HomeMy WebLinkAboutR-365313PORTION OF NE 1/4 OF SEC 16, T 23 N, R 5 E., E.M.
GENERAL NOTES
Surface Water Drainage Notes and Specifications
THESE NOTES SHALL APPEAR ON PROJECTS FOR THE SURFACE WATER UTILITY.
15. A// building downspouts and Footing drains shall be connected to the storm
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT AcnVTY OCCURS, A PRE - CONSTRUCTION
drainage system, unless approved by the City plan reviewer or Surface Water
MEEnNG MUST BE HELD WITH THE CITY OF RENTON PLAN REVIEWER.
Utility Section. An accurately dimensioned, certified as -built drawing of this
DATE
drainage system will be submitted to the City upon completion.
2. All construction shall be in accordance with the 1996 Standard Specifications
16. Issuance of the building or construction permits by the City of Renton does
for Road, Bridge and Municipal Construction prepared by WSDOT and the American
not relieve the owner of the continuing legal obligation and /or liability
Public Works Association (APWA), as amended by the City of Renton Public Works
connected with storm surface water disposition. Further, the City of Renton
Department
does not accept any obligation for the proper functioning and maintenance of the
J. The surface water drainage system shall be constructed according to the
system provided during construction.
approved plans, which are on file in the Public Works Department. Any deviation
from the approved plans will require written approval hom the City of Renton
17. The Contractor shall be responsible for providing adequate safeguard, safety
Public Works Department Surface Woter Utility Section.
devices, protective equipment, huggers, and any other needed actions to protect
the life, health, and safety of the public, and to protect property in
4. A copy of these approved plans must be on the job site whenevUr construction
connection with the performance of work covered by the contract. Any work
JOINT o
within the traveled right of way that may interrupt normal traffic flow shall
is in progress.
require a traffic control plan approve by the Public Works Department,
5. Datum shall be NAM 88 unless otherwise approved by the City of Renton Public
Transportation Systems Division. All sections of the WSDOT Standard
Works Department. Reference benchmark and elevations are noted on the plans.
Specifications 1 -07 -23 Traffic Control shall opp/y.
6. All sedimentation /erosion facilities must be in operation prior to clearing
18. Special drainage measures will be required if the project location is within
and building construction, and they must be satisfactorily maintained until
the aquifer protection area (APA).
construction is completed and the potential for on -site erosion has possed.7.
All retention /detention facilities must be installed and in operation prior to
CURB & GUTTER
or in conanction with all construction activity unless otherwise approved by
the Public Works Department, Surface Woter Utility Section.
CEMENT CONCRETE
8. Gross seed may be applied by hydroseeding. The grass seed mixture, other
than City of Renton approved standard mixes, shall be submitted by a Landscape
Architect and approved by the Public Works Department Surface Water Utility
Section.
SLOPE (TYP.)
9. All pipe and appurtenances shall be laid on a property prepared foundation in
accordance with Section 7- 02.3(1) of the current State of Washington Standard
Specification for Road and Bridge Construction. This shall include necessary
leveling of the trench bottom or the top of the foundation material, as well as
placement and compaction of required bedding material, to uniform grade so that
the entire length of the pipe will be supported on a uniformly dense, unyielding
base. All pipe bedding shall be APWA Class C ", with the exception of PVC pipe.
All trench backfill shall be compacted to minimum 95Z for pavement and
structural fill and 90% otherwise per ASTM D- 1557 -70. Pea gravel bedding shall
be 6 inches over and under PVC pipe.
10. Galvanized steel pipe and aluminized steel pipe for all drainage facilities
shall have asphalt treatment jet or better inside and outside.
11. Structures shall not be permitted within 10 feet of the spring Ane of any
storm drainage pipe, or 15 feet from the top of any channel bank.
12. All catch basin grates shall be depressed 0.10 feet below pavement level.
13 Open cut road crossings through existing public right of way will not be
allowed unless specifically approved by City of Renton Planning/Building/Public BASIC SHEET FLOW DISPERSION
Works Administrator 2' WIDE CRUSHED ROCK
14. Rock for erosion protection of roadside ditches, where required, shall be of 10' VEGETATED FLOW PATH
sound quarry rock laced to a depth of one 1 foot and must meet the following ER TABLE C.2.1.7 3/6
q p () 9 CONTINUE TO MATCH DRIVEWAY (T'p') (B
specifications:
4 - 8 inch rock / 40 - 70% passing,' CROSS SLOPE OVER 10 -FT VEGETATED
2 - 4 inch rock / 30 - 40% passing; and SLOPE PATH ALONG THE NORTH SIDE OF DRIVEWAY
less than 2 inch rode / 10 - 20% passing.
L
10'
5'.
4" COMPACTED DEPTH CLASS "B" ASPHAL
IN 2 - 2" LIFTS
6" COMPACTED DEPTH - CRUSHED_
SURFACING TOP COURSE
12" GRAVEL BASE AS NEEDED-
20' PAVED
SECTION
2.0%
ROAD SECTION PRIVATE DRIVEWAY
ROADWAY CENTERLINE
TRENCHES FOR ROAD CROSSINGS.
1. ANY AFFECTED LANE WALL BE GROUND DOWN 2 INCHES AND PAVED FOR
THE ENTIRE WIDTH OF THE LANE.
2. IF THE OUTSIDE OF THE TRENCHING IS WITHIN THREE FEET OF ANY
ADJACENT LANE LINE, THE ENTIRE ADJACENT TRAVELED LANE AFFECTED WILL
BE PAVED.
1 - #3 BAR
lip>
5 S��
2
2 - #3 BAR HOOP
#3 BAR EACH CO'
#3 BAR EACH
#3 BAR EACH
5 S..
2
4" MIN
EE SM PLAN F -3) (SEE Slq. PLAN
CO
5
I
RAMP WITH 12H: TV � Sl< NOTE T CEMENT CONLHE IE�
SLOPE (TYP') PLAN NEW B CURB & GUTTER
(SEE NOTE 3)
CEMENT CONCRETE DRIVEWAY ENTRANCE TYPE 1
6 - a' VARIES - 14' MIN.
I-- RAMP SEE CONTRACT RAMP
CEMEN CT PYCRETE PEDESTRIAN�� a
< CURB (TYP.)
CEMENT CONCRETE 3/8' EXPANSION JOINT (TYP.)
SIDEWAIX SECTION O (SEE SD. PLAN F -3)
RE
B (TYP.)
IN CONTRACT)
F -1)
TENT CONCRETE SIDEWALK
u
FRAME AND GRATE
5" RISER SECTION
12" RISER SECTION
PRECAST BASE SECTION
(MEASUREMENT AT THE TOP
OF THE BASE)
CATCH BASIN - TYPE 1
NTS
NOTES
1. Men the driveway width exceeds 15 feel, construct
a full depth expansion joint (see Standard Plan F -3)
with 3/8" joint filler along the driveway centerline.
Construct expansion joints parallel with the
centerline as required at 15' maximum spacing
when driveway widths exceed 30'.
2. See Std. Plan F -3 far sidewalk details.
3. Curb and gutter shown, see the Contract
Plans for the Curb design specified. Sea
Std. Plan F -1 for curb details.
4. Avoid placing drainage structures, junction
boxes or other obstructions in front of
driveway entrances.
6 - 0'
"VARIES -
6 - 0'
BY
6' - 0' "
1/2' R (TYP.)
DATE
BY
r C
CURB GUTTER
y�l =S
BY
DATE
CEMENT O
ONCRE
%
2S
3/8' EXPANSION JOINT
PEDESTRIAN C
CUF
' EXPANSION J
JOINT o
o (
(WHEN ST I
IBEt
(BY OTHERS)
CEMENT CONCRETE
CURB & GUTTER
(SEE NOTE 3)
CEMENT CONCRETE
PEDESTRIAN CURB (TYP.)�
RAMP W. 12H:1V
SLOPE (TYP.)
RAMP WITH 12H: TV � Sl< NOTE T CEMENT CONLHE IE�
SLOPE (TYP') PLAN NEW B CURB & GUTTER
(SEE NOTE 3)
CEMENT CONCRETE DRIVEWAY ENTRANCE TYPE 1
6 - a' VARIES - 14' MIN.
I-- RAMP SEE CONTRACT RAMP
CEMEN CT PYCRETE PEDESTRIAN�� a
< CURB (TYP.)
CEMENT CONCRETE 3/8' EXPANSION JOINT (TYP.)
SIDEWAIX SECTION O (SEE SD. PLAN F -3)
RE
B (TYP.)
IN CONTRACT)
F -1)
TENT CONCRETE SIDEWALK
u
FRAME AND GRATE
5" RISER SECTION
12" RISER SECTION
PRECAST BASE SECTION
(MEASUREMENT AT THE TOP
OF THE BASE)
CATCH BASIN - TYPE 1
NTS
NOTES
1. Men the driveway width exceeds 15 feel, construct
a full depth expansion joint (see Standard Plan F -3)
with 3/8" joint filler along the driveway centerline.
Construct expansion joints parallel with the
centerline as required at 15' maximum spacing
when driveway widths exceed 30'.
2. See Std. Plan F -3 far sidewalk details.
3. Curb and gutter shown, see the Contract
Plans for the Curb design specified. Sea
Std. Plan F -1 for curb details.
4. Avoid placing drainage structures, junction
boxes or other obstructions in front of
driveway entrances.
6 - 0'
6 - 0'
BY
DEPRESSED
1/2' R (TYP.)
DATE
BY
DATE
CURB GUTTER
y�l =S
BY
DATE
(SEE NOTE 3)
O
%
2S
3/8' EXPANSION JOINT
(TYP.) (SEE STD. PLAN F -3)
DRIVEWAY
SECTION O
(BY OTHERS)
DRIVEWAY
(BY OTHERS)
CEMENT CONCRETE
CURB & GUTTER
(SEE NOTE 3)
CEMENT CONCRETE
PEDESTRIAN CURB (TYP.)�
RAMP W. 12H:1V
SLOPE (TYP.)
(SEE NOTE
TYPE 1 - ISOMETRIC VIEW
1. AS ACCEPTABLE ALTERNATIVES TO THE REBAR SHOWN IN THE
PRECAST BASE SECTION, FIBERS (PLACED ACCORDING TO THE
STANDARD SPECIFICATIONS), OR WIRE MESH HAVING A MINIMUM AREA
OF 0.12 SQUARE INCHES PER FOOT SHALL BE USED WITH THE MINIMUM
REQUIRED REBAR SHOWN IN THE ALTERNATIVE PRECAST BASE SECTION.
WIRE MESH SHALL NOT BE PLACED IN THE KNOCKOUTS.
2. THE KNOCKOUT DIAMETER SHALL NOT BE GREATER THAN 26 ".
KNOCKOUTS SHALL HAVE A WALL THICKNESS OF 2" MINIMUM TO 2.5"
MAXIMUM. PROVIDE A 1.5" MINIMUM GAP BETWEEN THE KNOCKOUT WALL
AND THE OUTSIDE OF THE PIPE. AFTER THE PIPE IS INSTALLED, FILL
THE GAP WITH JOINT MORTAR IN ACCORDANCE WITH STANDARD
SPECIFICATION 9 -04.3.
3. THE MAXIMUM DEPTH FROM FINISHED GRADE TO THE LOWEST PIPE
INVERT SHALL BE 5'.
4. THE FRAME AND GRATE MUST BE INSTALLED WITH THE FLANGE
DOWN.
5. THE PRECAST BASE SECTION MAY HAVE A ROUNDED FLOOR, AND
THE WALLS MAY BE SLOPED AT A RATE OF 1:24 OR STEEPER.
6. THE OPENING SHALL BE MEASURED AT THE TOP OF THE PRECAST
BASE SECTION.
7. ALL PICKUP HOLES SHALL BE GROUTED FULL AFTER THE BASIN
HAS BEEN PLACED.
8. ALL GRADE RINGS AND CASTINGS SHALL BE SET IN MORTAR IN
ACCORDANCE WITH STANDARD SPECIFICATION 9 -04.3.
R- 365313
"AS- BUILT" NOTE:
"AS- BUILT" IS BASED ON A ACTUAL FIELD
SURVEY BY TOLIMA ENGINEERS AND
INFORMATION SUPPLIED BY CONTRACTOR.
RECOMMENDED
FOR APPROVAL
BY
DATE
BY
DATE
BY
DATE
BY
DATE
BY
DATE
A V26-k-3 to t `313
W
3 h
j aM
2 _<
W s
AAA �
Q
R a $
a
O y
N 2
II 7�
�V)
W
Q
~ W
WQ
W Q
Cr CC
vl Of
J O0
M
m
y
O
�m
'aN
ma
G r
zx w
o O�
z, U1
'�W
O y
N 2
II 7�
�V)
W
Q
~ W
WQ
W Q
Cr CC
vl Of
J O0
M
m
y
O
�m
'aN
ma
G r
zx w
o O�
z, U1
'�W