HomeMy WebLinkAboutT-3430104JOINT UTILITY TRENCH LEGEND -JT- JOINT UTILITY TRENCH P INSTALL X" DIAMETER CONDUIT - PSE POWER T INSTALL X" DIAMETER CONDUIT - CENTURYLINK C INSTALL X" DIAMETER CONDUIT - COMCAST c INSTALL X" DIAMETER CONDUIT - PSE X# X# GAS 1� TRENCH SECTION SEE SHTS 175 -179 9 ® INSTALL 264 TA VAULT - CENTURYLINK ® INSTALL PEDESTAL - CENTURYLINK o EX. SERVICE WIRE BOX - COMCAST 5106 DEEP VAULT INSTALL 5106 DEEP VAULT - PSE ® INSTALL J -BOX - PSE • INSTALL SECONDARY HANDHOLE - PSE ❑ INSTALL ABOVE GROUND TRANSFORMER - DESIGN BY: PSE • INSTALL INTERCEPT POINT - PSE ru INSTALL TOTAL UNDERGROUND PSE TRANSFORMER - PSE ® INSTALL 2436 VAULT - COMCAST ® INSTALL 2424 VAULT - COMCAST 0 INSTALL 17 "x30" VAULT - COMCAST " INSTALL ROUND VAULT - COMCAST ® INSTALL 253 TA - COMCAST - - - - - - - - - - - - - - - - APPROXIMATE CONSTRUCTION LIMITS - - - - PERMANENT EASEMENT - - - -- ROW LINE INTERCEPT POINT PROPERTY LINE CALL 2 DAYS BEFORE YOU DIG 1- 800 -424 -5555 NUMBER REVISION DESCRIPTION [loo Ou G 7 BY I APP.I DATE YANKEE GRILL PLAN 0 5 10 20 40 60 SCALE IN FEET 753 9th Avenue N 2502 Jefferson Avenue Seat6e,WA98109 Tacama,WA98402 (206) 2861640 (253) 627 -0720 www.kpg.com I , VAULT SCHEDULE 11-14 -11 SURVEYED: KPG Cis P1 5106 DEEP VAULT PV01 y� Q1 DRAWN BY: SOD CONTRACTOR C1 DESIGN BY: SOD THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF P2 CHECK BY: JLF PSE Q2 264 TA - �Qa C2 PROJ MGR: JF THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE P27 FILE: 0655DJUT01.dwg 753 9th Avenue N 2502 Jefferson Avenue Seat6e,WA98109 Tacama,WA98402 (206) 2861640 (253) 627 -0720 www.kpg.com I , VAULT SCHEDULE BID DOCUMENTS I D VAULT FRANCHISE UTILITY ID EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND P1 5106 DEEP VAULT PV01 6 -6" Q1 264 TA #913 CONTRACTOR C1 2436 MEDIUM DUTY VAULT - THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF P2 THREE PHASE J -BOX J03 PSE Q2 264 TA - 1p,3P,1 -4" C2 2436 MEDIUM DUTY VAULT - THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE P27 INTERCEPT POINT IP01A CONTRACTOR P28 INTERCEPT POINT IP01A - P29 INTERCEPT POINT IP01A CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE P30 INTERCEPT POINT IP01A 2 -6" P55 REMOVE VAULT PV01A - P56 REMOVE VAULT J04 CONVERSION. P82 SECONDARY HANDHOLE H1A - P84 INTERCEPT POINT IP01A BID DOCUMENTS OWNED BY GENERAL JOINT UTILITY TRENCH PLAN NOTES INSTALLED BY 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND PSE PSE ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY 6 -6" 2P'4P COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL CENTURYLINK CONTRACTOR AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE 2q,3q COMCAST THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF CONTRACTOR 1c,2c THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE PSE PSE FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE 4 -4" 1p,3P,1 -4" GAS, COMCAST, AND CENTURYLINK. CENTURYLINK 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE 1q COMCAST APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY CONTRACTOR - REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL PSE - CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE - 2 -4" CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE - CONTRACTOR FRANCHISE UTILITIES. 2 -6" 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL CONTRACTOR - CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS PSE - CONVERSION. - 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR - CONTRACTOR THE CITY OF RENTON. - 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED w - FOR THEIR CONVERSION. = 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE � - MADE BY THE FRANCHISE UTILITIES. CD + 7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE 2 -6" PROPERTY OWNER FROM THE RIGHT -OF -WAY TO EXISTING PRIVATE METERS. 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND w VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM x COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192. 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY STRUCTURES NO LONGER IN USE. 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER DESIGN. 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN /FROM LEFT CONDUIT OUT /TO RIGHT PSE PSE CONTRACTOR 6 -6" 2P'4P CENTURYLINK CENTURYLINK CONTRACTOR 1q 2q,3q COMCAST COMCAST CONTRACTOR 1c,2c 3c,4c PSE PSE CONTRACTOR 4 -4" 1p,3P,1 -4" CENTURYLINK CENTURYLINK CONTRACTOR - 1q COMCAST COMCAST CONTRACTOR - 1c,2c PSE - CONTRACTOR - 2 -4" PSE - CONTRACTOR - 2 -6" PSE - CONTRACTOR - 2 -6" PSE - CONTRACTOR - 2 -4" PSE - CONTRACTOR - - PSE - CONTRACTOR - - PSE PSE CONTRACTOR - - PSE - CONTRACTOR - 2 -6" CITY OF RENTON rLL Public Works Department APPROVED FOR CONSTRUCTION DATE: T- 3430104 CORRESPONDING SHEETS CATEGORY SHEET RIGHT OF WAY PLANS 7 EXISTING CONDITIONS 55 SITE PREPARATION & TESC PLAN 69 ALIGNMENT PLAN 81 ALIGNMENT PROFILE 93 DRAINAGE PLANS 104 DRAINAGE PROFILE 114 WATER PLAN 132 WATER PROFILE 146 JOINT UTILITY TRENCH PLAN - JOINT UTILITY TRENCH PROFILES 180 PROPERTY RESTORATION PLANS 195 CHANNELIZATION & SIGNING PLAN 217 ILLUMINATION PLANS 228 IRRIGATION PLAN 282 LANDSCAPE PLAN 294 RAINIER AVENUE S (SR 167) S GRADY WAY TO S 2ND ST JOINT UTILITY TRENCH PLAN STA 8 +00 TO STA 12 +00 DRAWING NO. 164 PROJECT NO. TED403430 FED AID NO. - CM0167 048) DATE: NOV 2011 SHEET NO. 164 OF 304 a z mya m /V y Oa pj I > o w a o w N O v;