG LIGHTING REINF REINFORCED, REINFORCING 4 DIAMETER, PHASE
1 PROPOSED FLANGE JOINT >---t PROPOSED STORM DRAIN CULVERT LW LOW WATER REQ'D REQUIRED
RESIL RESILIENT
a 1 EXISTING MECHANICAL JOINT Q EXISTING STORM DRAIN MANHOLE RJ RESTRAINT JOINT �s 276602
1 PROPOSED MECHANICAL JOINT ® PROPOSED STORM DRAIN MANHOLE
w
I C EXISTING HUB OR PUSH —ON JOINT
°
( PROPOSED HUB OR PUSH -ON JOINT PROJECT RELATED SYMBOLS PROJECT RELATED NOTES SECTION & DETAIL NWABERING SYSTEM SURVEY SYMBOLS
m �° EXISTING AIR RELIEF VALVE NONE
PROPOSED AIR RELIEF VALVE (1) FOUND SECTION CORNER SET IRON PIPE /REBAR
SECTION CUT ON DRAWINGS (3) DETAILS ARE CROSS - REFERENCED
P EXISTING BLOWOFF IN A SIMILAR MANNER EXCEPT THAT 0.0.0 FOUND QUARTER CORNER & FOUNj) MONUMENT IN CASE
ACCESS ROAD SECTION LETTER DETAILS ARE IDENTIFIED BY NUMBER FOUND SIXTEENTH CORNER I& FOUND SURFACE MONUMENT
IIT PROPOSED BLOWOFF RESURFACING A RATHER THAN BY LETTER.
i f�7 EXISTING BUTTERFLY VALVE CB DRAWING NO. ON WHICH �Q� FOUND CLOSING CORNER FOUND /SET LEAD &TACK, PK NAIL
iiii SECTION APPEARS ■
lk PROPOSED BUTTERFLY VALVE FOUND MEANDER CORNER o FOUND /SET HUB W /TACK
0 4V EXISTING CHECK VALVE ® SOIL BORING O SECTION CENTER
RAISE ACCESS ROAD Tqx LOT NUMBER
�I PROPOSED CHECK VALVE O LL W S
it AND RESURFACE (2) LS�oF WASy�o
m EXISTING GATE VALVE ON DRAWING 15 THIS SECTION IS SHOWN NOTE: N OWNERSHIP TIE
SECTION & DETAIL NUMBERING �.� 0
N PROPOSED GATE VALVE SYSTEM MAY OR MAY NOT BE USED. ANGLE POINT '"
CROSS SECTION A BENCHMARK I � sW
0 EXISTING PLUG VALVE O
IN PROPOSED PLUG VALVE RECONSTRUUCTTION SCALE 1" = 1'-O° o C4 FOUND IRON PIPE/REBAR bz F `
� /ONAL E�
AND RESURFACING DRAWING NO. ON WHICH
SECTION WAS CUT. Exais[s �i /e /�ao2
DI CD1 612
SCANNED SEP 1 % iWe
LL 176 F R' ®
..
s
s
s
no
oN
O O EE
3Q
W 3a
H G_
c v
sE
_E
om
z >
3 Ywa
o
a �
GENERAL NOTES
1. ALL WORK SHALL CONFORM TO THE CITY OF RENTON ENGINEERING STANDARDS
AND THE PROJECT DOCUMENTS. CITY OF RENTON STANDARD PLAN DETAILS ARE
LOCATED WITHIN THE BOUND CONTRACT SPECIFICATIONS.
2, VERTICAL AND HORIZONTAL CONTROL IS CITY OF RENTON AS INDICATED ON THE PLANS.
1 UTILITY LOCATIONS SHOWN ARE APPROXIMATE AND ACTUAL LOCATIONS MAY VARY.
THE CONTRACTOR SHALL CALL THE "ONE CALL" CENTER AT 1- 800 - 424 -5555 FOR
UTILITY MARKING 48 HOURS IN ADVANCE OF ANY EXCAVATION.
4. UTILITY CROSSING LOCATIONS AND ELEVATIONS SHALL BE VERIFIED BY THE
CONTRACTOR IN ADVANCE OF CONSTRUCTION.
5. FILTER FABRIC FENCE MUST BE CONSTRUCTED PER THE CITY OF RENTON STANDARD
PLAN B066.
6. INSTALL ORANGE BARRIER FENCE AROUND ALL TREES TO BE SAVED OR PROTECTED
WITHIN AND ADJACENT TO THE WORK AREA. REMOVE ALL BARRIER FENCING UPON
COMPLETION.
7. THE HOURS OF WORK SHALL BE LIMITED TO 8:00 AM TO 5:00 PM ON WEEKDAYS
UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS
ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE DEPT.
OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPT,
AND 911 SHALL BE NOTIFIED BY THE CONTRACTOR 24 HOURS IN ADVANCE.
8. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE
AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
9. A COPY OF APPROVED PLANS AND SPECIFICATIONS MUST BE ON THE JOB SITE
WHENEVER CONSTRUCTION IS IN PROGRESS.
10. ASSIGNMENT OF CONTRACTOR'S RESPONSIBILITIES AND OBLIGATION FOR LOCATING,
PROTECTING AND REPAIRING DAMAGE TO EXISTING UNDERGROUND UTILITIES IS
SHOWN IN THE SPECIAL PROVISIONS PORTION OF THE CONTRACT SPECIFICATIONS.
11. ALL WORK IS SHOWN SCHEMATICALLY (I.E. ENOUGH DETAIL ON DRAWINGS TO SHOW
INTENT). ALL ITEMS WILL BE FIELD FIT BY THE CONTRACTOR TO MATCH INTO
EXISTING CONDITIONS.
12. THE CONTRACTOR SHALL PLACE ANY WASTE MATERIALS INCLUDING LOGS OR
ROOTWADS AS DIRECTED BY THE ENGINEER.
13. ALL FINISH GRADE ELEVATIONS SHALL BE REVIEWED AND APPROVED BY THE
ENGINEER.
14. THE CONTRACTOR SHALL PROVIDE SMOOTH ROAD TRANSITIONS TO AND FROM ALL
AREAS DESIGNATED TO BE RECONSTRUCTED OR RAISED.
15. CONTRACTOR SHALL USE A VACUUM STREET SWEEPER TO REMOVE DUST AND
DEBRIS FROM PAVEMENT AREAS. FLUSHING OF STREETS SHALL NOT BE
PERMITTED WITHOUT PRIOR APPROVAL FROM THE CITY.
16. CONTRACTOR TO PROVIDE A ONE (1) YEAR WARRANTY ON ALL WORK EXCEPT
FOR NEW PLANTINGS WHICH REQUIRE A TWO (2) YEAR WARRANTY. CONTRACTOR
TO COME BACK AFTER ONE YEAR AND REPLACE ALL ORIGINAL PLANTINGS THAT
DID NOT TAKE.
17. "THUNDER HILLS" STREAM IS ALSO KNOWN AS "ROLLING HILLS" STREAM.
"A",* - s%° ?71"
GENERAL WORK APPROACH
TEMPORARY EROSION AND SEDIMENTATION CONTROL (TESL)
1. TEMPORARY EROSION AND SEDIMENTATION FACILITIES WILL BE CONTRUCTED AND
IMPLEMENTED PRIOR TO ANY EXCAVATION. THESE FACILITIES MUST BE SATISFACTORILY
MAINTAINED UNTIL THE CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR
ON -SITE EROSION HAS PASSED.
2. TEMPORARY SEDIMENTATION COLLECTION FACILITIES MUST BE PROVIDED AND
MAINTAINED TO ENSURE THAT SEDIMENTATION OR OTHER HAZARDOUS MATERIALS
DO NOT ENTER THE WATERS OF THE ADJACENT STREAM. AS CONSTRUCTION
PROGRESSES AND UNEXPECTED SEASONAL CONDITIONALS DICTATE, MORE EROSION
CONTROL FACILITIES MAY BE REQUIRED TO ENSURE COMPLETE SILTATION
CONTROL ON THE PROJECT. DURING THE COURSE OF CONSTRUCTION, IT SHALL
BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS
ANY NEW CONDITIONS THAT MAY BE CREATED BY CONSTRUCTION ACTIVITIES AND
TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE THE MINIMUM REQUIREMENTS,
AS MAY BE NEEDED TO ENSURE COMPLIANCE.
ROAD REPAIR AND RESTORATION AREAS
1. INSTALL EROSION /SEDIMENTATION CONTROLS
2. CLEAR AND GRUB AREAS REQUIRING EXCAVATION. STOCKPILE ANY MATERIALS
DESIGNATED BY THE ENGINEER TO BE USED IN STREAM STABILIZATION WORK.
3. CONSTRUCT ROAD REPAIRS.
4. FINISH GRADE AND CLEANUP ALL CONSTRUCTED AREAS.
5. INSTALL PLANTINGS AND HYDROSEED ALL DISTURBED AREAS.
6. REMOVE SEDMENTATION CONTROLS.
STREAM RESTORATION AREAS
1. INSTALL AND MAINTAIN STREAM DIVERSION AROUND THE WORK AREA BY USING
SANDBAG DIKES WITH PUMPING, CULVERTS OR OTHER ACCEPTABLE MEANS
APPROVED BY THE ENGINEER. PUMPS AND DIVERSION PIPING TO BE SIZED TO
HANDLE NORMAL ANTICIPATED FLOWS.
2. CONSTRUCT STREAM ENHANCEMENTS AND NEW FACILITIES, MAINTAINING THE
SEPARATION OF THE WORK FROM THE STREAM FLOW.
3. REMOVE THE STREAM DIVERSIONS, AS APPROVED BY THE ENGINEER.
4. PLANT MATERIAL FOR LIVESTAKING WILL BE COLLECTED FROM THOSE AREAS
APPROVED BY THE ENGINEER.
5. INSTALL PLANTINGS AND JUTE MATTING AS SHOWN ON THE PLANS AND
AT DISTURBED AREAS
6. REMOVE SEDMENTATION CONTROLS.
1 :1 Miff f?rA
ak b
S-276603
SCNNNtu SEP 13 2UU1
s •
W.
t7pF WA 0
JtiF. 'yam
c
r ,1
0
18]00
/ F GIS�µF.p \�F.
SS /ONAL ENG
III E%PIRES 11/8/2002
I m
N
I � I, I M`1
N M
N
I
~
d
Z
� O
�Q N
O'j,
U z
h
o
w
W t___
^ S
2
1--� a
t
. �
I
Of 0
of
U)
O+ W
J
Z
a <
I
w
N z
Q
U) w
-JQ CD�
—0
�
m
�
a
a
�
C)
i
s
s
s
no
oN
O O EE
3Q
W 3a
H G_
c v
sE
_E
om
z >
3 Ywa
o
a �
GENERAL NOTES
1. ALL WORK SHALL CONFORM TO THE CITY OF RENTON ENGINEERING STANDARDS
AND THE PROJECT DOCUMENTS. CITY OF RENTON STANDARD PLAN DETAILS ARE
LOCATED WITHIN THE BOUND CONTRACT SPECIFICATIONS.
2, VERTICAL AND HORIZONTAL CONTROL IS CITY OF RENTON AS INDICATED ON THE PLANS.
1 UTILITY LOCATIONS SHOWN ARE APPROXIMATE AND ACTUAL LOCATIONS MAY VARY.
THE CONTRACTOR SHALL CALL THE "ONE CALL" CENTER AT 1- 800 - 424 -5555 FOR
UTILITY MARKING 48 HOURS IN ADVANCE OF ANY EXCAVATION.
4. UTILITY CROSSING LOCATIONS AND ELEVATIONS SHALL BE VERIFIED BY THE
CONTRACTOR IN ADVANCE OF CONSTRUCTION.
5. FILTER FABRIC FENCE MUST BE CONSTRUCTED PER THE CITY OF RENTON STANDARD
PLAN B066.
6. INSTALL ORANGE BARRIER FENCE AROUND ALL TREES TO BE SAVED OR PROTECTED
WITHIN AND ADJACENT TO THE WORK AREA. REMOVE ALL BARRIER FENCING UPON
COMPLETION.
7. THE HOURS OF WORK SHALL BE LIMITED TO 8:00 AM TO 5:00 PM ON WEEKDAYS
UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS
ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE DEPT.
OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPT,
AND 911 SHALL BE NOTIFIED BY THE CONTRACTOR 24 HOURS IN ADVANCE.
8. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE
AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
9. A COPY OF APPROVED PLANS AND SPECIFICATIONS MUST BE ON THE JOB SITE
WHENEVER CONSTRUCTION IS IN PROGRESS.
10. ASSIGNMENT OF CONTRACTOR'S RESPONSIBILITIES AND OBLIGATION FOR LOCATING,
PROTECTING AND REPAIRING DAMAGE TO EXISTING UNDERGROUND UTILITIES IS
SHOWN IN THE SPECIAL PROVISIONS PORTION OF THE CONTRACT SPECIFICATIONS.
11. ALL WORK IS SHOWN SCHEMATICALLY (I.E. ENOUGH DETAIL ON DRAWINGS TO SHOW
INTENT). ALL ITEMS WILL BE FIELD FIT BY THE CONTRACTOR TO MATCH INTO
EXISTING CONDITIONS.
12. THE CONTRACTOR SHALL PLACE ANY WASTE MATERIALS INCLUDING LOGS OR
ROOTWADS AS DIRECTED BY THE ENGINEER.
13. ALL FINISH GRADE ELEVATIONS SHALL BE REVIEWED AND APPROVED BY THE
ENGINEER.
14. THE CONTRACTOR SHALL PROVIDE SMOOTH ROAD TRANSITIONS TO AND FROM ALL
AREAS DESIGNATED TO BE RECONSTRUCTED OR RAISED.
15. CONTRACTOR SHALL USE A VACUUM STREET SWEEPER TO REMOVE DUST AND
DEBRIS FROM PAVEMENT AREAS. FLUSHING OF STREETS SHALL NOT BE
PERMITTED WITHOUT PRIOR APPROVAL FROM THE CITY.
16. CONTRACTOR TO PROVIDE A ONE (1) YEAR WARRANTY ON ALL WORK EXCEPT
FOR NEW PLANTINGS WHICH REQUIRE A TWO (2) YEAR WARRANTY. CONTRACTOR
TO COME BACK AFTER ONE YEAR AND REPLACE ALL ORIGINAL PLANTINGS THAT
DID NOT TAKE.
17. "THUNDER HILLS" STREAM IS ALSO KNOWN AS "ROLLING HILLS" STREAM.
"A",* - s%° ?71"
GENERAL WORK APPROACH
TEMPORARY EROSION AND SEDIMENTATION CONTROL (TESL)
1. TEMPORARY EROSION AND SEDIMENTATION FACILITIES WILL BE CONTRUCTED AND
IMPLEMENTED PRIOR TO ANY EXCAVATION. THESE FACILITIES MUST BE SATISFACTORILY
MAINTAINED UNTIL THE CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR
ON -SITE EROSION HAS PASSED.
2. TEMPORARY SEDIMENTATION COLLECTION FACILITIES MUST BE PROVIDED AND
MAINTAINED TO ENSURE THAT SEDIMENTATION OR OTHER HAZARDOUS MATERIALS
DO NOT ENTER THE WATERS OF THE ADJACENT STREAM. AS CONSTRUCTION
PROGRESSES AND UNEXPECTED SEASONAL CONDITIONALS DICTATE, MORE EROSION
CONTROL FACILITIES MAY BE REQUIRED TO ENSURE COMPLETE SILTATION
CONTROL ON THE PROJECT. DURING THE COURSE OF CONSTRUCTION, IT SHALL
BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS
ANY NEW CONDITIONS THAT MAY BE CREATED BY CONSTRUCTION ACTIVITIES AND
TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE THE MINIMUM REQUIREMENTS,
AS MAY BE NEEDED TO ENSURE COMPLIANCE.
ROAD REPAIR AND RESTORATION AREAS
1. INSTALL EROSION /SEDIMENTATION CONTROLS
2. CLEAR AND GRUB AREAS REQUIRING EXCAVATION. STOCKPILE ANY MATERIALS
DESIGNATED BY THE ENGINEER TO BE USED IN STREAM STABILIZATION WORK.
3. CONSTRUCT ROAD REPAIRS.
4. FINISH GRADE AND CLEANUP ALL CONSTRUCTED AREAS.
5. INSTALL PLANTINGS AND HYDROSEED ALL DISTURBED AREAS.
6. REMOVE SEDMENTATION CONTROLS.
STREAM RESTORATION AREAS
1. INSTALL AND MAINTAIN STREAM DIVERSION AROUND THE WORK AREA BY USING
SANDBAG DIKES WITH PUMPING, CULVERTS OR OTHER ACCEPTABLE MEANS
APPROVED BY THE ENGINEER. PUMPS AND DIVERSION PIPING TO BE SIZED TO
HANDLE NORMAL ANTICIPATED FLOWS.
2. CONSTRUCT STREAM ENHANCEMENTS AND NEW FACILITIES, MAINTAINING THE
SEPARATION OF THE WORK FROM THE STREAM FLOW.
3. REMOVE THE STREAM DIVERSIONS, AS APPROVED BY THE ENGINEER.
4. PLANT MATERIAL FOR LIVESTAKING WILL BE COLLECTED FROM THOSE AREAS
APPROVED BY THE ENGINEER.
5. INSTALL PLANTINGS AND JUTE MATTING AS SHOWN ON THE PLANS AND
AT DISTURBED AREAS
6. REMOVE SEDMENTATION CONTROLS.
1 :1 Miff f?rA
ak b
S-276603
SCNNNtu SEP 13 2UU1
s •
W.
t7pF WA 0
JtiF. 'yam
c
r ,1
0
18]00
/ F GIS�µF.p \�F.
SS /ONAL ENG
III E%PIRES 11/8/2002
ti
n,,A-
R LL 176 F R
CID, SCANNED SEP 13 2002
N
a
a°
oN
wz s=
O 3E
E- Q
E_
G �
O E
m
o�
O
II y�
�o
O _H
_II
i
� ^
N
BETWEEN STA 6 +65 AND STA 7 +30
S
�
INSTALL A 6 -8 FT HIGH STREAM SIDE
BETWEEN STA 8 +15 AND
ROCKERY WALL FOR ROADWAY WASHOUT
STA 8 +50 NARROW NEW
N 9'
REPAIR AND STREAM BANK
�
AV4
N
w
d
a Z
s
Ld
Q
L
+
"'
a
LL)
Q
z
A Q
`sj �
�
O
z Of
(D
F-
A
(f)
CD
a
U)
j U LLJ
�U
L0
c}O
F
t Q
Of
Q
cry
W
Z
a
a°
oN
wz s=
O 3E
E- Q
E_
G �
O E
m
o�
O
II y�
�o
O _H
_II
i
BETWEEN STA 6 +65 AND STA 7 +30
INSTALL A 6 -8 FT HIGH STREAM SIDE
BETWEEN STA 8 +15 AND
ROCKERY WALL FOR ROADWAY WASHOUT
STA 8 +50 NARROW NEW
N 9'
REPAIR AND STREAM BANK
ROADWAY SURFACE
IN WIDTH
+
\ RESTORATION AREA 1. SEE 4
C5
STA 8 +00, REPLACE 25 STA EXIST 6 "0 PVC
`Z +23, REPLACE
LF EXIST 4 "0 PERF PIPE
j STA 8 +54, INSTALL NEW TYPE 1 CB (ON GROUND SURFACE) DRAIN PIPE WITH 20 LF, 12 °0
WITH SOLID LOCKING COVER. CONNECT W/ 4 °0 NON -PERF ADS
CO
WITH TED POLYETHYLENE
_ EXIST 4" ADS AND REPLACE EXIST POLYETHYLENE PIPE. PIPE. MAI AIN 24" COVER AND
1110+20 4 "0 ADS UNDER ROAD WITH 18 LF OF CONNECT TO NEW CB 2% SLOPE N. INSTALL NEW 12 "0 CORRUGATED POLYETHYLENE PIPE, ROCK LINED I LET PER 3
BETWEEN STA AND STA 10 +55,
CUT BACK BA K ON EAST SIDE OF MAINTAIN 24" COVER AND 2% SLOPE CS
ACCESS ROAD REMOVE MAPLE STUMP MIN. PLACE 4 " -8" QUARRY SPALL
AT STA 10 +46 (EXIST CEDAR STUMP TO RIP RAP AT OUTLET PER 1 O
: -
REMAIN) AND PLACE ON THE LOW WESTERLY C8 0 f v Ent J_ 7 m
STREAM BAN, DOWNSTREAM OF 48" 0 -1 / PER- P,cE E ,,.w; } : l
=- CULVERT, JUTE MAT SLOPE
AND LLA
�-
m <�z mss; > > •
F LOp InJB h TACT:
U _ 77, 7
i
// 11 11 11 f TI'1 2; Vc •T - \ �\ \ _
FCC
a0'PLACE 4 ° -8" QUARRY
s s:. 4 SECU R TO -.
' SPALL RIP RAP AT �
zzs - �_ 42 / PER,/ 1 SLOPE PER 4
- T
', `C7
- - -- 1 - / C8
G a REMOVE SOIL BERM THIS
i EDGE NEW ROADWAY F E ? � — - i - - STA 8+00, INSTALL AREA AND RESURFACE ACCESS
SURFACE, TYP. e F - " -4- —_ — -i '� ROAD PER
NEW TYPE 1 CB WITH SOLID 1
BETWEEN STA 11 +60 AND 11 +90 STA 10 +50��_ STA 8 +30 LOCKING COVER AND 14 LF, C5
V� INSTALL A 10 -12 FT HIGH STREAMSIDE CULVERT REMOVAL AND UTILITY _ CULVERT REMOVAL AND 1T °0 CORRUGATED POLY-
INSTALL NEW SURFACING ON ETHYLENE PIPE. EXISTING PARKING LOT DRAIN PIPE
y ROCKERY WALL FOR ROADWAY AND WALKWAY BRIDGE, AREA B. EXISTING UTILITY ACCESS ROAD, UTILITY WALKWAY BRIDGE,
STREAM BANK STABILIZATION AREA 2. SEE 2 SEE AREA A. SEE 1 MAINTAIN 24° COVER AND TERMINATES THIS AREA_ MATCH PIPE
SEE 3 ! C6 C5 C6 g% QUARRY SPALL L RIP RAP WATER TIGHT OCOUPLING (SUBMIT SHOP
k C6 APPROXIMATE LOCATION FOR SETTING 0 OUTLET PER 1 DWG) AND EXTEND W/ ±50' NEW
CORRUGATED POLYETHYLENE PIPE
MAPLE STUMP REMOVED FROM EAST C8 WITH `WATER TIGHT JOINTS_
SIDE ACCESS ROAD. COORDINATE TERMINATE W/ QUARRY SPALL RIP RAP PER 1
FINAL LOCATION WITH ENGINEER.
C8
EXISTING PROFILE © UTILITY l _
............. .................. :..... ....:........ :....... .:.... ..............:... ....:...... .....- - - ---- -- --- - -- -- -- ---- - -- --- --
ACCESS ROADWAY 250
- - O
_ ---- --- ------ -- - -
240 Q
-
_ —
266
Ld
-
/TWIN 36"0 CONCRETE z
. ..- ,_: . ...... ....... ...:..... -- -- ----- ---------- ------ -.... --- ---- 5 (REMOVE
THUNDER HILLS AND DISPOSE OFFSITE) U
STREAM FLOWLINE
48'0 STEEL CULVERT Q
. ......... . .. .... . ..... (REMOVE AND DISPOSE.. ... _ .. ..... - _ .... _ _ . _ ... .
OFFSITE)
2io
200
I %
��G;
18]00
I
fP lu f pt s /aant '
ExaiRES tt /a /zooz
S -21766
SCANNL,) SEP 13 ZUOZ
B B
i
FR OSO
0 n— - J -,7 4� e, 6 SCANNED SEP 13 2002
I A
� N
N STA 18 +55 END ROADWAY
o RESURFACING ImPRO`JEm'E
g PER 1 O
(714 m C5 {
W ^ m a r
u N�/
dE :, rZ I;iE ^i` CLEAN OUT DEBRIS FROM END a o Dr
OF EXIST CULVERT. PLACE 4 " -8" F-
� O QUARRY SPALLS AROUND OUTLET sT iee.�8_°
ry H-- Q -' AND FOR 5 LF DOWNSTREAM _ 3
- W -1- U PER 1;' - s _ —>— i
cllj
rip, T7
af o -
Q Q O "E" ED 3A610rJ
< CD
(n (n O - ! '�•�'> °sE _' Asa =—� ri- c;}.• -� _ ' t sG /
0 00
x °F P` �• t, . i ,
" ��
1
5
—
Hub Al-
t
- -- - vi V i
e
+ H STA 22 +53, INSTALL NEW METAL \
SWING GATE. GATE TO OPEN TO {
E! THE NORTHWEST AND "AT REST"
WILL LAY PARALLEL TO ACCESS fJ
NO FDIELDVERS E FINAL LOCATION
C5 y
L) 124
a�
9
-----
dY•� --------------- - - ---- - .....- ........... .. .......................... - - _ -
S-2*76607
-n� - -- -------- -- ---------
180 .
. - - - -- ... ---- - - - -.. - ---- - - - -- - - - - - -- -----
N ACE
ROVEMENTS
M
- --
- -- 170 - - - - - - - - - - - O
x _
n a W a
a a ..... ....... .. ... . ..... .... - -. . . .... . . . . ..... - -. .. ... ....-- -- - --- -- ........ ...... ...... ........... .... --- .... -- _ . . - - 170 160 .1. 70 . _ .. _.. -- - ----
160 Q
LINE PIPE OUTLET FOR 5 LF W/
w 4 " -8° QUARRY SPALLS PLACED --
o TO 12" DEPTH, MIN. -- _ Ld
x
150 - Z
.............. .......
1sa
— 1so
m - THUNDER HILLS _
STREAM FLOWLINE
C-)
H
140
.. .......................... ... .... ................... ................------- .... -- - -.. .....................--- -..... ..... -..... .150 .. ......................... - - - - -- - - - --
Z....:.........:...................:.........:.......................................:.........:.........:.........:.........:.......................................:........ ......... .. :................ . .. -.
0
w �LLWS.
e7oo ,�
w IONA
............................... ................. __ CIS-
U _
24 +00 23 +00 22 +00 21 +00 19 +00 eariRCS „ /e /zaoz 18 +00
C- C C C C
C ��; 27Z,!>4 7 SCANNLU SEP 15 4LLc
ROLL 176 FR' "I
s
s
"1
21
N
N
�
1 1 n
�
MATERIAL, GRAVEL BARROW
SEE
o
"s
SEC. 9- 03.14(1)
WIDEN AND RESURFACE EXIST ACCESS
WEIRS TO BE DETERMINED IN THE
ROAD AS SHOWN ON PLANS
FIELD BY ENGINEER.
N
8' MIN - 10' MAX
6" 0 GATE POST
z
s VARIES VARIES
BACKSLOPE
STREAM RESTORATION NOTES ON
J�
w
a
{Yl o (VARIES) I
a z Z
a
cn
w �� - �
O p
m Z J FOR STREAMBANK
O
STREAM RELOCATION, AREA 1 4
SCALE 1" =
Q
W w
U �% 0 PROTECTION, SEE
Z =1z OTHER DETAILS
cn W p
A N o
3" 4 SCH 40 STEEL PIPE-
I cn
2i '"� 1% TYP 2
Q(f) :::) �-
�W ow
Ld 1,110
a
w Qae�1
Q U Z=
I„
� Q Q �
f _
0
-Q v
x�
of U-)
>a� EXISTING ACCESS ROADWAY SURFACE
w
MOW DOWN AND BRUSH BACK EXISTING
VEGETATION AND INSTALL 10" MIN
COMPACTED DEPTH (SHOULDER)
T
BALLAST MATERIAL CONFORMING TO
~
APWA /WSDOT SECTION 9- 03.9(2)
UTILITY ACCESS ROAD RESURFACING DETAIL i
�o
OZ
SCALE 3/8" = 1' -0"
O O�
E_ 3 a
E'tl W as
0
m
o�
a�
z >
3
o =
1116
DRAINAGE PIPE
(NEW OR EXISTING, i
SEE PLAN) / C
C)
0 o
-4- O _ D OOOO EXCAVATE INLET AREA,
- - - -10 ODOO �FLOWLINE AND PLACE GE
QUARRY SPALLS AS SHOWN
0
\0 O 5' MIN
QOO O
PLAN
2
I 1
S'
DRAIN PIPE
4 ° -8' QUARRY SPALLS
12" DEEP (MIN.)
SECTION AT FLOWLINE
NEW ROCK LINED INLET DETAIL
SCALE 3/8" = V -0" VA
wwD -J7 -276A
ROLL
ROADWAY SURFACE
PER(@
NEW ROADWAY FILL
C5
MATERIAL, GRAVEL BARROW
SEE
CONFORM W/ APWA /WSDOT
EDGE OF
SEC. 9- 03.14(1)
WASHOUT
WEIRS TO BE DETERMINED IN THE
FIELD BY ENGINEER.
INSTALL 3 RED REFLECTORS
W/ 1/4" GALV STEEL PLATES
WELDED OR BOLTED TO GATE
BARS. REFLECTORS TO FACE
VEHICLE ENTRANCE SIDE ONLY
CONCRETE CAP
6" 0 SCH 80
STEEL POST
I 1' -10"
6 "4 SCH 80 STEEL
POST FILLED W/ CONC,
TYP EACH SIDE
ff3"SCH 40 STEEL PIPE
WELDED STEEL HINGE FIXTURES W/ BOLT
THRU CENTER, THREE (3) EACH
EDGE OF EXISTING
ACCESS ROAD
STREAMSIDE ROCKERY
WALL. SEE 2
C7
EXIST. STREAM BANK /
DO NOT DISTURB
NEW
TOP CENTER, TYPICAL WELDED
SEE
NOTES:
EXACT LOCATION OF BOULDER
WELD 3/8" PLATE TO GATE POST
WEIRS TO BE DETERMINED IN THE
FIELD BY ENGINEER.
1" 0 x 4" LONG
FOR CONSTRUCTION SEQUENCE AND
6" 0 GATE POST
STREAM FLOW DIVERSIONS SEE
STREAM RESTORATION NOTES ON
SHEET G3.
ROAD WASHOUT
REPAIR —
STREAM RELOCATION, AREA 1 4
SCALE 1" =
10' -0" C2
3 "0"0/8" ANGLE IRON CUT
TO FIT W/ 1 1/2" HOLE THRU
TOP CENTER, TYPICAL WELDED
TO GATE
WELD 3/8" PLATE TO GATE POST
GATE
1" 0 x 4" LONG
6" 0 GATE POST
PIN W/ 1/2" HOLE
3/8" FROM BOTTOM
PADLOCK
FURNISHED
BY CITY
3" 4 SCH 40 STEEL PIPE-
13'-0"
TOP OF GATE TO BE LEVEL
3' -0" 1 3' -0" 3' -0"
1
f _
6"
GALVANIZED
� 1`
GALVANIZED
STEEL 1
GUSSET
SUPPORTS
5' -0" 3" MIN
EXISTING ROAD SURF ACE
18 "0 CONCRETE
FOOTING, TYP-,
NOTES:
GATE & POST CONSTRUCTION SHALL CONSIST OF HOT DIPPED
GALVANIZED STEEL PIPE. ALL CROSSBARS SHALL HAVE CONTINUOUS
FILLET WELD.
CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & PROVIDE SHOP
DRAWINGS OF GATE & POST ASSEMBLY (INCLUDING HINGE &
LATCH FIXTURES) FOR APPROVAL BY CITY REPRESENTATIVE
PRIOR TO CONSTRUCTION.
ALL METAL & WELD JOINTS ASSOCIATED W/ GATE & POST
ASSEMBLY SHALL BE HOT DIPPED GALVANIZED STEEL &
GALVANIZED STICK TREATMENTS FOR JOINTS.
NEW METAL SWING GATE DETAIL 2
SCALE 1/2- = 1 ' -0" VA
S- ?16608
C �,• = ='��$ SCANNED SEP 13 2002
L /SF'G2 ss °rug ENG
EXPIRES 11/8/2002
4w
s
N
V�
a
s
a
�
� N
N �
N
�
NEW BOULDER WEIRS
N
NEW 48" WIDE GLULAM
-'
w
_j
BRIDGE WITH PIPE SUPPORT
TO OW /0 EXCAVATION AT TOE OF SLOPE.
C7
U)
EXIST. STREAM GRADE
u t;E�
0 O!
Ld
Ld w
V z NEW STREAM GRADE I 15 BURIED BED
CONTROL ROCKS
w C)
A �' REMOVE CULVERT PIPES
7 ZZ�<1
Q w O
^ 33
w
<0
Q
SECTION A
Q Q
J
J
m SCALE 1" = 10' -0"
V) 0
= O cn
I
Li
Li
z
S
ROADWAY RESURFACE PER 1
o°
—EXIJI SS ',4H #50 C5
INSTALL FLAT SURFACED ROCKS
. -j-
FOR 6" HIGH "STEP —UP" LANDING EXIST. ROCKERY, REMOVE ROCK
°a
3Q
EDGE EXIST ACCESS ROAD AS REQ'D TO INSTALL NEW BRIDGE
ABUTMENT AND REUSE ON BANKS
W
NEW CB AND DRAIN OR STREAM BOTTOM
,E-, �a
Qi rno
PIPE. SEE PLAN S A 8+ 0
a
a
7 8 +2
_ y
\£
A +50
—
zf
__ -
T1
NEW EDGE OF
ACCESS ROAD
€
r
BURIED BED
CONTROL ROCKS
A
Z
REMOVE &SE
OF TWIN 36" 0 RCP NEW BOULDER WEIRS (SPACED
"moo
ag
CULVERTS 15' APART) AND "KEY" INTO
BANK. DOWNSTREAM WEIR
a
TO HAVE BURIED BED
INSTA L FINE MESH JUTE MATTING, CONTROL ROCKS, SEE(
FROM TOP OF BANK TO STREAM C8
HIGH WATER FLOWLINE, 3 LOCATIONS NEW 48" WIDE GLULAM
PLANT WILLOW, SALMONBERRY, AND BRIDGE WITH PIPE SUPPORTS,
RED —OSIER DOGWOOD FROM ON —SITE SEE
a
STOCKS, SEE 3 4 S1
MATCH WITH EXIST GROUND, TYP
a
NOTES:
a
IF THERE ARE NOT SUFFICIENT ON —SITE PLANT STOCKS AVAILABLE AND IF DIRECTED
BY THE ENGINEER, THE CONTRACTOR SHALL IMPORT, AT THEIR EXPENSE, ALL
o
NECESSARY PLANT MATERIALS.
r
FOR CONSTRUCTION SEQUENCING AND STREAM FLOW DIVERSIONS SEE STREAM
m
RESTORATION NOTES ON SHEET G3.
CULVERT REMOVAL /UTILITY WALKWAY
BRIDGE, AREA A 1
0
SCALE 1 " = 10'-0" C2
ww�p 2T °�76B
,v
3 -
ROADWAfY RESURFACE, SEE
CS 1
rCV.t& o
EL 236 _�_
INSTALL NEW 3' r'
HIGH ROCKERY 'J
TOE OF BANKt
INSTALL FINE MESH JUTE
MATTING FROM TOP OF
BANK TO TOP OF NEW
ROCKERY. PLANT WILLOW,
SALMONBERRY AND RED —OSIER
DOGWOOD ON BANKS FROM
ON —SITE STOCK_ SEE/-j'\,-`A
REMOVE MATERIAL THIS AREA, SEE PLAN
INSTALL TWO SETS FLAT SURFACED ROCKS
FOR "STEP —UP" LANDING, EACH LANDING
TO BE 6" HIGH MAX
REMOVE AND DISPOSE
OF EXIST. 48" STEEL
CULVERT PIPE
15' MIN.
INSTALL NEW 3' HIGH
r' ROCKERY 0 TOE OF BANK
PRIOR TO PLACING JUTE
MATTING AND PLANTINGS, TYP
NEW 48" WIDE GLULAM BRIDGE
WITH PIPE SUPPORT SEE(D
S1
MATCH WITH EXISTING GROUND, TYP
NOTES:
INSTALL NEW ROCKERY ON EAST BANK BETWEEN
STA 10 +36 AND STA 10 +70 AND ON WEST BANK
BETWEEN STA 10 +30 AND STA 10 +50.
MAINTAIN A MINIMUM STREAM CHANNEL WIDTH OF 5'.
INSTALL ROCKERY PER DETAIL 2
C7
REMOVE TREES AS NECESSARY ON WEST SIDE OF
STREAM TO INSTALL NEW WALKWAY BRIDGE.
FOR CONSTRUCTION SEQUENCING AND STREAM FLOW
DIVERSIONS SEE STREAM RESTORATION NOTES ON SHEET G3_
CULVERT REMOVAL /UTILITY
WALKWAY BRIDGE, AREA B 2
SCALE 1 ° = 10' -0" C2
ROADWAY RESURFACE PER � _
EDGE OF EXIST
ACCESS ROAD—
ROADWAY REPAIR AND STREAMBANK
STABILIZATION, AREA 2
ExRIRES 11/8/2002
SCALE 1" = 10' -0" C2
S -2
SCANNED SEP 13 WOZ
8
REMOVE VEGETATION AND INSTALL NEW ROCKERY
WALL ON EXIST SLOPE FOR STREAMBANK
-'
STABILIZATION- ROCKERY INSTALLATION SIMILAR
TO OW /0 EXCAVATION AT TOE OF SLOPE.
C7
ROADWAY REPAIR AND STREAMBANK
STABILIZATION, AREA 2
ExRIRES 11/8/2002
SCALE 1" = 10' -0" C2
S -2
SCANNED SEP 13 WOZ
8
N
-o
N
°
STA NEW
BOULDER DER WEIR.
SEE 2
REMOVE MAT'L, 00
NEW WALKWAY
BRIDGE
DOWNSTREAM
N
00
C Q of
/
z
J�
C8 REUSE ON -SITE i-
AS NEEDED
?
F GROUND PROFILE
N OVER EXIST 48" CMP
W
w
n
w
C
/
a o
_
f,
EDGE EXIST. ACCESS ROAD C5
LLI
Q F
cn
EL 198.0 _ _ 5 a
t_
EL 197.0
- - - - - - - - - - - - - - - - - - - - -
-- -- -- -
w D�
a
20' 20'
- -- - - - - - - - - - - - - - - - --
Q =)
w p w
O W
� p
-
RELOCATED 8" WATER, SEE 2
NEW BOULDER WEIR
BURIED BED CONTROL
ROCKS, SEE
Q O z =
TYPICAL, SEE
C9
C8
cn Q Q C-)
REMOVE AND DISPOSE
\
140 LF, EXIST. 48" 0
O
}Lj
w
CMP AND WINGWALL
Of
LONG x 4 FT. WIDE
WALKWAY BRIDGE, REMOVE AND DISPOSE
m
ENTRANCE
SECTION
e
�T
NEW. VERIFY EXIST DEPTH
SCALE: 1" = 10' -0"
® ®` _
NEW ACCESS ROADWAY SURFACE, SEE e
C5
12" MIN SEE DETAIL 3 FOR ROCKERY PLANTINGS
2 -MAN ROCKS
BACKFILL WITH GRAVEL BORROW \� 1
MEETING APWA /WSDOT SEC. 9- 03.14(1) �3
2 " -4" QUARRY SPALLS EXIST STREAM BED
(1' MIN THICKNESS BEHIND ROCKERY)
BOTTOM TWO LAYERS
TO BE 3 -MAN ROCKS
EXISTING SUBGRADE 2' MIN
12" TYP.
NOTES:
EXCAVATION UMIT
ROCKERY HEIGHTS ARE NOTED ON THE PLANS.
BASE ROCKS SHOULD BE DROP SEATED INTO
QUARRY SPALLS.
UNLESS OTHERWISE NOTED MINIMUM ROCK SIZES
ARE TO HAVE AN AVERAGE DIMENSION OF 18 " -28 ".
STREAMSIDE ROCKERY WALL 2
NTS A
NOTE:
PIPE RESTRAINTS TO BE
PLACED PERPENDICULAR
TO EXISTING GRADE
CORRUGATED
POLYETHYLENE PIPE
WITH WATER TIGHT JOINTS
MATCH DIAMETER RUBBER HOSE FOR
OF EXIST PIPE -- ENCAPSULATION
EXISTING GRADE
z
NO. 4 HOOK REBAR
FOR RESTRAINT, 10
FT ON CENTER
M
�w
w
ABOVE GRADE PIPE
RESTRAINT SYSTEM 4
NTS C2
5
e cisr� -O��
s
ILt ez s�oru,� �
E%PIRES 11/8/2W2
SCANNEU SEP 131062
a �
C Q of
/
o
a
�_
E
\£--
-
/
7s
bo NEW ROADWAY SURFACE PERe
_
f,
EDGE EXIST. ACCESS ROAD C5
t_
- - - - - - - - - - - - - - - - - - - - -
-- -- -- -
- -- - - - - - - - - - - - - - - - --
i STA 15 +60 INST
NEW BOULDER WEIR
TYPICAL, SEE
\
TOP & OT E OF
INSTALL NEW 15 FT. EXIST. STREAM, TYPICAL
w
a
°
LONG x 4 FT. WIDE
WALKWAY BRIDGE, REMOVE AND DISPOSE
m
MATCH W/ GROUND EXISTING 48" 0. CMP �-
BOTH SIDES, SEE 1 CULVERT AND WINGWALL
REPLACE EXIST. 8" WM WITH
NEW. VERIFY EXIST DEPTH
AND LOCATION PRIOR TO NEW
CONSTRUCTION, SEE 2
C9
, i
� NOTES:
�
z
,
INSTALL FINE MESH JUTE MATTING ON ALL DISTURBED
-
AREAS (EXCEPT PATHWAY), PLANT WILLOW, SALMONBERRY,
AND RED -OSIER DOGWOOD, SEE 3 4
Crj C8
/ /
FOR CONSTRUCTION SEQUENCE AND STREAM FLOW DIVERSIONS
o
SEE STREAM RESTORATION NOTES ON SHEET G3.
3
CULVERT REMOVAL NEW PEDESTRIAN BRIDGE, AREA C i
SCALE: 1" = 10' -0" C3
i
® ®` _
NEW ACCESS ROADWAY SURFACE, SEE e
C5
12" MIN SEE DETAIL 3 FOR ROCKERY PLANTINGS
2 -MAN ROCKS
BACKFILL WITH GRAVEL BORROW \� 1
MEETING APWA /WSDOT SEC. 9- 03.14(1) �3
2 " -4" QUARRY SPALLS EXIST STREAM BED
(1' MIN THICKNESS BEHIND ROCKERY)
BOTTOM TWO LAYERS
TO BE 3 -MAN ROCKS
EXISTING SUBGRADE 2' MIN
12" TYP.
NOTES:
EXCAVATION UMIT
ROCKERY HEIGHTS ARE NOTED ON THE PLANS.
BASE ROCKS SHOULD BE DROP SEATED INTO
QUARRY SPALLS.
UNLESS OTHERWISE NOTED MINIMUM ROCK SIZES
ARE TO HAVE AN AVERAGE DIMENSION OF 18 " -28 ".
STREAMSIDE ROCKERY WALL 2
NTS A
NOTE:
PIPE RESTRAINTS TO BE
PLACED PERPENDICULAR
TO EXISTING GRADE
CORRUGATED
POLYETHYLENE PIPE
WITH WATER TIGHT JOINTS
MATCH DIAMETER RUBBER HOSE FOR
OF EXIST PIPE -- ENCAPSULATION
EXISTING GRADE
z
NO. 4 HOOK REBAR
FOR RESTRAINT, 10
FT ON CENTER
M
�w
w
ABOVE GRADE PIPE
RESTRAINT SYSTEM 4
NTS C2
5
e cisr� -O��
s
ILt ez s�oru,� �
E%PIRES 11/8/2W2
SCANNEU SEP 131062
a �
N
t0 N
N 1�
� i
N
I
�
Ld
py
o
a
ra O
_
li � J
w
Q
O
U z
LJ
� w
(f) w o
Q�
of
Q0
~w Ow
p
z - z=
vi Q Q cn
J
QI m
N Q
x
o U-,
w
n
z
Qo
mo
a .-
r� z N
°°
s=
Ey 3 ¢
W 3a
r-. a
� o
3 E
C�
o�
�7
z T ?o
o i Wa
FINE MESH JUTE MATTING MEETING
APWA /WSDOT SEC.9 -14.5 (1)
SECURED PER MANUFACTURER'S
RECOMMENDATIONS ---_
1
3F
\-LIVE STAKES
SEE 4
y 2 ca
)
EXISTING STREAMBANK
LIVE STAKES
SEE
C8
ROCKERY PLANTINGS & JUTE MATTING DETAIL 3
NTS VA
- w
i
° wwp_s� -1746
EXISTING
GROUND
CONNECT EXISTING OR NEW
4" 0 ADS TO NEW CB,
MATCH CROWNS, TYP.
\ NEW ACCESS ROADWAY
SURFACE, SEE PLANS i
REMOVE PORTION OF STAKE IF
DAMAGED DURING PLACEMENT.
STAKE SHOULD NOT PROTRUDE
MORE THAN 6" AFTER
INSTALLATION. STAKE 24" LENGTH
(WILLOW AT MIN 3/4" 0)
(DOGWOOD AT 1/2" 0)
DRIVE STAKES TO
18" MIN DEPTH 6,,
T%A
NATIVE SOIL
LIVE STAKES 4
NTS
NOTES:
INSTALL 12" CPEP 18" ABOVE INVERT
OF TYPE I CATCH BASIN.
TOTAL DEPTH OF TYPE I CATCH BASIN
IS 3' -6 ".
4 " -8" QUARRY SPALLS FROM
1 FT ABOVE TO 5 FT BELOW
PIPE OUTLET.
/ HIGH WATER SURFACE--\
\-12" CPEP, 24" MIN COVER
S = 2% MIN (LENGTH AS
NEW TYPE I CATCH BASIN, SHOWN ON PLANS)
STANDARD PLAN B012
WITH SOLID LOCKING COVER
CITY OF RENTON STD PLAN 8020
— — — — — —1
NEW CROSS CULVERT AND CATCH BASIN
NTS C2
17 6
1/4" - 3" ROUND ROCK LOW FLOW NOTCH BOULDER,
30" MIN DIA
FOUNDATION BOULDERS
SAME SIZE AS WEIR
= KEY INTO BOULDERS
STREAMBANK, TYP WEIR BOULDER
AVERAGE DIMENSION
18 " -28 ", KEY TOGETHER
z INTO ARCH SHAPE SHOWN.
a x PLUNGE
a POOL p C
BURIED BED
CONTROL ROCKS.
INSTALL ON DOWNSTREAM
BOULDER WEIR ONLY, SEDGE OF
UNLESS OTHERWISE SHOWN STREAM CHANNEL
PLAN
30"
2' MIN
TYPICAL
REV- tGETATE
DISTURBED
STREAMBANKS
3' DEEP LOW
FLOW NOTCH FOUNDATION
BOULDERS
SECTION C
4 Alp IVA" os PLUNGE POOL,
t 4v VSw UNLESS OTHERWISE
SHOWN, ONE
CHANNEL WIDTH WEIR BOULDER
(5' MIN)
6" ROUND ROCK
1' DEEP, MIN 2' MIN
BURIED BED CONTROL - -- ----------- - - - - -- - Q --
ROCKS 12 " -18" AV" Dl' - - -Q -- --
1/2 WEIR BOULDER DIA
INSTALL FOUNDATION BOULDERS SEAL UPSTREAM SIDE
IN FRONT OF AND BEHIND MAIN OF WEIR WITH 1/4"
WEIR BOULDERS, TYPICAL 3- ROUND ROCK
PROFILE
BOULDER WEIR DETAIL 2
NTS VA
_e
FtGISZf
4 �2,IOZ SS/ONAL
EXPIRES 11/8 /2002
L` 10 ; J�� a2dd a /zl' SCANNED SEP 13 2002
® r
�
� N
N
a e �
�
w
z
W
-3:
Ld
a z
e
ry z
o
O O
w
O w-
0!�
~(f)
til
Q� z
U
0 A
Q
= O Q
Of
h
a
a
z
�F
n.-
�a
o;
wz
s=
p p of
3Q
-� Ev �
s
E
C
ov
rn
REPLACE 60 LF W/ NEW TO BE REMOVED
8" 0 WATERMAIN TO
NEW DEPTHS, SEE 2 =
C1 C9 NEW CASING
Gi REMOVE EXISTING
(� 8" 22 1/2• VERT BEND
© (MJxMJ) CONC BLOCKING o REMOVE EXISTING
`= AND CONNECT NEW 8" DI 8° 22 1/2- VERT BEND
L -- -_- -- - - { (MJxMJ) CONC BLOCKING AND CONNECT NEW 8 D I
iS1 - -- - - - -- - --
-- - --
- - - - - - - - - - - - - - - - - - - - -----------
.� ------ - - - - --
NEW DEAD —MAN ANCHOR WITH SHACKLES, TYP
2 — 8" 22 1/2
VERTICAL BENDS (RJ x MJ)
WATERLINE RELOCATION PLAN VIEW
SCALE: 1" = 20' -0"
LENGTH = ±60'
�a
±17' 10' 6' 10' ±1 7'
TYP.
NEW ROCKERY EXIST GROUND PROFILE
z It WALL, INSTALL OVER WATERMAIN
° €s REMOVE AND INSTALL \ NEW STREAM CHANNEL PER 2
8" LONG BODY SLEEVE MJ
( ) FLOWLINE ELEV 197.5 �
REMOVE AND a
NEW CONCRETE DEAD—MAN - -= t SALVAGE TO CITY i
j ANCHOR, SEE DETAIL _ - -- - -- - - --
- o - -- - -- - - - -- — — — --------------- - --
THIS SHEET
ELEV 196.5 NEW 8 "— 22 1/2°
2' MIN VERT. BEND ( RJxMJ) p\
s I $
- - - - -- - -- -- - - -- - - -- - -- - -- -
a NEW 8 " -22 1/2° �\ \
VERT- BEND (MJxRJ)-------
4 26 LF NEW 18" O.D. x 0.375"
0
STEEL CASING W/ CENTERED REMOVE EXIST 48" CMP
} AND RESTRAINED CASING
m SPACERS & WRAP — AROUND
NOTE:
ALL NEW 8 "0 DI EXPOSED TO
o "EARTH" TO BE WRAPPED (ENCASED)
IN POLYETHYLENE PER CITY STANDARDS.
w
Ww/> -2.7 -3766
5411627"Oot
NEW CONCRETE DEAD —MAN ANCHOR
a SEE DETAIL, THIS SHEET
-
i
EXISTING 8 "0 PIPE
Of
U
D � C
M
T-
4 - 3/4° SHACKLE RODS
NOTES:
PLACE CONCRETE AGAINST UNDISTURBED EARTH, BOTH FACES
CLASS 5 1/2 SACK CONCRETE 3000 PSI MIN
PLAN VIEW
NTS
#4 REBAR 12" O.C" EACH
WAY, CENTER IN CONCRETE I
3° COVER TYP,
0
O D p
EXIST 8 "0 PIPE
4 — 3/4" SHACKLE RODS BETWEEN 6
DEAD —MAN ANCHOR AND NEW
22 1/2° BEND, TYP BOTH SIDES TYPICAL CONCRETE DEAD —MAN ANCHOR
CONSTRUCTION SEQUENCING NOTES NTS
1/8 THICK SYNTHETIC t 32 LF — 8" DI, CLASS 52, RESTRAINED JT. PIPE
RUBBER END SEAL, EQUAL W/ 3 CASING SPACERS PER PIPE SECTION, TYP. CONSTRUCTION SEQUENCE AND STREAM FLOW DIVERSIONS PER STREAM RESTORATION NOTES ON SHEET G3.
TO CASCADE END SEALS,
TYPICAL BOTH ENDS
SECTION 2
SCALE: 1 " = 5' -0"
To -m.'
COORDINATE ALL CONSTRUCTION, CONNECTIONS AND TESTING WITH THE CITY OF RENTON. ALL VALVE
OPERATIONS AND WATER SHUT DOWNS TO BE PERFORMED BY THE CITY ONLY.
PROVIDE CONSTRUCTION FENCING AROUND ALL EXCAVATIONS.
INSTALL DEAD —MAN ANCHOR BLOCKS ON EXISTING 8" WATERLINE AND SHACKLE ROD STUB OUTS. ALLOW 3 —DAY
CURING TIME FOR CONCRETE.
REMOVE EXISTING BENDS AND INSTALL 2 -8" (MJ) END CAPS AND SHACKLE TO DEAD —MAN ANCHOR BLOCKS,
REMOVE SECTION OF EXISTING WATERMAIN.
INSTALL NEW 8" DI PIPE IN STEEL CASING, VERTICAL BENDS, FITTINGS, SHACKLE RODS, TEMPORARY CAPS,
BLOWOFFS, AND BLOCKING.
PRESSURE TEST NEW PIPE, FLUSH, DISINFECT, AND OBTAIN PURITY TESTS.
REMOVE TEMPORARY END CAPS AND CONNECT EXISTING WATERLINE. FwT
SCANNED SEP 13 ZOOZ
I N L
y, o
E%PIRES 11/8/2002
I
`4
I c°�I
m N
^ M
V-6
N
\
1
4°
N
o
U
� 4
cV
a
a
/'�
V 1 L
w
z
w
N
Z s
14 Q�
W
to
D �
CD EL
ZO
w
p r
U)
°
N
wQ °
U) w
U z
�Q
0 W
O LLj
QIr o
p
m
U)
J
v Of
= Q E-
°
C�
a
o Of
a
ao
mo
ow
OO 0
a
[~E-
W 0- a
o
c
a �
�E
om
a�
�o 0
x
z
�N,
N
\
1
4°
N
o
U
� 4
a
a
w
a
�
m
0
3
3
CONT 4 "x6" BULL RAIL
4 "x6"x1'4" SCUPPER BLK Q 8' MAX. SECURE
W/ (2) 5/8"x12" LAG BOLTS @ 8" EA BLK
PATHWAY
f 1' -6" 1 t 1' -6"
8.75"x48" GLULAM W/ WOOD
3/4" MUSH OOM CLEATS OR EQUIV. TRACTION
HEAD BOLT SURFACING Q 4" O.C. SPACING
I
NOTE:
ACTUAL LOCATION OF BRIDGE ABUTMENTS TO
BE DETERMINED IN THE FIELD BY ENGINEER.
MAXIMUM ABUTMENT SPACING TO BE 25'.
r
F-
N L2.5x2.5x3/16" BRACE
4�6TO 5/8 "0x6" LAG BOLT
GLULAM
EXIST. 8" 0 SEWER LINE, SUSPEND FROM
GL W/ B -LINE B3100 -8 CLEVIS HANGER OR
EQUIV. PROVIDE B310OPS OVER X -BOLT.
SPACE HANGERS AT 10' MAX.
SECTION AT CREEK CROSSING
SCALE: 1" = 1' -0"
r
6" TYP
INSTALL FLAT SURFACED ROCKS
FOR "STEP -UP ". SEE PLANS. -
6"
3' -0"
6"
PIN PILE 2" DIA
2, -0" SCH 80 PIPE, TYP
GL 8.75
1 1/2"
2"
2„
2" DIA SCH 80 PIPE
±15' EMBEDMENT BEARING PLATE 3/8"
ASSUMED, FIELD VERIFY `1 PIPE 1.5 "Ox5"
SLEEVE, TYP.
SECTION AT ABUTMENT
vvwP.27- 17"
SCALE: 1" = 1' -0"
BULL RAIL BEYOND
GL DECK, MATCH
W/ SLOPE OF PIPE
8 "x8" TIMBER CAP
EXIST SEWER LINE BETWEEN PILES
TRANS SECTION AT ABUTMENT
SCALE: 1" = V -0"
/3/16 V
PLATE 1/4" EA SIDE, SECURE
W/ (2) 5/8" BOLTS
8 "x8" CAP W/ (2)
5/8" MUSHROOM
HEAD BOLTS, TYP.
3/16
BRIDGE AND ABUTMENT DETAIL
SCALE = AS SHOWN VA
STRUCTURAL NOTES
A. GENERAL
Al. AS -BUILT VERIFICATION
CONTRACT DOCUMENTS THAT DESCRIBE EXISTING CONDITIONS ARE BASED ON FIELD
OBSERVATIONS BY OTHERS AND ARE NOT BASED ON EXTENSIVE FIELD MEASUREMENTS,
OPENING OF CONCEALED CONDITIONS OR EXCAVATION OF BURIED ITEMS. THE STRUCTURAL
ENGINEER OF RECORD DOES NOT WARRANT THEM TO BE WITHOUT ERROR. THESE PORTIONS
OF THE DRAWINGS ARE INTENDED AS A GUIDE TO THE CONTRACTOR WHO SHALL VERIFY
ACTUAL CONDITIONS AT THE JOB SITE.
A2. DIMENSIONS
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS, BOTH FOR THIS WORK
AND FOR ALL EXISTING CONDITIONS WHICH EFFECT THIS WORK, PRIOR TO THE START OF
WORK AND IT SHALL BE HIS RESPONSIBILITY TO IMMEDIATELY NOTIFY THE STRUCTURAL
ENGINEER OF RECORD SHOULD ANY DISCREPANCIES EXIST.
A3. ERECTION BRACING
THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ADEQUATE ERECTION BRACING AS
REQUIRED FOR STABILITY OF THE STRUCTURE AND ITS STRUCTURAL COMPONENTS DURING
ALL PHASES OF CONSTRUCTION.
A4. SHOP DRAWINGS
SHOP DRAWINGS (2 SETS OF PRINTS) SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER
OF RECORD FOR REVIEW AFTER THE CONTRACTOR HAS REVIEWED AND STAMPED SAME FOR
COMPLIANCE AND PRIOR TO FABRICATION FOR THE FOLLOWING ITEMS:
1. STRUCTURAL STEEL
2. GLUED - LAMINATED TIMBER
3. DECK TRACTION SURFACING
A5. SPECIAL INSPECTIONS
IN ADDITION TO THE INSPECTIONS REQUIRED BY SECTION 108 OF THE UBC, THE OWNER OR
OWNER'S AGENT SHALL EMPLOY ONE OR MORE SPECIAL INSPECTORS WHO SHALL PROVIDE
INSPECTIONS DURING CONSTRUCTION ON THE FOLLOWING WORK:
1. PIPE PILE INSTALLATION: THE PROJECT GEOTECHNICAL ENGINEER OF RECORD
SHALL MONITOR AND APPROVE THE INSTALLATION OF ALL PIPE PILES.
2_ STRUCTURAL WELDING: PERIODIC SPECIAL INSPECTIONS SHALL BE PROVIDED FOR
ALL SINGLE -PASS FILLET WELDS.
B_ STRUCTURAL DESIGN
81_ BUILDING CODE:
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 1997 EDITION OT THE UNIFORM
BUILDING CODE (UBC) AS AMENDED AND ADOPTED BY THE CITY OF RENTON.
B2. DESIGN LOADS
DECK LIVE LOAD 1100PSF 5'i 7 "00
PIPE PILE VERTICAL CAPACITY 4 KIPS
B3. FOUNDATIONS
PILE INSTALLATION SHALL BE AS SPECIFIED IN THE PIN PILE RECOMMENDATIONS PREPARED
BY ZIPPER ZEMAN ASSOCIATES, INC_, DATED MARCH 13, 2000_
C_ STRUCTURAL STEEL
Cl. APPLICABLE CODES
STEEL CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE AISC MANUAL OF
STEEL CONSTRUCTION, 9TH EDITION_ WELDING SHALL BE IN ACCORDANCE WITH AWS DLL
C2. MATERIALS
W SHAPES, CHANNELS, ANGLES, BARS, AND PLATES: ASTM A36, FY = 36,000 PSI
STEEL PIPE PILES: ASTM A53, GRADE B
BOLT: ASTM A307, MUSHROOM HEAD WHERE NOTED
WELDING ELECTRODES: E70XX. ALL WELDING SHALL BE PERFORMED BY AWS AND WABO
CERTIFIED WELDERS_
C3_ HOT -DIP GALVANIZING
ALL STRUCTURAL STEEL SHALL BE HOT - DIPPED GALVANIZED AFTER FABRICATION.
D. TIMBER
D1_ APPLICABLE CODES
TIMBER CONSTRUCTION SHAT! CONFORM TO THE REQUIREMENTS OF CHAPTER 23 OF THE
UNIFORM BUILDING CODE_
D2. MATERIALS
1. LUMBER: DOUGLAS FIR #2, EXCEPT 8X MEMBERS SHALL BE DOUGLAS FIR #1.
PRESSURE TREAT PER AWPA C2_ TREATMENT SHALL COMPLY WITH WWPI'S
BEST MANAGEMENT PRACTICES FOR USE OF TREATED TIMBER IN AQUATIC
ENVIRONMENTS. ALL SAWN LUMBER SHALL BE GRADED AND MARKED IN
CONFORMANCE NTH WCLIB STANDARD GRADING RULES FOR WEST COAST
LUMBER NO.16, LATEST EDITION_
2. GLUED - LAMINATED TIMBER: DECKING SHALL BE DOUGLAS FIR GRADE L7,
PRESERVATIVE TREATMENT FOR SOIL CONTACT PER AITC 109 WITH WET USE
ADHESIVES PER ANSI /AITC A190.1 EACH MEMBER SHALL BEAR AN AITC
IDENTIFICATION MARK AND SHALL BE ACCOMPANIED BY AN AITC
CERTIFICATE OF CONFORMANCE.
3. FIELD TREATMENT: ONE GALLON OF COPPER NAPTHENATE (2% SOLUTION)
SHALL BE FURNISHED FOR FIELD TREATING WOOD. ALL ABRASIONS AND
CUTS MADE IN THE FIELD SHALL BE GIVEN 3 BRUSH COATS OF THE FIELD
TREATMENT SOLUTION. HOLES DRILLED W THE FIELD SHALL BE POURED
FULL OF PRESERVATIVE.
E. PIPE HANGERS
E1. PIPE HANGERS IDENTIFIED BY CATALOG NUMBER AS MANUFACTURED BY B -LINE
SYSTEMS, INC. REFER TO CATALOG 25198. PROVIDE HOT- DIPPED GALVANIZED
FINISH. EQUIVALENT DEVISES BY OTHER MANUFACTURERS MAY BE SUBSTITUTED
PROVIDED EQUIVALENCE CAN BE DEMONSTRATED TO THE ENGINEER OF RECORD.
FR 057
SCANNED SEP 13 ZOOZ
I p
EXPIRES 11/26/02
S!
g
9
FYI a
P w
Fyn
Z o 0
Iii/ z
0 1
n
g
8
a°
o°
® Q `oE
E-
>-4
H �a
w
•� O
E
\°S4
om
a�
g
r
Z
0
In
al
rr
wrvvP -a7— t�43
SCALE 1" = 1000'
,ATION ow
APPROXIMATE LOCATION
OF ACCESS ROAD AND
THUNDER HILLS STREAM
Em
S -? E
INDEX TO DRAWINGS
G1 COVER SHEET
G2 SYMBOLS AND ABBREVIATIONS
G3 GENERAL AND PROJECT NOTES
Cl STA 1 +00 TO STA 6 +50
C2 STA 6 +50 TO STA 12 +25
C3 STA 12 +25 TO STA 18 +00
C4 STA 18 +00 TO STA 24 +50
C5 MISCELLANEOUS DETAILS, SHEET 1
C6 MISCELLANEOUS DETAILS, SHEET 2
C7 MISCELLANEOUS DETAILS, SHEET 3
C8 MISCELLANEOUS DETAILS, SHEET 4
C9 WATERMAIN RELOCATION
S1 STRUCTURAL DETAILS AND NOTES
RECORD DRAWING
N
c�F� y Sro
BASED ON NFO W71OH COMPMEO
I
FROM THE 9WIRWFOR AND O7HM
�
BY
DATE
r
/arses'
U NIG510NE & ASSOCIATES. INC.
C7NIG ENS
N
4010 STONE WAY NORTH
SEA771E. WASHINFON =03
��
z
7
a z
C
G
1
ao
SCANNED MAR 9 8 2903
Of U)
W
O
( , u
Q
Wd
W
�
W
�/ z
VN
�
0o
<o
N
z�
z �$
o W
Q�
w
In N
W
= U
Q
a°
o°
® Q `oE
E-
>-4
H �a
w
•� O
E
\°S4
om
a�
g
r
Z
0
In
al
rr
wrvvP -a7— t�43
SCALE 1" = 1000'
,ATION ow
APPROXIMATE LOCATION
OF ACCESS ROAD AND
THUNDER HILLS STREAM
Em
S -? E
INDEX TO DRAWINGS
G1 COVER SHEET
G2 SYMBOLS AND ABBREVIATIONS
G3 GENERAL AND PROJECT NOTES
Cl STA 1 +00 TO STA 6 +50
C2 STA 6 +50 TO STA 12 +25
C3 STA 12 +25 TO STA 18 +00
C4 STA 18 +00 TO STA 24 +50
C5 MISCELLANEOUS DETAILS, SHEET 1
C6 MISCELLANEOUS DETAILS, SHEET 2
C7 MISCELLANEOUS DETAILS, SHEET 3
C8 MISCELLANEOUS DETAILS, SHEET 4
C9 WATERMAIN RELOCATION
S1 STRUCTURAL DETAILS AND NOTES
RECORD DRAWING
THIS ORAMMIG HAS BEEN PREPARED
c�F� y Sro
BASED ON NFO W71OH COMPMEO
FROM THE 9WIRWFOR AND O7HM
m i
/7
BY
DATE
HAINI0de1D. COLLBR & WADE—
/arses'
U NIG510NE & ASSOCIATES. INC.
C7NIG ENS
4010 STONE WAY NORTH
SEA771E. WASHINFON =03
S—
2
7
6
C
G
1
/kt- ; y_ = 7,,/,/ c--,F
SCANNED MAR 9 8 2903
ABBREVIATIONS
AB ANCHOR BOLT ELL ELBOW MAINT MAINTENANCE RM ROOM
n ` IOP(X`.RAPIdiC & MISCELLANEOUS UTILITY SYMBOLS AC ASPHALTIC CONCRETE, ACRE EMBD EMBEDDED MAS MASONRY RP RADIUS POINT, REFERENCE POINT
o a ACID ASBESTOS CEMENT PIPE EMER EMERGENCY MAT'L MATERIAL RPM REVOLUTIONS PER MINUTE
ca AGG AGGREGATE ENGR ENGINEER n '.X MAXIMUM RR RAILROAD
N \ CENTERLINE O EXISTING GAS METER AL ALUMINUM EQ EQUAL MB MAILBOX RT RIGHT
I C —_ — Qt EXISTING GAS VALVE ALT ALTERNATE EQUIP EQUIPMENT MCC MOTOR CONTROL CENTER R/W RIGHT OF WAY
PROPERTY LINE OR R/W ALUM ALUMINUM EQUIV EQUIVALENT MCU MASTER CONTROL UNIT .
(V __________ o EXISTING UTILITY POLE ANC ANCHOR ESMT EASEMENT MECH MECHANICAL S SOUTH, SLOPE, SANITARY SEWER
I W EASEMENT LINE APPROX APPROXIMATELY) EST ESTIMATE MFG MANUFACTURED SCFM STANDARD CUBIC FEET PER MINUTE
.� EXISTING UTILITY POLE ANCHOR APWA AMERICAN PUBLIC WORKS ASSOCIATION EVC END VERTICAL CURVE MFR MANUFACTURER SCH SCHEDULE
8 a J $ —�— BREAK LINE ASPH ASPHALT EW EACH WAY MG MILLION GALLONS SD STORM DRAIN
(7� _ - ASSY ASSEMBLY EXCL EXCLUDING MGD MILLION GALLONS PER DAY SE SOUTHEAST
d a W $ ® EXISTING STRUCTURE o- STREET LIGHT ATB ASPHALT TREATED BASE EXIST EXISTING MG/L MILLIGRAMS PER LITER SEC SECOND
AVAR AIR VACUUM & AIR RELEASE VALVE EXT EXTERIOR MGR MANAGER SECT SECTION
d (/) Z o EXISTING TELEPHONE RISER MH MANHOLE SF SQUARE FEET
Z 1-J 0 PROPOSED STRUCTURE AUTO AUTOMATIC
8
Of O 0 H AUX AUXILIARY F FAHRENHEIT, FACE, FAN MHHW MEAN HIGH HIGH WATER SHT SHEET
Ld EXISTING FENCE D MAIL BOX AVE AVENUE FF FINISH FLOOR MI MILE SIM SIMILAR
Q Q z m N AWWA AMERICAN WATER WORKS ASSOCIATION FAB FABRICATE(D), FABRICATION MIC MONUMENT IN CASE SL SLOPE, SLEEVE
N W ^ m r - w- -w--w- PROPOSED FENCE EXISTING RIP RAP F/F FACE TO FACE MIN MINIMUM, MINUTE SPEC SPECIFICATIONS
k-a BF BUTTERFLY VALVE FH FIRE HYDRANT MISC MISCELLANEOUS SO SQUARE
r� a Z$ —A50--- EXISTING CONTOUR LINE PROPOSED RIP RAP BLDG BUILDING FIN GR FINISHED GRADE MJ MECHANICAL JOINT SS STAINLESS STEEL, SANITARY SEWER
0' p m F� Z. BLK BLOCK FL FLANGE, FLOWL.INE ML MILLILITER ST STREET
QO Q 0 W 19�� PROPOSED CONTOUR LINE COO EXISTING ROCKERY BM BEAM, BENCHMARK FM FORCE MAIN MLLW MEAN LOWER LOW WATER STA STATION
Q A EXISTING SLOPE 000 PROPOSED ROCKERY BO BLOW OFF FO FIBER OPTIC MLW MEAN LOW WATER STD STANDARD
BOO BIOCHEMICAL OXYGEN DEMAND FPM FEET PER MINUTE MOC MIDDLE OF CURVE STL STEEL
N —...— v EXISTING SIGN BOT BOTT� FPS FEET PER SECOND MON MONUMENT STOR STORAGE
EXISTING DITCH OR EDGE OF WATER BRG BEARING FIRP FIBERGLASS REINFORCED PIPE MPH MILES PER HOUR STRUCT STRUCTURAL
(n W J BRK BREAK FT FEET, FOOT MSL MEAN SEA LEVEL SUPERV SUPERVISOR
J U O M'� PROPOSED DITCH O2 EDGE OF WATER r PROPOSED SIGN BST BITUMINOUS SURFACE TREATMENT FTG FOOTING SUPT SUPPORT
U FJ.� BTU BRITISH THERMAL UNIT FLIT FUTURE N NORTH
= Q N —OHT— OVERHEAD TELEPHONE LINE EXISTING TREE (CONIFER) BULKHDS BULKHEADS N/A NON APPLICABLE SY, SQUARE
EXISTING TREE (DECIDUOUS) G GUTTER, GAS NEG NEOUGATIVEST SYM SYMMETRICAL
q —UGT— UNDERGROUND TELEPHONE LINE ) CB CATCH BASIN GA GAGE
II p C TO C CENTER TO CENTER GAL GALLON NIC NOT IN CONTRACT T TOP
Z —OHTV— OVERHEAD TV LINE EXISTING YARD LIGHT CF CUBIC FEET GALV GALVANIZED NO NUMBER TAN TANGENT
CFH CUBIC FEET PER HOUR G) GUARD NS NOT SPECIFIED T & M TIME & MATERIALS
45.63 SPOT ELEVATION AT POINT SHOWN NTS NOT TO SCALE TB TOP OF BANK
S -UGTV- UNDERGROUND TV LINE CFM CUBIC FEET PER MINUTE GEN GENERAL
CFS CUBIC FEET PER SECOND GP GALVANIZED IRON PIPE NT WT NET WEIGHT TBM TEMPORARY BENCHMARK
-G- GAS LINE 45.63 SPOT ELEVATION AT DECIMAL POINT CI CAST IRON GL G•ULAM NW NORTHWEST TC TOP OF CURB
TC45.63 TOP OF CURB ELEVATION CIP CAST-IROWPIF'E GPD GALLONS PER DAY 02 OXYGEN TFR THREADED TRANSFORMER
_ -OHP- OVERHEAD POWER LINE CJ CONSTRUCTION JOINT GPM GALLONS PER MINUTE
o /G45.13 GUTTER ELEVATION CL CENTERLINE, CLASS GR GRADE, GRAVEL OC ON CENTERS THK THICK
--g -UGP- UNDERGROUND POWER. LINE CL2 CHLORINE GRID GROUND OD OUTSIDE DIAMETER, OUTSIDE DIMENSION THRU THROUGH
3 ° /XYY\ EDGE OF TREES OR BRUSH CMP CORRUGATED METAL. PIPE GRTG GRATING OH OVERHEAD, OVERHANG TOC TOP OF CONCRETE
c . •E OHP OVERHEAD POWER LINE TOP TOP OF PIPE
EXISTING GUARDRAIL CMU CONCRETE MASONRY UNIT GV GATE VALVE
r a Q ® E NATURAL GROUND CO CLEANOUT GYP GYPSUM OPT OPTIONAL TRM TRANSMITTER
a (~ 3Q ORIG ORIGINAL TRN TRANSDUCER
�— PROPOSED GUARDRAIL CO2 CARBON DIOXIDE
F a u e ►Z _° - CONCRETE COMB COMBINATION HOPE HIGH DENSITY POLYETHYLENE OZ OUNCE TYP TYPICAL
a ° m b' CONC CONCRETE CONCENTRIC HH HAND HOLE TWP TOWNSHIP
Ak WET AREA CONT CONTINUOUS HOR HORIZONTAL P POST, PER, POWER
y Q C o CONST CONSTRUCTION HP HIGH PRESSURE, HIGH POINT, HORSEPOWER PC POINT OF CURVATURE UBC UNIFORM BUILDING CODE
CRIB CRIBBING HT HEIGHT PE PLAIN END UG UNDERGROUND v I
a v y E ;a o PERF PERFORATED UGP UNDERGROUND POWER LINE
WATER SYMBOLS SANITARY /STORM SEWER SYMBOLS CS COMBINED SEWER HTR HEATER
z ¢ �E PH PHASE UUD UTILITY LOCAL IMPROVEMENT DISTRICT
CTR CENTER H/V HEATING AND VENTILATING
a °� CULV CULVERT HVAC HEATING, VENTILATING, AND AIR CONDITIONING PI POINT OF INTERSECTION U/P UTILITY POLE
—W— EXISTING WATERLINE —FM— EXISTING FORCE MAIN CV CHECK VALVE HW HIGH WATER PK PEAK USGS UNITED STATES GEwO^�'CAL SURVEY
c o CY /DAY CUBIC YARD PER DAY HWY HIGHWAY PL PROPERTY LINE
air PROPOSED WATERLINE PROPOSED FORCE MAIN CYL CYLINDER HYD HYDRANT PNEU PNEUMATIC VAR VARIES
HZ HERTZ (CYCLES PER SECOND) PP POWER POLE VC VERTICAL CURVE
$ L EXISTING CAP/PLUG —S— EXISTING SANITARY SEWER D DITCH PRES PRESSURE VCP VITRIFIED CLAY PIPE
DET DETAIL ID INSIDE DIAMETER PRV PRESSURE REGULATING VALVE VERT(S) VERTICAL(S)
L PROPOSED CAP/PLUG PROPOSED SANITARY SEWER DI DUCTILE IRON IE INVERT ELEVATION PS PUBLIC SEWER VF VERTICAL FOOT
DIA DIAMETER IN INCH PSF POUNDS PER SQUARE FOOT VOL VOLUME
o tt EXISTING COUPLING —SD— EXISTING STORM DRAIN DIAG DIAGRAM INCL INCLUDING PSIA POUNDS PER SQUARE INCH ABSOLUTE Vpl VERTICAL FONT OF INTERSECTION
DIFF DIFFERENTIAL INSUL INSULATE(D), INSULATION PSIG POUNDS PER SQUARE INCH GAGE VSS VOLATILE SUSPENDED SOLIDS
ai PROPOSED COUPLING PROPOSED STORM DRAIN DIM DIMENSION INV INVERT PT POINT, POINT OF TANGENCY
DIST DISTRICT IRRG IRRIGATION PUD PUBLIC UTILITY DISTRICT W WEST, WATER
D EXISTING REDUCER - -CS — EXISTING COMBINED SEWER DN DOWN PVC POLYVINYL CHLORIDE W/ WITH
POINT OF VERTICAL INTERSECTION W/O WITHOUT
DNR DEPARTMENT OF NATURAL RESOURCES K KIP (1,000 POUNDS) PVI
► PROPOSED REDUCER U EXISTING SANITARY SEWER CLEAN OUT DR DRIVEWAY KV KILOVOLT PVi PAVEMENT WD WATER DISTRICT
DO DISSOLVED OXYGEN KVA KILOVOLT AMPERE WM WATER MAIN, WATER METER, WIRE MESH
�I PROPOSED THRUST BLOCK • PROPOSED SANITARY SEWER CLEAN OUT DWG(S) DRAWING(S) KW KILOWATT QTY QUANTITY WS WATER SURFACE
WT WEIGHT
9 EH EXISTING WATER METER 0 EXISTING SANITARY SEWER MANHOLE E EAST LB POUND(S) R RADIUS, RANGE WWF WELDED WARE FABRIC
$ EA EXHAUST AIR, EACH LC LENGTH OF CURVE RAD RADIUS WWM WELDED WIRE MESH
B PROPOSED WATER METER a PROPOSED SANITARY SEWER MANHOLE ECC ECCENTRIC LEV LEVEL RCP REINFORCED CONCRETE PIPE
EFF EFFLUENT LF LINEAL FOOT(FEET) RECEPT RECEPTIONIST YD YARD
ty EXISTING FIRE HYDRANT ❑ EXISTING STORM DRAIN CATCH BASIN EL ELEVATION (ELEV) LFT LEFT RECIRC RECIRCULATION YR YEAR
ELECT ELECTRICAL LG LONG RECP RECEPTACLE
y/ PROPOSED FIRE HYDRANT ® PROPOSED STORM DRAIN CATCH BASIN LID LOCAL IMPROVEMENT DISTRICT RED REDUCE(R) HIE NUMBER, POUNDS
LS LUMP SUM REF REFERENCE & AND
a Y I EXISTING FLANGE JOINT EXISTING STORM DRAIN CULVERT LT LEFT REG REGULATOR 0 AT
LTG LIGHTING REINF REINFORCED, REINFORCING 0 DIAMETER, PHASE
1 PROPOSED FLANGE JOINT PROPOSED STORM DRAIN CULVERT LW LOW WATER REQ'D REQUIRED
RESIL RESILIENT
CL 1 EXISTING MECHANICAL JOINT ® EXISTING STORM DRAIN MANHOLE RJ RESTRAINT JOINT
IL
a S PROPOSED MECHANICAL JOINT • PROPOSED STORM DRAIN MANHOLE S
W C EXISTING HUB OR PUSH -ON JOINT
a
C PROPOSED HUB OR PUSH -ON JOINT PROJECT RELATED SYMBOLS PROJECT RELATED NOTES SECTION & DETAIL NUMBERING SYSTEM SURVEY SYMBOLS
m � EXISTING AIR RELIEF VALVE NONE - FOUND SECTION CORNER SET IRON PIPE/REBAR
PROPOSED AIR RELIEF VALVE (1) o0a FOUND QUARTER CORNER p FOUND MONUMENT IN CASE
SECTION CUT ON DRAWING 5 (3) DETAILS ARE CROSS- REFERENCED 0 FOUND SIXTEENTH CORNER 8 FOUND SURFACE MONUMENT
4 EXISTING BLOW/OFF IN A SIMILAR MANNER EXCEPT THAT
ACCESS ROAD sECnoN �� DETAILS ARE IDENTIFIED BY NUMBER FOUND CLOSING CORNER x FOUND /SET LEAD &TACK, PK NAIL
i PROPOSED BLOWOFF RESURFACING A RATHER THAN BY LETTER.
-' da EXISTING BUTTERFLY VALVE CB oRAwuaG NM ON vans+ mc FOUND MEANDER CORNER o FOUND /SET HUB W /TACK
sECna+ AvaEARs
Ix A PROPOSED BUTTERFLY VALVE ® SOIL BORING ORECOSE DRAWING CTION CENTER
g o ?1 EXISTING CHECK VALVE Q TAX LOT NUMBER
g rn RAISE ACCESS ROAD N OWNERSHIP TIE THIS DRAWING ON IN HAS BEEN PREPARED
g � N PROPOSED CHECK VALVE FROM THE CONTRACTOR AND OTHERS S��F W ss�'
S `r d ANGLE POINT
AND RESURFACE (2) ON DRAWING 15 THIS SECTION IS SHOWN NOTE: Ii4GJ?JI+`�✓ o yico�
g D4 EXISTING GATE VALVE
SECTION &DETAIL NUMBERING #A 8Y
N PROPOSED GATE VALVE
SYSTEM MAY OR MAY NOT BE USED. Y BENCHMARK
CROSS DATE � Petn.. ZPi. ?,011'3
0 EXISTING PLUG VALVE CROSS SEC Z �ry ION A ° FOUND IRON PIPE/REBAR HAMMOND. OOUER & WADIE-
UVMGSMW & ASSOCIATES,
ACCESS ROAD SCALE 1' = 1' -O' C4 CwAvING Mommy
ICI PROPOSED PLUG VALVE RECONSTRUCTION xN
rnnwNC Na m iqH
4010 STONE WAY 'NORTH
C AND RESURFACING SEC110N WAS CUT. SEATTLE, WASHINGTON 98103
Zp -,s -j>
S- 276662
/jo j=_ �)��aF SCANNED MAR 2 5 7003
i
ROLL 179 FR ffm
wa►� °2i -s ?si
- -
e i1. ✓
_ _
RECORD DRAIMNG
A�
M
�
N
M
_�
GENERAL NOTES
GENERAL 11VORK APPROACH
�
N
�_
�
yAwowFlo, c:ou� � wAOe-
lr�i��iz
uvx a Assoa�AlES, iN6.
ooNSU��+c
C
�ofo sraav= wAY t�tn+
��--��
s�r►rnE. wAICroN' s�aDS
I
°
�
1. ALL WORK SHALL CONFORM TO THE CITY OF RENTON ENGINEERING STANDARDS
h
i
AND THE PROJECT DOCUMENTS. GTY OF RENTON STANDARD PLAN DETAILS ARE...
TEMPORARY EROSION .AND SEDIMENTATION CONTROL (TESCi
N
d_
z
LOCATED WITHIN THE BOUND CONTRACT SPECIFlCATIONS.
aJ
(�✓ � r
2. VERTICAL AND HORIZONTAL CONTROL IS CITY OF RENTON AS INDICATED ON THE PLANS.
1. TEMPORARY EROSION AND SEDIMENTATION FACILITIES WILL BE CONTRUCTED AND
'PRIOR
w
� � �°
�
IMPLEMENTED TO ANY EXCAVATION. THESE FACILITIES MUST BE SATISFACTORILY
THE POTENTIAL FOR
�i
�
a w
3. UTILITY LOCATIONS SHOWN ARE APPROXIMATE AND ACTUAL LOCATIONS MAY VARY.
°ONE FOR
MAINTAINED UNTIL THE CONSTRUCTION. tS COMPLETED AND
d.
a �
THE CONTRACTOR SHALL CA1 THE -CAl1" CENTER AT 1- 800 - 424 -5555
ON -SITE EROSION HAS PASSED.
F,
UTILITY MARKING 48 HOURS IN ADVANCE OF ANY EXCAVATION.
i
8
w �
��j �
2. TEMPORARY SEDIMENTATION COLLECTION FACILITIES MUST BE PROVIDED AND
Q
�
`/ Z ;,r
4. UTILITY CROSSING LOCATIONS AND ELEVATIONS SHALL BE VERIFIED BY THE
MAINTAINED TO ENSURE THAT �DiMENTATION OR OTHER HAZARDOUS MATERIALS
n
�
� w
�
� � €.�
CONTRACTOR W ADVANCE OF CONSTRUCTION.
DO NOT ENTER THE WATERS OF THE ADJACENT STREAM. AS CONSTRUCTION
�
�
`" <�_
z a
PROGRESSES AND UNEXPECTED SEASONAL CONDITIONALS DICTATE, MORE EROSION
�J
�
3�
5. FlLTER FABRIC FENCE MUST BE CONSTRUCTED PER THE CITY OF RENTON STANDARD
CONTROL FACILITIES MAY BE'REQUIRED TO ENSURE COMPLETE SILTATION
� �
J
O w
PLAN 8066.
CONTROL ON -THE PROJECT. DURING THE COURSE OF CONSTRUCTION, IT SHALL
-
Q
� Q
BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS
Q v
w
� ¢
6. INSTALL ORANGE BARRIER FENCE AROUND ALL TREES TO BE SAVED OR PROTECTED
AN-Y NE�CONDLT]ONS- THAT MAY BE .CREATED.: BY CONSTRUCTION ACTIVITIES AND
��'Q
Z
�
WITHIN AND. ADJACENT TO THE WORK AREA. REMOVE ALL BARRIER.. FENCING UPON _
TO PROVIDE ADDITIONAL FAGLITIES, OVER AND ABOVE THE MINIMUM REQUIREMENTS,
`�,
J Q
C �
°'�
I'►�1 a�
COMPLETION_
AS MAY BE NEEDED TO ENSURE COMPLIANCE.
p
�L{ y g
7. THE HOURS OF WORK SHALL BE LIMITED TO 8:00 AM TO 5:00 PM ON WEEKDAYS
UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC. WORKS
--
w
ALL STREET CLOSURES, PARTIAL OR FULL, sHALL- BE APPROVED BY THE DEPT.
ROAD REPAIR AND RESTORATION AREAS
0
OF PUBLIC WORKS 24 HOURS 1N ADVANCE THE POLICE DEPARTMENT, FlRE DEPT,
Z
�
2
AND 911 SHALL BE NOTIFlED BY THE CONTRACTOR 24 HOURS IN ADVANCE.
_
�. INSTALL EROSION /SEDIMENTATION .CONTROLS
�
_ °° -- - -- .,
8. IT SHALT BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE
2, CLEAR AND GRUB AREAS REQUIRING .EXCAVATION. STOCKPILE. ANY MATERIALS
AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
DESIGNATED BY THE ENGINEER TO BE USED IN STREAM STABILIZATION WORK.
a
w
�
9. A COPY OF APPROVED PLANS AND SPECIFICAl10NS MUST BE ON THE JOB SITE
3. CONSTRUCT ROAD REPAIRS.
-% `0
y �
C
6 °
WHENEVER CONSTRUCTION IS IN PROGRESS.
a a �
�
� C
O � o�E
10. ASSIGNMENT OF CONTRACTOR'S RESPONSIBILITIES. AND OBLIGATION .FOR LOCATING,
4. FINISH GRADE AND CLEANUP ..ALL CONSTRUCTED AREAS.
'E" � `�
a a °
N y a �
a
3 °a
E"'' � _
�"' ,'� �,,;
PROTECTING AND REPAIRING DAMAGE TO EXISTING UNDERGROUND UTILITIES IS
SHOWN IN THE SPECIAL PROVISIONS PORTION OF THE CONTRACT SPECIFICATIONS.
5. INSTALL PLANTINGS AND HYDROSEED 'AL1 DISTURBED AREAS.
1 .ax �
a
s
�W
�
an:
�°
11. ALL WORK IS SHOWN SCHEMATICALLY (LE. ENOUGH DETAIL ON DRAWINGS TO SHOW
6. REMOVE SEDMENTATION CONTROLS.
o ¢ �
3
§
� � �
m E
INTENT). ALL ITEMS WILL BE FlELD FIT BY THE CONTRACTOR TO MATCH INTO
EXISTING CONDITIONS.
-
I�
�
`�
12. THE CONTRACTOR SHALL PLACE ANY WASTE MATERIALS INCLUDING LOGS -0R
STREAM RESTORATION AREAS
I/
o �f
o m
ROOTWADS AS DIRECTED BY THE ENGINEER.
a°
13. ALL FINISH GRADE ELEVATIONS SHALL BE REVIEWED AND APPROVED BY THE
1. INSTALL AND `MAINTAIN STREAM DIVERSION AROUND. THE WARK AREA BY USING
SANDBAG DIKES WITH PUMPING, CULVERTS OR OTHER` ACCEPTABLE MEANS
$�
ENGINEER.
APPROVED BY THE ENGINEER. PUMPS AND 4IVERSION PIPING TO BE SIZED TO
��
�
14. THE CONTRACTOR SHALL PROVIDE SMOOTH ROAD TRANSITIONS TO AND FROM ALL
HANDLE NORMAL ANTICIPATED FLOWS.
�
o
AREAS DESIGNATED TO BE RECONSTRUCTED OR RAISED.
15. CONTRACTOR SHALL USE A VACUUM STREET SWEEPER TO REMOVE DUST AND
2. CONSTRUCT STREAM .ENHANCEMENTS AND NEW .FACILITIES, MAINTAINING THE
SEPARATION OF THE WORK FROM THE STREAM FLOW.
�r� �
.DEBRIS FROM. PAVEMENT AREAS. FLUSHING OF STREETS SHALL NOT BE
3. REMOVE THE STREAM DIVERSIONS, AS APPROVED BY THE ENGINEER.
. 3
�>
PERMITTED WITHOUT PRIOR APPROVAL FROM THE CITY.
� �1
���
16. CONTRACTOR TO PROVIDE A ONE (1) YEAR WARRANTY ON AL1 WORK EXCEPT
4. PLANT MATERIAL FOR LIVESTAKING WILL BE COLLECTED FROM THOSE AREAS
N
a.�
FOR NEW PLANTINGS WHICH REQUIRE A TWO (2) YEAR WARRANTY. CONTRACTOR
APPROVED BY THE ENGINEER.
a
TO COME BACK AFTER ONE YEAR AND REPLACE ALL ORIGINAL PLANTINGS THAT
5. INSTALL "PLANTINGS AND JUTE MATTING AS SHOWN ON THE PLANS AND
DID NOT TAKE.
AT DISTURBED AREAS'.
17. "THUNDER HILLS° STREAM IS ALSO KNOWN AS °ROLLING HILLS° STREAM.
6. REMOVE SEDMENTATION' CONTROLS.
���<�
wa►� °2i -s ?si
- -
e i1. ✓
_ _
RECORD DRAIMNG
TMls orLAwrrc w►s ema ��m
g
_�
ni�ooN oli�s
z
o
�
DATE C JKh • �LIJ� ZOd �
�_
�
yAwowFlo, c:ou� � wAOe-
lr�i��iz
uvx a Assoa�AlES, iN6.
ooNSU��+c
C
�ofo sraav= wAY t�tn+
��--��
s�r►rnE. wAICroN' s�aDS
i\ I -ICI /
d_
z
wa►� °2i -s ?si
- -
e i1. ✓
_ _
RECORD DRAIMNG
TMls orLAwrrc w►s ema ��m
®All oa MIF'OROIAIWMI COMPkFD
_�
ni�ooN oli�s
� Toa �
BY T
DATE C JKh • �LIJ� ZOd �
�'
yAwowFlo, c:ou� � wAOe-
lr�i��iz
uvx a Assoa�AlES, iN6.
ooNSU��+c
C
�ofo sraav= wAY t�tn+
��--��
s�r►rnE. wAICroN' s�aDS
i\ I -ICI /
v2r3 ; S- ?�d6 /a SCANNEQ ue °° : � 1w3
310-
300'
290-
-RECORD DRAVANG:
7"SIGRAMP HWIMNePRWARW
FRW WHERS
BY.
Zan
DAME n
U70-
0
1+00
ISI-121716F6TCT1
SCANNED MAR 2 6 2063
°z wwP�si -2i66
� �
® ®_
� � Vii,'
/> r° ; 5 = ��6� �3 Scec��EO IJ�R 2 8 2�
B
STA 18 +55 END ROADWAY
Z �»� - :'- :mod
4 _ w
.:� �,
��,.a,,,.,� i
-276�C
/�� ; �= _�,��� scaare�o s�R E 8 1.x03
�►
I
� a
b
s;
eq
Qo o A
o c
z
a
F
'^
r-
M
n
M
EDGE OF EXISTING
ROAD
N
o
ACCESS
EDGE OF
WASHOUT
DEN AND RESURFACE EXIST ACCESS
STREAMSIDE ROCKERY
ROAD AS SHOWN ON PLANS
N
8' MIN - 10' MAX
CL
J
g $ BACKSLOPE VARIES VARIES
w
(VARIES) I
W
)?
(L
w Q
a z
O
a � z J0 FOR STREAMBANK
w w
o W_ PROTECTION, SEE
Z
d
U) w p
=� Qlz OTHER DETAILS
Q > I �o
} c�
f�
z a , TYP N U 2
~w Ljw
p
Q O Z=
Ci Q 1
J
Q
O
EXISTING ACCESS ROADWAY SURFACE
E
w
MOW DOWN AND BRUSH BACK EXISTING
VEGETATION AND INSTALL 10" MIN
:D
COMPACTED DEPTH (SHOULDER)
BALLAST MATERIAL CONFORMING TO
H
APWA /WSDOT SECTION 9- 03.9(2)
UTILITY ACCESS ROAD RESURFACING DETAIL
0o
W Z Y
SCALE 3/8" = 1' -0"
o E 3�
a
>4 z
�w
N a'a
IJ 1+1 mo
c
vE
UPIE
C
c
om
a�
's
a
0
3
DRAINAGE PIPE c
(NEW OR EXISTING, i
SEE PLAN)
X 0
-11
U0 0
O , COO
X00 5' MIN
PLAN
i
CL
)� EXCAVATE INLET AREA,
)o RE- ESTABLISH DRAINAGE
FLOWLINE AND PLACE
QUARRY SPALLS AS SHOWN
2
�1
5'
- --
------- - - - - --
DRAIN PIPE::�'r
4 " -8" QUARRY SPALLS
12" DEEP (MIN.)
SECTION AT FLOWUNE
NEW ROCK LINED INLET DETAIL 3
SCALE 3/8" = 1' -0" VA
*w'D ::r- ods
INSTALL 3 RED REFLECTORS
W/ 1/4" GALV STEEL PLATES
WELDED OR BOLTED TO GATE
BARS. REFLECTORS TO FACE
VEHICLE ENTRANCE SIDE ONLY
CONCRETE CAP
6" 0 SCH 80
STEEL POST
1 1' -10"
6 "0 SCH 80 STEEL
POST FILLED W/ CONC,
TYP EACH SIDE
73" SCH 40 STEEL PIPE
INGE FIXTURES W/ BOLT
THRU CENTER, THREE (3) EACH
ROADWAY SURFACE
PERe
C5
NEW ROADWAY FILL
MATERIAL, GRAVEL BARROW
EDGE OF EXISTING
ROAD
®
ACCESS
EDGE OF
WASHOUT
SEC. 9- 03.14(1)
STREAMSIDE ROCKERY
a
a
a
WALL SEE
P
C7
m
0
E
o
Z
DRAINAGE PIPE c
(NEW OR EXISTING, i
SEE PLAN)
X 0
-11
U0 0
O , COO
X00 5' MIN
PLAN
i
CL
)� EXCAVATE INLET AREA,
)o RE- ESTABLISH DRAINAGE
FLOWLINE AND PLACE
QUARRY SPALLS AS SHOWN
2
�1
5'
- --
------- - - - - --
DRAIN PIPE::�'r
4 " -8" QUARRY SPALLS
12" DEEP (MIN.)
SECTION AT FLOWUNE
NEW ROCK LINED INLET DETAIL 3
SCALE 3/8" = 1' -0" VA
*w'D ::r- ods
INSTALL 3 RED REFLECTORS
W/ 1/4" GALV STEEL PLATES
WELDED OR BOLTED TO GATE
BARS. REFLECTORS TO FACE
VEHICLE ENTRANCE SIDE ONLY
CONCRETE CAP
6" 0 SCH 80
STEEL POST
1 1' -10"
6 "0 SCH 80 STEEL
POST FILLED W/ CONC,
TYP EACH SIDE
73" SCH 40 STEEL PIPE
INGE FIXTURES W/ BOLT
THRU CENTER, THREE (3) EACH
ROADWAY SURFACE
PERe
C5
NEW ROADWAY FILL
MATERIAL, GRAVEL BARROW
EDGE OF EXISTING
ROAD
CONFORM W/ APWA /WSDOT
ACCESS
EDGE OF
WASHOUT
SEC. 9- 03.14(1)
STREAMSIDE ROCKERY
WALL SEE
C7
EXIST. STREAM BANK /
DO NOT DISTURB NEW BOULDER WEIR
SEE 2
NOTES: C8
EXACT LOCATION OF BOULDER
WEIRS TO BE DETERMINED IN THE
FIELD BY ENGINEER.
FOR CONSTRUCTION SEQUENCE AND
STREAM FLOW DIVERSIONS SEE
STREAM RESTORATION NOTES ON
SHEET G3.
ROAD WASHOUT REPAIR —
STREAM RELOCATION AREA 1
SCALE 1" = 10' -0" C27
r � y
3 "x3 "x3/8" ANGLE IRON CUT
TO FIT W/ 1 1/2" HOLE THRU
TOP CENTER, TYPICAL WELDED
TO GATE
r WELD 3/8" PLATE TO GATE POST
GATE
1" 0x4" LONG
PIN W/ 1/2" HOLE
3/8" FROM BOTTOM
PADLOCK
FURNISHE
BY CITY -
13' -0"
3' -0" 1 3' -0" 1
0 GATE POST
3" 0 SCH 40 STEEL PIPE_
TOP OF GATE TO BE LEVEL
_0" 4
x
GALVANIZED
GALVANNIZEIZE D
STEEL 1 -
GUSSET
SUPPORTS
5' -0" 3" MIN
EXISTING ROAD SURFACE
18 "0 CONCRETE
FOOTING, TYP-\
co
I
i�
NOTES:
GATE & POST CONSTRUCTION SHALL CONSIST OF HOT DIPPED
GALVANIZED STEEL PIPE. ALL CROSSBARS SHALL HAVE CONTINUOUS
FILLET WELD.
CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & PROVIDE SHOP
DRAWINGS OF GATE & POST ASSEMBLY (INCLUDING HINGE &
LATCH FIXTURES) FOR APPROVAL BY CITY REPRESENTATIVE
PRIOR TO CONSTRUCTION.
ALL METAL & WELD JOINTS ASSOCIATED W/ GATE & POST
ASSEMBLY SHALL BE HOT DIPPED GALVANIZED STEEL &
GALVANIZED STICK TREATMENTS FOR JOINTS. 54*7"15
NEW METAL SWING GATE DETAIL X21
SCALE 1/2" = 1' -0"
RECORD DRAWING
INS DRAYWIG HAS BEEN PREPARED
BASED ON 9*10INA7M COWUM
FROM 7W 0ON7RACTM AND OTHERS
By u,•o��
DA7E
HA(ID. COLLIER & WADE -
uwHGSSONE & ASSOCIA7E5, MIC.
C0N3IA.7= ENGNEM
4010 SWW WAY MOM
SEATRE, WAS SIGM =03
SCANNED UAR 2 8 M
ROADW RESURFACE, SEE( REMOVE MATERIAL THIS AREA, SEE PLAN
IJFIAI Rni II I1FR WFIRC -.
8
i I I i z IP- au - -''w
\�' i5 ', TANK. L UWNWKGAM WLIK
�= TO HAVE BURIED BED 2
INST FlNE MESH JUTE TING, MAT s CONTROL ROCKS, SEE
FROM TOP OF BANK TO STREAM C8
HIGH WATER FLOWLINE, 3 LOCATIONS NEW 48" WIDE GLULAM
PLANT WILLOW, SALMONBERRY, AND BRIDGE WITH <PIPE SUPPORTS, ROADWAY RESURFACE PER 1 raw A ROUT IN
RED —OSIER DOGWOOD FROM
ON SEE 1
STOCKS, SEE 3 4 S1 CS
C8 C8 I
MATCH WITH EXIST GROUND, TYP
cre +.+ n' t�__
NOTES:
IF THERE ARE NOT SUFFICIENT ON —SITE PLANT STOCKS AVAILABLE AND IF DIRECTED
BY THE ENGINEER, THE CONTRACTOR SHALL IMPORT, AT THEIR EXPENSE, ALL
NECESSARY PLANT MATERIALS.
FOR CONSTRUCTION SEQUENCING AND STREAM FLOW DIVERSIONS SEE STREAM
RESTORATION NOTES ON SHEET G3.
CULVERT REMOVAL /UTILITY WALKWAY
BRIDGE, AREA A 1
SCALE 1" = 10' -0" C2
Wir
EDGE OF EXIST
ACCESS ROAD —
i,-
REMOVE VEGETATION AND INSTALL NEW ROCKERY
WALL ON EXIST SLOPE FOR STREAMBANK
STABILIZATION. ROCKERY INSTALLATION SIMILAR
TO W /O EXCAVATION AT TOE OF SLOPE.
C7
ROADWAY REPAIR AND STREAMBANK -
STABILIZATIONy AREA 2 3.
SCALE 1" = 10' -0"
SCANNED MAR 2 8 Z01M
� o
9
z
0
LA
2
I
REPLACE EXIST. 8" WM WITH
NEW. VERIFY EXIST DEPTH
AND LOCATION PRIOR TO NEW
CONSTRUCTION, SEE 2
/ NOTES:
/
/
/ INSTALL FINE MESH JUTE MATTING ON ALL DISTURBED
AREAS (EXCEPT PATHWAY), PLANT WILLOW, SALMONBERRY,
AND RED -OSIER DOGWOOD, SEE 3 4
/
FOR CONSTRUCTION SEQUENCE AND STREAM FLOW DIVERSIONS
SEE STREAM RESTORATION NOTES ON SHEET G3.
CULVERT REMOVAL NEW PEDESTRIAN BRIDGE AREA C 1
I ( 1 1 I ww" s, • SCALE: 1 " = 10' -O" $
z
® ® A
RESTRAINT SYSTEM 4
NTS k. C2
191 ®IN NR1®
n
M
NEW WALKWAY
N
o
STA 15 +60, NEW
BRIDGE DOWNSTREAM
BOULDER WEIR.3
N
SEE 2 REMOVE MATL, cD
OD
_
$
w
J
Z
�+ 5�
28 REUSE ON -SITE �-
AS NEEDED X
? _ GROUND PROFILE
X OVER EXIST 48" CMP
NEW ACCESS ROADWAY SURFACE, SEE
e
3:
3.
Lij
d
W
z v
a o
w
io
w
I
EL 197.0
CS
12" MIN SEE DETAIL CS' FOR ROCKERY PLANTINGS
c/)
Uj
EL 198.0
b
N
LLI
� L
(� ;Z�
20'
2D' fl
,-
_" _ -
: "_"
BACKFILL WITH GRAVEL BORROW - = - -
'� 2 - MALL ROCS
Of �
�O.w
Z W `3 $
BURIED BED CONTROL
MEETING APWA /WSDOT SEC. 9- 03.14(1) �=' -` -:--- .: -
3
LLJ Q Z ='
'0 w
qQ
2
ROCKS, SEE:
RELOCATED 8 WATER, SEE 9 C8
;.
2 " -4" QUARRY SPACES
MIN THICKNESS BEHIND ROCKERY)
EXIST STREAM BED
N
R AND DISPOSE
(1'
Ljj
J
I
40 Lf, EXST. #8" 0
Q
�
x
C WALL
ENTRANCE
BOTTOM TWO L AYERS
TO BE 3 -MAN ROCKS
-
W
EXISTING SUBGRADE
% %% 2 MIN
z
SE-2
I,TI
"! 12° TYP T
r
=
_
SCALE. . 1- 10'-O"\,_')
NOTES.
ROCKERY HEIGHTS ARE NOTED ON THE PLANS. EXCAVATION
LIMIT .
a°
BASE ROCKS SHOULD BE DROP SEATED INTO
_
QUARRY SPALLS.
F w
wz ',off
EF is
/
/
UNLESS OTHERWISE' NOTED MINIMUM ROCK SIZES
ARE TO HAVE AN AVERAGE, DIMENSION OF: 18
�
g
N
g
STREAMSIDE ROCKERY WALL./`2
a a
-m
' E
,• ! \E
t " '613 EWE
'SE - T /
-'OE OP SLOPE
NTS
f EW ROADWAY SURFACE PER 1
a
EDGE EXIST.
ACCESS ROAD
l
NOTE:
PIPE RESTRAINTS TO BE
PLACED PERPENDICULAR
TO EXISTING GRADE
/
,
' q
/
, X
PLASTIC CAPS
V � �.� / -�.� ,._
. _- -- _� -- - - -- - - - - - - - - - - - - - - - - - -
CORRUGATED 12° Q
3
_
- _ \ \
_ --
i \�. 1.
4: 1
PIPE
-P& PI
WITH WATER TIGHT JOINTS
SECURED TO POSTS
a
_ /
` -
/
/ /
- _
W /HI TENSILE TIE WIRE
E
/ STA 15 +60 INS
STEEL FENCE POSTS
y; NEW BOULDER WEIR
TYPICAL, SEE
EXIS TINGGRADE
2
O Z
a
/ /
INSTALL NEW 15 FT. /
TOP & TOE OF
EXIST. STREAM, TYPICAL --
0 Q
w w
_
LONG x 4 FT. WIDE
/ /
REMOVE AND DISPOSE
a
o
WALKWAY BRIDGE,
/ /
EXISTING 48" 0. CMP !� _
m
MATCH W/ GROUND
BOTH SIDES, SEE 1
/ /
/ ,
CULVERT AND WINGWALL -
--
ABOVE GRADE PIPE
9
z
0
LA
2
I
REPLACE EXIST. 8" WM WITH
NEW. VERIFY EXIST DEPTH
AND LOCATION PRIOR TO NEW
CONSTRUCTION, SEE 2
/ NOTES:
/
/
/ INSTALL FINE MESH JUTE MATTING ON ALL DISTURBED
AREAS (EXCEPT PATHWAY), PLANT WILLOW, SALMONBERRY,
AND RED -OSIER DOGWOOD, SEE 3 4
/
FOR CONSTRUCTION SEQUENCE AND STREAM FLOW DIVERSIONS
SEE STREAM RESTORATION NOTES ON SHEET G3.
CULVERT REMOVAL NEW PEDESTRIAN BRIDGE AREA C 1
I ( 1 1 I ww" s, • SCALE: 1 " = 10' -O" $
z
® ® A
RESTRAINT SYSTEM 4
NTS k. C2
191 ®IN NR1®
NEW CROSS CULVERT AND CATCH BASIN
W NTS CZ 1/2 WEIR BOULDER DIA
INSTALL FOUNDATION BOULDERS
m IN FRONT OF AND BEHIND MAIN
WEIR BOULDERS, TYPICAL
0
ir
a
I
°z ww`o. ?' -J;w
PROFILE
SEAL UPSTREAM SIDE\ RECORD DRANANG
OF WEIR WITH 1/4- Jg DRAMG HAS BM PW
3" ROUND ROCK - S►, ON WOMA7M CMWI
BOULDER WEIR DETAIL 2'
NTS
I-
< i
G/zr(a :
0
1,913. z-96.1 /d SCANNED MAR 2 8 3003
O N
N
s N'z w
_ EX -1ST 48" CULVERT
1 J W 6 E TO BE REMOVED
z li W NEW BENCHMARK
p REPLACE 60,LF / ,
zO O r '. 8" 0 WATERMAIN TO RIM OF MANHOLE
i Q V Z NEW DEPTHS, SEE 2 EL 200.96'
ro V) w U Q ` ' C9 o NEW 18 "0 CASING
REMOVE EXISTING
Of C? Z W 3 't �, j 8" 22.1/2' VERT BEND REMOVE EXISTING
~ � Q L1 ; ( ) CT NEW KING 8" 22 1/2' VERT BEND
Q U Z , 1 _ _ ^- AND CONNE C BLO 8" DI (MJxMJ) CONC BLOCKING
w 14 MJzMJ CO
Q Q ' 8 i x, _ ; IN U I ; 4 3L vu WITH $ SLEEVE AND CONNECT NEW 8" DI
`' ,.� t - y -- --- -- - -- - - - _ - BENDS
T
-
o , - - -- -
_ - - -- WITH 2 8° 22 1/2'
} �1 f
- -- - -- - - - --
1 8 SLEEVE
N� ---- --- - - - - -- �` -
1 J -- - -- 8 „S -
Q1 ; - EXITT I ING 8 11 1/4' VERT BEND _ - - -
- - -- -
- - - -- -- `
: --- - - - - -- \
11 1,/4 VERTICAL EXISTING 8” 11 1/4' VERT BEND
-- BEND (RS x MJ) `
t -
NEW DEAD -MAN ANCHOR WITH SHACKLES, TYP
a° - k S `'C 8 "x8' "x8" TkPP,w TEE :.8 22 1 2" VERTICAL
AND 8r" GV ®END`'(RJ_x MJ):
s
N O c + 8 457: VERTICAL \
1 s U
BEND (RJ x MJ)
3 1
a =W �,� �°
WATERLINE RELOCATION, PLAN VIaEW
a v 3 � SE
a E
E
c
OF
c y
a�
NOTE: SHACKLE BETWEEN ALL FITTINGS
rl
AND DEAD MAN ANCHORS
0 16' 10'
-- - - - - -- FINISHED CHANNEL w ui
Z 2 - 8" 22 1/2' BENDS (RJ) N EL 196.6' _ �n��
rn
Tt _ -�_-
_ � r 202.1 .- � _
--
o
� 8" 22 1/2' BEND 8" SLEEVE
8" SLEEVE rn
Zn 0 18 "0 CASIN - -
�OVER 10" SS 8" 11 1/4= BEND
I "If -------0---------
8" 45' BEND (RJ)
I
m NOTE:
ALL NEW 8 "0 DI EXPOSED TO
"EARTH" O BF-- MIRAPPED (ENCASED)
IN POLYETHYLENE PER CITY STANDARDS_
BENCHMARK: RIM MANHOLE EL 200.96 , w
SEE PLAN VIEW
tor of CAS�Me -.
EL. t93A.' t
SECTION 2
SCALE: 1" = 5' -0"
(LOOKING UPSTREAM)
CONSTRUCTION SEQUENCING NOTES
APPROX. 2.,G± t-
G VALVE a_'U ER ,
i
t,
t ;
ce ; I
t I
i
I I EXIST
EXISTING 8" 11 1/4* VERT BEND -\ I FH
,
EXISTING 8 DI
7-77777777, _r� ,
EXISTING
1- 8 "x8 "x8" TEE
3 -8" GV'S f
EXISTING TO PIPE
U
T I
4 - 3/4" SHACKLE RODS
NOTES:
PLACE CONCRETE AGAINST UNDISTURBED EARTH, BOTH FACES
CLASS 5 1/2 SACK CONCRETE 3000 PSI MIN
PLAN MEW
NTS '
#4 REBAR 12" O.C. EACH
WAY, CENTER IN CONCRETE
3" COVER TYP.
ar 1°
6 _ I EXIST 8 "0 PIPE
r
TYPICAL CONCRETE DEAD -MAN ANCHOR
NTS
RECORD DRAWING
CONSTRUCTION SEQUENCE AND STREAM FLOW DIVERSIONS PER STREAM RESTORATION NOTES ON SHEET G3.
COORDINATE ALL CONSTRUCTION, CONNECTIONS AND TESTING WITH THE CITY OF RENTON. ALL VALVE
OPERATIONS AND WATER SHUT DOWNS TO BE PERFORMED BY THE CITY ONLY.
PROVIDE CONSTRUCTION FENCING AROUND ALL EXCAVATIONS.
INSTALL DEAD -MAN ANCHOR BLOCKS ON EXISTING 8" WATERLINE AND SHACKLE ROD STUB OUTS. ALLOW 3 -DAY
CURING TIME FOR CONCRETE.
REMOVE EXISTING BENDS AND INSTALL 2 -8" (MJ) END CAPS AND SHACKLE TO DEAD -MAN ANCHOR BLOCKS.
REMOVE SECTION OF EXISTING WATERMAIN.
INSTALL NEW 8" DI PIPE IN STEEL CASING, VERTICAL BENDS, FITTINGS, SHACKLE RODS, TEMPORARY CAPS,
BLOWOFFS, AND BLOCKING.
PRESSURE TEST NEW PIPE, FLUSH, DISINFECT, AND OBTAIN PURITY TESTS.
B -
DATE
SEATRZ
�r
REMOVE TEMPORARY END CAPS AND CONNECT EXISTING WATERLINE. W I- 12I716I6{C91
Aar; '7 - z ?&I'v scmN €D OR I I M
o n ro CONT 4 "x6" BULL RAIL
N -'- 4 "x6 "x1'4" -) CUPPER BLK ® 8' MAX. SECURE STRUCTURAL NOTES
W/ (2) 5/8 "x12" LAG BOLTS ® 8" EA BLK A. GENERAL
Al. AS -BUILT VERIFICATION
w PATHWAY CONTRACT DOCUMENTS THAT DESCRIBE EXISTING CONDITIONS ARE BASED ON FIELD
OBSERVATIONS BY OTHERS AND ARE NOT BASED ON EXTENSIVE FIELD MEASUREMENTS,
d -i t OPENING OF CONCEALED CONDITIONS OR EXCAVATION OF BURIED ITEMS. THE STRUCTURAL
w � V g t V -6" 1 t V -6-
Sa \
4-
8.75 "x48" GLULAM WITH O
OR. THESE PORTIONS
ENGINEER OF RECORD DOES NOT WARRANT THEM TO BE WITHOUT ERR
�
C (D
W
z
OF THE DRAWINGS ARE INTENDED AS A GUIDE TO THE CONTRACTOR WHO SHALL VERIFY
1
8'
w Of
Q 0
u
3/4" MUSH 00
HEAD BOLT
4
N d Q
w
Z_
Q >
1
ro
} cn
<�
z$
�a
O w
O w
Q�.o
p'
4
Y
6
N� J�
(n w
¢g
F
CV
_
Of
;.
o
Z
D
S
x
aS
w
a
i
o�
Q � of
=Lj
as
^N
PQ
wu
q¢
3,
v` E
�°
� E
`m
c
om
a�
s
0
T
a
6-
Sa \
4-
8.75 "x48" GLULAM WITH O
OR. THESE PORTIONS
ENGINEER OF RECORD DOES NOT WARRANT THEM TO BE WITHOUT ERR
GALVANIZED UNIT SKID MESH O
OF THE DRAWINGS ARE INTENDED AS A GUIDE TO THE CONTRACTOR WHO SHALL VERIFY
6
1 1/2" PLATE 1/4- EA SIDE, SECURE
W/ (2) 5/8" BOLTS
1 i f k 2 -� 2"
2" DIA SCH 80 PIPE
±15 EMBEDMENT BEARING PLATE 3/8-
ASSUMED, FIELD VERIFY W/ PIPE 1.5 "0x5"
z SLEEVE, TYP.
0
w
SECTION AT ABUTMENT
SCALE: 1" = 1' -0"
w wp - a7 - ?7 #d
8"x8" CAP W/ (2)
5/8- MUSHROOM
HEAD BOLTS, TYP.
3/16
BRIDGE AND ABUTMENT DETAIL
SCALE = AS SHOWN
D1. APPLICABLE CODES
TIMBER CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF CHAPTER 23 OF THE
UNIFORM BUILDING CODE.
D2. MATERIALS
1. LUMBER: DOUGLAS FIR #2, EXCEPT 8X MEMBERS SHALL BE DOUGLAS FIR Y #1.
PRESSURE TREAT PER AWPA C2. TREATMENT SHALL COMPLY WITH WWPI'S
BEST MANAGEMENT PRACTICES FOR USE OF TREATED TIMBER IN AQUATIC
ENVIRONMENTS. ALL SAWN LUMBER SHALL BE GRADED AND MARKED IN RECORD DRAWING
CONFORMANCE WITH WCLIB STANDARD GRADING RULES FOR WEST COAST 7lNS DRA%WR HAS BEEN PREPARED
LUMBER NO.16, LATEST EDITION. BASED ON N FORMAIM COMPLID
2. GLUED - LAMINATED TIMBER: DECKING SHALL BE DOUGLAS FIR GRADE L1, FRMI " N7RAC70R =AND 07"ER8
PRESERVATIVE TREATMENT FOR SOIL CONTACT PER AITC 109 WITH WET USE BY j
ADHESIVES PER ANSI /AITC A190.1 EACH MEMBER SHALL BEAR AN AITC
IDENTIFICATION MARK AND SHALL BE ACCOMPANIED BY AN AITC DALE �QjO °• 2�3
CERTIFICATE OF CONFORMANCE. HAINIONQ OOLLN'R & WADE -
3. FIELD TREATMENT. ONE GALLON OF COPPER NAPTHENATE (2% SOLUTION) LINNH+'SHI E $ ASSOCIAIES, INC
SHALL BE FURNISHED FOR FIELD TREATING WOOD. ALL ABRASIONS AND CONSlL7M ENDIIIJEERS
CUTS MADE IN THE FIELD SHALL BE GIVEN 3 BRUSH COATS OF THE FIELD 010 SMINE I Y NORTH
3EATP- !KA
TREATMENT SOLUTION. HOLES DRILLED IN THE FIELD SHALL BE POURED
FULL OF PRESERVATIVE. L�$5. IS
E. PIPE HANGERS
�� G
E1. PIPE HANGERS IDENTIFIED BY CATALOG NUMBER AS MANUFACTURED BY B -LINE `m - x
SYSTEMS, INC. REFER TO CATALOG 25198. PROVIDE HOT- DIPPED GALVANIZED ,9 I Oil '- At
FR: V
07
FINISH. EQUIVALENT DEVISES BY OTHER MANUFACTURERS MAY BE SUBSTITUTED
PROVIDED EQUIVALENCE CAN BE DEMONSTRATED TO THE ENGINEER OF RECORD.
'417. `r' "71.e I SCANNED MAR 2 8 2003
FR: V
07
FINISH. EQUIVALENT DEVISES BY OTHER MANUFACTURERS MAY BE SUBSTITUTED
PROVIDED EQUIVALENCE CAN BE DEMONSTRATED TO THE ENGINEER OF RECORD.
'417. `r' "71.e I SCANNED MAR 2 8 2003