HomeMy WebLinkAboutT-3430113N
F—
w
w
x
0
CD
F—
to
w
z
J
x
U
H
CALL 2 DAYS
BEFORE YOU DIG
1- 800 -424 -5555
WALKER'S
i�
/ ivy
°l / CONSTRUCTION NOTES
k�
h ! % 33 4" DIAMETER CONDUI - CENTURYLINK (2 CONDUIT)
3 �� 1,r
�Q d
T/ 7i 3" DIAMETER COND IT— COMCAST (1 CONDUIT)
A9 3" DIAMETER CO DUIT — COMCAST (3 CONDUIT)
JOINT UTILITY TRENCH LEGEND AC DIAMETER CONDUIT —PSE GAS (1 CONDUIT)
FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. A6" DIAMETER CONDUIT —PSE POWER (2 CONDUIT)
END INSTALLATION OF 6" DIAMETER CONDUIT -PSE GAS - APPROXIMATE STA
47 +40, LT
0 5 10 20 40 60
SCALE IN FEET
WALGREEN'S
VAULT SCHEDULE
GENERAL JOINT UTILITY TRENCH PLAN NOTES
1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND
ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY
COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL
AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE
THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE
FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE
GAS, COMCAST, AND CENTURYLINK.
2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE
APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY
REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL
CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE
CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE
FRANCHISE UTILITIES.
3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL
CONVERSION, PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS
CONVERSION.
4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR
THE CITY OF RENTON.
5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED
FOR THEIR CONVERSION.
6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE
MADE BY THE FRANCHISE UTILITIES.
7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE
PROPERTY OWNER FROM THE RIGHT —OF —WAY TO EXISTING PRIVATE METERS.
8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS
AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND
VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND
PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM
COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER
UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE
TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO
AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192.
9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL
EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS
COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL,
CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING U11UTY
STRUCTURES NO LONGER IN USE.
10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE.
SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER
DESIGN.
11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS.
12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN.
ID
VAULT
FRANCHISE
UTILITY ID
OWNED BY
PROVIDED BY
INSTALLED BY
CONDUIT IN /FROM
LEFT
CONDUIT
OUT /TO RIGHT
Q13
264 TA
#925
CENTURYLNK
CENTURYLINK
CONTRACTOR
29q,30q
31q,32q
C24
2436 MEDIUM DUTY VAULT
—
COMCAST
COMCAST
CONTRACTOR
40c,41c,50c
43c,44c,45c
Q14
264 TA
#926
CENTURYLINK
CENTURYLINK
CONTRACTOR
31q,32q
—
C25
2436 MEDIUM DUTY VAULT
—
COMCAST
COMCAST
CONTRACTOR
43c,44c,45c
—
C28
17 "00"
—
COMCAST
COMCAST
CONTRACTOR
50c
1 -3"
P41
CONNECT TO EX. VAULT
PV03
PSE
—
CONTRACTOR
—
42p,43p
P42
CONNECT TO EX. VAULT
SW04
PSE
—
CONTRACTOR
—
40p,41p
P43
CONNECT TO EX. VAULT
J24
PSE
—
CONTRACTOR
40p,41p,42p,43p
—
P83
CONNECT TO EX. VAULT
SW03
PSE
—
CONTRACTOR
38p,39p
—
C39
INTERCEPT POINT
—
COMCAST
—
CONTRACTOR
1 -3"
—
T- 3430113
CORRESPONDING SHEETS
CATEGORY
SHEET
RIGHT OF WAY PLANS
16
EXISTING CONDITIONS
64
SITE PREPARATION & TESC PLAN
78
ALIGNMENT PLAN
90
ALIGNMENT PROFILE
102
DRAINAGE PLANS
113
DRAINAGE PROFILE
123,124
WATER PLAN
141
WATER PROFILE
155
JOINT U11UTY TRENCH PLAN
—
JOINT U11UTY TRENCH PROFILES
189
PROPERTY RESTORATION PLANS
204
CHANNELIZATION & SIGNING PLAN
226
ILLUMINATION PLANS
237
IRRIGATION PLAN
291
LANDSCAPE PLAN
303
�Q�GIgC
�B CITY OF RFNTON
r1 -tan SURVEYED: KPG RAINIER AVENUE S (SR 167) DRAWING NO. 1707
OS WASH y DRAWN BY: SOD
S GRADY WAY TO S 2ND ST PROJECT NO. TED403430
S o�N" DESIGN BY: SOD BID Public Works Department
— 753 9th Avenue N 2502 Jefferson Avenue
CHECKBY: JLF Seattle, WA 98109 Tacoma, WA 98402 DOCUMENTS JOINT UTILITY TRENCH PLAN FED AID NO. - CM0167(046)
PISTE `° (206)286.1640 (2531627 -0720 APP V FOR CONSTRUCTION DATE: NOV 2011
PROJ MGR: JF
' /ONAL E wM SHEET NO. 173 OF 304
NUMBER REVISION DESCRIPTION BY APP. DATE FILE: 0655DJUT01.dwg BY: DATE: / 2�b STA 45 +00 TO STA 49 +00
a
a
z
m
a
a
m
m
a O
.0
wa
a
< (�
a
o w
N O
c