Loading...
HomeMy WebLinkAboutT-3430109w 0 w 0 rr 0 �1 0 z 0 z w a! U 0 O i Z O N A7 U 2 i 9 II- ------- RAI4RQAD R -Q_W - - -- J . ( i cc 6 F9P - .P 10 - - - - -- �P11 —, G9 II L, I _30 0 I I _ sr� _ F1 MAZATLAN F1 T F5 - 2 - J_ ------ F3` r11 GENERAL JOINT UTILITY TRENCH PLAN NOTES SOUTH LAKE VETERINARY CONSTRUCTION NOTES J 32 INSTALL 12" STEEL CASING FOR CONDUITS UNDER WALL FOOTING. SEE WALL 4 PLAN, SHEET 31 AND BORE CASING DETAIL — JUT, SHT 172. -- - o RAINIER �VE S r w I Cn CD + dd .7.L,- w -- ID ` G c � I r I + - - - - - -- 1 —C1 - — 14 (RAINIER VILLAGE I I I 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS PROVIDED BY ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY CONDUIT IN /FROM LEFT AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND P10 COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL Jib VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PSE AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE 16p,17p,18p,19p PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM Q10 THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF #922 COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER CENTURYLINK THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE 16q,1 7q UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE C9 FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE — TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE COMCAST GAS, COMCAST, AND CENTURYLINK. 13c,14c,15c,16c UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE V10 AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192. PSE APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL C10 REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL — EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMCAST CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE 19C COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, P12 CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE J17 CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY PSE FRANCHISE UTILITIES. 20p STRUCTURES NO LONGER IN USE. 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. CENTURYLNK CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS 18q SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER C11 CONVERSION. — DESIGN. 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. P13 THE CITY OF RENTON. V13 PSE 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. C12 FOR THEIR CONVERSION. — COMCAST 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLNK AND COMCAST SHALL BE 15c,16c,17c 20c,21c P14 MADE BY THE FRANCHISE UTILITIES. V11 PSE 7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE 22p — P37 PROPERTY OWNER FROM THE RIGHT —OF —WAY TO EXISTING PRIVATE METERS. H10A PSE - I -� RAILROAD R -Q -W VAULT SCHEDULE F— I Q 00 L - - - -- - -- — — — — -- Y— UGP U- UGP�_ �w AUTO BODY AND PAINT-- JOINT UTILITY TRENCH LEGEND FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. ID VAULT FRANCHISE UTILITY ID OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN /FROM LEFT CONDUIT OUT /TO RIGHT P10 THREE PHASE J —BOX Jib PSE PSE CONTRACTOR 16p,17p,18p,19p 23p,24p,25p Q10 264 TA #922 CENTURYLINK CENTURYLINK CONTRACTOR 16q,1 7q 21q,22q,1 -4" C9 253 TA — COMCAST COMCAST CONTRACTOR 13c,14c,15c,16c — P11 5106 DEEP VAULT V10 PSE PSE CONTRACTOR 23p 1 -4" C10 17 "00" — COMCAST COMCAST CONTRACTOR 19C 18C P12 THREE PHASE J —BOX J17 PSE PSE CONTRACTOR 20p 18p,19p,21p,22p Q24 C -520 PEDESTAL — CENTURYLINK CENTURYLNK CONTRACTOR 18q — C11 2436 MEDIUM DUTY VAULT — COMCAST COMCAST CONTRACTOR 18C 17c P13 TOTAL UNDERGROUND TRANSFORMER V13 PSE PSE CONTRACTOR 21p — C12 2436 MEDIUM DUTY VAULT — COMCAST COMCAST CONTRACTOR 15c,16c,17c 20c,21c P14 5106 DEEP VAULT V11 PSE PSE CONTRACTOR 22p — P37 SECONDARY HAND HOLE H10A PSE PSE CONTRACTOR 1 -4" — P38 CONNECT TO EX. VAULT J18 PSE — CONTRACTOR 24p,25p 26p,27p,28p,29p Q27 CONNECT TO EX. PEDESTAL — CENTURYLINK CENTURYLINK CONTRACTOR 15q — Q28 264 TA #921 CENTURYLINK CENTURYLINK CONTRACTOR 19q,20q 14q,1 8q P66 REMOVE VAULT V14 PSE — CONTRACTOR — — P67 REMOVE VAULT V12 PSE — CONTRACTOR — — P68 REMOVE VAULT V15 PSE — CONTRACTOR — — P94 IREMOVE VAULT — PSE — CONTRACTOR — — P95 REMOVE VAULT — PSE — CONTRACTOR — — i- 3430109 PLAN 0 5 10 20 40 60 SCALE IN FEET CALL 2 DAYS BEFORE YOU DIG 1- 800 -424 -5555 CORRESPONDING SHEETS CATEGORY SHEET RIGHT OF WAY PLANS 12 EXISTING CONDITIONS 60 SITE PREPARATION & TESC PLAN 74 ALIGNMENT PLAN 86 ALIGNMENT PROFILE 98 DRAINAGE PLANS 109 DRAINAGE PROFILE 119,120 WATER PLAN 137 WATER PROFILE 151 JOINT UTILITY TRENCH PLAN — JOINT UTILITY TRENCH PROFILES 185 PROPERTY RESTORATION PLANS 200 CHANNELIZATION & SIGNING PLAN 222 ILLUMINATION PLANS 233 IRRIGATION PLAN 287 LANDSCAPE PLAN 299 z �y j.1.i m /r ti c O �> < w o w N O N GIq 11 -1x11 109`z'4� WA yG'6' 'TF 20320E y`r 'got e SURVEYED: KPG DRAWN BY: SOD DESIGN BY: SOD CHECK BY: JLF PROJ MGR: JF FILE: 0655DJUT01.dwg ��� 7539th Avenue N 2502 Jeferson Avenue BID Seaft WA98109 Tamma,WA 98402 DOCUMENTS (206)2861640 (253) 627 -0720 waw,k ,can '�" CITY OF RENTON Public Works Department APPROV D FOR CONSTRUCTION BY: DATE :1 /001e– RAINIER AVENUES SR 167 S GRADY WAY TO S(2ND ST JOINT UTILITY TRENCH PLAN STA 29 +00 TO STA 33 +50 DRAWING NO. 169 PROJECT NO. TE0403430 FED AID NO. - CM0167(046) DATE: NOV 2011 SHEET NO. 169 OF 304 NUMBER REVISION DESCRIPTION BY APP. DATE z �y j.1.i m /r ti c O �> < w o w N O N