HomeMy WebLinkAboutT-3430104JOINT UTILITY TRENCH LEGEND
-JT- JOINT UTILITY TRENCH
P INSTALL X" DIAMETER CONDUIT - PSE
POWER
T INSTALL X" DIAMETER CONDUIT -
CENTURYLINK
C INSTALL X" DIAMETER CONDUIT -
COMCAST
c INSTALL X" DIAMETER CONDUIT - PSE
X# X# GAS
1� TRENCH SECTION
SEE SHTS 175 -179 9
®
INSTALL 264 TA VAULT - CENTURYLINK
®
INSTALL PEDESTAL - CENTURYLINK
o
EX. SERVICE WIRE BOX - COMCAST
5106 DEEP VAULT
INSTALL 5106 DEEP VAULT - PSE
®
INSTALL J -BOX - PSE
•
INSTALL SECONDARY HANDHOLE - PSE
❑
INSTALL ABOVE GROUND TRANSFORMER -
DESIGN BY:
PSE
•
INSTALL INTERCEPT POINT - PSE
ru
INSTALL TOTAL UNDERGROUND
PSE
TRANSFORMER - PSE
®
INSTALL 2436 VAULT - COMCAST
®
INSTALL 2424 VAULT - COMCAST
0
INSTALL 17 "x30" VAULT - COMCAST
"
INSTALL ROUND VAULT - COMCAST
®
INSTALL 253 TA - COMCAST
- - - - - - - - - - - - -
- - - APPROXIMATE CONSTRUCTION LIMITS
- - - -
PERMANENT EASEMENT
- - - --
ROW LINE
INTERCEPT POINT
PROPERTY LINE
CALL 2 DAYS
BEFORE YOU DIG
1- 800 -424 -5555
NUMBER
REVISION DESCRIPTION
[loo Ou G 7
BY I APP.I DATE
YANKEE
GRILL
PLAN
0 5 10 20 40 60
SCALE IN FEET
753 9th Avenue N 2502 Jefferson Avenue
Seat6e,WA98109 Tacama,WA98402
(206) 2861640 (253) 627 -0720
www.kpg.com
I ,
VAULT SCHEDULE
11-14 -11
SURVEYED:
KPG
Cis
P1
5106 DEEP VAULT
PV01
y�
Q1
DRAWN BY:
SOD
CONTRACTOR
C1
DESIGN BY:
SOD
THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF
P2
CHECK BY:
JLF
PSE
Q2
264 TA
-
�Qa
C2
PROJ MGR:
JF
THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE
P27
FILE: 0655DJUT01.dwg
753 9th Avenue N 2502 Jefferson Avenue
Seat6e,WA98109 Tacama,WA98402
(206) 2861640 (253) 627 -0720
www.kpg.com
I ,
VAULT SCHEDULE
BID
DOCUMENTS
I D
VAULT
FRANCHISE
UTILITY ID
EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND
P1
5106 DEEP VAULT
PV01
6 -6"
Q1
264 TA
#913
CONTRACTOR
C1
2436 MEDIUM DUTY VAULT
-
THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF
P2
THREE PHASE J -BOX
J03
PSE
Q2
264 TA
-
1p,3P,1 -4"
C2
2436 MEDIUM DUTY VAULT
-
THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE
P27
INTERCEPT POINT
IP01A
CONTRACTOR
P28
INTERCEPT POINT
IP01A
-
P29
INTERCEPT POINT
IP01A
CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE
P30
INTERCEPT POINT
IP01A
2 -6"
P55
REMOVE VAULT
PV01A
-
P56
REMOVE VAULT
J04
CONVERSION.
P82
SECONDARY HANDHOLE
H1A
-
P84
INTERCEPT POINT
IP01A
BID
DOCUMENTS
OWNED BY
GENERAL JOINT UTILITY TRENCH PLAN NOTES
INSTALLED BY
1.
EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND
PSE
PSE
ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY
6 -6"
2P'4P
COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL
CENTURYLINK
CONTRACTOR
AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE
2q,3q
COMCAST
THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF
CONTRACTOR
1c,2c
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE
PSE
PSE
FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE
4 -4"
1p,3P,1 -4"
GAS, COMCAST, AND CENTURYLINK.
CENTURYLINK
2.
THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE
1q
COMCAST
APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY
CONTRACTOR
-
REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL
PSE
-
CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE
-
2 -4"
CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE
-
CONTRACTOR
FRANCHISE UTILITIES.
2 -6"
3.
PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL
CONTRACTOR
-
CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS
PSE
-
CONVERSION.
-
4.
THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR
-
CONTRACTOR
THE CITY OF RENTON.
-
5.
COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED
w
-
FOR THEIR CONVERSION.
=
6.
UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE
�
-
MADE BY THE FRANCHISE UTILITIES.
CD
+
7.
UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE
2 -6"
PROPERTY OWNER FROM THE RIGHT -OF -WAY TO EXISTING PRIVATE METERS.
8.
CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS
AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND
w
VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND
PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM
x
COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER
UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE
TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO
AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192.
9.
CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL
EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS
COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL,
CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY
STRUCTURES NO LONGER IN USE.
10
INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE.
SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER
DESIGN.
11.
CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS.
12.
CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN.
OWNED BY
PROVIDED BY
INSTALLED BY
CONDUIT
IN /FROM LEFT
CONDUIT
OUT /TO RIGHT
PSE
PSE
CONTRACTOR
6 -6"
2P'4P
CENTURYLINK
CENTURYLINK
CONTRACTOR
1q
2q,3q
COMCAST
COMCAST
CONTRACTOR
1c,2c
3c,4c
PSE
PSE
CONTRACTOR
4 -4"
1p,3P,1 -4"
CENTURYLINK
CENTURYLINK
CONTRACTOR
-
1q
COMCAST
COMCAST
CONTRACTOR
-
1c,2c
PSE
-
CONTRACTOR
-
2 -4"
PSE
-
CONTRACTOR
-
2 -6"
PSE
-
CONTRACTOR
-
2 -6"
PSE
-
CONTRACTOR
-
2 -4"
PSE
-
CONTRACTOR
-
-
PSE
-
CONTRACTOR
-
-
PSE
PSE
CONTRACTOR
-
-
PSE
-
CONTRACTOR
-
2 -6"
CITY OF RENTON
rLL
Public Works Department
APPROVED FOR CONSTRUCTION
DATE:
T- 3430104
CORRESPONDING SHEETS
CATEGORY
SHEET
RIGHT OF WAY PLANS
7
EXISTING CONDITIONS
55
SITE PREPARATION & TESC PLAN
69
ALIGNMENT PLAN
81
ALIGNMENT PROFILE
93
DRAINAGE PLANS
104
DRAINAGE PROFILE
114
WATER PLAN
132
WATER PROFILE
146
JOINT UTILITY TRENCH PLAN
-
JOINT UTILITY TRENCH PROFILES
180
PROPERTY RESTORATION PLANS
195
CHANNELIZATION & SIGNING PLAN
217
ILLUMINATION PLANS
228
IRRIGATION PLAN
282
LANDSCAPE PLAN
294
RAINIER AVENUE S (SR 167)
S GRADY WAY TO S 2ND ST
JOINT UTILITY TRENCH PLAN
STA 8 +00 TO STA 12 +00
DRAWING NO. 164
PROJECT NO.
TED403430
FED AID NO.
- CM0167 048)
DATE:
NOV 2011
SHEET NO.
164 OF 304