Loading...
HomeMy WebLinkAboutT-343026WE 0 r7 s 2� II 11\: PLAN VIEW i BNSF BRIDGE CLEARANCE TABLE POINT NO STATION OFFSET DESCRIPTION EXISTING GROUND ELEVATION FINAL GRADE ELEVATION BOTTOM OF BRIDGE ELEV. VERTICAL CLEARANCE 1 32 +12.74 42.5' LT ROADWAY SURFACE 19.77' 19.82' 38.6' 18.78' 2 31 +90.34 42.5' LT ROADWAY SURFACE 19.73' 19.62' 38.6' 18.98' 3 32 +10.40 7,5' LT ROADWAY SURFACE 20.92' 20.39' 38.6' 18.21' 4 31 +88.16 7.5' LT ROADWAY SURFACE 20.90' 20.21' 38.6' 18.39' 5 32 +10.20 4.5' LT ROADWAY SURFACE 21.28' 20.42' 38.4' 17.98' 6 31 +87.97 4.5' LT ROADWAY SURFACE 21.33' 20.25' 38.4' 18.15' 7 32 +07.17 42.5' RT ROADWAY SURFACE 22.21' 20.87' 38.4' 17.53' 8 31 +84.70 42.5' RT ROADWAY SURFACE 22.21' 20.83' 38.4' 17.57' 9 32 +07.08 52.8' RT TOP OF SIDEWALK 22.11' 26.86' 38.3' 11.44' 10 32 +06.68 60.8 RT TOP OF SIDEWALK 25.78' 27.02' 38.3' 11.28' 11 31 +82.76 59.2' RT TOP OF SIDEWALK 26.02' 27.16' 38.3' 11.14' 12 31 +83.17 51.7' RT TOP OF SIDEWALK 21.91' 27.00' 38.3' 11.30' HMA OVERLAY WHERE IDENTIFIED ON PLANS EXISTING HMA SURFACE, DEPTH VARIES DEPTH AS DIRECTED BY ENGINEER 2' MAXIMUM. BURIED CONCRETE SLABS MAY BE PRESENT GRAVEL BORROW COMPACTED SUBGRADE NEW IMPROVEMENTS PER PLANS, TYPICAL SECTIONS, AND DETAILS. VERTICAL SAWCUT TACK WITH PAVING ASPHALT BOTTOM EXTENT OF ROADWAY EXCAVATION PER PLANS, TYPICAL SECTIONS AND DETAILS OR BOTTOM EXTENT OF TRENCH EXCAVATION CONSTRUCTION GEOTEXTILE FOR SEPARATION NOTE: FOR CLARITY, NOT ALL IMPROVEMENTS AND TRENCH SECTIONS ARE SHOWN UNSUITABLE FOUNDATION EXCAVATION NTS APPROX BOTTOM OF BRIDGE ELEVATION 38.6 FT CONCRETE SLOPE PROTECTION PANEL APPROXIMATE PILE CAP ELEVATION 17.8 FT BNSF BRIDGE STRUCTURE i 0 J �Q nZ W U Z W / CONCRETE BRIDGE COLUMN (TYP) ao J m U 0 O Z_ �Om PROPOSED PCC ROADWAY GRADE w EXISTING GROUND M PROFILE VIEW APPROX BOTTOM OF BRIDGE ELEVATION 38.4 FT APPROX BOTTOM OF BRIDGE ELEVATION 38.3 ELEVATED SIDEWALK CONCRETE SLOPE PROTECTION PANEL CAST IN PLACE WALL APPROXIMATE PILE CAP ELEVATION 17.3 FT BRIDGE CLEARANCE NOTES: 1. THE MINIMUM VERTICAL CLEARANCE BETWEEN THE FINISHED GRADE TRAVELED WAY AND THE BOTTOM OF THE BNSF BRIDGE STRUCTURE SHALL BE 17.5 FT. THE MINIMUM CLEARANCE BETWEEN THE FINISHED GRADE SIDEWALK AND THE BOTTOM OF THE BNSF BRIDGE STRUCTURE SHALL BE 8.0 FT. 2. THE CONTRACTOR SHALL NOT PERFORM ANY WORK THAT COMPROMISES THE BNSF BRIDGE STRUCTURE. ALL ELEMENTS OF THE STRUCTURE SHALL BE PROTECTED FROM DAMAGE AT ALL TIMES. 3. THE CONTRACTOR SHALL COMPLY WITH ALL BNSF REQUIREMENTS WHILE WORKING WITHIN THE BNSF RIGHT OF WAY. BRIDGE CLEARANCE DETAIL NTS GRATE OR LID LSIDEWALI WIDTH - SEE ALIGNMENT FRAME SEAL JOINT WITH PLANS & TYPICAL SECTIONS F► 1=0" PAVING ASPHALT 1" R (TYP) CEMENT CONIC. PAVEMENT 1 5.5" #3 REBAR #4 CONTINUOUS SEE UTILITY CASTING BOXOUT ; 2% MAX /2 R CONTTINUOUS DETAIL, SHEET 89 %z" R ADJUSTING BRICK HMA CLASS 1/2' PG 70 -22 OR CONIC RISER, o NO STEEL RISERS ° ALLOWED (TYP) --- DIG OUT LIMIT NOTES: EXISTING MANHOLE 4" CSBC #4 REBAR CONTINUOUS 24" REINFORCED CEMENT CONC. TRAFFIC CURB & GUTTER AND THICKENED CEMENT CONC. SIDEWALK APPROXIMATE STA 30 +56 TO STA 31 +51, LT NTS 1. HMA OR CONCRETE PERIMETER SHALL EXTEND AT LEAST 2" BELOW TOP ADJUSTMENT RINGS OR ROADWAY SECTION DEPTH, WHICHEVER IS GREATER. 2. WHERE FINISHED SURFACE IS HMA, UTILITIES WITH CONCRETE COLLAR AROUND STRUCTURE SHALL HAVE CONCRETE REMOVED AND REPLACED WITH HMA CL r PG 70 -22. UTILITY ADJUSTMENT DETAIL T=343026 FOR STORM DRAIN, SEWER & WATER STRUCTURES NTS 4gGIAC0 11 -04 -11 SURVEYED: KPG 64� RAINIER AVENUE S (SR 167) DRAWING NO. 26 os w, By DRAWN BY: JLF OF FENTON a �� CITY p .I S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 o �%` DESIGN BY: JLF BID Public Works Department „ - 7539tlhAvenueN 2502 Jefferson Avenue CHECKSY: NM SeaWe,WA98109 Tacoala,WA98W2 DOCUMENTS FED AID NO. - CM0167(048) r0? p 20320 y`r APPROVED FOR CONSTRUCTION F r PROJ MGR: JF (2061288 -1840 (253)821 -0720 DETAILS DATE: NOV 2011 NUMBER REVISION DESCRIPTION BY APP. DATE L FILE: 0655DDET01.dwg v kpg mm BYJ I DATE: //N SHEET NO. 26 OF 304 a z m a m a Q vi 0 -C W o w N O