HomeMy WebLinkAboutT-343027s
6' -1 1/4"
a'
d
r
.4
L____
FULL DEPTH ELECTRICAL COgUIT
EXPANSION JOINT (TYP) STUB -UP
d a SEE'DETAIL THIS SHEET..
A a ° d .
a °
4
d °
FULL DEPTH
EXPANSION JOINT (TYP) -
CEMENT
CONCRETE SIDEWALK
if
O
w
U
U
z
U
U
. I
O
I
<V
20' -0"
Q 4.
a I LJ I
LJ 4
a d FUTURE SHELTER
° MOUNTING PLATE TO BE
INSTALLED BY OTHERt (TYP) d a
4 ° d o
a i
4 a.. A
4 Q
d 4' o
a a
Q d C-4
4
d
PLACEMENT REFERENCE POINT
PLAN VIEW SEE PLACEMENT SCHEDULE, THIS SHEET
20' -0"
ELECTRICAL CONDUIT
I
I
1
11 +89.19
60.50' RT
STUB -UP, SEE DETAIL,
I
I
3
25 +74.69
60.40' RT
4
36 +16.88
I
°
38 +78.84
#5 ® 12" MAX EACH WAY
I
O
THIS SHEET
a
I
TOP AND BOTTOM.
I
z
I
SPACE REBAR TO MISS
I I
FUTURE ANCHOR RODS
I
• r : `
•1MU'
� f a✓` 7
d
� -7 f �. °
"I11
CI
V .. � -a
. +�
$+• °.'� .v�'.St�
� .� i.�. err °��
Jrn �•" �� rf j.
�7777
77777,
0
4" CSBC
U
z
SECTION A -A
M
RAPID RIDE BUS SHELTER FOUNDATION
NTS
FUTURE SHELTER LEG
TO BE INSTALLED BY OTHERS
1" GRS COUPLING
\RAPID RIDE
BUS SHELTER FOUNDATION
q , 3 "'.PVG.CO.-
FOAM FILL
1" A THREADED GRS
ELECTRICAL CONDUIT STUB -UP
NTS
TO ELECTRICAL HAND HOLE
SEE ILLUMINATION AND
INTERCONNECT PLANS
FOR SPECIFIC LOCATION
RAPID RIDE BUS SHELTER FOUNDATION NOTES
1. MATCH TO EXISTING SIDEWALK SLOPE TO
ASSURE PROPER DRAINAGE OF SURFACE
WATER; 27 MAX CROSS SLOPE
2. PROVIDE TEN (10) DAYS PRIOR NOTICE
FOR ANY CONSTRUCTION IMPACTS TO
BUS STOPS OR BUS SERVICE. CONTACT
RICHARD GARCIA, KING COUNTY METRO'S
CONSTRUCTION COORDINATOR AT (206)
684 -2732.
3. CONTACT METRO INSPECTOR PAUL MILLER
AT (206) 684 -2224, 48 HOURS BEFORE
FORMING AND POURING CONCRETE FOR
THE BUS SHELTER FOUNDATION.
4. ANY CONSTRUCTION OR INSTALLATION
ACTIVITIES AFFECTING TRANSIT
OPERATIONS OR FACILITIES MUST BE
COORDINATED THROUGH METRO TRANSIT
CONSTRUCTION INFORMATION CENTER.
FOR NOTIFICATION INFORMATION AND
GUIDELINES, PLEASE VISIT:
HTTP: / /WWW.KING000NTY.GOV /TRANSPORTATION /
KCDOT/ METROTRANSIT /CONSTRUCTION.ASPX.
RAPID RIDE BUS SHELTER FOUNDATION
PLACEMENT SCHEDULE
#
q STATION
OFFSET
1
11 +89.19
60.50' RT
2
20 +07.05
60.50' LT
3
25 +74.69
60.40' RT
4
36 +16.88
54.50' RT
5
38 +78.84
54.50' LT
\ \\
5 -9" (X 5' -9 ")
ELEVATION VIEW
FUTURE SIGN TO BE
INSTALLED BY OTHERS
#4 ® 12" O.C.
b
D'
SECTION C -C
METRO SIGN FOUNDATION
NTS
FUTURE 6" HIGH STEM WALL
TO BE INSTALLED BY OTHERS
O
I
� STATION
OFFSET
� G
11 +61.29
.n
2
20 +29.55
�
as
25 +58.91
04
4
7"
3 -9 1/2"
3' -0"
0 0 0 O
,a.
0 0 0
a ELECTRICAL CONDUIT STUB -UP
a . SEE DETAIL, THIS SHEET
9 1/2"
a a 4
OF
CONDUIT
e a
METRO TECH PYLON FOUNDATION
PLACEMENT SCHEDULE
#
� STATION
OFFSET
1
11 +61.29
60.50' RT
2
20 +29.55
60.50' LT
3
25 +58.91
60.50' RT
4
36 +00.38
54.50' RT
5
39 +05.53
54.50' LT
d G
2' -6"
5' -0"
PLAN VIEW
FUTURE 6" HIGH STEM WALL
TO BE INSTALLED BY OTHERS
FLUSH WITH
ADJACENT
FLAT SURFACE
PLACEMENT REFERENCE POINT
SEE PLACEMENT SCHEDULE,
THIS SHEET
ELECTRICAL CONDUIT STUB -UP
SEE DETAIL, THIS SHEET
all
AWAY FULL DEPTH EXPANSION JOINT (TYP) #5 4" CSBC EAC1 2
BOT
AND BOTTOM 1" 4 GRS
## GENERAL NOTE NUMBER. (PLUGGED UNTIL
SEE GENERAL NOTES. SECTION B -B PYLON READY
FOR INSTALLATION)
METRO TECH PYLON FOUNDATION
NTS
METRO SIGN FOUNDATION
PLACEMENT SCHEDULE
#
� STATION
OFFSET
1
12 +09.19
52.88' RT
2
19 +81.17
52.88' LT
3
25 +93.11
52.78' RT
4
36 +37.38
46.88' RT
5
38 +58.34
46.88' LT
METRO TECH PYLON GENERAL NOTES
1. ALL NEW CONDUIT INSTALLED UNDERGROUND SHALL HAVE A MINIMUM
COVER OF 24 INCHES.
2. PLACE 6 INCH WIDE MAGNATEK WARNING TAPE, OR APPROVED EQUAL,
12 INCHES BELOW GRADE OVER ALL CONDUIT RUNS.
3. STUB UP THE CONDUIT AS INDICATED WITH A COUPLING INSTALLED ON
THE STUBBED UP END WITH THE TOP OF THE COUPLING FLUSH WITH
FINISHED SURFACE. A THREADED MALE PLUG SHALL BE INSTALLED IN
THE TOP OF THE COUPLING AT THE TIME OF THE FOUNDATION /STEM
WALL PLACEMENT. WRAP PLUG, COUPLING AND TOP 2 INCHES OF
CONDUIT WITH DUCT TAPE PRIOR TO POURING CONCRETE.
4. EPDXY ALL JOINTS TO ENSURE WATER CANNOT ENTER THE CONDUIT
THROUGH THE CONNECTION. DO NOT EPDXY THE PLUG.
T- 343021
11 -14 -11 SURVEYED: KPG RAINIER AVENUE S (SR 167) DRAWING NO. 27
9F', 'X, O� DRAWN BY: JMD Kp� �� '� CITY OF RENTON
W,2032O BID ru S GRADY WAY TO S 2ND ST PROJECT NO. TED40343DESIGN BV: KPG 753901AvenueN 2502 Jefferson Avenue Public Works Department FED AID NO. - CM0167(CHECK BY: JLF Seatte,WA96109 Tworna,WA9M02 DOCUMENTS DETAILS (206) 266-1640 (25 3) 6 27 -07 2 0 APPROVED FOR CONSTRUCTION DATE: NOV 2011
PROJ MGR: JF G/� vw w.I�.CIXn BY: DATE:! �1L SHEET NO. 27 OF 304
NUMBER REVISION DESCRIPTION BY APP. DATE FILE: 0655DDET01.dwg
z
�y
C
m
�O
J
I
�N
�n
o
-c
W
a
O
O
N
0
a