HomeMy WebLinkAboutR-365310PORTION OF NE 1/4 OF SEC 16, T 23 N, R 5 E., E.M. EROSION /SEDIMENTATION CONTROL NOTES 1. APPROVAL OF THIS EROSION SEDIMENTA77ON CONTROL (TESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E. G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS CHANNELS, RETENTION FACILITIES, UTILITIES ETC.) 2. THE IMPLEMENTA71ON OF THESE TESC PLANS AND THE CONSTRUCTION, MAINTENANCE REPLACEMENT, AND UPGRADING OF THESE 7ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/TESC SUPERVISOR UNTIL ALL CONSTRUCTION IS APPROVED. 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED BY A CON77N000S LENGTH OF SURVEY TAPE (OR FENCING, IF REQUIRED) PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT /TESC SUPERVISOR FOR THE DURATION OF THE CONSTRUCTION. 4. THE 7ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CON✓UNC77ON WITH ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS, DRAINAGE SYSTEMS, AND ADJACENT PROPER7ES IS MINIMIZED. 5. THE TESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE TESC FACIL177ES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SI7E CONDIT70NS (E. G. ADDITIONAL SUMP PUMPS, RELOCAT70N OF DITCHES AND SILT FENCES, ETC.). 6. THE 7ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT 17ESC SUPERVISOR . AND MAINTAINED TO INSURE CONTINUED PROPER FUNCTIO NIN G WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE 7ESC FACIL177ES DURING THE WET SEASON (OCT 1 -APRIL 30) DRY SEASON MAY 1 - SEPTEMBER 30. 774 Y REVIEWS DURING THE D AND OF MON L ( ) 7. ANY AREA OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS THAT WILL NOT BE DISTURBED FOR TWO (2) DAYS DURING THE WET SEASON OR SEVEN (7) DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED TESC METHODS (E.G., SEEDING, MULCHING, PLAS77C COVERING, ETC.). 8. ANY AREA NEEDING TESC MEASURES NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN 15 DAYS. 9. THE TESC FACIL177ES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A STORM EVENT. 10. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. 11. STABILIZED CONSTRUCT70N ENTRANCES AND ROADS SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF 774E PROJECT. ADDITIONAL MEASURES, SUCH AS WASH PADS, MAY BE REQUIRED TO INSURE 77-IAT ALL PAVED ARES ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. 12. ANY PERMANENT RE7ENT70N/DETENT70N FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST ONE (1)FOOT ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 13. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF 2 TO 3 INCHES. 14. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTUEBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONE CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY INSPECTOR. THE CITY. INSPECTOR CAN REQUIRE SEEDING OF ADDITIONAL AREAS IN ORDER TO PROTECT SURFACE WATERS, ADJACENT PROPERTIES, OR DRAINAGE FACILITIES. CONSTRUCTION SEQUENCE NOTES 1. ARRANGE AND ATTEND PRE - CONSTRUCTION MEETING WITH CITY SITE DEVELOPMENT INSPECTOR. 2. FLAG PROPERTY LINES, CLEARING LIMITS, AND ANY N.G.P.E. TRACTS. J. POST SIGN WITH NAME AND PHONE NUM8ER OF TESC SUPERVISOR. 4. INSTALL CATCH BASIN PR07EC77ON IF REQUIRED. 5. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). 6. INSTALL ROCK CONSTRUCTION ENTRANCE. Z GRADE AND STABILIZE CONSTRUCTION ROADS. B. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY STANDARDS AND MANUFACTURER'S RECOMMENDATIONS. 9. RELOCATE EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY STANDARDS AND MANUFACTURER'S RECOMMENDATIONS. 10. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLAS77C SHEETING OR EQUIVALENT. 11. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 12. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. STABILIZED AND BMPS REMOVED IF APPROPRIATE. 13. UPON COMPLETION OF 774E PROJECT, ALL DISTURBED AREAS MUST BE a BTANOARO $TRENCH \ OryMI_ ",A FABRIC y f III I I III \ u*Cx BASw � II MOTES 1. CONDITIONOFUSE 1,1. SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN BOB FEET OF A DISTURBED OR CONSTRUCTION AREA UNLESS THE RUNOFF THAT ENTERS THE CATCHBASIN WILL BE CONVEYEO TO A SEDIMENT POND OR TRAP. 2 MAY BE USED ERE AT THE APPLICANT ON 'S DISCRETI TO PROTECT DRAINAGE SYSTEM. 1.. 1.3. THE CONTRIBUTING NRIBUTING NG D DRAINAGE AREA MOST NOT BE LARGER THAN (ACRE. 2. DESIGN ANDINSTALLATION SPECIFICATIONS 2.1, FILTER FABRIC IS ONLY ALLOWED WERE FUNDING WILL NOT BE A TRAFFIC CONCERN AND WHERE SLOPE EROSION WILL NOT RESULT IF THE CURB IS OVERTOPPED BY PONDED WATER. 22 THE PLACEMENT OF A FILTER FABRIC UNDER GRATES IS GENERALLY PROHIBITED AND THE USE OF FILTER FABRIC OVER GRATES IS STRICTLY LIMITED AND DISCOURAGED. 3. MAINTENANCE STANDARDS 3.1. ANY ACCUMULATED SEDIMENT ON OR AROUND INLET PROTECTION SHALL BE REMOVED IMMEDIATELY. SEDIMENT SHALL NOT BE REMOVED WITH WATER AND ALL SEDIMENT MUST BE DISPOSED OF AS FILL ON SITE OR HAULED OFF SITE. O PUBLIC WORKS FILTER FABRIC PROTECTION STD. PLAN - 218.20 DEPARTMENT MARCH 2008 OFNCWAYS SMPIL BEGAVEDTOTIE EWE � OF PRwRrolNSV,uAnory of ixF 1M'Daow wraraucnox FNTRN.CE TDAVwO E.R$ AR- NS�ALL ExT EBECRO DSOTNT RUNBFF..WSOFFMc DMV AYCULNFRTIS A ROADSIDE DNPI PRESEPERCRYRUDSTANJMDS 1T MIH. TiICKNE55 PRONG£ FLLL wI AFGA NOTES IxDGVCss,EGRFSS AoE4 1. CONDITIONOFUSE 1,1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE. 2, DESIGN AND INSTALLATION SPECIFICATIONS 2.1. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN ARES THAT WILL GOT BE USED FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILRATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. 2.2. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE. 2.3. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE. 3. MAINTENANCE STANDARDS 3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. 3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF THE WHEEL WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASHED WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND. 3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREATTO PUBLIC SAFETY. IF IT NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONDUCTED, THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE ITCAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. 3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 3.5. IF VEHICLES ARE ENTERING OR EXITING THE SUES AT POIMS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL TRAFFIC. s PUBLIC WORKS STABILIZED 311). PLAN - 215.10 DEPARTMENT CONSTRUCTION ENTRANCE MARCH 2008 Jd US NFILTERFABRICERRU6ESFUC O cnPo U ES"FIEEU'F ..... CR F.T Li GRAB TENSIU STREBNGFI ASTM04]51 HL P5I MIN. SPACING MAY BE REQUIRED F GRAB TENSILE ELONGATION ASTM 04511 309 N✓X MUIIEN BUFST 3TRENGIH ASTM D379E130A AOS (ASTM D1751) 4tlI P51LLS. STAMIN. XY4 5 N M R D SIEVE SIZ 2, DESIGN AND INSTALLATION SPECIFICATIONS 2.1. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN ARES THAT WILL GOT BE USED FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILRATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. 2.2. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE. 2.3. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE. 3. MAINTENANCE STANDARDS 3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. 3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF THE WHEEL WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASHED WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND. 3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREATTO PUBLIC SAFETY. IF IT NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONDUCTED, THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE ITCAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. 3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 3.5. IF VEHICLES ARE ENTERING OR EXITING THE SUES AT POIMS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL TRAFFIC. s PUBLIC WORKS STABILIZED 311). PLAN - 215.10 DEPARTMENT CONSTRUCTION ENTRANCE MARCH 2008 Jd US NFILTERFABRICERRU6ESFUC O cnPo U ES"FIEEU'F ..... CR F.T Li IIEIo.maliwnl FOn"IT F U" P $^ACING MAV BE INCRF.ISEO SPACING MAY BE REQUIRED F TO C I F NIPS BACQNG M UBF0 3'Jm51EVE51z[10.3oo.15MA FOx OTriRFnanl¢ 11- BY 1<.a WIRc OR STREW TE FABRIC USED STRENGTH FABRIC 115E0 BACUU11 -H HAFIVE POSTS. REMB, OF EQUIVA­E� 1. CONDITIONOFUSE 1.1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS. 12 SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW. ANY CONCENTRATED FLOW MOST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND. 2. DESIGNAND INSTALLATIONSPECIFIMTONS 2.1. THE GEOTEXTILE USED MOST MET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MOST BE AVAILABLE ON SITE. 22. IIEIo.maliwnl FOn"IT F U" tA31ASIM Wnu SPACING MAY BE REQUIRED F 2.1 3'Jm51EVE51z[10.3oo.15MA FOx OTriRFnanl¢ WAIFAPEWLiNM 13Tnp191 0.0tSK^1 MNIMIIM GMBIFNUIf SThMCMIIASTMOY3I .Ml Mx lglpl I. GNFABPiC 3 .. Mx. 1.Al.M.FOSmLNC.FAPIG G FBO,IEGONWnox ASIMMSII n uTMwoun:FellnAxcEl -s m•M 22. STANDARD STRENGTH FABRI( BY SPACING MAY BE REQUIRED F 2.1 WHERE THE FENCE IS INSTAL 2.4. IF ATYPICAL SILT FENCE IS U! BY IS WELL BURIED AND SECURE 3 FENCE. OF THE FENCE. WIRE BACKING OR CLOSER POST \RRANTS A STRONGER FENCE. 3. IWNTENANCE STANDARDS 3.1. ANY DAMAGE SHALL BE REPAIR IMMEDIATELY. 3.2 IF CONCENTRATED FLOES ARE EVIDENT UPHILL OD THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND, 3.1 IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING CHANNEUU!ATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVED THE TRAP SEDIMENT. 3.4. SEDIMENT MOST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH. 15. IF THE FILTER FABRIC (GEOTEMILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED. PUBLIC WORKS I SILT FENCE DEPARTMENT I STD. PLAN - 214.00 MARCH 2008 R- 365310 "AS- BUILT" NOTE: "AS- BUILT" IS BASED ON A ACTUAL FIELD SURVEY BY TOUMA ENGINEERS AND INFORMATION SUPPLIED BY CONTRACTOR. 12 -3 40 qg--P=z 10 RECOMMENDED FOR APPROVAL BY DATE BY DATE BY DATE BY DATE BY DATE ((�� vJ �! 2 d�(i N um 0 l , W ti 3 TKO o�m 0 z 1 N m °z r.1 Wh x po W O 2 ti ! ll I^ A N M co0 Lu (1 / LAJ o Z V) C) W NomN' L..1. Lv W V) O LL1 0- -1 w �y n rn O C n um N to y ma l , ti TKO o�m 0 z 1 N m °z r.1 � x po w