HomeMy WebLinkAboutT-34301800 a 0 51 z 0 z w U w 0 O i NOTE 01 2" CONDUIT UNLESS STATED OTHERWISE ON PLANS a J§" DIA IDLE, TYP STEEL PLATE BOLT CIRCLE (DIA SIZE TO LUMINAIRE BASE ANCHOR BOLT PLATE DIMENSION) TEMPLATE ANCHOR 1" DIA, 1' -6" MIN BELOW GROUND, 2' -0" MIN UNDER PAVEMENT 36" U EXTEND THE CONDUIT 6" MIN BEYOND THE FOUNDATION OR THE CONTROLLED DENSITY TOP OF BACKFILL FOUNDATION #4 HOOP, TYP ANCHOR BOLT, 4 TOTAL 1" DIA, TYP #7, TYP ANCHOR BOLT TEMPLATE, TYP 2 1/2" CUR 1" HEX NUTS, STEEL, Of 4 REQ'D PER ANCHOR BOLT FLAT WASHERS, 4 REQ'D PER ANCHOR BOLT N ANCHOR BOLT ASSEMBLY EDGE OF SHOULDER LUMINAIRE POLE UNDISTURBED SOIL TYP z LIGHT STANDARD �'tl FOUNDATION 3' -0" DIA (CASE A SHOWN) DRAWING SOURCE WSDOT STANDARD PLAN J- 28.30 -01 WITH MODIFICATIONS TOP VIEW FIXED BASE EIGHT #7 BARS, EVENLY SPACED CENTER THE CONDUIT IN THE FOUNDATION 1' -3" DIA BOLT CIRCLE, TYP HOOP, TYP _" CHAMFER, TYP z SECTION VIEW FIXED BASE 7 0 o F a 0 z 0 NOTES 1. SEE WSDOT STANDARD PLAN J -28.40 FOR LUMINAIRE POLE BASE MOUNTING DETAILS, EXCEPT USE 4 -BOLT PATTERN. 2. THE STRAP TEMPLATES SHALL BE HELD IN PLACE BY NUTS, 6" FROM THE TOP OF THE FOUNDATION AND 3" FROM THE BOTTOM OF THE ANCHOR BOLTS. 18 HEAVY DUTY HEX NUTS AND 6 PLATE WASHERS ARE REQUIRED FOR A FIXED BASE ASSEMBLY. 3. THIS DESIGN IS NOT VALID FOR SLOPES STEEPER THAN 2H:1V. SLOPES STEEPER THAN THIS SHALL REQUIRE A SPECIAL DESIGN. 4. THE LUMINAIRE POLE HEIGHT SHALL NOT EXCEED 50' (H1). 5. FOUNDATIONS CONSTRUCTED WITHIN ECOLOGY EMBANKMENTS SHALL BE INCREASED IN DEPTH BY THE DEPTH OF THE ECOLOGY EMBANKMENT. 6. EXPOSED PORTIONS OF THE FOUNDATION SHALL BE FORMED TO CREATE A CLASS 2 SURFACE FINISH. ALL FORMING SHALL BE REMOVED UPON COMPLETION FOUNDATION CONSTRUCTION. 7. FOR CASING OPTIONS, SEE METHOD 1 AND METHOD 2 BELOW. CONTRACTOR SHALL ASSUME THE SPECIAL CONSTRUCTION METHODS SHOWN BELOW FOR THE FOUNDATIONS WILL BE REQUIRED FOR ALL ROADWAY LUMINAIRE AND SIGNAL POLE FOUNDATIONS. 8. THE ANCHOR BOLTS SHALL BE HIGH STRENGTH STEEL, MANUFACTURED FROM ASTM A449, WITH HEAVY HEX NUTS AND HARDENED WASHERS. GALVANIZE THE ANCHOR BOLTS ACCORDING TO AASHTO M232. 9. THE FOUNDATION SHALL BE GROUNDED IN ACCORDANCE WITH THE REQUIREMENTS OF WSDOT STANDARD SPECIFICATION SECTION 8- 20.3(4). .UMINAIRE POLE FOUNDATION DESIGN DETAIL POLE BASE SLOPE ROUNDING EMBANKMENT WIDENING SLOPE 2H:1V, MAX OR FLATTER UNDISTURBED SOIL CONSTRUCTION NOTES 1. THESE FOUNDATION CONSTRUCTION METHODS ARE APPLICABLE TO ALL STEEL LIGHT AND SIGNAL STANDARD PLACEMENT CASES. 2. CONSTRUCTION METHODS FOR POLE FOUNDATIONS TYPICALLY INVOLVE DRILLING A VERTICAL SHAFT WITH A SINGLE - FLIGHT AUGER DRILL RIG, PLACING A REINFORCING STEEL CAGE INTO THE DRILLED HOLE, AND FILLING THE HOLE WITH CONCRETE. 3.TWO METHODS OF CASING REMOVAL ARE OUTLINED BELOW. a. METHOD 1: THE CASING SHOULD BE PULLED OUT AS CONCRETE IS PLACED IN THE HOLE, WHILE A SUFFICIENT HEAD OF CONCRETE IS MAINTAINED INSIDE THE CASING TO PREVENT CAVING AND SLOUGHING OF THE HOLE. b.METHOD 2: THE CASING SHOULD BE PULLED IMMEDIATELY AFTER THE PLACEMENT OF THE CONCRETE, AND THE HOLE IS TOPPED OFF WITH CONCRETE AFTER THE CASING HAS BEEN REMOVED. LUMINAIRE POLE FOUNDATION SPECIAL CONSTRUCTION METHODS DETAIL NTS 0 z K x m o a zQ CL � o � a CL z C) C) x H � w d J � a n FINISHED GROUND LINE CONCRETE CLASS 4000P #5 BAR, TYP EVENLY SPACED RE- INFORCEMENT DETAILS 8 #5 BARS PEDESTRIAN (14 w o � z w o w o z C) 0 Y4" CHAMFER, TYP � Z N I � CV 2" ELECTRICAL CONDUIT 1 1/2" 1 Sy" DIA HOLE, TYP ANCHOR BOLT DETAILS /0 I \ I \ I ANCHOR BOLT TEMPLATE LUMINAIRE POLE FOUNDATION DESIGN DETAIL 'co I ANCHOR BOLT TEMPLATE, TYP 1" HEX NUTS, STEEL, 4 REQ'D PER ANCHOR BOLT FLAT WASHERS, 4 REQ'D PER ANCHOR BOLT Y" STEEL PLATE BOLT CIRCLE (TO BE PROVIDED BY MANUFACTURER) T- 3430180 DETAILS BASED ON GEOTECHNICAL REPORT PROVIDED BY JACOBS ASSOCIATES, DATED OCTOBER 2011, FOUND IN THE APPENDICES OF THESE CONTRACT DOCUMENTS 11 -14 -11 SURVEYED: KPG �ctGyAr CITY OF FENTON RAINIER AVENUES (SR 167) DRAWING NO. 240 SP c w sy 'F DRAWN BY: AMK S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 DESIGN BY: AMK BID Public Works Department 753 stl Avenue 2502 Jefferson Avenue FED AID NO. - CM0167(048) CHECK BV: JC Sea0e, WA 98109 Tacoma, WA 96402 DOCUMENTS ILLUMINATION FOUNDATION DETAILS 'AO�, Rf39,�E4 �QZ (2061266 -1640 253 621 -0720 APP FOR CONSTRUCTION DATE: NOV 2011 �'vo ��� PROJ MGR: JF wwa.kpg.min ( I NUMBER REVISION DESCRIPTION BY APP. DATE �� FILE: O655DILL02.dwg BY: DATE' /6 �� SHEET NO. 240 OF 304 z �y Mh �O a Z �> o -c 1 w j .p o w O N z U a zz N a 0 0 x a z I SECTION VIEW FIXED BASE 7 0 o F a 0 z 0 NOTES 1. SEE WSDOT STANDARD PLAN J -28.40 FOR LUMINAIRE POLE BASE MOUNTING DETAILS, EXCEPT USE 4 -BOLT PATTERN. 2. THE STRAP TEMPLATES SHALL BE HELD IN PLACE BY NUTS, 6" FROM THE TOP OF THE FOUNDATION AND 3" FROM THE BOTTOM OF THE ANCHOR BOLTS. 18 HEAVY DUTY HEX NUTS AND 6 PLATE WASHERS ARE REQUIRED FOR A FIXED BASE ASSEMBLY. 3. THIS DESIGN IS NOT VALID FOR SLOPES STEEPER THAN 2H:1V. SLOPES STEEPER THAN THIS SHALL REQUIRE A SPECIAL DESIGN. 4. THE LUMINAIRE POLE HEIGHT SHALL NOT EXCEED 50' (H1). 5. FOUNDATIONS CONSTRUCTED WITHIN ECOLOGY EMBANKMENTS SHALL BE INCREASED IN DEPTH BY THE DEPTH OF THE ECOLOGY EMBANKMENT. 6. EXPOSED PORTIONS OF THE FOUNDATION SHALL BE FORMED TO CREATE A CLASS 2 SURFACE FINISH. ALL FORMING SHALL BE REMOVED UPON COMPLETION FOUNDATION CONSTRUCTION. 7. FOR CASING OPTIONS, SEE METHOD 1 AND METHOD 2 BELOW. CONTRACTOR SHALL ASSUME THE SPECIAL CONSTRUCTION METHODS SHOWN BELOW FOR THE FOUNDATIONS WILL BE REQUIRED FOR ALL ROADWAY LUMINAIRE AND SIGNAL POLE FOUNDATIONS. 8. THE ANCHOR BOLTS SHALL BE HIGH STRENGTH STEEL, MANUFACTURED FROM ASTM A449, WITH HEAVY HEX NUTS AND HARDENED WASHERS. GALVANIZE THE ANCHOR BOLTS ACCORDING TO AASHTO M232. 9. THE FOUNDATION SHALL BE GROUNDED IN ACCORDANCE WITH THE REQUIREMENTS OF WSDOT STANDARD SPECIFICATION SECTION 8- 20.3(4). .UMINAIRE POLE FOUNDATION DESIGN DETAIL POLE BASE SLOPE ROUNDING EMBANKMENT WIDENING SLOPE 2H:1V, MAX OR FLATTER UNDISTURBED SOIL CONSTRUCTION NOTES 1. THESE FOUNDATION CONSTRUCTION METHODS ARE APPLICABLE TO ALL STEEL LIGHT AND SIGNAL STANDARD PLACEMENT CASES. 2. CONSTRUCTION METHODS FOR POLE FOUNDATIONS TYPICALLY INVOLVE DRILLING A VERTICAL SHAFT WITH A SINGLE - FLIGHT AUGER DRILL RIG, PLACING A REINFORCING STEEL CAGE INTO THE DRILLED HOLE, AND FILLING THE HOLE WITH CONCRETE. 3.TWO METHODS OF CASING REMOVAL ARE OUTLINED BELOW. a. METHOD 1: THE CASING SHOULD BE PULLED OUT AS CONCRETE IS PLACED IN THE HOLE, WHILE A SUFFICIENT HEAD OF CONCRETE IS MAINTAINED INSIDE THE CASING TO PREVENT CAVING AND SLOUGHING OF THE HOLE. b.METHOD 2: THE CASING SHOULD BE PULLED IMMEDIATELY AFTER THE PLACEMENT OF THE CONCRETE, AND THE HOLE IS TOPPED OFF WITH CONCRETE AFTER THE CASING HAS BEEN REMOVED. LUMINAIRE POLE FOUNDATION SPECIAL CONSTRUCTION METHODS DETAIL NTS 0 z K x m o a zQ CL � o � a CL z C) C) x H � w d J � a n FINISHED GROUND LINE CONCRETE CLASS 4000P #5 BAR, TYP EVENLY SPACED RE- INFORCEMENT DETAILS 8 #5 BARS PEDESTRIAN (14 w o � z w o w o z C) 0 Y4" CHAMFER, TYP � Z N I � CV 2" ELECTRICAL CONDUIT 1 1/2" 1 Sy" DIA HOLE, TYP ANCHOR BOLT DETAILS /0 I \ I \ I ANCHOR BOLT TEMPLATE LUMINAIRE POLE FOUNDATION DESIGN DETAIL 'co I ANCHOR BOLT TEMPLATE, TYP 1" HEX NUTS, STEEL, 4 REQ'D PER ANCHOR BOLT FLAT WASHERS, 4 REQ'D PER ANCHOR BOLT Y" STEEL PLATE BOLT CIRCLE (TO BE PROVIDED BY MANUFACTURER) T- 3430180 DETAILS BASED ON GEOTECHNICAL REPORT PROVIDED BY JACOBS ASSOCIATES, DATED OCTOBER 2011, FOUND IN THE APPENDICES OF THESE CONTRACT DOCUMENTS 11 -14 -11 SURVEYED: KPG �ctGyAr CITY OF FENTON RAINIER AVENUES (SR 167) DRAWING NO. 240 SP c w sy 'F DRAWN BY: AMK S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 DESIGN BY: AMK BID Public Works Department 753 stl Avenue 2502 Jefferson Avenue FED AID NO. - CM0167(048) CHECK BV: JC Sea0e, WA 98109 Tacoma, WA 96402 DOCUMENTS ILLUMINATION FOUNDATION DETAILS 'AO�, Rf39,�E4 �QZ (2061266 -1640 253 621 -0720 APP FOR CONSTRUCTION DATE: NOV 2011 �'vo ��� PROJ MGR: JF wwa.kpg.min ( I NUMBER REVISION DESCRIPTION BY APP. DATE �� FILE: O655DILL02.dwg BY: DATE' /6 �� SHEET NO. 240 OF 304 z �y Mh �O a Z �> o -c 1 w j .p o w O N