Loading...
HomeMy WebLinkAboutT-343044I t C L 3 F�- a 11.5' SOUTHBOUND LANE 11.5' SOUTHBOUND LANE 11' SOUTHBOUND LANE 11' SOUTHBOUND LANE 11' LEFT TURN LANE 11' LEFT TURN LANE 11' NORTHBOUND LANE VARIES PAINTED MEDIAN 1' BUFFER 2' BUFFER 11' NORTHBOUND LANE TRAFFIC SAFETY DRUMS WITH LIGHT SECTION E -E 11' NORTHBOUND LANE 11' NORTHBOUND LANE SECTION F -F 1, BUFFER 2' BUFFER --2'�--- TRAFFIC SAFETY DRUMS WITH LIGHT PLAN GENERAL CONSTRUCTION CHANNELIZATION NOTES FOR GENERAL CONSTRUCTION CHANNELIZATION NOTES, SEE SHEET 37. CONSTRUCTION CHANNELIZATION LEGEND TRAFFIC SAFETY DRUMS WITH LIGHT MAXIMUM EXTENTS OF WORK ZONE BUSINESS OPEN DURING CONSTRUCTION SIGN, SEE DETAIL SHEET 38. - - - - - - - CONSTRUCTION LIMITS DIRECTION OF TRAVEL TEMPORARY CHANNELIZATION NOTES O1 WORKZONE BARRIER, SEE CONSTRUCTION STAGING LEGEND, THIS SHEET O2 PAINTED DOUBLE YELLOW CENTER LINE O3 PAINTED LANE LINE ® PAINTED EDGE LINE 5� PAINTED WIDE LINE © PAINTED MEDIAN LINE O7 PAINTED TYPE 2L ARROW ® PAINTED TWO -WAY LEFT TURN LINE 10 PAINTED DOTTED EXTENSION LINE. it PAINTED STOP LINE. 12 PAINTED TYPE 2R ARROW 13 EXISTING CROSSWALK STRIPING TO REMAIN 14 MAINTAIN ADA COMPLIANT PEDESTRIAN ACCESS 15 FOR SIGNAL INSTALLATION, MODIFY RIGHT TURN LANE CONSTRUCTION CHANNELIZATION AND PROVIDE TRAFFIC SAFETY DRUMS WITH LIGHT TO ACCOMMODATE SIGNAL CONSTRUCTION AND AS NECESSARY TO PROTECT NEW SIGNAL EQUIPMENT ONCE CONSTRUCTED. N lJ REMOVE EXISTING CROSSWALK OR CHANNELIZATION PAINTED TYPE 1 ARROW TEMPORARY CROSSWALK STRIPING V.Tk Iff] -1 a1' : 12.11 , V 3 2 n z x fF_ Q T- 343044 a 'z �y a m O �N 0 a F w a .p, o0 �.Ir N O Z 11.1411 Q94'4�GWA C0�9 1 02� — �r0sres QQ� SURVEYED: KPG DRAWN BY: JLF /KAT DESIGN BY: JLF CHECK BY: JIG PROJ MGR: JF FILE: 0655DCONST02A.dwg ��� 753961 Avenue N 2502 Jefferson Avenue BID Sealte,W A98109 Tacoma,WA98402 DOCUMENTS (206) 286-1640 (253) 627 -0720 www.kpg.Wm Q� '� CITY OF PENTON =1L Public Works Department APPROVED FOR CONSTRUCTION B Y DATE: /j� ��r. RAINIER AVENUES SR 167 S GRADY WAY TO S 2ND ST CONSTRUCTION CHANNELIZATION PLANS - STAGE 2 STA 30 +50 TO STA 42 +50 DRAWING NO. 44 PROJECT NO. TED403430 FED AID NO. - CM0167(048) DATE: NOV 2011 SHEET NO. 44 OF 304 NUMBER REVISION DESCRIPTION BY APP. DATE a 'z �y a m O �N 0 a F w a .p, o0 �.Ir N O Z