Loading...
HomeMy WebLinkAboutW-358212VENT TO ATMOSPHERE PROPOSED SAMPLE FLOW REGULATOR. INSTALL A MIN. OF 24' ABOVE CHLORINE ANALYZER. 0 PROPOSED PRE-CT CHLORINE ANALYZER 0 EXISTING POST -CT CHLORINE 1 ANALYZER & MANUAL SAMPLE TAP STATION nztll Y2' PVC DI PROPOSED Y2' PE SAMPLE LINE FROM SAMPLE TAP, SEE SITE PLANS FOR CONTINUATION. TRANSITION TOY' PE TUBING WITHIN BUILDING PROPOSED 1' SCH. 40 PVC DRAIN LINE FROM PROPOSED CHLORINE ANALYZER TO EXISTING FLOOR DRAIN CORE DRILL 3' DIA. HOLE THROUGH CMU WALL ABOVE BOND BEAM FOR SAMPLE LINE. SEAL PENETRATION WATER TIGHT WITH FOAM INSULATION. CONTRACTOR- FABRICATED ENCLOSURE NOTES 1. CONTRACTOR TO PROVIDE SECURE WEATHER -TIGHT ENCLOSURE WITH HINGED ACCESS PANEL AND HIGH-SECURITY LOCKING HASP. ENCLOSURE TO BE CONTRACTOR -DESIGNED AND FABRICATED FROM TYPE 304 STAINLESS STEEL (MIN.16 GAUGE). TOP OF ENCLOSURE TO BE SLOPED TO DRAIN. 2. CONTRACTOR TO SIZE ENCLOSURE BASED ON FIELD CONDITIONS. 3. ENCLOSURE TO BE SECURELY ATTACHED TO THE EXISTING CMU WALL WITH ADHESIVE ANCHORS (HILTI OR EQUAL) LOCATED WITHIN THE ENCLOSURE. 4. PROVIDE 6' THICK REINFORCED CONCRETE PAD UNDER ENCLOSURE, SLOPE TO DRAIN AWAY FROM BUILDING. PROVIDEY2' PJF AT EX. WALL. 5. INSULATE INTERIOR OF ENCLOSURE WITH EXTRUDED POLYSTYRENE RIGID FOAM INSULATION. PROPOSED POWER CONDUIT FROM EXISTING PROPOSED CHLORINE ANALYZER DISTRIBUTION PANEL TO EXISTING DISTRIBUTION PANEL Q PROPOSED (AND EXISTING BEHIND PUMP) CHLORINE ANALYZER PROPOSED DRAIN LINE FROM PROPOSED CHLORINE ANALYZER TO EXISTING FLOOR DRAIN EXISTING FLOOR DRAIN PROPOSED 1/4" PVC BALL VALVE r i PROPOSED CHLORINE ANALYZER STRAINER PROPOSED)/2" PVC BALL VALVE PROPOSED INSTRUMENTATION EXISTING TELEMETRY PANEL. INSTALL PROPOSED INSTRUMENTATION CONDUIT FROM PROPOSED TERMINAL BLOCKS IN EXISTING TELEMETRY CONDUIT FROM PROPOSED CHLORINE ANALYZER TO PANEL FOR TERMINATING FIELD WIRE FROM CHLORINE ANALYZER TO EXISTING TELEMETRY PANEL. PROPOSED CHLORINE ANALYZER. CONNECT EXISTING TELEMETRY PANEL. PROPOSED WIRE FROM PROPOSED TERMINAL BLOCKS TO EXISTING SPARE ANALOG INPUT. LIBERTY PARK WELL EW -3 PROPOSED CHLORINE ANALYZER NOT TO SCALE PROPOSED % "GRS INSTRUMENTATION CONDUIT FROM PROPOSED CHLORINE PROPOSED CHLORINE ANALYZER TO EXISTING TELEMETRY LOCATION OF EXISTING ANALYZER PANEL CONTAINING (1)- 2CONDUCTOR DISTRIBUTION PANEL SHIELDED CABLE PROPOSED CHLORINE Al PROPOSED 1/4" BRASS BALL VALVE ANALYZER DRAIN LINE l /1 SECURE AND ROUTE DRAIN 12" SQ. LINE ALONG WALL TO DRAIN ✓% ~ MIN. —�I PROPOSED LOCKING HASP T I PROPOSED PVC CAP, INSTALL LOOSE WITH ADDITIONAL PULL CORD FASTEN TO INSIDE. PROPOSED CONTRACTOR- FABRICATED ENCLOSURE, SEE NOTE FOR ADDITIONAL INFORMATION. PROPOSED CONCRETE PAD �T CONTRACTOR TO POTHOLE TO DETERMINE LOCATION OF UTILITIES AND PERIMETER DRAIN. DEPTH OF 3" PVC CARRIER CONDUIT MAY BE REDUCED NEAR BUILDING TO 18" AS NEEDED TO AVOID EX. UTILITIES AND TO MINIMIZE DISTURBANCE TO BUILDING FOUNDATION. LIBERTY PARK WELL EW -3 PROPOSED CHLORINE ANALYZER SAMPLE AND DRAIN LINE ROUTING A D22 LIBERTY PARK WELL EW -3 EXISTING TELEMETRY PANEL NOT TO SCALE EXISTING MOTOR CONTROL CENTER EXISTING TELEMETRY PANEL INSTALL PROPOSED 20A,1 -POLE CIRCUIT BREAKER IN EXISTING DISTRIBUTION PANEL. l� CONNECT PROPOSED CHLORINE ANALYZER TO PROPOSED CIRCUIT BREAKER. �T CONTRACTOR TO POTHOLE TO DETERMINE LOCATION OF UTILITIES AND PERIMETER DRAIN. DEPTH OF 3" PVC CARRIER CONDUIT MAY BE REDUCED NEAR BUILDING TO 18" AS NEEDED TO AVOID EX. UTILITIES AND TO MINIMIZE DISTURBANCE TO BUILDING FOUNDATION. LIBERTY PARK WELL EW -3 PROPOSED CHLORINE ANALYZER SAMPLE AND DRAIN LINE ROUTING A D22 LIBERTY PARK WELL EW -3 EXISTING TELEMETRY PANEL NOT TO SCALE EXISTING MOTOR CONTROL CENTER EXISTING TELEMETRY PANEL NOT TO SCALE REVISED TO CONFORM TO CONSTRUCTION RECORDS xx` L 9/23/13 52 ENGINEERING INC. DATE U REVISED TO CONFORM TO CONSTRUCTION RECORD NO. i REVISION SIGNEk 111131ffi? SIGNS& » ,43,42 ♦(r�L M to 3� LU OM W Oza Z� C v� L a LL Y LU Fn OcnwZ cc ya aa a U (/� i