Surface Water Drainage Notes and Specifications
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS,
A PRE - CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF
RENTON PLAN REVIEWER.
2. All construction shall be in accordance with the 1996 Standard
Specifications for Road, Bridge and Municipal Construction prepared
by WSDOT and the American Public Works Association (APWA), as
amended by the City of Renton Public Works Department.
3. The surface water drainage system shall be constructed
according to the approved plans, which are on file in the Public
Works Department. Any deviation from the approved plans will
require written approval from the City of Renton Public Works
Department, Surface Water Utility Section.
4. A copy of these approved plans must be on the job site
whenever construction is in progress.
5. Datum shall be NAVD 88 unless otherwise approved by the City
of Renton Public Works Department. Reference benchmark and
J elevations are noted on the plans.
6. All sedimentation /erosion facilities must be in operation prior to
clearing and building construction, and they must be satisfactorily
maintained until construction is completed and the potential for
on -site erosion has passed.
7. All retention /detention facilities must be installed and in
operation prior to or in conjunction with all construction activity
unless otherwise approved by the Public Works Department, Surface
Water Utility Section.
8. Grass seed may be applied by hydroseeding. The grass seed
mixture, other than City of Renton approved standard mixes, shall
be submitted by a Landscape Architect and approved by the Public
Works Department, Surface Water Utility Section.
9. All pipe and appurtenances shall be laid on a properly prepared
foundation in accordance with Section 7- 02.3(1) of the current
State of Washington Standard Specification for Road and Bridge
Construction. This shall include necessary leveling of the trench
bottom or the top of the foundation material, as well as placement
and compaction of required bedding material, to uniform grade so
that the entire length of the pipe will be supported on a uniformly
dense, unyielding base. All pipe bedding shall be APWA Class "C ",
with the exception of PVC pipe. All trench badkfill shall be
compacted to minimum 95% for pavement and structural fill and 90
% otherwise per ASTM D- 1557 -70. Pea gravel bedding shall be 6
inches over and under PVC pipe.
10. Galvanized steel pipe and aluminized steel pipe for all drainage
facilities shall hove asphalt treatment 11 or better inside and
outside.
11. Structures shall not be permitted within 10 feet of the spring
line of any storm drainage pipe, or 15 feet from the top of any
channel bank.
12. All catch basin grates shall be depressed 0.10 feet below
pavement level.
13. Open cut road crossings through existing public right of way will
not be allowed unless specifically approved by City of Renton
Plonning/Building/Public Works Administrator.
14. Rock for erosion protection of roadside ditches, where required,
shall be of sound quarry rock placed to a depth of one (1) foot
and must meet the fallowing specifications:
4 - 8 inch rode / 40 - 70% passing;
2 - 4 inch rock / 30 - 40% passing; and
less than 2 inch rock / 10 - 20% passing.
15. All building downspouts and footing drains shall be connected to
the storm drainage system, unless approved by the City plan
reviewer or Surface Water Utility Section. An accurately
dimensioned, certified as -built drawing of this drainage system will
be submitted to the City upon completion.
16. Issuance of the building or construction permits by the City of
Renton does not relieve the owner of the continuing legal obligation
and /or liability connected with storm surface water disposition.
Further, the City of Renton does not accept any obligation for the
proper functioning and maintenance of the system provided during
construction.
17. The Contractor shall be responsible for providing adequate
safeguard, safety devices, protective equipment, floggers, and any
other needed actions to protect the life, health, and safety of the
public, and to protect property in connection with the performance
of work covered by the contract. Any work within the traveled right
of way that may interrupt normal traffic flow shall require a traffic
control plan approve by the Public Works Department, Transportation
Systems Division. All sections of the WSDOT Standard Specifications
1 -07 -23 Traffic Control shall apply.
18. Special drainage measures will be required if the project location
is within the aquifer protection area (APA).
19. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS,
A PRE - CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF
RENTON, PUBLIC WORKS DESIGN ENGINEER.
20. All limits of clearing and areas of vegetation preservation as
prescribed on the plans) shall be clearly flagged in the field and
observed during construction.
21. All required sedimentotion /erosion control facilities must be
constructed and in operation prior to land clearing and /or
construction to ensure that sediment laden water does not enter
the natural drainage system. All erosion and sediment facilities
shall be maintained in a satisfactory condition until such time that
clearing and /or construction is complete and potential for on -site
erosion has passed. The implementation, maintenance, replacement
and additions to erosion /sedimentation control systems shall be the
responsibility of the permitee.
22. The erosion and sedimentation control systems depicted on this
drawing are intended to be minimum requirements to meet
anticipated site conditions. As construction progresses and
unexpected or seasonal conditions dictate, the permitee shall
anticipate that more erosion and sedimentation control facilities will
be necessary to ensure complete siltation control on the proposed
site. During the course of construction, it shall be the obligation
and responsibility of the permitee to address any new conditions
that may be created by the activities and to provide additional
facilities, over and above minimum requirements, as may be needed,
to protect adjacent properties and water quality of the receiving
drainage system.
23. Approval of this plan is for erosion /sedimentation control only.
It does not constitute an approval of storm drainage design, size
nor location of pipes, restrictors, channels, or retention facilities.
24. During the time period of October 1st through April 30th, all
project distributed soil areas greater than 5,000 square feet, that
are to be left un- worked for more than 12 hours, shall be covered
by mulch, sodding or plastic covering.
25. In any area which has been stripped of vegetation and where no
further work is anticipated for a period 30 days or more, all
disturbed areas must be immediately stabilized with mulching, grass
planting or other approved erosion control treatment applicable to
the time of year. Grass seeding alone will be acceptable only
during the months of April through September, inclusive. Seeding
may proceed, however, whenever it is in the interest of the
permitee, but must be augmented with mulching, netting or other
treatment approved by the City of Renton, outside the specified
time period.
26. For all erosion /sedimentation control ponds where the dead
storage depth exceeds 6 inches, a fence is required with a
minimum height of three (3) feet, 3:1 side slopes.
27. A temporary gravel construction entrance, 24 feet x 50 feet x
8 inches of 4 to 6 inch quarry spoils shall be located at all points
of vehicular ingress and egress to the construction site.
MPX�
ORIGINAL GROUND
12" MIN. THICKNESS
2 " -4" QUARRY SPALLS
6
GRAVEL BACKFILL FOR DRAINS
PERFORATED
PIPE 4" MIN.
FILTER FABRIC
NOTES:
1. SEE SECTION 4.30.
2. SEE WSDOT /APWA 9- 03.12(4)
3. FENCE OR HANDRAIL MAY BE REQUIRED WHEN ROCKERY HEIGHT EXCEEDS 30 INCHES AND IS
LOCATED IN A PUBLIC AREA.
4. THE WALL FOUNDATION IS TO BE CLEARED OF ORGANIC MATTER AND DEBRIS AND THE UNDERLYING
MINERAL SOIL COMPACTED TO 95 PERCENT OF THE MAX. DRY DENSITY. THE EMBANKMENT MATERIAL IS
TO BE GRAVEL BORROW MEETING THE REQUIREMENTS OF 9 -13.14 OF THE WSDOT STANDARDS. THE
BACKFILL IS TO BE PLACED IN THIN LIFTS, NOT EXCEEDING SIX INCHES IN THICKNESS AND COMPACTED
TO 95 PERCENT OF THE MAX. DRY DENSITY.
5. (NOT USED)
6. ZONE OF INFLUENCE, FLATTER SLOPE MAY BE REQUIRED IN LESS STABLE SOILS. ALL DRIVEWAYS,
PARKING AREAS, AND ROADS SHALL LIE BELOW THE ZONE OF INFLUENCE.
7. EMBANKMENTS BEHIND FILL SECTION ROCKERIES EXCEEDING 4 FEET IN HEIGHT SHALL BE
GEOSYTHENTIC FABRIC OR GEOGRID.
S. ROCK WALLS SHALL BE PLACED NO CLOSER THAN 5 FEET FROM THE EDGE OF ANY PEDESTRIAN
WALKWAY, PUBLIC EASEMENT OR RIGHT OF WAY.
9. MAXIMUM HEIGHT, AS MEASURED FROM THE KEYWAY, IS EIGHT (8) FEET. ALL WALLS FOUR FEET OR
HIGHER SHALL REQUIRE A BUILDING PERMIT. ALL WALLS TO BE CONSTRUCTED IN A FILL SECTION OR
THOSE WALLS SUPPORTING A SURCHARGE (DRIVEWAY, ROAD, BUILDING OR PARKING AREA) SHALL
REQUIRE DESIGN BY A LICENSED ENGINEER.
10. THE TOP OF ALL ROCK WALLS SHALL BE CONFIGURED TO PREVENT SURFACE DRAINAGE OVER THE
TOP OF THE WALL.
ROCK WALL, CUT &
DWG. ST-26 & ST -27
NOTE
THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES IS SHOWN
IN AN HA GENS ON DETERMINE APPROXIMATE
EXACT LOCATION OF ALL EXXIISTINGRUTILITIES
BEFORE COMMENCING WORK. CONTRACTOR AGREES
TO BE FULLY CONSULTANTS, LLC AND WHICHMI
SERVE ANY A D ALL FOR ANY AND BUNDERGROUNDLUTILITIES�Y LOCATE
CIVIL MNEERING alt LAND DEVELOPMENT CONSULTANTS I
648 -48TH AVE SW Seaffle WA 98126 CALL 48 HOURS
phone 206 938 -6168 fax 206'938 -7645 BEFORE YOU DIG
smai H.Hagenson0(X)MCASTMET
1- 800 -424 -5555
FILL SECTIONS
143
475
0 +00
NE 1/4 OF SE 1/4 OF SEC. 32, TWP. 23N., RGE. 5E., W.M.
lRAME AND VANED ORATE
OR IT
ONE A BAR HOOP FOR r HEIGHT
TWO 113 BAR HOOPS FOR 17 HEIGHT
RECTANOULAR ADJUSTMENT SECTION
lee
p3 BAR EACH SIDE
i
N
93 BAR EACH WAY
PRECAST BASE SECTION
03 BAR EACH CORNER
18' MIN.
G
f
SEE NOTE 1
ALTERNATIVE PRECAST BASE SECTION
PIPE ALLOWANCES
sD
MAXIMUM
PIPE ■ATSMAL
INSIDE
3/19/1
DIAMETER
REINFORCED OR
12"
PLAIN CONCRETE
o
ALL METAL PIPE
15"
CPSSP*
HEH
(STD. SPEC. 90520)
12"
SOLID WALL PVC
15„
(STD. SPEC. 9-05.12(1y
DATE
PROFILE WALL PVC
15"
(STD. SPEC. 9-05. 12(2))
•.
* CORRUGATED POLYETHYLENE
STORM SEWER PIPE
NOTES
1. As acceptable alematives to the mbar shown in the PRECAST BASE
SECTION, fibers (placed according to the Standard Specifications), or
wire mesh having a minimum are a of 0.12 square inches per foot shall
be used with the minimum required niber shown in the ALTERNATIVE
PRECAST BASE SECTION. Wine mesh shall not be placed in the
knockouts.
2. The knockout diameter shell not be greaser than 20 ". Knockouts shat
have a wall thickness of 2' minimum to 2.5' maximum. Provide a 1.5"
minimum gap between the knockout well and the outside of the pipe.
After the pipe is installed, fin the gap with joint mortar in accordance
with Standard Specification 9 -04.3.
3. The maximum depth from the finished grade to the lowest pipe invert
Shall be V.
4_ The frame and grass must be installed with the flange down.
5. The Precast Base Section may have a rounded floor, and the wells may
be eloped at a late of 1:24 or sleeper.
B. The opening shall be measured at this top of the precast base section.
7. All pickup holes shall be grouted full after the basin has been placed.
S. All grade rings and castings shall be set in mortar in accordance with
Standard Speci icatbn 9-04.3.
PUBLIC WORKS CATCH BASIN TYPE 7 SM. PLAIT - 200. DO
8 DEPARTMENT
MARCH 2008
Dk
FSS/ONAL�G\
EXPIRES 11/15/16
1 +00
CROSS SECTION - WETIDETENTION POND
SCALE HORIZ.• I" = 0' VERT• 1" = 5'
4 REVISED PER CITY COMMENTS
3 REVISED & ADDED POND SIGN
2 REVISED PER 8/16/13 CITY COMMENTS
1 INITIAL PERMIT SUBMITTAL
NO. REVISION
e
"•
•
K11
F
sCAJLEI 1 " =20'
ONE INCH
AT FULL SCALE
IF N0T ONE INCH
SCALE ACCORDINGLY
VERIIG1L NAVD 1968
HORIZONTAL: HAD 1983/1991
DATU M
sD
WALL
THICKNESS
suRVEYM.
OH
=H
3/19/1
InZR REINFORCING STEEL
IN EACH DIRECTION
DESIGNM.
HEH
=H
1/31 /1
o
-H
30 13
LL
HEH
=H
5/1/13
4.5'
CHECKED:
HEH
BY
DATE
APPR
-H EH
sCAJLEI 1 " =20'
ONE INCH
AT FULL SCALE
IF N0T ONE INCH
SCALE ACCORDINGLY
VERIIG1L NAVD 1968
HORIZONTAL: HAD 1983/1991
DATU M
CATCH BASIN FRAME AND VANED GRATE (DETAIL 204.0%
HANDHOLD
RECTANGULAR ADJUSTMENT SECTION
OR CIRCULAR ADJUSTMENT SECTION
GROUT, TYPICAL (SEE NOTE 5)
FLAT SLAB TOP
MORTAR(TYP.)
o
z
z =
RerFanra+o erg trip.)
14' GRAVEL BACKFILL FOR
� PIPEZONE
SEPARATE BASE INTEGRAL BASE
CAST4N4PLACE PRECAST VAN RISER
1?
a: OMYa &K1ff, ILL FOR
PPE zow 11FDOM
SEPARATE BASE
PRECAST
CATCH BASIN DIMENSIONS
sD
WALL
THICKNESS
THICKNESS
IQ
SIZE
DISTANCE
BETWEEN
KNOCKOUTS
InZR REINFORCING STEEL
IN EACH DIRECTION
N
I INTEGRAL BASE
to
CATCH BASIN FRAME AND VANED GRATE (DETAIL 204.0%
HANDHOLD
RECTANGULAR ADJUSTMENT SECTION
OR CIRCULAR ADJUSTMENT SECTION
GROUT, TYPICAL (SEE NOTE 5)
FLAT SLAB TOP
MORTAR(TYP.)
o
z
z =
RerFanra+o erg trip.)
14' GRAVEL BACKFILL FOR
� PIPEZONE
SEPARATE BASE INTEGRAL BASE
CAST4N4PLACE PRECAST VAN RISER
1?
a: OMYa &K1ff, ILL FOR
PPE zow 11FDOM
SEPARATE BASE
PRECAST
CATCH BASIN DIMENSIONS
sD
WALL
THICKNESS
THICKNESS
IQ
SIZE
DISTANCE
BETWEEN
KNOCKOUTS
InZR REINFORCING STEEL
IN EACH DIRECTION
SEPARATE BABE
I INTEGRAL BASE
48'
o
s'
38'
LL
023
46', 54', 69', 72% W OR 98'
54.
4.5'
r
4T
8"
0.19
0.16
b
•.
r
48"
P
025
I°
STEPS OR
6"
M
80"
17
LADDER
024
8d•
CATCH BASIN FRAME AND VANED GRATE (DETAIL 204.0%
HANDHOLD
RECTANGULAR ADJUSTMENT SECTION
OR CIRCULAR ADJUSTMENT SECTION
GROUT, TYPICAL (SEE NOTE 5)
FLAT SLAB TOP
MORTAR(TYP.)
o
z
z =
RerFanra+o erg trip.)
14' GRAVEL BACKFILL FOR
� PIPEZONE
SEPARATE BASE INTEGRAL BASE
CAST4N4PLACE PRECAST VAN RISER
1?
a: OMYa &K1ff, ILL FOR
PPE zow 11FDOM
SEPARATE BASE
PRECAST
CATCH BASIN DIMENSIONS
BASIN
DIAMETER
WALL
THICKNESS
THICKNESS
IQ
SIZE
DISTANCE
BETWEEN
KNOCKOUTS
InZR REINFORCING STEEL
IN EACH DIRECTION
SEPARATE BABE
I INTEGRAL BASE
48'
4"
s'
38'
8"
023
0.15
54.
4.5'
r
4T
8"
0.19
0.16
W
5"
r
48"
P
025
025
77
6"
M
80"
17
0.35
024
8d•
r
17
7T
IF
039
029
W
I r
IT
1 84"
IF
0.39
029
NOTES
1. No steps are required when height Is 4D or less.
2. The bottom of the precast catch basin may be sloped to facltate cleaning.
3. The rectangular frame and grate must be Installed with the flange doom.
The frame may be cast Into the adjustment section.
4. Knockouts shall have a wall thickness of 2" minimum to 2.5" maximum. Provide
a 1.5" minimum gap between the knockout wall and the outside of the pipe. After
the pipe is installed, fill the gap with joint mortar in accordance with Standard
Specification 9.04.3.
5. All grade rings, risers, and castings shall be set in mortar in accordance with
Standard Specficetion 9 -04.3.
PIPE ALLOWANCES
CATCH
PIPE MATERIAL WITH MAXIMUM INSIDE DIAMETER
BASIN
DIAMETER
ALL
METAL
CP99P
O
SOLID PROFILE
WALL WALL
A^COO PVC@
4Nr
24"
37
24"
2r I 30"
sr
30'
38"
30"
2r 3s'
ee"
38"
4r
38'
30' 4r
7r
42'
54'
4Z'
3W 48"
s4"
54'
e0'
54"
i 38" 415"
618'
80"
7r
Cmugebd PaWWWie SmDn Sa- Plpa (SkL 51- TIMM)
30 (Std. Spec. 9-05.12(2))
�® PUBLIC WORKS CATCH BASIN TYPE 2 SM. PLAN - 201'00
DEPARTMENT
8
MARCH 2008
. CITY OF
RENTON
Planning /Building /Public Works Dept.
D- 311113
I CHECK FOR COMPLIANCE TO CITY STANDARDS I
NOTES AND DETAILS
LAKESIDE FAIRWOOD PLAT
18621 - 116TH AVE SE
RENTON, WASHINGTON
LAKESIDE INVESTMENTS, LLC
1A1-
5/1/13
C13
%Im: OR
13
NNNNAA
a
h F
c� C7
�n
a_
r;, 0
O
nd
r �
a
-d