Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
T-343043
a _o N 0 M z c� i 0 Y i SEATTLE SUPER � SUPPLEMENT i C C'4 I- 3 2 2 — — — — — 7 — CD - - - -~ - -- 5 WALKER RENTON SUBARU 11' SOUTHBOUND LANE 5M, MAXIMUM EXTENTS OF WORK ZONE. ACTUAL EXTENTS ON FIELD SIDE SHALL VARY TO MINIMIZE IMPACT TO ADJACENT BUSINESSES. (TYP) s ` �—�11_It 0 4 LES SCHWAB 11' 11' 11' 11' SOUTHBOUND LEFT TURN LEFT TURN NORTHBOUND LANE LANE LANE LANE SECTION C -C 12.5' 11' VARIES 11' SOUTHBOUND LANE SOUTHBOUND I LANE TWO -WAY LEFT TURN LANE NORTHBOUND LANE SECTION D -D 2 5 & 1 1' BUFFER 2' BUFFER 11' NORTHBOUND LANE R ( 2 FLAN 0 20 40 80 120 SCALE IN FEET ARBYS CAR WASH 1 © mop. 3 T 111 R \ 13 BOB BRIDGE SCION `\ 14 \ \ \ i -.I 2' f -- TRAFFIC SAFETY DRUMS WITH LIGHT 1' BUFFER 2' BUFFER 11' NORTHBOUND LANE ---12' TRAFFIC SAFETY DRUMS WITH LIGHT C D C� i i 7 15 w GENERAL CONSTRUCTION CHANNELIZATION NOTES FOR GENERAL CONSTRUCTION CHANNELIZATION NOTES, SEE SHEET 37. CONSTRUCTION CHANNELIZATION LEGEND _rT__rr__TT TRAFFIC SAFETY DRUMS WITH LIGHT MAXIMUM EXTENTS OF WORK ZONE BUSINESS OPEN DURING CONSTRUCTION SURVEYED: KPG DRAWN BY: JLF /KAT DESIGN BY: JLF CHECK BY: JG PROJ MGR: JF FILE: 0655DCONST02A.dwg SIGN, SEE DETAIL SHEET 38. - CONSTRUCTION LIMITS q DRAWING NO. 407 PROJECT NO. TED403430 FED AID NO. - CM016710481 DATE: NOV 2011 SHEET NO. 43 OF 304 DIREC11ON OF TRAVEL 1 IHOP �l TEMPORARY CHANNELIZATION NOTES Q1 WORKZONE BARRIER, SEE CONSTRUCTION STAGING LEGEND, THIS SHEET Q2 PAINTED DOUBLE YELLOW CENTER LINE Q3 PAINTED LANE LINE ® PAINTED EDGE LINE 05 PAINTED WIDE LINE © PAINTED MEDIAN LINE O7 PAINTED TYPE 2L ARROW ® PAINTED TWO -WAY LEFT TURN LINE 10 PAINTED DOTTED EXTENSION LINE. 11 PAINTED STOP LINE. 12 PAINTED TYPE 2R ARROW 13 EXISTING CROSSWALK STRIPING TO REMAIN 14 MAINTAIN ADA COMPLIANT PEDESTRIAN ACCESS 15 FOR SIGNAL INSTALLATION, MODIFY RIGHT TURN LANE CONSTRUCTION CHANNELIZA11ON AND PROVIDE TRAFFIC SAFETY DRUMS WITH LIGHT TO ACCOMMODATE SIGNAL CONSTRUCTION AND AS NECESSARY TO PROTECT NEW SIGNAL EQUIPMENT ONCE CONSTRUCTED. 16 REMOVE EXISTING CROSSWALK OR CHANNELIZATION 17 PAINTED TYPE 1 ARROW 18 TEMPORARY CROSSWALK STRIPING 1g PAINTED TYPE 3R ARROW T=343043 a a z �1 ya m /y O i � y w0 N d � -c w a K 0 N O 0 ti 11.1x11 o�tigR WA , I y — 0211 - '? 20320 ya .n rsrea TONAL '0 SURVEYED: KPG DRAWN BY: JLF /KAT DESIGN BY: JLF CHECK BY: JG PROJ MGR: JF FILE: 0655DCONST02A.dwg Kph 753901 AvenueN 2502 Jefferson Avenue BID Seaft,WA96109 Tacama,WA98402 DOCUMENTS (206)286-1640 (253) 627 -0720 wwwApporn e. CITY OF RENTON Public Works Department APPROV D FOR CONSTRUCTION BY: DATE: /_�0f, RAINIER AVENUE S (SR ST S GRADY WAY TO S 2ND ST CONSTRUCTION CHANNELIZATION PLANS - STAGE 2 STA 18 +00 TO STA 30 +50 q DRAWING NO. 407 PROJECT NO. TED403430 FED AID NO. - CM016710481 DATE: NOV 2011 SHEET NO. 43 OF 304 NUMBER REVISION DESCRIPTION BY APP. DATE a a z �1 ya m /y O i � y w0 N d � -c w a K 0 N O 0 ti