Loading...
HomeMy WebLinkAboutS-0354909z LL TEMP BYPASS PUMPING SYSTE EXIST i\ 14 PLUG MH 5315135 (TYP EA END) RIM EL = 398.04± 1 2 CL CHNL 12" (N, E) = 386.39± R \ S ENIENFION \ DF.NTEI�; ION POND I LIP.IITS OF CONS - RUCTION (T YP) EXIST 20 PcR[%!ANENT 12" SS EASELIENT (TYP) - i 1C' CONSTRUC?ISiIC' _ \ iI- X 600 ° - MH5314079 _ I STA O i 75.77 d r SiSS ° Y7° ° o ° ° o ° 1 +50 0i 2 1 �y 1 RECORD DRAWINGS THESE RECORD DRAWINGS HAVE BEEN PREPARED BASED IN PART ON INFORMATION PROVIDED BY OTHERS THIS DRAWING SET WAS PREPARED ONLY FOR THE PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREON AND IS NOT TO BE USED ELSEWHERE Date By 17/6//3 aJ � Fns JI S � i I r ENCE' IPYP) I' 1 f:, VALVE VAULT I a 12 SS \ O I OO � ELECT BLDG WET WELL i g I / EAST RENTON E2 LIFT STATION I 7XI`I'T 60'0 /I FACILITY rvi OT 0+0 060 ST I 0 +00.00 % 1 I` 4 EMERGENCY STORAGE WELL -7 EXIST / 10" SS / ' TEMP BYPASS r i KING COUNTY W -7LAND ANC PUMPING SYSTEM STREAM BUFF ER I1191TS / OCrI\ PLUG 14 (TYP EA END) r r r � A I r V 1 1 I 1 1 1 I 1 1 EXIST MH 5314 078 RIM EL = 401.20 CL CHNL 10" (E, W) = 387.20 A BYPASS PUMPING PLAN C -04 SCALE: 1 " =20' FILE: 8235C00 -C -100 BURIED UTILITIES IN AREA PLEASE CALL BEFORE YOU DIG 1.800.424.5555 y 5" SS EXIST I I GENERAL NOTES: A. 4" PVC CONDUIT DESIGNED BY CENTURY LINK NOT SHOWN ON THIS SHEET. SEE PIPING PLAN AND PROFILE SHEETS FOR DETAILS, T" OKNESS TO MATCH 'TING. CLASS 3/4" HMA WSDOT SECTION 9 -03.8 3- INCHES CSTC PER WSDOT SECTION 9 -03.9 (3) EXIST 60 "0 MH 5314 079 1 MANHOLE CHANNELING C -OS SCALE: 314"= V -0" FILE: 8235C10 -C -08 EXIST GRADE QUARRY SPALL CHES CSBC PER WSDOT :TION 9 -03.9 (3) 2 NEW AC PAVEMENT C-06 SCALE: 3/4" = V -O" FILE: C- 07.dwg COARSE AGGREGATE AS NEEDED TO SUPPORT LOADS C SECTION 5 - j SCALE: 1 1/27= FABRIC TEMPORARY 8 "0 PIPE CULVERT KEY NOTES: OTEMPORARY BYPASS PUMPING MANHOLE. MAX NOISE OF TEMPORARY BYPASS SYSTEM SHALL BE 45 dBa AT NEAREST RESIDENTIAL PROPERTY LINE. FIELD VERIFY DIAMETER OF MANHOLE. 2OLOCATION AND DATA FOR EXISTING MANHOLE IS BASED ON CITY OF RENTON GIS DATA AND IS APPROXIMATE. CONTRACTOR TO FIELD VERIFY. OCHANNEL WITH FAST SETTING CONCRETE. CHANNEL HEIGHT= 12 INCHES. OBYPASS PUMPING DISCHARGE LOCATION. ROUTE PIPING TO INVERT OF EMERGENCY STORAGE WELL. TEMPORARILY SUPPORT PIPING AS REQD. 55 CONSTRUCTION OF TEMPORARY STREAM CROSSING IS PROVIDED TO FACILITATE EQUIPMENT ACCESS ALONG PIPELINE ALIGNMENT. CONTRACTOR TO INSTALL PER GENERAL DETAILS SHOWN ON THE DWGS AND PER BEST MANAGEMENT PRACTICES. SUBMITTEMPORARY STREAM CROSSING TO ENGINEER FOR APPROVAL PRIOR TO INSTALLATION. REMOVE ALL MATERIALS FOR TEMPORARY STREAM CROSSING PRIOR TO STREAMBANK RESTORATION. SEE SUBSECTION 10.02910 FOR ADDITIONAL REQUIREMENTS. OCOMPACT CSBC AND CSTC TO 95% MOD PER ASTM D 1557. OCOMPACT HMA TO AT LEAST 91% OF ITS MAXIMUM THEORETICAL SPECIFIC GRAVITY (RICE DENSITY). OCONTRACTOR TO COORDINATE WITH LOCAL HOA FOR STORMWATER DETENTION POND ACCESS. OTEMPORARY BYPASS PIPING. CONTRACTOR TO ROUTE ABOVE GROUND /UNDERGROUND AND SUPPORT AS REQUIRED. 1p SEE STREAM DEWATERING PLAN FOR COFFERDAM DETAILS. ADD VISQUEEN SHEET OR EQUIVALENT TO FUNNEL STREAM FLOW. 11 VISQUEEN SHEET OR EQUIVALENT AT OUTLET OF CULVERT. 12 EXTEND CLSM TO 5 FEET OUTSIDE OF STREAM. 13 INSTALL CONCRETE CUT -OFF WALL AT END OF CLSM. 14 USE TEMPORARY PLUG TO BLOCK FLOW TO RING BYPASS PUMPING. 07 C-05!,,/ SCALE: 1/2" - 1' -0" FILE: 8235C10 -C -08 SMU354yuy 4 r a Sri O r Gy N � y O O 3 a o 'p z