Loading...
HomeMy WebLinkAboutT-3430113N F— w w x 0 CD F— to w z J x U H CALL 2 DAYS BEFORE YOU DIG 1- 800 -424 -5555 WALKER'S i� / ivy °l / CONSTRUCTION NOTES k� h ! % 33 4" DIAMETER CONDUI - CENTURYLINK (2 CONDUIT) 3 �� 1,r �Q d T/ 7i 3" DIAMETER COND IT— COMCAST (1 CONDUIT) A9 3" DIAMETER CO DUIT — COMCAST (3 CONDUIT) JOINT UTILITY TRENCH LEGEND AC DIAMETER CONDUIT —PSE GAS (1 CONDUIT) FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. A6" DIAMETER CONDUIT —PSE POWER (2 CONDUIT) END INSTALLATION OF 6" DIAMETER CONDUIT -PSE GAS - APPROXIMATE STA 47 +40, LT 0 5 10 20 40 60 SCALE IN FEET WALGREEN'S VAULT SCHEDULE GENERAL JOINT UTILITY TRENCH PLAN NOTES 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE GAS, COMCAST, AND CENTURYLINK. 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE FRANCHISE UTILITIES. 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL CONVERSION, PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS CONVERSION. 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR THE CITY OF RENTON. 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR CONVERSION. 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE MADE BY THE FRANCHISE UTILITIES. 7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE PROPERTY OWNER FROM THE RIGHT —OF —WAY TO EXISTING PRIVATE METERS. 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192. 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING U11UTY STRUCTURES NO LONGER IN USE. 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER DESIGN. 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. ID VAULT FRANCHISE UTILITY ID OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN /FROM LEFT CONDUIT OUT /TO RIGHT Q13 264 TA #925 CENTURYLNK CENTURYLINK CONTRACTOR 29q,30q 31q,32q C24 2436 MEDIUM DUTY VAULT — COMCAST COMCAST CONTRACTOR 40c,41c,50c 43c,44c,45c Q14 264 TA #926 CENTURYLINK CENTURYLINK CONTRACTOR 31q,32q — C25 2436 MEDIUM DUTY VAULT — COMCAST COMCAST CONTRACTOR 43c,44c,45c — C28 17 "00" — COMCAST COMCAST CONTRACTOR 50c 1 -3" P41 CONNECT TO EX. VAULT PV03 PSE — CONTRACTOR — 42p,43p P42 CONNECT TO EX. VAULT SW04 PSE — CONTRACTOR — 40p,41p P43 CONNECT TO EX. VAULT J24 PSE — CONTRACTOR 40p,41p,42p,43p — P83 CONNECT TO EX. VAULT SW03 PSE — CONTRACTOR 38p,39p — C39 INTERCEPT POINT — COMCAST — CONTRACTOR 1 -3" — T- 3430113 CORRESPONDING SHEETS CATEGORY SHEET RIGHT OF WAY PLANS 16 EXISTING CONDITIONS 64 SITE PREPARATION & TESC PLAN 78 ALIGNMENT PLAN 90 ALIGNMENT PROFILE 102 DRAINAGE PLANS 113 DRAINAGE PROFILE 123,124 WATER PLAN 141 WATER PROFILE 155 JOINT U11UTY TRENCH PLAN — JOINT U11UTY TRENCH PROFILES 189 PROPERTY RESTORATION PLANS 204 CHANNELIZATION & SIGNING PLAN 226 ILLUMINATION PLANS 237 IRRIGATION PLAN 291 LANDSCAPE PLAN 303 �Q�GIgC �B CITY OF RFNTON r1 -tan SURVEYED: KPG RAINIER AVENUE S (SR 167) DRAWING NO. 1707 OS WASH y DRAWN BY: SOD S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 S o�N" DESIGN BY: SOD BID Public Works Department — 753 9th Avenue N 2502 Jefferson Avenue CHECKBY: JLF Seattle, WA 98109 Tacoma, WA 98402 DOCUMENTS JOINT UTILITY TRENCH PLAN FED AID NO. - CM0167(046) PISTE `° (206)286.1640 (2531627 -0720 APP V FOR CONSTRUCTION DATE: NOV 2011 PROJ MGR: JF ' /ONAL E wM SHEET NO. 173 OF 304 NUMBER REVISION DESCRIPTION BY APP. DATE FILE: 0655DJUT01.dwg BY: DATE: / 2�b STA 45 +00 TO STA 49 +00 a a z m a a m m a O .0 wa a < (� a o w N O c