HomeMy WebLinkAboutT-3430109w
0
w
0
rr
0
�1
0
z
0
z
w
a!
U
0
O
i
Z
O
N
A7
U
2 i
9 II- ------- RAI4RQAD R -Q_W -
- --
J
. ( i
cc
6
F9P - .P
10 - - - - -- �P11 —,
G9 II
L, I
_30 0
I
I _
sr� _ F1
MAZATLAN
F1
T
F5 -
2 - J_ ------ F3`
r11
GENERAL JOINT UTILITY TRENCH PLAN NOTES
SOUTH LAKE
VETERINARY
CONSTRUCTION NOTES
J 32 INSTALL 12" STEEL CASING FOR CONDUITS
UNDER WALL FOOTING. SEE WALL 4 PLAN, SHEET 31 AND
BORE CASING DETAIL — JUT, SHT 172.
-- - o
RAINIER �VE S r w
I Cn
CD
+
dd
.7.L,- w
--
ID ` G
c � I r
I
+
- - - - - -- 1
—C1 - —
14
(RAINIER VILLAGE
I I I
1.
EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND
8.
CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS
PROVIDED BY
ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY
CONDUIT IN /FROM
LEFT
AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND
P10
COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL
Jib
VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND
PSE
AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE
16p,17p,18p,19p
PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM
Q10
THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF
#922
COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER
CENTURYLINK
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE
16q,1 7q
UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE
C9
FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE
—
TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
COMCAST
GAS, COMCAST, AND CENTURYLINK.
13c,14c,15c,16c
UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO
2.
THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE
V10
AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192.
PSE
APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY
9.
CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL
C10
REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL
—
EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS
COMCAST
CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE
19C
COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL,
P12
CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE
J17
CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY
PSE
FRANCHISE UTILITIES.
20p
STRUCTURES NO LONGER IN USE.
3.
PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL
10
INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE.
CENTURYLNK
CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS
18q
SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER
C11
CONVERSION.
—
DESIGN.
4.
THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR
11.
CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS.
P13
THE CITY OF RENTON.
V13
PSE
5.
COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED
12.
CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN.
C12
FOR THEIR CONVERSION.
—
COMCAST
6.
UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLNK AND COMCAST SHALL BE
15c,16c,17c
20c,21c
P14
MADE BY THE FRANCHISE UTILITIES.
V11
PSE
7.
UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE
22p
—
P37
PROPERTY OWNER FROM THE RIGHT —OF —WAY TO EXISTING PRIVATE METERS.
H10A
PSE
-
I
-�
RAILROAD R -Q -W
VAULT SCHEDULE
F— I Q
00
L - - - -- - -- — — — — -- Y— UGP U- UGP�_
�w
AUTO BODY AND PAINT--
JOINT UTILITY TRENCH LEGEND
FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164.
ID
VAULT
FRANCHISE
UTILITY ID
OWNED BY
PROVIDED BY
INSTALLED BY
CONDUIT IN /FROM
LEFT
CONDUIT OUT /TO
RIGHT
P10
THREE PHASE J —BOX
Jib
PSE
PSE
CONTRACTOR
16p,17p,18p,19p
23p,24p,25p
Q10
264 TA
#922
CENTURYLINK
CENTURYLINK
CONTRACTOR
16q,1 7q
21q,22q,1 -4"
C9
253 TA
—
COMCAST
COMCAST
CONTRACTOR
13c,14c,15c,16c
—
P11
5106 DEEP VAULT
V10
PSE
PSE
CONTRACTOR
23p
1 -4"
C10
17 "00"
—
COMCAST
COMCAST
CONTRACTOR
19C
18C
P12
THREE PHASE J —BOX
J17
PSE
PSE
CONTRACTOR
20p
18p,19p,21p,22p
Q24
C -520 PEDESTAL
—
CENTURYLINK
CENTURYLNK
CONTRACTOR
18q
—
C11
2436 MEDIUM DUTY VAULT
—
COMCAST
COMCAST
CONTRACTOR
18C
17c
P13
TOTAL UNDERGROUND
TRANSFORMER
V13
PSE
PSE
CONTRACTOR
21p
—
C12
2436 MEDIUM DUTY VAULT
—
COMCAST
COMCAST
CONTRACTOR
15c,16c,17c
20c,21c
P14
5106 DEEP VAULT
V11
PSE
PSE
CONTRACTOR
22p
—
P37
SECONDARY HAND HOLE
H10A
PSE
PSE
CONTRACTOR
1 -4"
—
P38
CONNECT TO EX. VAULT
J18
PSE
—
CONTRACTOR
24p,25p
26p,27p,28p,29p
Q27
CONNECT TO EX. PEDESTAL
—
CENTURYLINK
CENTURYLINK
CONTRACTOR
15q
—
Q28
264 TA
#921
CENTURYLINK
CENTURYLINK
CONTRACTOR
19q,20q
14q,1 8q
P66
REMOVE VAULT
V14
PSE
—
CONTRACTOR
—
—
P67
REMOVE VAULT
V12
PSE
—
CONTRACTOR
—
—
P68
REMOVE VAULT
V15
PSE
—
CONTRACTOR
—
—
P94
IREMOVE VAULT
—
PSE
—
CONTRACTOR
—
—
P95
REMOVE VAULT
—
PSE
—
CONTRACTOR
—
—
i- 3430109
PLAN
0 5 10 20 40 60
SCALE IN FEET
CALL 2 DAYS
BEFORE YOU DIG
1- 800 -424 -5555
CORRESPONDING SHEETS
CATEGORY
SHEET
RIGHT OF WAY PLANS
12
EXISTING CONDITIONS
60
SITE PREPARATION & TESC PLAN
74
ALIGNMENT PLAN
86
ALIGNMENT PROFILE
98
DRAINAGE PLANS
109
DRAINAGE PROFILE
119,120
WATER PLAN
137
WATER PROFILE
151
JOINT UTILITY TRENCH PLAN
—
JOINT UTILITY TRENCH PROFILES
185
PROPERTY RESTORATION PLANS
200
CHANNELIZATION & SIGNING PLAN
222
ILLUMINATION PLANS
233
IRRIGATION PLAN
287
LANDSCAPE PLAN
299
z
�y
j.1.i
m /r
ti
c
O
�>
< w
o w
N O
N
GIq 11 -1x11
109`z'4� WA yG'6'
'TF 20320E y`r
'got e
SURVEYED: KPG
DRAWN BY: SOD
DESIGN BY: SOD
CHECK BY: JLF
PROJ MGR: JF
FILE: 0655DJUT01.dwg
���
7539th Avenue N 2502 Jeferson Avenue BID
Seaft WA98109 Tamma,WA 98402 DOCUMENTS
(206)2861640 (253) 627 -0720
waw,k ,can
'�" CITY OF RENTON
Public Works Department
APPROV D FOR CONSTRUCTION
BY: DATE :1 /001e–
RAINIER AVENUES SR 167
S GRADY WAY TO S(2ND ST
JOINT UTILITY TRENCH PLAN
STA 29 +00 TO STA 33 +50
DRAWING NO. 169
PROJECT NO. TE0403430
FED AID NO. - CM0167(046)
DATE: NOV 2011
SHEET NO. 169 OF 304
NUMBER
REVISION DESCRIPTION
BY
APP.
DATE
z
�y
j.1.i
m /r
ti
c
O
�>
< w
o w
N O
N