HomeMy WebLinkAboutT-3430222Y
3
I
I
1
I
I
I
9
I
— I -4 —
I
I
SR 167
I
I
I
I
I
I
1
I
I
u
I
I
I
I
_
♦♦♦ HONDA
♦♦ 0 O
♦♦♦ 1S-A 2S -A
13.9 31.5
♦♦` - -- - - - -- 1 -? --------------------
3/4 1Y 3
YANKEE
GRILL
PLAN
0 5 10 20 40 60
SCALE IN FEET
III 174 r7
CN
CN
1 "
2 +
III w
II =
II N
II o8 CD
III 1 +
IIL —
IVIIII �
LJ
M
Q SOUND
FORD
SEE SHEETS 292 AND 293 FOR
IRRIGATION SCHEDULE, DETAILS
AND GENERAL NOTES.
CONSTRUCTION NOTES
01 ALL CONTROL VALVES TO BE LOCATED IN PLANTER AREAS.
INSTALL VALVE BOX TIGHT TO EDGE OF PAVEMENT TO
MAXIMIZE PLANTING AREA. LOCATION SHOWN IS
DIAGRAMMATIC.
OINSTALL MAIN LINE IN PLANTER AREA WHEREVER POSSIBLE,
LOCATION SHOWN IS DIAGRAMMATIC.
OS COORDINATE MAIN LINE AND LATERAL LINE INSTALLATION WITH
JOINT UTILITY TRENCHING AND ILLUMINATION CONDUIT
LOCATIONS.
IRRIGATION SCHEDULE
SYMBOL
MANUFACTURER MODEL NO.
RIGHT OF WAY PLANS
7
EXISTING CONDITIONS
55
SITE PREPARATION & TESC PLAN
6
ALIGNMENT PLAN
?
II
93
<
104
DRAINAGE PROFILE
114
,T
<
RAINBIRD
1800 -15 STRIP
III
m
p
RAINBIRD
1800 -15 STRIP
II
Illik 8Q
8H
M
Q SOUND
FORD
SEE SHEETS 292 AND 293 FOR
IRRIGATION SCHEDULE, DETAILS
AND GENERAL NOTES.
CONSTRUCTION NOTES
01 ALL CONTROL VALVES TO BE LOCATED IN PLANTER AREAS.
INSTALL VALVE BOX TIGHT TO EDGE OF PAVEMENT TO
MAXIMIZE PLANTING AREA. LOCATION SHOWN IS
DIAGRAMMATIC.
OINSTALL MAIN LINE IN PLANTER AREA WHEREVER POSSIBLE,
LOCATION SHOWN IS DIAGRAMMATIC.
OS COORDINATE MAIN LINE AND LATERAL LINE INSTALLATION WITH
JOINT UTILITY TRENCHING AND ILLUMINATION CONDUIT
LOCATIONS.
IRRIGATION SCHEDULE
SYMBOL
MANUFACTURER MODEL NO.
RIGHT OF WAY PLANS
7
EXISTING CONDITIONS
55
SITE PREPARATION & TESC PLAN
6
ALIGNMENT PLAN
RAINBIRD
BUBBLER SERIES - 1402
93
DRAINAGE PLANS
104
DRAINAGE PROFILE
114
,T
SST
RAINBIRD
1800 -15 STRIP
SERIES (SHRUB)
m
p
RAINBIRD
1800 -15 STRIP
SERIES (LAWN)
Illik 8Q
8H
RAINBIRD
8 SERIES MPR
(SHRUB)
2, m
m
RAINBIRD
12 SERIES MPR
(LAWN)
12Q 12H
12F
REVISION DESCRIPTION
BY
APP.
a ®
12Q 12H
®
12F
RAINBIRD
12 SERIES MPR
(SHRUB)
e&!�C
15Q 15H
15F
RAINBIRD
15 SERIES MPR
(SHRUB)
0 o
O
15Q 15H
15F
RAINBIRD
15 SERIES MPR
(LAWN)
SEE SHEET 292 FOR COMPLETE IRRIGATION SCHEDULE.
T- 3430122
CORRESPONDING SHEETS
CATEGORY
SHEET
RIGHT OF WAY PLANS
7
EXISTING CONDITIONS
55
SITE PREPARATION & TESC PLAN
69
ALIGNMENT PLAN
81
ALIGNMENT PROFILE
93
DRAINAGE PLANS
104
DRAINAGE PROFILE
114
WATER PLAN
132
WATER PROFILE
146
JOINT UTILITY TRENCH PLAN
164
JOINT UTILITY TRENCH PROFILES
180
PROPERTY RESTORATION PLANS
195
CHANNELIZATION & SIGNING PLAN
217
ILLUMINATION PLANS
228
IRRIGATION PLAN
-
LANDSCAPE PLAN
294
z
�y
n
� O
N Ci 6mA
N � '
0
° 0
i
rn
V
o �"rc
QiNw
U
t.,l o
J
11-14-11
Z.
M
rc
V
SURVEYED: KPG
DRAWN BY: EM
DESIGN BY: EM
CHECK BY: EG
PROJ MGR: JF
FILE: 0655DIRR01.dwg
KPG'r
15396 Avenue N 2502Je8ersonAvenue B�D
Seate,WA98109 Tacoma,WAN02 DOCUMENTS
(�I286 -1640 (25 31 6 27 -012 0
axly kpg mm
rTT�T T��T�7 T�7
�� CITY OF 1♦L'.LVTO1V
Public Works Department
APP DFOR CONSTRUCTION
BY: DATE: /ill IlZ
RAINIER AVENUES (SR 167)
S GRADY WAY TO S 2ND ST
IRRIGATION PLAN
STA 8 +98 TO STA 12 +00
DRAWING NO. 202
PROJECT NO. TED403430
ols�ro4sl
DATE: NOV 2011
SHEET NO. 282 OF 304
NUMBER
REVISION DESCRIPTION
BY
APP.
DATE
z
�y
n
� O
N Ci 6mA
N � '
0
° 0
i
rn