Talbot
I GENERAL NOTES
1. CONSTRUCTION STANDARDS
ALL MATERIALS, WORKMANSHIP, DESIGN, AND CONSTRUCTION SHALL CnNFORM TO THE CONSTRUCTION DRAWINGS,
TECHNICAL SPECIFICATIONS, THE UNIFORM BUILDING CODE (1997 EDITION) AS AMENDED BY CHAPTER 51 -40 OF
THE WAC THE RENTON MUNICIPAL CODE, AND THE CITY OF RENTON STANDARD PLANS & SPECIFICATIONS.
2. CONSTRUCTION SAFETY
THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE PUBLIC AND PREVENT NUISANCES WHILE
PERFORMING CONSTRUCTION WORK ON THIS PROJECT. CONTRACTOR SHALL PROVIDE TEMPORARY BRACING FOR THE
STRUCTURE AND STRUCTURAL COMPONENTS UNTIL ALL FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE
WITH THE PLANS.
3. EXISTING LIFT STATION AND UTILITIES
a. EXISTING LIFT STATION: DURING CONSTRUCTION THE CONTRACTOR SHALL PROVIDE TEMPORARY BRACING, PROVIDE
FOR NORMAL OPERATION, AND PROVIDE ACCESS TO THE EXISTING LIFT STATION UNTIL THE PROPOSED LIFT STATION IS
OPERATIONAL AND APPROVED IN WRITING BY THE OWNER.
b. ALL UTILITIES: EXISTING UTILITIES INDICATED ANYWHERE ON THE DRAWINGS HAVE BEEN PL 0 ED FROM THE BEST
INFORMATION AVAILABLE TO THE ENGINEER AND SURVEYOR. THE SOURCE OF INFORMATION GENERALLY CONSISTS OF
CONSTRUCTION RECORDS, UTILITY LOCATES, AND OTHER DATA OBTAINED VERBALLY FROM OFFICIALS ASSOCIATED WITH
THE PARTICULAR UTILITY. OWNER AND ENGINEER DO NOT GUARANTEE NOR ASSUME RESPONSIBILITY FOR THE
ACCURACY OF THIS INFORMATION. IT IS UNDERSTOOD THAT OTHER ABOVE GROUND AND UNDERGROUND FACILITIES
NOT SHOWN ON THE DRAWINGS MAY BE ENCOUNTERED DURING THE COURSE OF THE WORK. THE CONTRACTOR SHALL
VERIFY THE TRUE AND CORRECT LOCATION OF EXISTING UTILITIES TO AVOID DAMAGE OR DISTURBANCE. THE
CONTRACTOR SHALL REPAIR ALL DAMAGED 'UTILITIES IMMEDIATELY.
4. PRE - CONSTRUCTION CONFERENCE
A PRE - CONSTRUCTION CONFERENCE AND TWENTY -FOUR HOUR NOTICE WILL BE REQUIRED PRIOR TO STARTING
CONSTRUCTION.
5. PERMITS AND INSPECTIONS
a. PERMITS: THE CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. SEE
SPECIFICATIONS FOR FURTHER INFORMATION REGARDING PERMITS.
b. INSPECTION: THE CONTRACTOR SHALL OBTAIN ALL BUILDING DEPARTMENT 'N PECTIONS DURING CONSTRUCTION. SOME
OF THE INSPECTIONS WILL BE PERFORMED BY A REPRESENTATIVE OF THE CIT( OF RENTON. THE CONTRACTOR SHALL
NOTIFY THE REPRESENTATIVE 24 HOURS IN ADVANCE OF ANY BACKFILLING OR COVERING OF CONSTRUCTION.
6. MAINTAINING LIFT STATION OPERATION
THE EXISTING LIFT STATION SHALL NOT BE TAKEN OUT OF SERVICE UNTIL THE LIFT STATION CONSTRUCTED UNDER THIS
CONTRACT HAS BEEN INSTALLED, TESTED, AND APPROVED IN WRITING BY THE OWNER. A TEMPORARY PUMPING SYSTEM
CAN BE INSTALLED DURING CONSTRUCTION TO ALLOW FOR CONSTRUCTION OF THE PROPOSED LIFT STATION TO BE
COMPLETED. THE CONTRACTOR SHALL PROVIDE A PLAN TO THE OWNER FOR APPROVAL THAT DETAILS THE PROPOSED
METHOD OF KEEPING THE LIFT STATION OPFRATIONAI DURING THE CONSTRUCTION WORK. INSTALLATION OF THE
TEMPORARY PUMPING SYSTEM SHALL NOT BEGIN UNTIL WRITTEN APPROVAL HAS BEEN OBTAINED FROM THE OWNER. A
HIGH LEVEL ALARM FLOAT SHALL BE CONNECTED TO THE EXISTING TELEMETRY SYSTEM FOR PROVIDING NOTIFICATION TO
THE OWNER IF THE TEMPORARY SYSTEM HAS FAILED. THE CONTRACTOR SHALL BE AVAILABLE TO RESPOND TO ANY
TEMPORARY SYSTEM FAILURE.
7. DEWATERING
IT HAS BEEN ANTICIPATED DURING THE DESIGN PHASE THAT DEWATERING WILL NOT BE REQUIRED DURING THE LIFT
STATION IMPROVEMENTS; THEREFORE, THE PLANS AND SPECIFICATIONS DO NOT IDENTIFY ANY DEWATERING DESIGN. IF IT
IS DETERMINED BY THE CITY DURING CONSTRUCTION THAT A DEWATERING SYSTEM IS REQUIRED TO STABILIZE THE SOILS
FOR CONSTRUCTION, THE CONTRACTOR SHALL DETERMINE THE SCOPE, TYPE, SIZE, QUALITY, METHOD OF INSTALLATION,
OPERATION, AND REMOVAL OF THE DEWATERING SYSTEM NEEDED TO KEEP THE EXCAVATION SITE DEWATERED.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A METHOD OF STORMWATER REMOVAL AND CONTROL TO KEEP
EXCAVATION PITS DRY.
8. CONTRACTOR INITIATED CHANGES
CHANGES SHALL BE SUBMITTED IN WRITING TO THE OWNER FOR APPROVAL PRIOR TO FABRICATION OR
CONSTRUCTION. CHANGES SHOWN ON SHOP DRAWINGS ONLY, WILL NOT SATISFY THIS REQUIREMENT.
9. CONSTRUCTION EXCLUSION PERIOD
NO MAJOR CONSTRUCTION THAT COULD IMPEDE THE FLOW OF TRAFFIC ON TALBOT CREST DRIVE SHALL BEGIN BEFORE
JANUARY 10, 2000.
10. H -20 TRAFFIC RATING
ALL STRUCTURES, MANHOLES, VAULTS, HANDHOLES, LIDS, COVERS, AND ACCESS HATCHES INSTALLED THIS PROJECT
SHALL BE H -20 TRAFFIC RATED.
w W#0 _ 12 .7 - ?79"?
®RAWINIS INDEX
0
A
SHEET DRAWING NUMBER
COVER AND GENERAL INFORMATION
1
G1
EXISTING SITE PLAN
2
n4
PROPOSED SITE PLAN
3
TC2
PROPOSED STRUCTURAL PLAN
4
TS1
PROPOSED MECHANICAL PLAN AND PROFILE
,wr
T
TM1
PROPOSED ONE -LINE DIAGRAM
6
TEL
1999 Sewer ft Statl*on Replacement
Talbot
I GENERAL NOTES
1. CONSTRUCTION STANDARDS
ALL MATERIALS, WORKMANSHIP, DESIGN, AND CONSTRUCTION SHALL CnNFORM TO THE CONSTRUCTION DRAWINGS,
TECHNICAL SPECIFICATIONS, THE UNIFORM BUILDING CODE (1997 EDITION) AS AMENDED BY CHAPTER 51 -40 OF
THE WAC THE RENTON MUNICIPAL CODE, AND THE CITY OF RENTON STANDARD PLANS & SPECIFICATIONS.
2. CONSTRUCTION SAFETY
THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE PUBLIC AND PREVENT NUISANCES WHILE
PERFORMING CONSTRUCTION WORK ON THIS PROJECT. CONTRACTOR SHALL PROVIDE TEMPORARY BRACING FOR THE
STRUCTURE AND STRUCTURAL COMPONENTS UNTIL ALL FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE
WITH THE PLANS.
3. EXISTING LIFT STATION AND UTILITIES
a. EXISTING LIFT STATION: DURING CONSTRUCTION THE CONTRACTOR SHALL PROVIDE TEMPORARY BRACING, PROVIDE
FOR NORMAL OPERATION, AND PROVIDE ACCESS TO THE EXISTING LIFT STATION UNTIL THE PROPOSED LIFT STATION IS
OPERATIONAL AND APPROVED IN WRITING BY THE OWNER.
b. ALL UTILITIES: EXISTING UTILITIES INDICATED ANYWHERE ON THE DRAWINGS HAVE BEEN PL 0 ED FROM THE BEST
INFORMATION AVAILABLE TO THE ENGINEER AND SURVEYOR. THE SOURCE OF INFORMATION GENERALLY CONSISTS OF
CONSTRUCTION RECORDS, UTILITY LOCATES, AND OTHER DATA OBTAINED VERBALLY FROM OFFICIALS ASSOCIATED WITH
THE PARTICULAR UTILITY. OWNER AND ENGINEER DO NOT GUARANTEE NOR ASSUME RESPONSIBILITY FOR THE
ACCURACY OF THIS INFORMATION. IT IS UNDERSTOOD THAT OTHER ABOVE GROUND AND UNDERGROUND FACILITIES
NOT SHOWN ON THE DRAWINGS MAY BE ENCOUNTERED DURING THE COURSE OF THE WORK. THE CONTRACTOR SHALL
VERIFY THE TRUE AND CORRECT LOCATION OF EXISTING UTILITIES TO AVOID DAMAGE OR DISTURBANCE. THE
CONTRACTOR SHALL REPAIR ALL DAMAGED 'UTILITIES IMMEDIATELY.
4. PRE - CONSTRUCTION CONFERENCE
A PRE - CONSTRUCTION CONFERENCE AND TWENTY -FOUR HOUR NOTICE WILL BE REQUIRED PRIOR TO STARTING
CONSTRUCTION.
5. PERMITS AND INSPECTIONS
a. PERMITS: THE CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. SEE
SPECIFICATIONS FOR FURTHER INFORMATION REGARDING PERMITS.
b. INSPECTION: THE CONTRACTOR SHALL OBTAIN ALL BUILDING DEPARTMENT 'N PECTIONS DURING CONSTRUCTION. SOME
OF THE INSPECTIONS WILL BE PERFORMED BY A REPRESENTATIVE OF THE CIT( OF RENTON. THE CONTRACTOR SHALL
NOTIFY THE REPRESENTATIVE 24 HOURS IN ADVANCE OF ANY BACKFILLING OR COVERING OF CONSTRUCTION.
6. MAINTAINING LIFT STATION OPERATION
THE EXISTING LIFT STATION SHALL NOT BE TAKEN OUT OF SERVICE UNTIL THE LIFT STATION CONSTRUCTED UNDER THIS
CONTRACT HAS BEEN INSTALLED, TESTED, AND APPROVED IN WRITING BY THE OWNER. A TEMPORARY PUMPING SYSTEM
CAN BE INSTALLED DURING CONSTRUCTION TO ALLOW FOR CONSTRUCTION OF THE PROPOSED LIFT STATION TO BE
COMPLETED. THE CONTRACTOR SHALL PROVIDE A PLAN TO THE OWNER FOR APPROVAL THAT DETAILS THE PROPOSED
METHOD OF KEEPING THE LIFT STATION OPFRATIONAI DURING THE CONSTRUCTION WORK. INSTALLATION OF THE
TEMPORARY PUMPING SYSTEM SHALL NOT BEGIN UNTIL WRITTEN APPROVAL HAS BEEN OBTAINED FROM THE OWNER. A
HIGH LEVEL ALARM FLOAT SHALL BE CONNECTED TO THE EXISTING TELEMETRY SYSTEM FOR PROVIDING NOTIFICATION TO
THE OWNER IF THE TEMPORARY SYSTEM HAS FAILED. THE CONTRACTOR SHALL BE AVAILABLE TO RESPOND TO ANY
TEMPORARY SYSTEM FAILURE.
7. DEWATERING
IT HAS BEEN ANTICIPATED DURING THE DESIGN PHASE THAT DEWATERING WILL NOT BE REQUIRED DURING THE LIFT
STATION IMPROVEMENTS; THEREFORE, THE PLANS AND SPECIFICATIONS DO NOT IDENTIFY ANY DEWATERING DESIGN. IF IT
IS DETERMINED BY THE CITY DURING CONSTRUCTION THAT A DEWATERING SYSTEM IS REQUIRED TO STABILIZE THE SOILS
FOR CONSTRUCTION, THE CONTRACTOR SHALL DETERMINE THE SCOPE, TYPE, SIZE, QUALITY, METHOD OF INSTALLATION,
OPERATION, AND REMOVAL OF THE DEWATERING SYSTEM NEEDED TO KEEP THE EXCAVATION SITE DEWATERED.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A METHOD OF STORMWATER REMOVAL AND CONTROL TO KEEP
EXCAVATION PITS DRY.
8. CONTRACTOR INITIATED CHANGES
CHANGES SHALL BE SUBMITTED IN WRITING TO THE OWNER FOR APPROVAL PRIOR TO FABRICATION OR
CONSTRUCTION. CHANGES SHOWN ON SHOP DRAWINGS ONLY, WILL NOT SATISFY THIS REQUIREMENT.
9. CONSTRUCTION EXCLUSION PERIOD
NO MAJOR CONSTRUCTION THAT COULD IMPEDE THE FLOW OF TRAFFIC ON TALBOT CREST DRIVE SHALL BEGIN BEFORE
JANUARY 10, 2000.
10. H -20 TRAFFIC RATING
ALL STRUCTURES, MANHOLES, VAULTS, HANDHOLES, LIDS, COVERS, AND ACCESS HATCHES INSTALLED THIS PROJECT
SHALL BE H -20 TRAFFIC RATED.
w W#0 _ 12 .7 - ?79"?
®RAWINIS INDEX
CONTACT PERSONNEL
DRAWING NAME
SHEET DRAWING NUMBER
COVER AND GENERAL INFORMATION
1
G1
EXISTING SITE PLAN
2
TC1
PROPOSED SITE PLAN
3
TC2
PROPOSED STRUCTURAL PLAN
4
TS1
PROPOSED MECHANICAL PLAN AND PROFILE
5
TM1
PROPOSED ONE -LINE DIAGRAM
6
TEL
PROPOSED ELECTRICAL SITE PLAN
7
TE2
PROPOSED ELECTRICAL PLAN
8
TE3
LADDER AND GRATING DETAILS
9
TG1
MISCELLANEOUS DETAILS
10
G2
ELECTRICAL DETAILS
11
E1
TELEMETRY DETAILS
12
E2
R n,
R +
114WFLL 1'��6�9 F
APPROVED BY:
i
i
DRAWING_AP_ 0I./ED BY
DAVE CHRISTENSEN DA
WASTEWATER UTILITY AND TECHNICAL SERVICE SUPERVISOR
CITY OF RENTON
5- 27OP3Q1
REVISED TO CONFORM
TO CONSTRUCTION RECORDS
MARK MILLER 07/18/00
RH2 ENGINEERING INC. DATE
CONTACT PERSONNEL
CONTACT
NAME
POSITION
PHONE
CITY OF RENTON
MIKE BENOIT
PROJECT MANAGER
425 - 430 -7206
CITY OF RENTON
RON SHAFFER
SEWER AND STORM OPERATIONS MANAGER
425- 235 -2585
CITY OF RENTON
RAY SLED
WATER OPERATIONS MANAGER
425- 235 -2646
RH2 ENGINEERING
MARK MILLER
PROJECT ENGINEER
425- 951 -5372
PSE
DAVE'JENNESS
ELECTRICAL &'GAS
253- 395 -6858
US WEST
FRANK FOREST
TELEPHONE
206- 345 -2968
APPROVED BY:
i
i
DRAWING_AP_ 0I./ED BY
DAVE CHRISTENSEN DA
WASTEWATER UTILITY AND TECHNICAL SERVICE SUPERVISOR
CITY OF RENTON
5- 27OP3Q1
REVISED TO CONFORM
TO CONSTRUCTION RECORDS
MARK MILLER 07/18/00
RH2 ENGINEERING INC. DATE
0
C)
EXISTING LIFT STATION
li m VENT PEDESTAL
m n O
z O z
m �
o D
r-
EXISTING LIFT STATION
EXISTING TELEMETRY
ENCLOSURE AND ANTENNA.
v
EXISTING PLASTIC NATURAL GAS o v
MAIN, TO BE RELOCATED BY _
PUGET SOUND ENERGY.
CONTRACTOR TO COORDINATE
I C—
NECESSARY.
COMPANY AS
--
-L 1.
_ - -- �, _ .tee ----- o
I
SS F «� I TEC
r
4' SS Fns a' SS Ftd ss F7
4" SS 4' ss F!' �
NOTE: F T sS F
MONUMENT IN CASE LOCATED AT 3
STATION 10 +00 AT PT OF CURVE
ON TALBOT CREST DRIVE S.
I� II
I II I� I I 12,
I
._ ��VI!lllll��� EXISTING OVERFLOW
SS -_ ,
+o S02 °15'47 »W J -
0
N �1
o II 500.64' NEW DRY WELL + '1
NEW WET WELL
- v W
_ ° I TALBOT CREST DRIVE S. °
- -- -- - - - - -- w - - - - -- '
- - -- -- f
i s
--- j-;- -- s s r
NOTE:
-- EXISTING SANITARY FORCE n
-
MAIN CONSTRUCTED OF � Z -
LIMITS OF CONSTRUCTION
CONTRACTOR SHALL MAINTAIN ACCESS TO
ALL RESIDENCES ALONG TALBOT CREST DRIVE
S. AT ALL TIMES EXCEPT FOR SHORT TIMES
WHERE ACCESS WOULD BE SPECIFICALLY
PRECLUDED BY A CONNECTION TO EXISTING
SANITARY FORCE MAIN OR BY PAVING AND
SIDEWALK RECONSTRUCTION. CONTRACTOR
!3AY WORK OUTSIDE THESE LIMITS WHEN
REQUIRED FOR IMPROVEMENTS OUTSIDE THE
NORMAL LIMITS OF CONSTRUCTION.
EXISTING SITE LEGEND
EX SSMH TRAFFIC JUNCTION BOX
EX CATCH BASIN TYPE 1
EX CATCH BASIN TYPE 2 DECIDUOUS TREE
WATER VALVE CONIFER TREE
FIRE HYDRANT
WATER METER HEDGE
IRRIGATION VALVE UTILITY POLE
WATER BLOW OFF GUY POLE
TELEPHONE CABINET o MAIL BOX
CABLE TV CABINET Cl ROCKERY
GAS VALVE b MON IN CASE
GAS METER • SURFACE BRASS MONUMENT
TELEPHONE MANHOLE PK NAIL
POWER VAULT FOUND REBAR & CAP
LIGHT POLE OR IRON PIPE
u YARD LIGHT EX WATER LINE
® MONITORING WELL FX SANITARY SEWER LINE
EX SIDE SEWER LINE
PEDESTRIAN PUSH EX STORM LINE
BUTTON POLE IRON FENCE
SIGN ss Fn EX FORCE MAIN LINE
TWO POST SIGN CONSTRUCTION FENCE
CONSTRUCTION NOTES
1. EXISTING LIFT STATION, ASSOCIATED PIPING AND CONTROL SYSTEMS ARE TO REMAIN IN SERVICE UNTIL
PROPOSED LIFT STATION HAS BEEN APPROVED BY OWNER FOR OPERATION.
2. REMOVE ALL EXISTING MECHANICAL AND ELECTRICAL COMPONENTS FROM EXISTING LIFT STATION AND
DELIVER TO CITY SHOPS. PUMP 'OUT AND DISPOSE OF ALL EXISTING CONTENTS OF WETWELL REMOVE AND
DISPOSE OF EXISTING LIFT STATION TO 24" BELOW GRADE. BACKFILL LIFT STATION WITH CRUSHED ROCK TO
WITHIN TWO FEET OF SURFACE. BACKFILL REMAINDER WITH TOP SOLI RESTORE AREA TO MATCH EXISTING
LANDSCAPING.
3. AFTER COMPLETION, RESTORE ANY DISTURBED LANDSCAPING TO ORIGINAL OR BETTER CONDITION.
RECONSTRUCT SIDEWALK TO REMOVE CURVED PORTION PER RENTON STANDARD PLANS.
4. CONTRACTOR TO COMPLY WITH ALL CITY AND STATE STORMWATER RUNOFF, EXCAVATION AND TRAFFIC
CONTROL STANDARDS.
5. CONTRACTOR MAY CLOSE THE STREET DURING DRY WELL AND WET WELL CONSTRUCTION WITHIN THE
CONSTRICTION LIMITS. IN ADDITION, THE CONTRACTOR WILL BE ALLOWED TO CLOSE ADDITIONAL AREAS WHERE
PAVING AND ROADWAY RESURFACING ARE REQUIRED. THE CONTRACTOR SHALL NOT IMPEDE THE ABILITY OF
HOMEOWNERS ALONG TALBOT CREST DRIVE S. TO ACCESS THEIR RESIDENCES AND SHALL PROVIDE PROPER
SIGNAGE AT THE TWO INTERSECTIONS WITH TALBOT ROAD S. INDICATING THAT THE ROADWAY IS CLOSED AND
ONLY LOCAL ACCESS IS ALLOWED. AFTER THE DRY WELL AND 'WET WELL HAVE BEEN PLACED AND BACKFILLED,
CONTRACTOR SHALL ADJUST THE CONSTRUCTION FENCE TO OPEN ONE LANE OF TRAFFIC.
CONNECTED T
EXISTING SITE PLAN
1 "= 10'
O (TELEMETRY SYSTEM
A, +.10 79
OVERFLOW PIPE
TO EXISTING
LIFT STATION
" I
— _ I
S02'15'47 "W
I
500.64'
I
I
I
y
I
FINAL SITE PLAN
1 = 10'
- Aw�
NEW DRYWELL ACCESS
HATCH tS Aw7
NEW ELECTRICAL ACCESS
HATCH.
NEW EXHAUST VENT PEDESTAL. SEE
PROPOSED SITE PLAN.
NEW EG RECEPTACLE. SEE
ELECTRICAL SITE PLAN.
NEW TELEMETRY AND YAGI
ANTENNA. REUSE EXISTING
POLE.
NEW INTAKE VENT PEDESTAL
NEW BACKFLOW PREVENTER.
NEW WATER METER
CURB RECONSTRUCTED TO
ALIGN WITH EXISTING
STRAIGHT CURB SECTIONS.
NEW WETWELL ACCESS
HATCH
REVISED TO CONFORM
TO CONSTRUCTION RECORDS
MARK MILLER 07/18/00
RI-12 ENGINEERING INC. DA E
REVISED TO CONFORM TO CONSTRUCTION RECORDS DMB I MM 07/18/0(
NO. REVISION BY REVIEW DATE
RH2 ENGINEERING, INC.
WEN !NT E R S BOTHELL OFFICE I R S
S T S EAST WENATCHEE OFFICE 22780
�acrsrs�6 °t SIGNED:
DRAWING IS NOT TO SCALE
11/11/99
,F BAR IS NOT 2' LONG EXPIRES 3 Ts 2002
rrTv czr
til l 1 0 RENTON -1999 SEWER
1
LIFT STATION REPLACEMENT PROJECT
TALBOT CREST LIFT STATION
EXIS T IN G SITE'' rL.AN
JOH NO FILE ENGINEER RENEWED DATE SCALE PLOP UWG NO
199.054 1 TAL -CER RCP I MM I NOV 22, 2000 ' SHOWN 10 TCl 1 2-112
C.v) ..
NEW ENGINE GENERATOR
i
WET WELL ABANDONED IN CONNECTION NEW LOCATION OF TELEMETRY
PLACE. AND ANTENNA. REUSE
EXISTING ANTENNA MAST AND
NEMA 3R ENCLOSURE.
EW SIDE SEWER UNDER EXHAUST VENT PEDESTAL'S
RY WELL WITH DUCTILE NEW INTAKE VENT PEDESTAL. COMPLETE
4. IRON PIPE. NEW 3' WETWELL VENT
PIPE CONSTRUCTION AFTER DECOMMISSION OF
EXISTING LIFT STATION -
- -, NEW 6' EXHAUST VENT BACKFILOW PREVENTER, SEE DETAIL SHEET. NEW 6"
PIPE _
- - -
INTAKE VENT
- -- — - -- PIPE
— PER
-- - -- CITY STANDARD DETAIL
TEL
� ,a T r d d
`L
e - - _
THE CONTRACTOR SHALL LOCATE THE
EXISTING FORCEMAIN AND INSTALL A -- - - - -iL a
TEMPORARY WYE FITTING WITH TWO GATE - 1
VALVES_ SEE DETAIL THIS SHEET. AFTER REBUILD SIDEWALK AFTER
THE PROPOSED LIFT STATION IS TESTED \ o- F
AND APPROVED FOR OPERATION, THE ABANDONMENT OF EXISTING LIFT
1 3 b `•s r I 1 f !
WYE AND GATE VALVES SHALL BE �� ������ 1 ,
STATION.
AND REPLACED WITH fl i
4 5 84N DI PIPE,O
2 - LT ' \ 1,, I; I ! .. ii
9
i - e s� r s Lti TO DRYWELL SERVICE
2 - 4' DI COUPLING ��� I'
i. �' 1 4 k s al �I a`iy ti sn -fir .y.
NEW 4" DI FORCEMAIN ® r� i ' 0
2'�
I
SOUTH BORDER OF PAVEMENT AND
CURB, GUTTER, AND SIDEWALK ® - \ \ yr ABANDON FORCEMAIN
IL
(WEST SIDE OF STREET)
RESTORATION. N_ -4'
wwoo . d ;p -?7p,?
EXISTING SITE LEGEND
EX SSMH TRAFFIC JUNCTION BOX
EX CATCH BASIN TYPE I
EX CATCH BASIN TYPE 2 DECIDUOUS TREE
WATER VALVE CONIFER TREE
FIRE HYDRANT
WATER METER HEDGE
IRRIGATION VALVE UTILITY POLE
WATER BLOW OFF GUY POLE
TELEPHONE CABINET o MAIL BOX
CABLE TV CABINET C-) 3 ROCKERY
GAS VALVE ® MON IN CASE
GAS METER ® SURFACE BRASS MONUMENT
TELEPHONE MANHOLE fig( PK NAIL
POWER VAULT ® FOUND RON PBAAE & CAP
YARD
® LIGHT POLE LIGHT EX WATER LINE
u EX SANITARY SEWER LINE
0 MONITORING WELL EX SIDE SEWER LINE
PEDESTRIAN PUSH EX STORM LINE
BUTTON POLE - - - - -_- IRON FENCE
SIGN EX FORCE MAIN LINE
TWO POST SIGN CONSTRUCTION FENCE
PROPOSED SITE LEGEND
EXCAVATION LIMITS
PROPOSED SEWER PIPING
PROPOSED WATER PIPING
CONSTRUCTION NOTES
1. LIMITS OF EXCAVATION SHOWN ARE TO BE MAINTAINED AT ALL TIMES. CONTRACTOR MAY NOT
EXCEED SHOWN LIMITS WITHOUT PRIOR WRITTEN AUTHORIZATION BY OWNER'S REPRESENTATIVE.
2. ACCESS TO ALL DRIVEWAYS MUST BE PROVIDED BETWEEN THE HOURS OF 4pm AND 9am.
3. EXISTING LIFT STATION MUST REMAIN IN SERVICE UNTIL PROPOSED STATION IS APPROVED BY
OWNER FOR OPERATION:
4. ANY IMPROVEMENTS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO ORIGINAL OR
BETTER CONDITION AS DETERMINED BY OWNER. STREET, CURB, SIDEWALK, LANDSCAPING, FENCES,
UTILITIES AND ALL OTHER EXISTING IMPROVEMENTS ARE INCLUDED AND INCIDENTAL TO THE
PROJECT.
5. EXCAVATION FOR WETWELL MAY ONLY BEACCOII?LWHE©BYAUGERING TO 'MINIMIZE AREA OF
EXCAVATION. DRYWELL MAY BE INSTALLED USING OPEN TRENCH EXCAVATION.
6. CONSTRUCTION OF 8" SEWER BETWEEN EXISTING MANHOLE AND PROPOSED WETWELL MAY BE
CONSTRUCTED BY ONE OF TWO METHODS. (1) OPEN' TRENCH or (2) TUNNELING WITH APPROPRIATE
WORKER' PROTECTION. WHICHEVER METHOD IS SELECTED, EXCAVATION SNACLNOT EXTEND BEYOND
THE LIMITS SHOWN ON THIS PLAN.
7. PAVEMENT, CURB & GUTTER, AND SIDEWALK - CONTRACTOR SHALL SAW CUT AND REMOVE ALL
ASPHALT WITHIN BOUNDARIES SHOWN ON THE PLANS, INCLUDING ALL CURB & GUTTER AND
SIDEWALK ON THE WEST SIDE. CURB, GUTTER, 'AND SIDEWALK ON THE EASTSIDE SHALL NOT BE
REPLACED UNLESS DAMAGED BY THE CONTRACTOR DURING CONSTRUCTION. CONTRACTOR SHALL
REPLACE ALL CURB, GUTTER,' AND SIDEWALK TO MATCH' EXISTING. THE REMOVED ROADWAY SHALL
BE REPLACED WITH 4° ASPHALT IN TWO LIFTS OVER 6" OF COMPACTED CRUSHED SURFACING TOP
COURSE (CSTC). CSTC SHALL, BE COMPACTED TO 95% MODIFIED.
8. A GEOTECHNICAL INVESTIGATION WAS PERFORMED DURING THE DESIGN PHASE AND THE BORING
WAS STOPPED AT A DEPTH OF APPROXIMATELY 18'. IT IS ANTICIPATED THAT THE CONTRACTOR
WILL ENCOUNTER BEDROCK FROM THIS DEPTH TO THE BOTTOM OF THE EXCAVATION. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO INVESTIGATE THE SITE AND IT'S CONDITIONS PRIOR TO BEGINNING
CONSTRUCTION.
9. THE CONTRACTOR SHALL EXPOSE AND VERIFY THE LOCATION OF THE EXISTING GRAVITY SEWER
PRIOR TO BEGINNING AUGERING FOR CONSTRUCTION OF THE WETWELL. THE CONTRACTOR SHALL
PRESERVE AND PROTECT THE GRAVITY SEWER DURING CONSTRUCTION AND SHALL REPLACE ANY
SANITARY SEWER THAT IS DAMAGED DURING CONSTRUCTION.
S•Y7l303
GATE VALVE
THRUST BLOCKING - EXISTING SEWER PIPE
EXISTING SEWER PIPE �y NEW SEWER PIPE
_5,
WYE FITTING'S
GATE VALVE
TEMPORARY FORCEMAIN CONNECTION DETAIL
r dl� .. f
NOT TO SCALE
REVISED TO CONFORM
TO CONSTRUCTION RECCQDS
MARK MILLER 07/18/00
RH2 ENGINEERING INC. DATE
H
NEW UNIHOIST WALL SLEEVE
PRECAST CONCRETE DRYWELL VAULT EQUAL TO 8' INSIDE DIAMETER x 22' INSIDE DEPTH PRECAST
IS
TO MATCH CITY'S EXISTING
UTILITY VAULT MODEL 814 -8 -LA. MINIMUM CONCRETE WETWELL EQUAL TO PIPE INC. 96" MANHOLE
INSIDE DIMENSIONS OF 8'- 0 "Wx14'- 0 "Lx8' -0 "H.
SYSTEM. INSTALL AS
WITH CUSTOM TOP SLAB AS DETAILED ON THIS SHEET.
PROVIDE WATERTIGHT GASKET AT ALL JOINTS. PROVIDE WATERTIGHT GASKETS AT ALL JOINTS.
NOT TO INTERFERE WITH
SURFACE AND SLOPE.
DRYWELL ACCESS LADDER -",HATCH OPERATION.
\
CDF, CEMENT, OR CONCRETE SHALL BE PLACED IN
�- - 3.5'
i
THRUST RESTRAINT BLOCK.
EXTEND BLOCK TO OUTSIDE
WALL AND REINFORCE VAULT
STRUCTURE AS REQUIRED.
6'x4' DRYWELL ACCESS
HATCH. SEE CONSTRUCTION
NOTES THIS SHEET.
I
9' -4
1.05'
9' -4"
EXISTING 8" SEWER
FINAL PLAN VIEW
1" = 3' -0"
6'x4' ELECTRICAL HANDHOL
PROVIDE RISER(S) AS ACCESS HATCH. SEE
NECESSARY TO MATCH CRADE. CONSTRUCTION NOTES THIS
SHEET.
UPPER WETWELL ACCESS LADDER
UNIHOIST WALL SLEEVE TO MATCH CITY'S EXISTING SYSTEM. INSTALL
SO AS NOT TO INTERFERE WITH HATCH OPERATION.
EXISTING MANHOLE. RECHANNEL BOTTOM OF 1
MANHOLE AS SHOWN ON DWG N0. TM1.
CONTRACTOR SHALL PROVIDE
THE STRUCTURE AT THE TOP
EXISTING FORCEMAIN
EXISTING 8" SEWER TO WETWELL_
EXISTING OVERFLOW
PIPE. DO NOT DISTURB.
E 6'x6' WETWELL
ACCESS HATCH. SEE
OF VAULT AND ALL INCLUDED
DOORS AND HARDWARE FLUSH
STANDARD SPECIFICATIONS WITH
CONSTRUCTION
WITH EXISTING ROADWAY
NOTES THIS SHEET.
SURFACE AND SLOPE.
3/8 °6° NELSON STUDS WELDED
CDF, CEMENT, OR CONCRETE SHALL BE PLACED IN
TO HATCH FRAME AT 12" O.C.
LIFTS THAT SHALL BE CONSTRUCTED AS THE WETWELL
RESTORE ASPHALT BASE AND SURFACING
WHERE DISTURBED TO CITY OF RENTON
ACCESS HAT°H�
STANDARDS.
108.00' (0.00')
v 107.50' (- 0.50') Y- Y" �ynndlsJyh�� APPROX. WETWELL RIM
DRYWELL RIM .j , rf T?crin�. .ice ,3`` 'rev• r.\ ',j'n ,� J ' ,i;r,(n �� . _ �y�%'Sr..�'`'�
_ 0
°
rr _
LOOSE EARTH
- DRYWELL LADDER, SEE DWG. NO. TG1 O SLOPE LOOSE SOIL AS
APPROXIMATE ` NECESSARY FOR
WORKER PROTECTION
DENSE EARTH OR
BEDROCK 5 5 WETWEU_ UPPER LADER,
PROVIDE GRATING SEE DWG NO. TGi
O OVER DRAIN SUMP -6" (TYP) i>
97.00>�1- 11.00') 24„ .
V DRYWEI I EI QOR ( +1 "1
MINIMUM DIAMETER, OF AUGERED
6„ HOLE SHALL BE THE OUTSIDE
(
_h DIAMETER OF THE WETWELL PLUS 12
\
1' -3' TYP ) INCHES.
93.92' - 14.08'
i �.�.
CLEANING PAD TOP
BEDROCK TUKWILLA FORMATION DRYWELL SUMP, SEE PLAN THIS SHEET CLEANING PAD, SEE DWG N0. TG1.
6" SIDE SEWER WETWELL LOWER LADDER
•v, (SHOWN RAISED)
CDF BACKFILL IN AUGERED HOLE
SHALL CONSIST OF CDF PER WSDOT
STANDARD SPECIFICATIONS WITH
PRO -FLOW ADMIXTURE FOR
INCREASED WORKABILITY. 1' -7"
NOTE:
CDF, CEMENT, OR CONCRETE SHALL BE PLACED IN
s
LIFTS THAT SHALL BE CONSTRUCTED AS THE WETWELL
VAULT IS PLACED. PLACEMENT OF A WETWELL VAULT
SECTION WILL NOT BE PERMITTED UNTIL THE LOWER
WETWELL VAULT SECTIONS HAVE BEEN BACKFILLED
WITH CDF AS REQUIRED.
2' -10"
FINAL WEST ELEVATION
1" = 3' -0„
TS1
2' -10"
WETWELL FLOOR
BUILD UP SLOPING BOTTOM WITH CONCPPTE
OR GROUT. AREA BELOW LOWER ACCESS
LADDER SHALL BE FLAT TO PROVIDE LANDING
AREA. FLAT AREA SHALL HAVE A 1% SLOPE
TOWARDS PUMP TO AVOID EFFLUENT
COLLECTION IN THAT AREA.
15"
#3 ® 4" O.C.
(2) #4 CONTINUOUS
12"
^' (3) #6 CONTINUOUS
#4 REBAR DOWELS EXTEND THROUGH LID.
DRILL AND EPDXY INTO 72° CONCRETE FI LL ANY VOIDS WITH
MANHOLE ® 24° 0_C_ MIN. HILTI "HIT 100" STRUCTURAL GROUT.
ADHESIVE SYSTEM OR APPROVED EQUAL.
WETWELL INTERIOR WETWELL EXTERIOR
WETWELL TOP SLAB SECTION
1° - 1' -0" TS1
DRYWELL SUMP PLAN
1" = 1' -0"
1q F R 2'7-w 7
%09
)UAL SUMP PUMPS,
SEE MECHANICAL PLAN
DWG. NO. TMI.
DRYWELL WALL
#4 REBAR HOOP,
6" O.C.
1° - 4'-0"
CONSTRUCTION NOTES
1. DRYWELL AND WETWELL ACCESS HATCHES TO BE DOUBLE LEAF, ALUMINUM DIAMOND PLATE
H -20 RATED DOORS WITH BILCO CAPTIVE BOLTS EQUAL TO BILCO MODEL JD- AL -H20 WITH ALL
STAINLESS STEEL HARDWARE AND FASTENERS. DOORS TO LOCK IN VERTICAL POSITION WITHOUT
MOVEMENT, SPRING OR PISTON ASSIST OPENING, ODOR RESISTANT GASKET, MILL FINISH,
RECESSED HASP COVERED WITH HINGED LID, SS SAFETY CHAIN w /CLEVIS HOOK ON EACH OPEN
ENO. ROUTE 136" PVC DRAIN FROM FRAME TO DRAIN SUMP OR BELOW CLEANING PAD, MOUNT
SECURELY WITH SS BRACKETS.
2. FINISH WETWELL AND DR"VELL INTERIORS PER "FINISHES" SECTION IN SPECIFICATIONS. 'COAT
EXTERIOR OF WETWELL'AND DRYWELL WITH COAL -TAR EPDXY.
3: CORE' -DRILL ALL VAULT PENETRATIONS. GROUT WATERTIGHT AFTER PIPE INSTALLATION. NO
FITTINGS OR FASTENERS SHALL BE INSTALLED WITHIN, 4° OF GROUT PACK.
4. WETWELL AND DRYWELL VAULTS TO''BE CONTRACTOR' DESIGNED AND CONSTRUCTED TO
WITHSTAND LOADS AND DEPTHS AS SHOWN ON THESE PLANS AND DETAILED''IN THE
PROVIDE ROVID REINFORCING AS REQUIRED TO WITHSTAND THESE
SPECIFICATIONS. CONTRACTOR SHALL E QU
FORCES, AND SHALL PROVIDE REINFORCING REQUIRED TO WITHSTAND THE ADDITIONAL FORCES
IMPOSED BY THRUST BLOCKING. THE BASE OF THE VAULTS SHALL BE DESIGNED TO WITHSTAND
BOUYANCY UPLIFT FORCES.
5. CONTRACTOR SHALL PROVIDE A WETWELL VAULT THAT WILL WITHSTAND UPLIFTING BUUYANCY
FORCES. THE CONTRACTOR SHALL, AT HIS OPTION, CHOOSE ONE OF THREE ALTERNATIVES FOR
RESISTING BUUYANCY UPLIFT FORCES. OPTION ONE SHALL CONSIST OF SELECTING A WETWELL
VAULT WITH WALLS THAT ARE MINIMUM 13° THICK. OPTION TWO SHALL CONSIST OF A
CONCRETE BASE POURED AT A MINIMUM THICKNESS OF 36 ". OPTION THREE WILL BE 'ALLOWED
IF THE BASE OF THE MANHOLE IS SET ON BEDROCK. THE CONTRACTOR SHALL ANCHOR INTO
THE BEDROCK TO PROVIDE UPLIFT RESTRAINT FOR THE MANHOLE. CONTRACTOR SHALL
SUBSTANTIATE HIS PROPOSED ANCHORAGE INTO THE BEDROCK WITH CALCULATIONS STAMPED BY
A PE LICENSED IN WASHINGTON STATE.
6. DRYWELL' BUOYANCY SHALL BE RESISTED BY AN OVERSIZED FLOOR SLAB. EXTENDED FLOOR
MAY EITHER BE CAST AS AN INTEGRAL PART OF THE VAULT BOTTOM OR CAN BE SEPARATELY
CAST AFTER THE VAULT BOTTOM IS INSTALLED. EXTENSON TO BE DESIGNED TO WITHSTAND THE
LOADS TO BE ENCOUNTERED. IF EXTENSION IS TO BE CAST SEPARATELY, EXTENSION SHALL BE
ADEQUATELY SECURED TO THE VAULT BOTTOM. CONTRACTOR TO PROVIDE CALCULATIONS THAT
ARE STAMPED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF WASHINGTON.
REVISED TO CONFORM
TO CONSTRUCTION RECORDS
MARK MILLER 07/18/00
RH2 ENGINEERING INC. DATE
C (� C _ a 7 ho t<
ti
APPROX. 108.00' (0.00
p
1ji1� tr
DRYWELL RIM
?
a'
�
15
ELECTRICAL VAULT °-
EMERGENCY PUMP STOP FLOAT
AT 10' HEAL E.",:;H EQUAL TO PACO PIP 701a.
I,
o
_.-4 Fk r , +
o a
83.55' (- 24.70')
WETWELL FLOOR ®
PLUMB TO WETWELL WITH 114" PIPE INCLUDING
CHECK VALVE. PROVIDE BALL VALVE ON EACH
PUMP RUN. PROVIDE UNION ON EACH RUN OF
STRAIGHT PIPE. SECURE PIPE TO WALL. SET PUMPS
5 -8
9�
ELECTRICAL VAULT
I
° 0
4 °
°
DRAIN LINE
I
-� �99.54' ( 8.46')
PIPE CENTERLINE
� 10
I
DRYWELL
-
PUMP REMOVAL GUIDE
RAIL SISIEM. INSTALL
PER MA °._i ACTJRER'S
EXHAUST FAN AND
°
SAFETY CHAIN
a a.
° °
RECOMMENDATIONS.
VENT (WEST WALL)
°Z 00' (- 11.00'11
4
DR�YWELL FLUOR
..Q_.
INTAKE VENT (WEST WALL)
-
o: --7
°
PRESSURE GAUGE.
THRUST BLOCK, SEE STRUCTURAL PLAN
�°
SEE SPECIFICATIONS
a . °
�
DWG. N0. TS1.
0 6
88.50 19.75')
HIGH LEVEL ALARM FLOAT FINAL EAST SECTION &47930tT
87.75' - 20.50' A
° a. EMERGENCY PUMP START FLOA
(- 20.75') 87.50' a 1.. - 2' -0„ TM1
v HIGH LEVEL ALARM
REVISED TO CONFORM
(- 21.50') 86.75' ° a '
TO CONSTRUCTION RECORDS
L� AG PUMP START a
p o I a.
1- 2') 85.75'
L� E 2.50 MP START a Q k €j AU T I I -O ° MARK MILLER 07/18/00
RH2 ENGINEERING INC. DATE
84 75'
PUMP STOP
p
1ji1� tr
?
a'
DUAL SUMP PUMP SYSTEM. (2) 120V MIN 45gpm
�
15
EMERGENCY PUMP STOP FLOAT
AT 10' HEAL E.",:;H EQUAL TO PACO PIP 701a.
I,
o
_.-4 Fk r , +
o a
83.55' (- 24.70')
WETWELL FLOOR ®
PLUMB TO WETWELL WITH 114" PIPE INCLUDING
CHECK VALVE. PROVIDE BALL VALVE ON EACH
PUMP RUN. PROVIDE UNION ON EACH RUN OF
STRAIGHT PIPE. SECURE PIPE TO WALL. SET PUMPS
5 -8
9�
I
° 0
i ELECTRICAL EQUIPMENT.
�L �ll
I
-� �99.54' ( 8.46')
PIPE CENTERLINE
� 10
I
5
DRYWELL
EXHAUST FAN AND
°
SAFETY CHAIN
a a.
° °
0
12
VENT (WEST WALL)
°Z 00' (- 11.00'11
4
DR�YWELL FLUOR
..Q_.
-
o: --7
�°
a . °
�
CLEANING PAD
�
a.
SUMP PUMP DISCHARGE.
°
SUMP
NOTE
93.92' ('- 14.08')
o
111
°
a.
PROVIDE 90° TURNDOWN
CONTRACTOR TO PROVIDE FIRST AID KIT AND FIRE EXTINGUISHER AS DESCRIBED IN
CLEANING PAD TOP
a °
._._
a
AND PIPE TO EXTEND
THE SPECIFICATIONS TO BE LOCATED IN THE DRYWELL
a o
BELOW CLEANING PAD.
SECURE WITH SS CLIPS
19
a p
3
91.35' (- 16.65'
-MHOIE
M INVERT OUT
,:.-
�.
WETWELL
SLOPE 1% TO WETWELL
a'o:
�a
0 6
88.50 19.75')
HIGH LEVEL ALARM FLOAT FINAL EAST SECTION &47930tT
87.75' - 20.50' A
° a. EMERGENCY PUMP START FLOA
(- 20.75') 87.50' a 1.. - 2' -0„ TM1
v HIGH LEVEL ALARM
REVISED TO CONFORM
(- 21.50') 86.75' ° a '
TO CONSTRUCTION RECORDS
L� AG PUMP START a
p o I a.
1- 2') 85.75'
L� E 2.50 MP START a Q k €j AU T I I -O ° MARK MILLER 07/18/00
RH2 ENGINEERING INC. DATE
84 75'
PUMP STOP
° °
1ji1� tr
?
84.50' (- 23.75')
DUAL SUMP PUMP SYSTEM. (2) 120V MIN 45gpm
�
r
EMERGENCY PUMP STOP FLOAT
AT 10' HEAL E.",:;H EQUAL TO PACO PIP 701a.
/7-
o
_.-4 Fk r , +
83.55' (- 24.70')
WETWELL FLOOR ®
PLUMB TO WETWELL WITH 114" PIPE INCLUDING
CHECK VALVE. PROVIDE BALL VALVE ON EACH
PUMP RUN. PROVIDE UNION ON EACH RUN OF
STRAIGHT PIPE. SECURE PIPE TO WALL. SET PUMPS
a a 41
c a ° 'n a ° ° a ° .° ° a ° ° a a ° a c ° p d.
I
f
� I
EXISTING MANHOLE
EXISTING CHANNEL.
RECHANNEL TO NEW
OUTLET.
19
I
EXISTING OVERFLOW -�
EXISTING 8" SEWER TO
ABANDONED LIFT STATION
H o I
TM1
5' M
WETWELL
f 3" PVC WETWELL VENT.
SEE SITE PLAN AND
DETAIL SHEET
TO RUN AS LEAD AND LAG. ALL PIPE AND FITTINGS
TO BE PVC, COPPER OR BRASS. -
SUMP DRYWELL
DISCHARGE
EXISTING 8" SEWER
SHACKLE RODS SEE PNOTE 4'25' 7.7'
m
O
F
2.58'
0 O
C
it �I
1 2.60'
- 1
0
SAFETY CHAIN __ - --
SEE DETAIL
DWG NO. G2
©IC
2.84'
L
FINAL PLAN VIEW
2.0 - ----- 1 1" = 2'-0"
PIPI G NOT TO SCALE
'c
R
m
�
:8)
Og 3 14 26 25
r;
u
F
2.58'
0 O
C
it �I
1 2.60'
- 1
0
SAFETY CHAIN __ - --
SEE DETAIL
DWG NO. G2
©IC
2.84'
L
FINAL PLAN VIEW
2.0 - ----- 1 1" = 2'-0"
PIPI G NOT TO SCALE
6" PVC DRYWELL 50 FEET OF 3/4" INDUSTRIAL
VENT INTAKE. SEE GRADE FLEXIBLE WATER HOSE
SITE PLAN. WITH NOZZLE AND FIBERGLASS
WALL MOUNT RACK,
F'R
R144MILL 1� 6 9
17
18
A
TM1
6" EXHAUST DUCT FAN, MIN
325cfm AT '/a" STATIC
PRESSURE, EQUAL TO
KANALFLAKT K6XL. PROVIDE
BLADE GUARD OVER INLET,
MECHANICAL LEGEND
Oj SUBMERSIBLE SUMP PUMP, SEE SPECS.
O 4" STAND MOUNTED DISCHARGE ELBOW FROM PUMP MAKER (FL)
O3 4" DI SPOOL (FLxFL) 155" LENGTH
V 4" DI 90' BEND (FLxMJ)
O 4" DI PIPE, APPROX. 53" LENGTH
© 4" DI LONG PATTERN MJ SLEEVE
O7 4" DI PIPE, APPROX. 56" LENGTH
® 4" FCA
Og 4" COUNTERWEIGHT SWING CHECK VALVE (FLxFL) EQUAL TO M &H MODEL 159, SEE SPECS
10 4" ECCENTRIC VALVE (FLxFL) w /HANDWHEEL
11 4" DI 90' BEND (FLxFL)
12 4" DI SPOOL (FLxFL) 17" LENGTH
13 4" DI TEE (FLxFLxFL), PROVIDE PORT FOR PRESSURE GAUGE.
14 4" DI PIPE (FLxFL), 70" LENGTH
15 4" DI PIPE (FLxPE), APPROX. 40" LENGTH
16 4" DI PIPE, APPROX. 63" LENGTH
17 4" DI 45' BEND (MJxMJ) w /THRUST BLOCK
18 4" Di PIPE, APPROX. 116 LENGTH, SEE SITE PLAN FOR CONTINUATION
19 8" DI SPOOL (FLxPE), APPROX. 24" LENGTH. PLUMB P,-. FROM EXISTING MANHOLE.
RECHANNEL MANHOLE.
20 8" RS GATE VALVE (FLxFL)
21 8" DI TEE (FLxFLxFL)
© 8" DI SPOOL (FLxPE) w /BEVELED END, APPROX. 36" LENGTH
�3 ADJUSTABLE SADDLE TYPE PIPE SUPPORT (3 -4 ") WITH BASE AND RISER PIPE
3/4" HOSE BIB, MOUNT 2' -0" ABOVE VAULT FLOOR.
0 AIR RELIEF ASSEMBLY, 4" x 1/2" SADDLE, 1/2" BALL VALVE, (2) 1/2" BRASS 90' BEND,
1/2" BRASS WYE STRAINER, i /2" BRASS UNION, 1/2" BRASS PIPE. ALL FITTINGS ARE TO BE
BRASS THREADED.
26 4" GATE VALVE (FLxFL) w /HANDWHEEL
PUMP I
/ GUIDE RAILS
DISCHARGE ELBOW
PROVIDE (8) 5/8" HILT]
DRILL AND EPDXY
CONCRETE ANCHORS INTO
" STAINLESS STEEL MOUNTING - WETWELL BASE
PLATE. SIZE AS NECESSARY TO
EXTEND 4" BEYOND EONS. DRILL AND TAP PLATE TO
BASES IN ALL DIRECTIONS. MATCH DISCHARGE ELBOW
BASE. ATTACH WITH 3/4"
GROUT BENEATH PLATE AS SS HARDWARE.
NECESSARY FOR LEVELING.
PUMP BASE PLATE
NO SCALE
a
o �
z
0
ry �
10
2.64'
:8)
Og 3 14 26 25
I
i ELECTRICAL EQUIPMENT.
�L �ll
I
SEE ELECTRICAL PLAN.
� 10
I
5
6" PVC DRYWELL 50 FEET OF 3/4" INDUSTRIAL
VENT INTAKE. SEE GRADE FLEXIBLE WATER HOSE
SITE PLAN. WITH NOZZLE AND FIBERGLASS
WALL MOUNT RACK,
F'R
R144MILL 1� 6 9
17
18
A
TM1
6" EXHAUST DUCT FAN, MIN
325cfm AT '/a" STATIC
PRESSURE, EQUAL TO
KANALFLAKT K6XL. PROVIDE
BLADE GUARD OVER INLET,
MECHANICAL LEGEND
Oj SUBMERSIBLE SUMP PUMP, SEE SPECS.
O 4" STAND MOUNTED DISCHARGE ELBOW FROM PUMP MAKER (FL)
O3 4" DI SPOOL (FLxFL) 155" LENGTH
V 4" DI 90' BEND (FLxMJ)
O 4" DI PIPE, APPROX. 53" LENGTH
© 4" DI LONG PATTERN MJ SLEEVE
O7 4" DI PIPE, APPROX. 56" LENGTH
® 4" FCA
Og 4" COUNTERWEIGHT SWING CHECK VALVE (FLxFL) EQUAL TO M &H MODEL 159, SEE SPECS
10 4" ECCENTRIC VALVE (FLxFL) w /HANDWHEEL
11 4" DI 90' BEND (FLxFL)
12 4" DI SPOOL (FLxFL) 17" LENGTH
13 4" DI TEE (FLxFLxFL), PROVIDE PORT FOR PRESSURE GAUGE.
14 4" DI PIPE (FLxFL), 70" LENGTH
15 4" DI PIPE (FLxPE), APPROX. 40" LENGTH
16 4" DI PIPE, APPROX. 63" LENGTH
17 4" DI 45' BEND (MJxMJ) w /THRUST BLOCK
18 4" Di PIPE, APPROX. 116 LENGTH, SEE SITE PLAN FOR CONTINUATION
19 8" DI SPOOL (FLxPE), APPROX. 24" LENGTH. PLUMB P,-. FROM EXISTING MANHOLE.
RECHANNEL MANHOLE.
20 8" RS GATE VALVE (FLxFL)
21 8" DI TEE (FLxFLxFL)
© 8" DI SPOOL (FLxPE) w /BEVELED END, APPROX. 36" LENGTH
�3 ADJUSTABLE SADDLE TYPE PIPE SUPPORT (3 -4 ") WITH BASE AND RISER PIPE
3/4" HOSE BIB, MOUNT 2' -0" ABOVE VAULT FLOOR.
0 AIR RELIEF ASSEMBLY, 4" x 1/2" SADDLE, 1/2" BALL VALVE, (2) 1/2" BRASS 90' BEND,
1/2" BRASS WYE STRAINER, i /2" BRASS UNION, 1/2" BRASS PIPE. ALL FITTINGS ARE TO BE
BRASS THREADED.
26 4" GATE VALVE (FLxFL) w /HANDWHEEL
PUMP I
/ GUIDE RAILS
DISCHARGE ELBOW
PROVIDE (8) 5/8" HILT]
DRILL AND EPDXY
CONCRETE ANCHORS INTO
" STAINLESS STEEL MOUNTING - WETWELL BASE
PLATE. SIZE AS NECESSARY TO
EXTEND 4" BEYOND EONS. DRILL AND TAP PLATE TO
BASES IN ALL DIRECTIONS. MATCH DISCHARGE ELBOW
BASE. ATTACH WITH 3/4"
GROUT BENEATH PLATE AS SS HARDWARE.
NECESSARY FOR LEVELING.
PUMP BASE PLATE
NO SCALE
a
o �
z
0
ry �
EXISTING YAGI ANTENNA BACKFLOW
i
! PREVENTER
i GFI RECEPTACLE I
% ! FOR RP HEAT TAPE,
WP
GFI
TELEMETRY PANEL
S'
I I
I TELEMETRY PANEL WILL BE PROVIDED BY TS2
OWNER FOR INSTALLATION BY
CONTRACTOR THIS CONTRACT.
ABOVE GRADE I I
ISA SYMBOL LEGEND
LEVEL SWITCH
LEVEL SWITCH
SPDT LIMIT SWITCH
EdLEVEL TRANSMITTER
THERMOSTAT
T'1
NEW ELECTRICAL 6'x3' ELECTRICAL VAULT FOR
SPLICING JACKETED CABLE TO BUILDING WIRE
POWER RACEWAY SCHEDULE
i
RACEWAY DESCRIPTION
DEVICE
TERMINATION
1 1/4" GRC, 4 - #3
SERVICE DISCONNECT
UTILITY METER
Z�
EXISTING CONDUIT, 4 - #3
UTILITY METER
SERVICE DISCONNECT
/s
1 1/4" GRC, 4 - #3
SERVICE DISCONNECT
MANUAL TRANSFER SWITCH
0
1 -#6 BARE COPPER GROUND
SERVICE DISCONNECT
SEWER PIPE BOND
0
1 1/4" GRC, 4 - #3
MANUAL TRANSFER SWITCH
GENERATOR CONNECTION RECEPTACLE
1 /�\
1 1/4" GRC, 4 - 03
MANUAL TRANSFER SWITCH
DISTRIBUTION BLOCK
0
1/2" GRC, 2 - #10, 1 - #10G
DISTRIBUTION BLOCK
DISCONNECT SWITCH
A
3/4" GRC, 3 - #8, 1 - #8G
DISTRIBUTION BLOCK
PUMP CONTROL PANEL
Q
1/2" GRC, 2 -#10, 1 - #10G
DISCONNECT SW! 'CH
480 VOLT HEATER
WEATHERPROOF. CROUSE HINDS MODEL NO.
AREA10486 OR EQUAL
1 1/4" GRC, 2 - #3, 1 - #8C
5 kVA LIGHTING TRANSFORMER
LOAD PANEL
Al
3/4" GRC, 2 - #12, 1 - #12G
TELEMETRY UNIT
BREAKER
A
112" GRC, 2 - #12, 1 - #12G
WET WELL LIGHT
BREAKER
0
1/2" GRC, 2 - #12, 1 - #12G
HVAC CONTROL PANEL
BREAKER
0
1/2" GRC, 2 - #12, 1 - #12G
SUMP PUMP
BREAKER
A
1/2" GRC, 2 - #12, 1 - #12G
VALVE VAULT RECEPTACLE
BREAKER
A
1/2" GRC, 2 - #12, 1 - #12G
VALVE VAULT LIGHTS
BREAKER
A
1/2" GRC, 2 - #12, 1 - #12G
SUMP PUMP
BREAKER
A
1/2" GRC, 2 - #12, 1 - #12G
VALVE VAULT RECEPTACLE
BREAKER
A
1" GRC, 3 - #12, 4 - #14, 1 - #12G
MOTOR NO. 1
MOTOR STARTER
A
1" GRC, 3 - #12, 4 - #14, 1 - #12G
MOTOR NO 2
MOTOR STARTER
A
1 -1/2" GRC, PUMP 1 JACKETED CABLE
MOTOR NO. 1
MOTOR STARTER
A
1-1/2" GRC, PUMP 1 JACKETED CABLE
MOTOR NO. 2
MOTOR STARTER
0
1" GRC, 6 - #14
FLOAT SWITCHES
TELEMETRY PANEL
A
1 -1/2" GRC, JACKETED CABLE
LEVEL TRANSDUCER
TELEMETRY PANEL
SHALL COORDINATE WITH PSE.
1" GRC, 8 - #12, 4 - #12G
VALVE VAULT DEVICES
TELEMETRY PANEL
IA
2" GRC, 3 -FLOAT CABLES
FLOATS
TELEMETRY PANEL
A
ANTENNA CABLE
TELEMETRY RADIO
ANTENNA
1/2" GRC, 2 - #12, 1 - #12G
DEHUMIDIFIER
BREAKER
3/4" GRC, 2 - #12, 1 - #12G
HOTBOX RECEPTACLE
BREAKER
C
1" GRC, 12 - #14, 1 - #12G
PUMP CONTROL PANEL
TELEMETRY PANEL
wW#o -p1` -tpp `
PUMP CONTROL PANEL OE ( AM t vr1
i
- - -
DEVICE OR EQUIPMEN i TERMINAL
I C
- - - -- - -
F EXISTING POWER POLE
15A 15A
3P'.
CONNECTIONS TO TELEMETRY
3P',
15 AMP
480 VOLT WIRING
MR ���, �-j -
I rrR
3F
J - SFTP
MR
TRANSIENT VOLTAGE SURGE
©
SERVICE DISCONNECT SWITCH
C
V,or
T'{
ETOL
I
OLJ
30 AMP FUSE BLOCK SUPPRESSOR - ORION MODEL
ORN -3Y 277/480C.
�- GENERATOR CONNECTION RECEPTACLE - 500V,
GFI
? N,
NEW EQUIPMENT
120VAC, 20 AMP WITH GROUND PRONG (FOR SUMP
- 100A, 4-POLE 3 -WIRE, THREADED CAP,
- ' WP
PUMPS AND DEHUMIDIFIER). DUPLEX RECEPTACLES
LOCATED IN DRYWELL.
\
WEATHERPROOF. CROUSE HINDS MODEL NO.
AREA10486 OR EQUAL
r
SWITCH, 120VAC, 20 AMP
FUSE
L
LIGHT FIXTURE
HEATER LOCATED IN VAULT
HEATER DISCONNECT SWITCH
Sr
UTILITY METER ENCLOSURE AS
APPROVED BY PUGET SOUND ENERGY
N
\I
DISTRIBUTION TRANSFORMER
0
480 VOLT DISTRIBUTION BLOCS( ©
=
I NEW CONDUCTORS IN EXISTING AND
I I� KWH
I a ' \ 100A
-
j
430 VOLT 'y
PFR -
PHASE FAIL RELAY
PROPOSED 1 1/2° CONDUIT. CONTRACTOR
\ N 3P
MR -
MOTOR RUN
NEW 480/277 SERVICE TO
HEATER 0 30A
OL -
MOTOR OVERLOAD
SHALL REMOVE OLD CONDUCTORS.
- _
L 1 Y
SFIL
- SEAL FAIL INDICATOR LIGHT
REPLACE EXISTING 240V, 3
Z 3P
MOIL
- MOTOR OVERTEMP INDICATOR LIGHT
APPROXIMATELY 120 FEET OF CONDUIT IS
EXISTING.
- -` K
Q
_ _
f
PHASE SERVICE CONTRACTOR.
S
OC -
3
1
SHALL COORDINATE WITH PSE.
_
g` MANUAL
STRANSR
([ 2
I
i
PUMP CONTROL PANEL OE ( AM t vr1
i
- - -
DEVICE OR EQUIPMEN i TERMINAL
I C
- - - -- - -
120 VOLT WIRING
15A 15A
3P'.
CONNECTIONS TO TELEMETRY
3P',
15 AMP
480 VOLT WIRING
MR ���, �-j -
I rrR
3F
J - SFTP
MR
SFII ,
yFTP�
I NO
J
3
4 X
V,or
T'{
ETOL
GFI
OLJ
M
HOC
GFI
DEDICATED SINGLE OUTLET GFI RATED RECEPTACLE,
ELECTRICAL VAULT
E fS
CLASS 1 DIVISION
1 AREA
CONDUIT PENETRATIONS
TO VAULT AND WET
WELL PROVIDE
INSULATED PLASTIC
BUSHING. THOMAS AND g
BETTIS #226 TYPICAL f
WET WELL, VALVE VAULT,
AND HAND HOLES �Tr
T•.
s
100A
3P
DISCONNECT SWITCH '
0
i
6! O
F
30A
3P
JJ LIGHT TRANSFORMER 5kVA, 1
PHASE 480V PRI /120 /24OVSEC
LIGHT SWITCH ( 20A 20A 0
20A 2 0A � 20A -
--T 20A 20
- 20A 20A -
EYS
20A o20A -
20A 20A
- LOAD PANEL
ELECTRICAL VAULT
WATERPROOF
CABLE SPLICE J J
(TYPICAL) LEVEL TRANSMITTER BELLOWS
ATTACHED TO SIDE OF VAULT PER
MANUFACTURE'S RECOMMENDATIONS
CLASS 1 DIVISION
1 AREA
ii
T WELL LS3 -.
FLOATS
LS2
LS1
L o '
,HP,,'1/
PUMP # 1 PUMP # 2
EQUIPMENT LOCATED ON
TALBOT ROAD SOUTH.
OWNER TO APPROVE
LOCATION OF EQUIPMENT
O BEFORE INSTALLATION
R
``100A NEW SERVOS
DISCONNECT SWITCH
iGi 1
J 'o-
J
BELOW
GRADE
#6 BARE COPPER GROUNDING ELECTRODE
CONDUCTORS TO GROUND RODS PER N.E.C.
J
u
M1 .� T
=
LS4 LS5
=GFI
' CHECK VALVE LIMIT QT - -T -
I '
I ZS1 SWITCHES. (TYPICAL) O
f -
- I
I � Z52
o
GFI EXHAUST FAN MOTOR I ,,
WIP
--
DEHUMIDIFIER M % M - L -- 6, - -GFI - - -'�
1000 W, 120V ` --
I
_GFI TS1 \.
WIFb
WET WELL TRANSDUCER SUMP PUMP MOTORS (TYPICAL)
NEW HVAC CONTROL PANEL. SEE DWG.
SAR,2793 N0. E1 FOR CONTROL LOGIC
F�R 2 `
SEE LEGEND ON DWG NO. TE3 FOR DESCRIPTIONS I
FLOOD SWITCH (TYPICAL OF 2) 1 R.��
S aF •sg�NQ%i
REVISED TO CONFORM � F r
TO CONSTRUCTION RECORDS
22513
MARK MILLER 07/18/00 acisxs86 °tir� SIGNED:
RH2 ENGINEERING INC. DATE tOu 11/11/99 I
EXPIRES 71/3/01
a '
r
m '
0
y M
r
� I
m Iro
9 e
z
-� c
ELECTRICAL SYMBOL LEGEND
- - -
DEVICE OR EQUIPMEN i TERMINAL
- - - -- - -
120 VOLT WIRING
_
CONNECTIONS TO TELEMETRY
480 VOLT WIRING
- -_ W_P
DUPLEX OUTLET RECEPTACLE, 120VAC, 20
_
AMP WITH GROUND PRONG (WATERPROOF
GFI
WHERE INDICATED WITH WP) - GFI RATED
M
3 PHASE MOTOR
GFI
DEDICATED SINGLE OUTLET GFI RATED RECEPTACLE,
120VAC, 20 AMP WITH GROUND PRONG (FOR SUMP
- ' WP
PUMPS AND DEHUMIDIFIER). DUPLEX RECEPTACLES
NOT ACCEPTABLE.
MAGNETIC BREAKER ONLY
SWITCH, 120VAC, 20 AMP
FUSE
L
LIGHT FIXTURE
Sr
N
SOLID NEUTRAL
M
SINGLE PHASE MOTOR
=
GROUND
®�
EYS EXPLOSON PROOF CONDUIT SEAL FITTING
ABBREVIATIONS LEGEND
PFR -
PHASE FAIL RELAY
TELEMETRY WIRING
MR -
MOTOR RUN
OL -
MOTOR OVERLOAD
EQUIPMENT /DEVICE ENCLOSURE
SFIL
- SEAL FAIL INDICATOR LIGHT
MOIL
- MOTOR OVERTEMP INDICATOR LIGHT
J
JUNCTION BOX SIZED PER NEC
RTM
- RUN TIME METER
OC -
OPERATION COUNTER
J
u
M1 .� T
=
LS4 LS5
=GFI
' CHECK VALVE LIMIT QT - -T -
I '
I ZS1 SWITCHES. (TYPICAL) O
f -
- I
I � Z52
o
GFI EXHAUST FAN MOTOR I ,,
WIP
--
DEHUMIDIFIER M % M - L -- 6, - -GFI - - -'�
1000 W, 120V ` --
I
_GFI TS1 \.
WIFb
WET WELL TRANSDUCER SUMP PUMP MOTORS (TYPICAL)
NEW HVAC CONTROL PANEL. SEE DWG.
SAR,2793 N0. E1 FOR CONTROL LOGIC
F�R 2 `
SEE LEGEND ON DWG NO. TE3 FOR DESCRIPTIONS I
FLOOD SWITCH (TYPICAL OF 2) 1 R.��
S aF •sg�NQ%i
REVISED TO CONFORM � F r
TO CONSTRUCTION RECORDS
22513
MARK MILLER 07/18/00 acisxs86 °tir� SIGNED:
RH2 ENGINEERING INC. DATE tOu 11/11/99 I
EXPIRES 71/3/01
a '
r
m '
0
y M
r
� I
m Iro
9 e
z
-� c
r
NOTE
ALL CONDUIT INSTALLED lM -EARTH; SHALL BE,
CONCRETE ENCASED, SEE DETAIL THIS,SHEET.
NEW CRUSHED SUI
NEW STRU
NIATI\/F (1R r
i
i
INTERCEPT EXISTING CONDUIT FROM
SOUTH TALBOT ROAD. EXTEND CONDUIT
TO PROPOSED DISCONNECT
ELECTRICAL SITE PLAN
1 " =40'
NEW ELECTRICAL WARNING TAPE
>NDUIT
CONCRETE ENCASEMENT DETAIL
NOT TO SCALE
N CONCRETE ENCASEMENT.
IIMUM OF 3" COVER ON ALL
ES OF CONDUITS.
V CONDUIT (TYPICAL)
m
(TY')
UTILITY METER ENCLOSURE I
SERVICE DISCONNECT
271$03
2
REVISED TO CONFORM
4" UNISTRUT TO CONSTRUCTION RECORDS
CHANNEL
MARK MILLER 07 /18/00
2" UNISTRUT RI-12 ENGINEERING INC. DATE
CHANNEL CROSS
MEMBERS
EMBED THE 4"
UNISTRUT CHANNEL IN
THE CENTER OF THE �tb 4= a LjNCT�
12" DIAMETER
CONCRETE CYLINDER.
r
r
L4S�_ 22513
j,
r F �crs' s � SIGNED
G i`TG I` I0 11/11/99
�E. p[ EXPIRES 11/3/01
ya��i d ar, 2 REVISED TO CONFORM TO CONSTRUCTION RECORDS DMB MM 07/18/00
vre� NO. REVISION BY' REVIEW I DATE
-m RH2 ENGINEERING. iNC.
it •.P t L. A 46
OBLIQUE �p�yyyY9 w xsy� �G
(TYP)
PLAN VIEW
SERVICE DISCONNECT AND METER
MOUNTING DETAILS
NOT TO SCALE
EXISTING ANTENNA MAST AND NEMA 3R ENCLOSURE FOR TELEMETRY
EQUIPMENT. CONTRACTOR SHALL INSTALL PROPOSED TELEMETRY PANEL
o
NEW EG RECEPTAC?_E.
INSIDE NEMA 3R ENCLOSURE. CONTRACTOR SHALL MOUNT ANTENNA ON
ANTENNA MAST SAME AS EXISTING. ANTENNA AND TELEMETRY PANEL WILL
BE PROVIDED BY OWNER.
EXISTING TE,_EPHONC PEDESTAL ----_
INSTALL 4" THICK CONCRETE WALL
DOWN MIDDLE OF ELECTRICAL
BACKFLOW PREVENTER
VAULT TO PROVIDE WATER TIGHT
SEPARATION.
5 30 -1- 29 2 24 2 26 24 2 f SPARE 1" GRC CONDUIT
ti Y
Y
- ___ - - --
SPARE T° --GRC CONDUIT
I
NEW DRYWELL VAULT
— -
-
_____
NOTE
r
NOTE
ALL CONDUIT INSTALLED lM -EARTH; SHALL BE,
CONCRETE ENCASED, SEE DETAIL THIS,SHEET.
NEW CRUSHED SUI
NEW STRU
NIATI\/F (1R r
i
i
INTERCEPT EXISTING CONDUIT FROM
SOUTH TALBOT ROAD. EXTEND CONDUIT
TO PROPOSED DISCONNECT
ELECTRICAL SITE PLAN
1 " =40'
NEW ELECTRICAL WARNING TAPE
>NDUIT
CONCRETE ENCASEMENT DETAIL
NOT TO SCALE
N CONCRETE ENCASEMENT.
IIMUM OF 3" COVER ON ALL
ES OF CONDUITS.
V CONDUIT (TYPICAL)
m
(TY')
UTILITY METER ENCLOSURE I
SERVICE DISCONNECT
271$03
2
REVISED TO CONFORM
4" UNISTRUT TO CONSTRUCTION RECORDS
CHANNEL
MARK MILLER 07 /18/00
2" UNISTRUT RI-12 ENGINEERING INC. DATE
CHANNEL CROSS
MEMBERS
EMBED THE 4"
UNISTRUT CHANNEL IN
THE CENTER OF THE �tb 4= a LjNCT�
12" DIAMETER
CONCRETE CYLINDER.
r
r
L4S�_ 22513
j,
r F �crs' s � SIGNED
G i`TG I` I0 11/11/99
�E. p[ EXPIRES 11/3/01
ya��i d ar, 2 REVISED TO CONFORM TO CONSTRUCTION RECORDS DMB MM 07/18/00
vre� NO. REVISION BY' REVIEW I DATE
-m RH2 ENGINEERING. iNC.
it •.P t L. A 46
OBLIQUE �p�yyyY9 w xsy� �G
(TYP)
PLAN VIEW
SERVICE DISCONNECT AND METER
MOUNTING DETAILS
NOT TO SCALE
NEW ACCESS LADDER
NEW LIMIT SWITCH ON ,ACCESS
HATCH TO ACTIVATE LIGHT
CIRCUIT WHEN OPEN.
NEW DRY WELL VAULT
L
NEW LIMIT SWITCH ON ACCESS
HATCH TO ACTIVATE
VENTILATION SYSTEM.
NEW WET WELL LIGHT SWITCH. MOUNT IN
ACCESS HATCH FRAME AREA CLEAR OF
HATCH COMPONENTS. SWITCH SHALL
NOT INTERFERE WITH HATCH CLOSURE.
SWITCH SHALL BE ACCESSIBLE FROM
STREET LEVEL.
NEW RECEPTACLE. MOUNT IN ACCESS
HATCH FRAME AREA CLEAR OF HATCH
COMPONENTS. RECEPTACLE SHALL NOT
INTERFERE WITH HATCH CLOSURE.
RECEPTACLE SHALL BE ACCESSIBLE FROM
STREET LEVEL.
NEW ACCESS HATCH TO DRY
WELL VAULT
J
HVAIC PANEL [DRY WELL ELECTRICAL PLAN
NEW ELECTRICAL HANDHOLE
30 AMP FUSE BLOCK � ACCESS HATCH.
r SURGE SURPRESSOR -
/ A
NEW DRY WELL VAULT
NEW LEVEL TRANSMITTER
NSTALLED IN "- — 1
SEE DETAIL OP
EXHAUST FAN rJ C r� TAKE PIPE PENETRATION
I, a. 3,
�I -�
- o
d: \ DRAIN TROUGH
a -�o o a' o:Q 6 o o 0
�-
o
DRY WELL VAULT - SECTION
TE3
1" = 2' -0"
•
P,
TE3
WET WELL ELECTRICAL PLAN
1 = 2' -0"
ATS AND MOUNTING
. SEE SPECIFICATIONS
SILS.
REVISED TO CONFORM TO CONSTRUCTION RECORDS DIVE MM 0//18/00
NO. REVISION BY REVIEW" DATE
NEW LADDER ® REVISED TO CONFORM RH2 ENGINEERING. INC
TO CONSTRUCTION RECORDS L' '1Sp
1� °t WAS , ?Z�
MARK MILLER 07/18/00 ENGINEERS BOTHELL. OFFICE
RH2 ENGINEERING INC. DATE PLANNERS
SCIENTISTS EAST WENATCHEE OFFICE .g, 22780
�R�clstse6 °� SIGNED:
fonrnL �'
NEW WET WELL STRUCTURE DRAWING IS NOT TO SCALE 11112199
IF BAR IS NOT 2" LONG ExpIRES �/ s zooz
0 L, 2..
NEW CLEANING PAD R CITY Y OF RENTON -1999 SEWER
SQL • E$
*As LIFT STATION ':REPLACEMENT PROJECT
TALBOT CREST LIFT STATION
22513 ! I p p, /�
01ST-0 ` SIGNED: ELECTRICAL f AN
TONAL 11/11/99
aoe elo. rim EriclNEEa acVErho DA FE scnve vi.ur ow(; No swErr
Ex IHr s 11/3/01 199.054 TAI - -E5R MM I MM I NOV 22, 2000 1 SHOWN' 24 1 TE3 8 -112
Y
ELECTRICAL NOTES
1. ALL WIRES SHALL BE ROUTED IN RIGID GALVANIZED STEEL CONDUIT UNLESS OTHERWISE NOTED, SIZE AS
NOTED ON DRAWING. CONDUIT SHALL BE 1/2" SIZE WHEN NOT ON PLANS.
2. 480 VOLT WIRING SHALL BE ROUTED IN SEPARATE CONDUITS FROM 120 VOLT (AND OTHER VOLTAGE)
CIRCUITS.
3. ALL WIRE SHALL BE A MINIMUM SIZE # 12 UNLESS SHOWN OTHERWISE.
4.
LOCATION OF CONDUIT ENDS ARE SHOWN APPROXIMATELY. CONTRACTOR IS RESPONSIBLE FOR ENDING
CONDUITS IN LOCATION THAT WILL NOT CONFLICT WITH EQUIPMENT IN THE VAULT.
5. CONDUIT ROUTING IS SHOWN DIAGRAMMATIC. CONTRACTOR IS RESPONSIBLE TO ROUTE CONDUITS IN A
NEAT MANNER, PARALLEL OR PERPENDICULAR TO WALLS AND SECURELY ATTACHED TO WALL OR CEILING.
6. ALL
CONDUIT PENETRATIONS INTO THE CONCRETE STRUCTURES REQUIRE A LINK -SEAL FITTING AROUND THE
CONDUIT. PENETRATION SHALL BE WATERTIGHT.
ELECTRICAL EQUIPMENT LEGEND
Oq
SERVICE ENTRANCE DISCONNECT SWITCH - NEMA 3R, HEAVY DUTY BREAKER, SERVICE RATED, 100
AMP, 600 VOLT, CIRCUIT BREAKER SWITCH. SIEMENS MODEL E3RED63B10O OR EQUAL. SERVICE
ENTRANCE SWITCH SHALL INCLUDE A SURGE SUPPRESSION UNIT AS IDENTIFIED ON DWG NO. TE1.
OB
MANUAL TRANSFER SWITCH - NEMA 3R, DOUBLE THROW, NON -FUSED SAFETY SWITCH, 600 VOLT, 100
AMP, SIEMENS MODEL NFR353DTK OR EQUAL. (SIZE: 12 "Wx25 "Hx5 "D)
©
480 VOLT DISTRIBUTION BOX - NEMA 3R, SIZED PER N.E.C.
DO
240/120V LIGHTING PANELBOARD - NEMA 3R, SINGLE PHASE, 3 WIRE, SOLID NEUTRAL, 16 SPACES.
SIEMENS MODEL W1624MB1100CU OR EQUAL PROVIDE BREAKERS AS SHOWN ON ONE -LINE DIAGRAM.
(SIZE: 14.5 "Wx22 "Hx4.5 "D)
of
PUMP CONTROL PANEL - SEE SPECIFICATIONS.
OF
TRANSFORMER DISCONNECT SWITCH - NEMA 3R, HEAVY DUTY, 3 -POLE, 3 -WIRE, 30 AMP, 600 VOLT,
FUSED DISCONNECT SWITCH. SIEMENS MODEL FR351 OR EQUAL. (SIZE: 8.5 "Wx15 "Hx4.5 "D)
©
LOW VOLTAGE TRANSFORMER - OUTDOOR RATED, DRY -TYPE, 5 KVA, 240x480- 120/24OV, SINGLE
PHASE. SIEMENS MODEL lDlNO05ST OR EQUAL. (SIZE: 10 "Wx15 "Hx12 "D)
OH
ELECTRICAL CEILING HEATER - IOKW, 480 VOLT, 3 PHASE 34,100 BtuH, ELECTRICAL HEATER WITH
UNIVERSAL MOUNTING BRACKET. MOUNT PER MANUFACTURER'S RECOMMENDATION. DAYTON
HEAVY -DUTY MODEL OR APPROVED EQUAL. PROVIDE WITH WALL MOUNTED THERMOSTAT ADJUSTABLE
BETWEEN 50' TO 807. THERMOSTAT SHALL HAVE A ROOM TEMPERATURE THERMOMETER. SET
THERMOSTAT AT 557.
OJ
ELECTRICAL HEATER DISCONNECT - NEMA 3R, HEAVY DUTY, 3 -POLE, 3 -WIRE, 30 AMP, 600 VOLT,
FUSED DISCONNECT SWITCH. SIEMENS MODEL FR351 OR EQUAL. (10 "Wx15 "Hxi2 "D)
OK
UTILITY METER ENCLOSURE - AS APPROVED BY PUGET SOUND ENERGY.
©
GENERATOR CONNECTION RECEPTACLE - OUTDOOR RATED, 600 VOLT, 100A, 4 -POLE, 3 -WIRE,
THREADED CAP, WEATHERPROOF. CROIISE HINDS MODEL NO. AREA10486 OR EQUAL THAT MATCHES
CITY'S EXISTING PLUG.
OM
TELEMETRY PANEL FROM EXISTING LIFT STATION. OWNER WILL PROVIDE PANEL FOR INSTALLATION BY
CONTRACTOR. ENCLOSURE SHALL BE INSTALLED IN EXISTING NEMA 3R TELEMETRY ENCLOSURE AFTER
EXISTING PANELS IS RELOCATED.RE -USE EXISTING CONDUIT PENETRATIONS WHEN POSSIBLE. CONNECT
TO PROPOSED SENSORS, ALARMS, AND DEVICES.
0
WALL MOUNTED INCANDESCENT FIXTURE - EXPLOSION PROOF, 120 VOLT, 150 WATT RATED. FURNISH
WITH 150 WATT EXTENDED SERVICE LIGHT BULB. APPLETON PART NOS. AALB -75 (BRACKET), AAU -15N
(FIXTURE UNIT), AAGU -1 (ALUMINUM GUARD) OR EQUALS. FURNISH ALL NECESSARY CONDUIT AND
SEALS TO MEET EXPLOSION PROOF CRITERIA. MOUNT AS HIGH AS POSSIBLE ON WALL.
©
ELECTRICAL EQUIPMENT PANEL LIGHT FIXTURE - INCANDESCENT, 120 VOLT, 150 WATT RATED. FURNISH
WITH 150 WATT EXTENDED LIFE BULB. HUBBELL MODEL VX -151 OR EQUAL-
LIGHT AND HVAC LIMIT SWITCHES
®
DISCONNECT SWITCH - NEMA 3R, HEAVY DUTY BREAKER, SERVICE RATED, 100 AMP, 600 VOLT,
CIRCUIT BREAKER SWITCH. SIEMENS MODEL E3RED63B100 OR EQUAL.
OS
INTRUSION ALARM SWITCH - SQUARE D HEAVY DUTY TYPE C, CLASS 9007 OR EQUAL. USE LIQUID
TIGHT FLEXIBLE CONDUIT BETWEEN JUNCTION BOX AND LIMIT SWITCH. CONTRACTOR SHALL SELECT
ACTUATOR LEVER ALARM BEST SUITED FOR MOUNTING CONFIGURATION.
V
CHECK VALVE POSITION LIMIT SWITCH - SQUARE D HEAVY DEITY TYPE C, CLASS 9007 OR EQUAL. USE
LIQUID TIGHT FLEXIBLE CONDUIT BETWEEN JUNCTION BOX AND LIMIT SWITCH. SEE DETAIL ON DWG NO.
G2.
O
FLOOD SWITCH - OMEGA MODEL LV -10 OR EQUAL. MOUNT TO END OF 1/4" PVC PIPE AND SECURE TO
WALL WITH MINIMUM OF TWO STAINLESS STEEL PIPE CLAMPS. SWITCH SHALL TRIP AT 1/2" OF WATER
LEVEL IN VAULT.
(�
LOW TEMPERATURE DEHUMIDIFIER 7.7 AMP, 115V, 1 PHASE, 0.7 PINTS PER HOUR ® 80% RELATIVE
HUMIDITY AND 557 TEMPERATURE. EBCO OASIS MODEL OD 3800HG OR APPROVED EQUAL. PROVIDE
WITH MOUNTING FIBERGLASS SHELF MOUNTED TO WALL FOR SUPPORTING THE DEHUMIDIFIER. PROVIDE
WITH RUBBER DRAIN HOSE AND FITTINGS TO SUMP PIT.
REVISED TO CONFORM TO CONSTRUCTION RECORDS DIVE MM 0//18/00
NO. REVISION BY REVIEW" DATE
NEW LADDER ® REVISED TO CONFORM RH2 ENGINEERING. INC
TO CONSTRUCTION RECORDS L' '1Sp
1� °t WAS , ?Z�
MARK MILLER 07/18/00 ENGINEERS BOTHELL. OFFICE
RH2 ENGINEERING INC. DATE PLANNERS
SCIENTISTS EAST WENATCHEE OFFICE .g, 22780
�R�clstse6 °� SIGNED:
fonrnL �'
NEW WET WELL STRUCTURE DRAWING IS NOT TO SCALE 11112199
IF BAR IS NOT 2" LONG ExpIRES �/ s zooz
0 L, 2..
NEW CLEANING PAD R CITY Y OF RENTON -1999 SEWER
SQL • E$
*As LIFT STATION ':REPLACEMENT PROJECT
TALBOT CREST LIFT STATION
22513 ! I p p, /�
01ST-0 ` SIGNED: ELECTRICAL f AN
TONAL 11/11/99
aoe elo. rim EriclNEEa acVErho DA FE scnve vi.ur ow(; No swErr
Ex IHr s 11/3/01 199.054 TAI - -E5R MM I MM I NOV 22, 2000 1 SHOWN' 24 1 TE3 8 -112
Y
NOT TO SCALE
WETWELL HATCH ACCESS
SS OFFSET SUPPORT BRACKET
/// BILCO LADDER UP EXTENDER.
ALUMINUM WITH
NON— CORROSIVE HARDWARE.
fSS '" DIA ROD SS 2"x 1 1/4" BAR
f
PROVIDE MINIMUM OF 1
INTERMEDIATE WALL SUPPORT.
13' -6"
i
SAFETY CHAIN
_s
SS 3"x 3"x1/2" ANGLE
CLEANING PAD
EXTREN 625 W 4 x 4 x 1/4"
_�.
MORRISON MOLDED FIBER
3' —O"
GLASS COMPANY (MMFG)
111----- 1--- -- BOLT THROUGH GRATING
FIBREBOLT 1/2 "0 -13 UNC
FRONT
FIBERGLASS STUDS AND
EXTREN 625
NUTS, TYPICAL (OR MAY
3" x 3" x 1/4 ",
SUBSTITUTE STAINLESS
EACH SIDE GRATING CONNECTION @ BEAM
STEEL BOLTS)
EXTREN 625
SEE DETAIL ON DWG NO. G2.
W4x4x1 /4"
SS BENT PLATE
3' -0"
3" x 3" x 1/4"
ei �
LOWER LADDER NOTES
ANCHOR
PLAN SECTION
GRATING DETAILS
_
NOT TO SCALE
WETWELL HATCH ACCESS
SS OFFSET SUPPORT BRACKET
/// BILCO LADDER UP EXTENDER.
ALUMINUM WITH
NON— CORROSIVE HARDWARE.
fSS '" DIA ROD SS 2"x 1 1/4" BAR
f
PROVIDE MINIMUM OF 1
INTERMEDIATE WALL SUPPORT.
13' -6"
i
SAFETY CHAIN
_s
SS 3"x 3"x1/2" ANGLE
CLEANING PAD
_�.
.._.
SS 3 "x 3 "x 112" PLATE.
3' —O"
1 —4 O
111----- 1--- -- BOLT THROUGH GRATING
FRONT
TO ANGLE ABOVE.
SIDE
_
WETWELL UPPER LADDER
1" = 2' -0"
WETWELL ACCESS HATCH
SS OFFSET SUPPORT BRACKET _
WETWELL
a ,
r LADDER H LD HOOK, SEE
DETAIL I DWG. NO. G2.
2' 3"
LADDER NOTES
1. ENTIRE WETWELL LADDER,
ANCHORING AND 'HARDWARE SHALL
BE STAINLESS STEEL FIBERGLASS
LADDER IS AN ACCEPTABLE
ALTERNATIVE PENDING REVIEW OF
DESIGN BY ENGINEER.
2. LADDERS SHALL BE
CONSTRUCTED TO ALL APPLICABLE.
OSHA STANDARDS.
3. LADDERS SHALL BE
CONSTRUCTED MINIMUM 16" WADE,
12" RUNG SPACING WITH MINIMUM
3/4" DIAMETER IOR 2" WIDE
RUNGS.
1
T
� a
CLEANING P AO
3' —O"
3
LADDER SLIDE, TYPICAL OF 6.
„
SEE DETAIL ON DWG NO. G2.
3' -0"
ei �
LOWER LADDER NOTES
'Il
SEE DWG NO. G2 FOR LOWER
_
LADDER DETAILS.
Fa
h
LADDER SLIDES TO
RETRACT ABOVE HIGH
5' -2"
WATER LEVEL.
4 8
a
WETWELL LOWER LADDER
1" = 2' -0"
MMFG FIBREBOLT 1/20 13 LING
FIBERGLASS STUDS, TYPICAL OF
BEAM /BEAM CONNECTIONS.
5/80 SS DRILL AND EPDXY ANCHOR SYSTEM
EQUAL TO HILTI "HIT C100" WITH SS NUT AND
WASHER. 6" EMBEDMENT TYPICAL OF ALL
BEAM /WALL CONNECTIONS_
UPPER LADDER, SEE
DETAIL THIS SHEET
EXTREN 625 3"x3 "x1/4"
FRP ANGLE (TYP OF 3)
FIBERGLASS GRATING, 1 —PIECE FOR
ENTIRE PLATFORM. CUT HOLE ON
GRATING ABOVE VALVE OPERATING
NUT LARGE ENOUGH FOR VALVE KEY_
SEE GRATING DETAILS
THIS SHEET.
INSTALL SADDLE —TYPE
HOLD —DOWN CLIPS AT THE
FOUR LOCATIONS SHOWN FOR
THE SINGLE GRATING PIECE_
LADDER HOLD HOOK, SEE
DETAIL THIS SHEET AND ON —
DWG. NO. G2
LADDER SLIDE SEE DETAIL DWG_
NO. G2
VAULT ACCESS HATCH
INSTALL SADDLE TYPE HOLD —DOWN
r,i 1.11 ".i
INSTALL SADDLE TYPE HOLD —DOWN
CLIPS THIS LOCATION.
UNI —HOIST WALL SLEEVE.
EXTREN 625 4"x4 "x1/4" FRP
WIDE FLANGE BEAM (TYP OF 3)
INSTALL SADDLE TYPE
HOLD —DOWN CLIPS THIS
LOCATION.
SEE GRATING DETAILS
THIS SHEET
ACCESS HATCH OUTLINE
CLEANING PAD PLAN
1" = 1' -0"
=—
BILCO LADDER UP EXTENDER. ts 2174V3 f
_UMINUM WITH
)N— CORROSIVE HARDWARE.
DRYWELL LADDER
1" = 2' —O"
2ECAST VAULT
REVISED TO CONFORM
TO CONSTRUCTION RECORDS
MARK MILLER 07/18/00
.UMINUM LADDER FROM VAULT RH2 ENGINEERING INC. DATE
1NUFACTURER. LOCATE
ODER AS SHOWN ON PLANS.
REVISED TO CONFORM TO CONSTRUCTION RECORDS DMB MM 07/18/00
NO. REVISION BY REVIEW DATE
mRH2 ENGINEERING, INCL.ANEERS E30THELL, OFFICE NNER S NTISTS EAST WENATCHEE OFFICE 22780
a�aISTa�6 °1 SIGNED:
DRAWING IS NOT TO SCALE
11/11/99
IF BAR IS NO[ 2" LONG 0 I„ 2„ EXPIRES 3 19 2002
-IT 1 OF PENTON -1999 SEWER
vl1 V
LIFT STATION REPLACEMENT PROJECT
TALBOT CREST LIFT STATION
nLADD ER Allu m T llru DETAILS
lOO N0. FILE ENGINEER RENEWED DATE SCALE'. PLOT OWG NO 'iHEEf
199.054 I 7AL -01R I RCP MM I NOV 22, 2000 SHOWN 1 24 1 TG11 1 9'or12
C_rx1, 6,9
s
WETWELL VENT, IN j� DRYWELL VENT
EXHAUST PEDESTAL ONLY
PLAN
3/4" DIA. REDUCED PRESSURE ASSEMBLY
EQUAL TO FE3CO MODEL
INSULATED ENCLOSURE WITH LOCK, 825YA ANGLE PATTERN.
HEAT SOURCE, AND DRAIN PORTS. \
LOK BOX, MODEL H875 OR APPROVED
EQUAL. CENTER ENCLOSURE OVER 3/4" DIA. ISOLATION VALVE,
PIPING. EACH SIDE
AIR GAP DRAIN, ROUTE TO
DRAIN PORTS
3/4" DIA. "Y" STRAINER 3/4° HOSE E3
4
GFI RECEPTACLE
12" MIN.
I
ANCHOR ENCLOSURE TO
- PAD W IH (4) SS 1/2°
ANCHOR. BOLTS_
CONDUIT TO MOTOR CONTROL PANEL
PIPE FROM WATER METER. PIPE TO VALVE VAULT.
RACKFLOW PREVENTION AND
ENCLOSURE DETAIL
NOT TO SCALE
CUT SLEEVE PIPE TO ALLOW RUNGS
TO PASS THROUGH UNOBSTRUCTED.
FILE EDGES SMOOTH.
1 %" DIA SS SOLID BAR
1" DIA SS SOLID RUNG
LOWER LADDER
NOT TO SCALE
LADDER, SHOWN
TRANSPARENT FOR CLARITY.
STAINLESS STEEL PIPE, 6"
LENGTH. SELECT TO PROVIDE
INSIDE DIAMETER OF 1 -9/16°
MIN TO 1- 11'/16 MAX.
2 x1/e" BENT STAINLESS STEEL
ANGLE. ANCHOR BOLT TO WALL
WITH HILTI ANCHORS AND
EPDXY. LENGTH AS NECESSARY
FOR 8" OFFSET FROM WALL.
3 "x3 "x %" BASE PLATE, WELD
CONTINUOUS TO LADDER RAIL.
LOWER LADDER GLIDE
NOT TO SCALE
INSIDE WALL OF CONCRETE
1/4" SS CLEVIS GRAP
3/4" SS EYE BOLTS AND a HOOK WITH SAFETY LATCH
HILTI "HIT 100" DRILL AND 1/4" SS CHAIN (TYPICAL)
EPDXY ANCHOR SYSTEM
INTO WET WELL WALL. Y�
MINIMUM EMBEDMENT 6 ".Ti353�s
(TYPICAL)
A
3' -6„
TOE PLATE a
CLEANING PAD - SEE DWG NO.
TE1 FOR DETAILS
SAFETY CHAIN DETAIL
NOT TO SCALE
AM
I -IN -w f
}
%" DIA SS BAR BENT INTO "U"
SHAPE. ANCHOR MIN 4" INTO
WETWELL WALL.
3/4" SS TUBE FOR HINGE.
WELD TO HOOK BAR.
14 "x2 "x1/8" SS BAR. BEND
END INTO HOOK TO CAPTURE
LADDER RUNG.
LOWER LADDER HOLD HOOK
NOT TO SCALE
4" ASPHALT IN TWO LIFTS.
WIDTH BY
CONTRACTOR 6" CRUSHED SURFACING TOP COURSE.
CONFLICTING UTILITIES NOT
SHOWN THIS DETAIL.
N STRUCTURAL FILL. COMPACTED
92% OF MAXIMUM DRY DENSITY PER
DIFIED PROCTOR (ASTM 1557D).
V 4" FORCE MAIN AND ALL
V DUCTILE PIPING
V PIPE BEDDING MATERIAL (TYPICAL)
PIPE TRENCH DETAIL
NOT TO SCALE - -
ACCESS HATCH - \
1
6-°
a
WETWELL 4° :a
° a
'4.
FIBERGLASS : DESTAL, MINIMUM
a
4.
/1
2 "0 GALVANIZED
!NSID DIMENSIONS AS NECESSARY TO
CONDUIT TO
STEEL PIPE
INSTALL VENT PIPES MAXIMUM
°'•
TELEMETRY.
DIMENSIONS OF 12 "Wx121. EQUAL TO
ANCHOR SYSTEM EQUAL TO HILTI
KERNEY /WESTERN POWERGLASS
SECONDARY PEDESTAL.
"HIT C100" WITH SS NUT AND
4
PROVIDE 6 "x6" STAINLESS
TOPPING GROUT
STEEL OR FIBERGLASS LOUVER
VALVE VAULT FLOOR.
a
a
VERTICAL
AND INSECT SCREEN.
w p -07 -1792
NOT TO SCALE
24
.:4.'.a:.
4 '.
HASP AND PADLOCK TO MATCH
WETWELL LOWER LADDER
a
}
f 6" MIN
a, .
a°
CITY KEY".
I
12" MIN
a,
WETWELL
° P
UPPER
��
LADDER
a' e
3` SCH 80 PVC WETWELL VENT
6"
SCH 40 PVC DRYWELL VENT
4
CLEHP:
ELEVATION
16
:a._Q.
a:
\\
y
/
4 :.4:.
°
12"
3/4" DIA. REDUCED PRESSURE ASSEMBLY
EQUAL TO FE3CO MODEL
INSULATED ENCLOSURE WITH LOCK, 825YA ANGLE PATTERN.
HEAT SOURCE, AND DRAIN PORTS. \
LOK BOX, MODEL H875 OR APPROVED
EQUAL. CENTER ENCLOSURE OVER 3/4" DIA. ISOLATION VALVE,
PIPING. EACH SIDE
AIR GAP DRAIN, ROUTE TO
DRAIN PORTS
3/4" DIA. "Y" STRAINER 3/4° HOSE E3
4
GFI RECEPTACLE
12" MIN.
I
ANCHOR ENCLOSURE TO
- PAD W IH (4) SS 1/2°
ANCHOR. BOLTS_
CONDUIT TO MOTOR CONTROL PANEL
PIPE FROM WATER METER. PIPE TO VALVE VAULT.
RACKFLOW PREVENTION AND
ENCLOSURE DETAIL
NOT TO SCALE
CUT SLEEVE PIPE TO ALLOW RUNGS
TO PASS THROUGH UNOBSTRUCTED.
FILE EDGES SMOOTH.
1 %" DIA SS SOLID BAR
1" DIA SS SOLID RUNG
LOWER LADDER
NOT TO SCALE
LADDER, SHOWN
TRANSPARENT FOR CLARITY.
STAINLESS STEEL PIPE, 6"
LENGTH. SELECT TO PROVIDE
INSIDE DIAMETER OF 1 -9/16°
MIN TO 1- 11'/16 MAX.
2 x1/e" BENT STAINLESS STEEL
ANGLE. ANCHOR BOLT TO WALL
WITH HILTI ANCHORS AND
EPDXY. LENGTH AS NECESSARY
FOR 8" OFFSET FROM WALL.
3 "x3 "x %" BASE PLATE, WELD
CONTINUOUS TO LADDER RAIL.
LOWER LADDER GLIDE
NOT TO SCALE
INSIDE WALL OF CONCRETE
1/4" SS CLEVIS GRAP
3/4" SS EYE BOLTS AND a HOOK WITH SAFETY LATCH
HILTI "HIT 100" DRILL AND 1/4" SS CHAIN (TYPICAL)
EPDXY ANCHOR SYSTEM
INTO WET WELL WALL. Y�
MINIMUM EMBEDMENT 6 ".Ti353�s
(TYPICAL)
A
3' -6„
TOE PLATE a
CLEANING PAD - SEE DWG NO.
TE1 FOR DETAILS
SAFETY CHAIN DETAIL
NOT TO SCALE
AM
I -IN -w f
}
%" DIA SS BAR BENT INTO "U"
SHAPE. ANCHOR MIN 4" INTO
WETWELL WALL.
3/4" SS TUBE FOR HINGE.
WELD TO HOOK BAR.
14 "x2 "x1/8" SS BAR. BEND
END INTO HOOK TO CAPTURE
LADDER RUNG.
LOWER LADDER HOLD HOOK
NOT TO SCALE
4" ASPHALT IN TWO LIFTS.
WIDTH BY
CONTRACTOR 6" CRUSHED SURFACING TOP COURSE.
CONFLICTING UTILITIES NOT
SHOWN THIS DETAIL.
N STRUCTURAL FILL. COMPACTED
92% OF MAXIMUM DRY DENSITY PER
DIFIED PROCTOR (ASTM 1557D).
V 4" FORCE MAIN AND ALL
V DUCTILE PIPING
V PIPE BEDDING MATERIAL (TYPICAL)
PIPE TRENCH DETAIL
NOT TO SCALE - -
ACCESS HATCH - \
1
6-°
a
WETWELL 4° :a
° a
'4.
STANDON ADJUSTABLE
PIPE SUPPORT
a
4.
/1
2 "0 GALVANIZED
AS REQUIRED
CONDUIT TO
STEEL PIPE
°'•
TELEMETRY.
(2) 5/8 "0 SS DRILL AND EPDXY
ANCHOR SYSTEM EQUAL TO HILTI
1
a
"HIT C100" WITH SS NUT AND
4
WASHER, EMBED 4" MINIMUM
TOPPING GROUT
vQ v
VALVE VAULT FLOOR.
a
a
VERTICAL
PIPE SUPPORT
w p -07 -1792
NOT TO SCALE
3/4" DIA. REDUCED PRESSURE ASSEMBLY
EQUAL TO FE3CO MODEL
INSULATED ENCLOSURE WITH LOCK, 825YA ANGLE PATTERN.
HEAT SOURCE, AND DRAIN PORTS. \
LOK BOX, MODEL H875 OR APPROVED
EQUAL. CENTER ENCLOSURE OVER 3/4" DIA. ISOLATION VALVE,
PIPING. EACH SIDE
AIR GAP DRAIN, ROUTE TO
DRAIN PORTS
3/4" DIA. "Y" STRAINER 3/4° HOSE E3
4
GFI RECEPTACLE
12" MIN.
I
ANCHOR ENCLOSURE TO
- PAD W IH (4) SS 1/2°
ANCHOR. BOLTS_
CONDUIT TO MOTOR CONTROL PANEL
PIPE FROM WATER METER. PIPE TO VALVE VAULT.
RACKFLOW PREVENTION AND
ENCLOSURE DETAIL
NOT TO SCALE
CUT SLEEVE PIPE TO ALLOW RUNGS
TO PASS THROUGH UNOBSTRUCTED.
FILE EDGES SMOOTH.
1 %" DIA SS SOLID BAR
1" DIA SS SOLID RUNG
LOWER LADDER
NOT TO SCALE
LADDER, SHOWN
TRANSPARENT FOR CLARITY.
STAINLESS STEEL PIPE, 6"
LENGTH. SELECT TO PROVIDE
INSIDE DIAMETER OF 1 -9/16°
MIN TO 1- 11'/16 MAX.
2 x1/e" BENT STAINLESS STEEL
ANGLE. ANCHOR BOLT TO WALL
WITH HILTI ANCHORS AND
EPDXY. LENGTH AS NECESSARY
FOR 8" OFFSET FROM WALL.
3 "x3 "x %" BASE PLATE, WELD
CONTINUOUS TO LADDER RAIL.
LOWER LADDER GLIDE
NOT TO SCALE
INSIDE WALL OF CONCRETE
1/4" SS CLEVIS GRAP
3/4" SS EYE BOLTS AND a HOOK WITH SAFETY LATCH
HILTI "HIT 100" DRILL AND 1/4" SS CHAIN (TYPICAL)
EPDXY ANCHOR SYSTEM
INTO WET WELL WALL. Y�
MINIMUM EMBEDMENT 6 ".Ti353�s
(TYPICAL)
A
3' -6„
TOE PLATE a
CLEANING PAD - SEE DWG NO.
TE1 FOR DETAILS
SAFETY CHAIN DETAIL
NOT TO SCALE
AM
I -IN -w f
}
%" DIA SS BAR BENT INTO "U"
SHAPE. ANCHOR MIN 4" INTO
WETWELL WALL.
3/4" SS TUBE FOR HINGE.
WELD TO HOOK BAR.
14 "x2 "x1/8" SS BAR. BEND
END INTO HOOK TO CAPTURE
LADDER RUNG.
LOWER LADDER HOLD HOOK
NOT TO SCALE
4" ASPHALT IN TWO LIFTS.
WIDTH BY
CONTRACTOR 6" CRUSHED SURFACING TOP COURSE.
CONFLICTING UTILITIES NOT
SHOWN THIS DETAIL.
N STRUCTURAL FILL. COMPACTED
92% OF MAXIMUM DRY DENSITY PER
DIFIED PROCTOR (ASTM 1557D).
V 4" FORCE MAIN AND ALL
V DUCTILE PIPING
V PIPE BEDDING MATERIAL (TYPICAL)
PIPE TRENCH DETAIL
NOT TO SCALE - -
ACCESS HATCH - \
1
6-°
a
WETWELL 4° :a
45' BEVEL-CUT ° a 4 a a a.r 4 a Q; 4 °_ .c
BOTT 4 °` n 4 4-
4. e:1
4 a 4 a 4 a 4 a 4:
OM OF PIPE
STARTING AT
CENTERLINE LEVEL TRANSMITTER DETAIL
NOT TO SCALE
REVISED TO CONFOPM
TO CONSTRUCTION RECORDS
A PM- DA
MARK MILLER 07/18/00
RH2 ENGINEERING INC. DATE
REVISED TO CONFORM TO CONSTRUCTION RECORDS DMB I MM 07/18/0
NO, REVISION I BY` IREVIEW1 DATE
RH2 ENGINEERING. INC.
L. A
v SA
9 o wAsgr �G
k
ENGINEERS BOTHELLOFFICE
PLANNERS-
SCIENTISTS EAST WENATCHEE OFFICE .g, 22780
ro °�c�7n18R'l SIGNED:
DRAWING; IS NOT TO SCALE 11/11/99
E %FIRES 3 19/2002
F BAR IS NOT 2" LONG 0 1" 2"
CITY OF RENTON -1999 SEWER
LIFT STATION REPLACEMENT PROJECT
,
TALBOT CREST LIFT STATION
MISCELLANEOUS DETAILS
JOB No FILE ENGINEER REVEW*B OATS ",f,ALE PLOP ➢WG NO ^HEEL
199.054 1 TAL -DETR I SLR I M.M I NOV 22. 2000 SHOWN 17-62 1 10-112
CZ) . 5- ? 47.fe, A
`L
1;1
I:'1
° a
'4.
PVC COATED GRC
a
4.
°
CONDUIT TO
°'•
TELEMETRY.
1
a
4
4.
e
00
44 °
o
4.'
- 4
a 4.
a:
:.:..4 -.
4.
.:4.'.a:.
4 '.
WETWELL LOWER LADDER
a
a, .
a°
a,
WETWELL
° P
UPPER
LADDER
a' e
,4
4
CLEHP:
PAD
:a._Q.
a:
Q
4 :.4:.
°
°:
°
4" 0 SCH 40 PVC PIPE.
MOUNT FLUSH WITH
4
:�a
1'
BOTTOM OF WETWELL
-0"
TRANSDUCER CABLE
a
°
•a
a
4
c':
4 A -:
SECURE TO WALL WITH
STAINLESS STEEL
a
MECHANICAL PIPING NOT
CLAMPS AT 3' -0" O.C.
° n -:.
A:
SHOWN THIS VIEW FOR
6'�e
°e
LEVEL TRANSDUCER
a.•-
4r ° ":
:a "
°.
.a _v
:-,a
a .
45' BEVEL-CUT ° a 4 a a a.r 4 a Q; 4 °_ .c
BOTT 4 °` n 4 4-
4. e:1
4 a 4 a 4 a 4 a 4:
OM OF PIPE
STARTING AT
CENTERLINE LEVEL TRANSMITTER DETAIL
NOT TO SCALE
REVISED TO CONFOPM
TO CONSTRUCTION RECORDS
A PM- DA
MARK MILLER 07/18/00
RH2 ENGINEERING INC. DATE
REVISED TO CONFORM TO CONSTRUCTION RECORDS DMB I MM 07/18/0
NO, REVISION I BY` IREVIEW1 DATE
RH2 ENGINEERING. INC.
L. A
v SA
9 o wAsgr �G
k
ENGINEERS BOTHELLOFFICE
PLANNERS-
SCIENTISTS EAST WENATCHEE OFFICE .g, 22780
ro °�c�7n18R'l SIGNED:
DRAWING; IS NOT TO SCALE 11/11/99
E %FIRES 3 19/2002
F BAR IS NOT 2" LONG 0 1" 2"
CITY OF RENTON -1999 SEWER
LIFT STATION REPLACEMENT PROJECT
,
TALBOT CREST LIFT STATION
MISCELLANEOUS DETAILS
JOB No FILE ENGINEER REVEW*B OATS ",f,ALE PLOP ➢WG NO ^HEEL
199.054 1 TAL -DETR I SLR I M.M I NOV 22. 2000 SHOWN 17-62 1 10-112
CZ) . 5- ? 47.fe, A
`L
1;1
I:'1
CRM1
120V PUMP
m CALL INTERPOSE RELAY
IMS1
PUMP RUN
ORI
j
REMOTE 120VDC THERMAL FAIL
r (SHIELDED). CONNECT TO TELEMETRY
YPICAL MOTOR CONTROL CONTROL LOGIC
NO SCALE
PUMP NO. 1 STARTER
PUMP NO. 1 OVERTEMP LIGHT
RBS
V.- JUNCTION BOX v
ACCESS HATCH COVER MARKED ELECTRICAL
SEAL
v v-
NEW BRUSHE[
N1
NEW CONCRETE RISER SECTION LOCATED
OVERTEMP RELAY
PLATE MOUNTED T(
CLASS 1, DIVISION 1
HAZARDOUS AREA
SYMBOLS LEGEND
- - -- FROM 9610 -2004 -0300 --
ABOVE DRY WELL VAULT
(PRESS TO TEST)
RUNNING TIME METER
NEW LIMIT SWITCH.
CONNECTION TO TELEMETRY
POWER AND SENSING J -PDX: XP AND NEMA 4
\
\
STRIP AND
NCOVER. BCONTROL d
120V
• • CONNECTION TO REMOTE FIELD DEVICE
DOME BOX: NEMA
o_.
v .
CABLE -TO- CONDUCTOR CONNECTIONS MADE !N
BOXES. BOLT AND TAPE MOTOR LEAD
�.�.�F �
FNM Ti FNM
I
RTM MOTOR RUN TIME METER
v
v
CONNECTIONS MAKE SENSING AND CONTROL
112 2
RBS -
CONNECTIONS ON TERMINAL STRIPS
OC MOTOR OPERATION COUNTER
— TO PUMP CONTROL PANEL
_
i
K )- RED
v
\
` SEAL
v
�_ GRC CONDUIT WITH
RESET
/`�
NON- SHRINK GROUT o_"
v .
BUSHINGS OR END BELLS
PUMP 1 SEAL & THERMAL. FAIL RESET
CL CLEAR
NOTE
`.: v -.-.. v v'... v` : V.. '.. v`-
: v v` :.v_ .. V
_ . v v
PROVIDE MAXIMUM SEPARATION BETWEEN
...
2 5
24VAC T2
EACH SPLICE IN ELECTRICAL VAULT-
Rl PUMP N0.1 MOTOR
DRY WELL VAULT
SST MOUNTING BRACKET OR FRAMING CHANNEL
10 7
ROOF SLAB
FASTEN SECURELY TO BOTH SIDES OF HANDHOLE
CRM1
120V PUMP
m CALL INTERPOSE RELAY
IMS1
PUMP RUN
ORI
j
REMOTE 120VDC THERMAL FAIL
r (SHIELDED). CONNECT TO TELEMETRY
YPICAL MOTOR CONTROL CONTROL LOGIC
NO SCALE
PUMP NO. 1 STARTER
PUMP NO. 1 OVERTEMP LIGHT
RBS
V.- JUNCTION BOX v
(PRESS TO TEST)
SEAL
v v-
NEW BRUSHE[
STAINLESS STEEL
OVERTEMP RELAY
PLATE MOUNTED T(
VALVE FLANGE
PUMP /SEAL FAIL
(PRESS TO TEST)
RUNNING TIME METER
NEW LIMIT SWITCH.
START COUNTER
MOTOR SPLICE DETAIL
NOT TO SCALE
ACCESS HATCH COVER MARKED ELECTRICAL NOTE
PROVIDE MAXIMUM SEPARATION BETWEEN
PROPOSED CONCRETE RISER SECTION FLOAT SPLICE AND LEVEL TRANSMITTER
LOCATED ABOVE DRY WELL VAULT CLASS 1, DIVISION 1 CABLE IN ELECTRICAL VAULT.
HAZARDOUS AREA -
LEVEL TRANSMITIER BELLOWS
H 120V CIRCUIT FROM N
LIGHTING PANEL
[� NEMA 12 ENCLOSURE WITH SIZED ❑
b TO FIT CONTROL EQUIPMENT. PANEL
JCB #2 – SHALL BE UL LABELED. –
OFF
TSH
CR ISPST THERMOSTAT
AUTO LS SWITCH
MOTOR
LI M I TS WI TCH CONTACTORS
CR SPST LIMIT SWITCH
HS I ON DOOR
LOCATED ON DRY WELL 2
ACCESS HATCH CR -LS
I k_'_LQw_TEED'
M IMOTOR CONTACTOR
CR HS FOR VENTILATOR
12OV, SINGLE
HIGH SPEED PHASE, 2 SPEED
I
VENT FAN CONTROL LOGIC DRY WELL VAULT
_ NO SCALE
TO TELEMETRY PANEL
NON - SHRINK GROUT
0�: LL 1�6'9
F�R 25i;14
POWER AND SENSING J -BOX: XP AND NEMA 4
(0 RING): GOB TYPE WITH TERMINAL STRIP AND
DOME COVER. CONTROL J -BOX: NEMA 4.
CABLE -TO- CONDUCTOR CONNECTIONS MADE IN
BOXES. BOLT AND TAPE MOTOR LEAD
CONNECTIONS MAKE SENSING AND CONTROL
CONNECTIONS ON TERMINAL STRIPS
GRC CONDUIT WITH
BUSHINGS OR END BELLS
v- .-..v' v -.'.v- ;,v...vrrr v v v .v :,v...:
DRYWELL VAULT SST MOUNTING BRACKET OR FRAMING CHANNEL
ROOF SLAB FASTEN SECURELY TO BOTH SIDES OF HANDHOLE
FLOAT SPLICE HANDHOLE
_ NOT TO SCALE
30-24749308
REVISED TO CONFORM
TO CONSTRUCTION RECORDS
MARK MILLER 07/18/00
RH2 ENGINEERING INC. DATE
EL R.
oy WA3g
a
g 22513
�'b 8dC13Tt &6�. SIGNED:
joint 11/11/99
EXPIRES 11/3/01
01
0
n
o a
N 0
z
b
r
z
RBS
V.- JUNCTION BOX v
SEAL
v v-
POWER AND SENSING J -BOX: XP AND NEMA 4
(0 RING): GOB TYPE WITH TERMINAL STRIP AND
DOME COVER. CONTROL J -BOX: NEMA 4.
CABLE -TO- CONDUCTOR CONNECTIONS MADE IN
BOXES. BOLT AND TAPE MOTOR LEAD
CONNECTIONS MAKE SENSING AND CONTROL
CONNECTIONS ON TERMINAL STRIPS
GRC CONDUIT WITH
BUSHINGS OR END BELLS
v- .-..v' v -.'.v- ;,v...vrrr v v v .v :,v...:
DRYWELL VAULT SST MOUNTING BRACKET OR FRAMING CHANNEL
ROOF SLAB FASTEN SECURELY TO BOTH SIDES OF HANDHOLE
FLOAT SPLICE HANDHOLE
_ NOT TO SCALE
30-24749308
REVISED TO CONFORM
TO CONSTRUCTION RECORDS
MARK MILLER 07/18/00
RH2 ENGINEERING INC. DATE
EL R.
oy WA3g
a
g 22513
�'b 8dC13Tt &6�. SIGNED:
joint 11/11/99
EXPIRES 11/3/01
01
0
n
o a
N 0
z
b
r
z
Im Y SHOPS
SCREEN UP6RADES AND
— MODIEICA ONS TO Hlll MACHINE
_ -ROGRAMMING aND
COMMUNICATIONS THER
BY OTHERS.
i
I
i
i
I
EQUIPMENT PROVIDED BY OTHERS.
I
NEW ANTENNA INSTALLED ON
MASTER
I
HMI COMPUTER
SUPPLY ANTENNA TO THE
_ ._...._._
TELEMETRY
NEW ANTENNA CABLE PROVIDED
UPGRADES
AND INSTALLED BY
CONTRACTOR.
SNIT (MTU)
�
I
TELEMETRY SYSTEM BLOCK DIAGRAM
NO SCALE
REVISED TO CONFORM
TO CONSTRUCTION RECORDS
MARK MILLER 07/18/00
RH2 ENGINEERING INC. DATE
R3yPG
2213
R�aISTSR SIGNED:
foNaL 11/11/99
EXPIRES 11 3 Oi
LEGEND
CONDUIT AND WIRE CONNECTION BY
CONTRACTOR
CONNECTION BY OTHERS.
EQUIPMENT PROVIDED BY CONTRACTOR..
INSTALLED BY CONTRACTOR.
EQUIPMENT PROVIDED BY OTHERS.
INSTALLED BY CONTRACTOR.
NEW ANTENNA INSTALLED ON
EQUIPMENT PROVIDED BY OTHERS.
EXISTING MAST. OWNER WILL
INSTALLED BY OTHERS.
SUPPLY ANTENNA TO THE
CONTRACTOR.
NEW ANTENNA CABLE PROVIDED
AND INSTALLED BY
CONTRACTOR.
TELEMETRY SYSTEM BLOCK DIAGRAM
NO SCALE
REVISED TO CONFORM
TO CONSTRUCTION RECORDS
MARK MILLER 07/18/00
RH2 ENGINEERING INC. DATE
R3yPG
2213
R�aISTSR SIGNED:
foNaL 11/11/99
EXPIRES 11 3 Oi
LEGEND
CONDUIT AND WIRE CONNECTION BY
CONTRACTOR
CONNECTION BY OTHERS.
c,
:5
FR
Psmew"LL 161,9 215
EQUIPMENT PROVIDED BY CONTRACTOR..
INSTALLED BY CONTRACTOR.
EQUIPMENT PROVIDED BY OTHERS.
INSTALLED BY CONTRACTOR.
EQUIPMENT PROVIDED BY OTHERS.
INSTALLED BY OTHERS.
c,
:5
FR
Psmew"LL 161,9 215