Loading...
HomeMy WebLinkAboutR-371502D- _ ._ _41� q54 UNDER THIS CONTRACT TO INCLUDE THE NECESSARY TO PROVIDE IMPROVEMENTS. DEMOLITION OF ALL EXISTING SITE H Z AND TOPSOIL OFFSITE. I 1 l J U w W i 0 � CONDITIONS AND TO CORRELATE THESE a W DOWNSTREAM. SPRAY EXPOSED SOILS WITH AND INCLUDE ALL NECESSARY DEMOLITION, WATER TO PREVENT DUST RUNOFF SHALL WHETHER SHOWN OR NOT, AND INCLUDE ALL > SUCH COSTS IN THE BASE BID. r "z _ I �C- p / ■ 1 CONTRACTOR SHALL EXCAVATE AND FILL AS 1 NECESSARY TO ACHIEVE SUBGRADES IN LAWN COMPLETE ALL THE WORK OF THIS PROJECT. 'M�tYI81E L s % usmoa sEC S,ancu .l� 3. CONTRACTOR SHALL LEGALLY DISPOSE OFF THE OWNER'S PROPERTY, ALL DEMOLISHED 8. PROTECT EXISTING UTILITIES WITHIN THE W WORK LIMITS NOT SPECIFICALLY INDICATED OTHERWISE. FOR DEMOLITION. RAISE EXISTING UTILITIES TO FINISHED GRADE. ■ Ljj SEE SHEETS C1.4 AND C1.5 FOR TEMPORARY DEMOLITION ACTIVITIES. SEE SPECIFICATIONS EROSION AND SEDIMENT CONTROL NOTES ■ 1�-t CONSTRUCTION SEQUENCE D- _ ._ _41� q54 UNDER THIS CONTRACT TO INCLUDE THE NECESSARY TO PROVIDE IMPROVEMENTS. DEMOLITION OF ALL EXISTING SITE CONTRACTOR SHALL DISPOSE OF EXCESS SOD IMPROVEMENTS AS INDICATED BY THIS AND TOPSOIL OFFSITE. DRAWING OR AS REQUIRED FOR NEW l J I v�I \ RESPONSIBILITY TO FULLY REVIEW THE SITE SHALL BE REMOVED BY SWEEPING. CONDITIONS AND TO CORRELATE THESE \. OBSERVATIONS WITH THE PROJECT WORK DOWNSTREAM. SPRAY EXPOSED SOILS WITH AND INCLUDE ALL NECESSARY DEMOLITION, WATER TO PREVENT DUST RUNOFF SHALL WHETHER SHOWN OR NOT, AND INCLUDE ALL SHEET C1.1 SUCH COSTS IN THE BASE BID. I "z _ I �C- 2. CLEARING: IT IS THE INTENT OF THE WORK 'i> Q CONTRACTOR SHALL EXCAVATE AND FILL AS 1 NECESSARY TO ACHIEVE SUBGRADES IN LAWN COMPLETE ALL THE WORK OF THIS PROJECT. 'M�tYI81E L s usmoa sEC S,ancu .l� 3. CONTRACTOR SHALL LEGALLY DISPOSE OFF THE OWNER'S PROPERTY, ALL DEMOLISHED 8. PROTECT EXISTING UTILITIES WITHIN THE W WORK LIMITS NOT SPECIFICALLY INDICATED OTHERWISE. FOR DEMOLITION. RAISE EXISTING UTILITIES TO FINISHED GRADE. ■ Ljj SEE SHEETS C1.4 AND C1.5 FOR TEMPORARY DEMOLITION ACTIVITIES. SEE SPECIFICATIONS EROSION AND SEDIMENT CONTROL NOTES FOR ALLOWABLE BACKFILL MATERIALS. AND DETAILS. CONSTRUCTION SEQUENCE Ljj / z ■IS ■ A mmmm, wM ■� 1 I' l a I d- v tv v� a� ■ U I Z r -- - -- �' - -- >s J D- _ ._ _41� SHEET C1.3 ,l o-ea.o P� I ;'yu4ls�iry JW�iwo "�aD°. --w� I � I� ■ 456.... .e_. p 458 J -7 7T ''ST ,t s p J" p,, a/ SHEET C1.2 Know what's beim. Call before you dig. c 011 REVISION ACE 11/28/141 WJF BY I DATE I APPR A BRAUN F. KATONA k FIERST D- x--_ jqj I I� s GENERAL NOTES 1. DEMOLITION: IT IS THE INTENT OF THE WORK 5. q54 UNDER THIS CONTRACT TO INCLUDE THE NECESSARY TO PROVIDE IMPROVEMENTS. DEMOLITION OF ALL EXISTING SITE CONTRACTOR SHALL DISPOSE OF EXCESS SOD IMPROVEMENTS AS INDICATED BY THIS AND TOPSOIL OFFSITE. DRAWING OR AS REQUIRED FOR NEW l J CONSTRUCTION. IT IS THE CONTRACTOR'S 6. 1 0 RESPONSIBILITY TO FULLY REVIEW THE SITE SHALL BE REMOVED BY SWEEPING. CONDITIONS AND TO CORRELATE THESE SEDIMENTS SHALL NOT BE WASHED OBSERVATIONS WITH THE PROJECT WORK DOWNSTREAM. SPRAY EXPOSED SOILS WITH AND INCLUDE ALL NECESSARY DEMOLITION, WATER TO PREVENT DUST RUNOFF SHALL WHETHER SHOWN OR NOT, AND INCLUDE ALL NOT BE CREATED BY SPRAYING. EROSION SUCH COSTS IN THE BASE BID. I "z _ I �C- 2. CLEARING: IT IS THE INTENT OF THE WORK 'i> UNDER THIS CONTRACT TO CONDUCT ALL T CONTRACTOR SHALL EXCAVATE AND FILL AS CLEARING NECESSARY TO BE ABLE TO NECESSARY TO ACHIEVE SUBGRADES IN LAWN COMPLETE ALL THE WORK OF THIS PROJECT. 'M�tYI81E L s usmoa sEC S,ancu .l� SHEET C1.3 ,l o-ea.o P� I ;'yu4ls�iry JW�iwo "�aD°. --w� I � I� ■ 456.... .e_. p 458 J -7 7T ''ST ,t s p J" p,, a/ SHEET C1.2 Know what's beim. Call before you dig. c 011 REVISION ACE 11/28/141 WJF BY I DATE I APPR A BRAUN F. KATONA k FIERST D- x--_ jqj I I� s GENERAL NOTES 1. DEMOLITION: IT IS THE INTENT OF THE WORK 5. REMOVE EXISTING SOD AND TOPSOIL AS UNDER THIS CONTRACT TO INCLUDE THE NECESSARY TO PROVIDE IMPROVEMENTS. DEMOLITION OF ALL EXISTING SITE CONTRACTOR SHALL DISPOSE OF EXCESS SOD IMPROVEMENTS AS INDICATED BY THIS AND TOPSOIL OFFSITE. DRAWING OR AS REQUIRED FOR NEW l J CONSTRUCTION. IT IS THE CONTRACTOR'S 6. SEDIMENTS TRACKED ONTO PAVED SURFACES RESPONSIBILITY TO FULLY REVIEW THE SITE SHALL BE REMOVED BY SWEEPING. CONDITIONS AND TO CORRELATE THESE SEDIMENTS SHALL NOT BE WASHED OBSERVATIONS WITH THE PROJECT WORK DOWNSTREAM. SPRAY EXPOSED SOILS WITH AND INCLUDE ALL NECESSARY DEMOLITION, WATER TO PREVENT DUST RUNOFF SHALL WHETHER SHOWN OR NOT, AND INCLUDE ALL NOT BE CREATED BY SPRAYING. EROSION SUCH COSTS IN THE BASE BID. CONTROL MEASURES SHALL BE PROVIDED "z THROUGHOUT CONSTRUCTION. 2. CLEARING: IT IS THE INTENT OF THE WORK UNDER THIS CONTRACT TO CONDUCT ALL T CONTRACTOR SHALL EXCAVATE AND FILL AS CLEARING NECESSARY TO BE ABLE TO NECESSARY TO ACHIEVE SUBGRADES IN LAWN COMPLETE ALL THE WORK OF THIS PROJECT. AND PLANTER BEDS REQUIRED BY THE LANDSCAPE PLANS. 3. CONTRACTOR SHALL LEGALLY DISPOSE OFF THE OWNER'S PROPERTY, ALL DEMOLISHED 8. PROTECT EXISTING UTILITIES WITHIN THE AND REMOVED MATERIALS UNLESS INDICATED WORK LIMITS NOT SPECIFICALLY INDICATED OTHERWISE. FOR DEMOLITION. RAISE EXISTING UTILITIES TO FINISHED GRADE. 4. BACKFILL AND COMPACT ALL VOIDS AND DEPRESSIONS OCCURING AS A RESULT OF 9. SEE SHEETS C1.4 AND C1.5 FOR TEMPORARY DEMOLITION ACTIVITIES. SEE SPECIFICATIONS EROSION AND SEDIMENT CONTROL NOTES FOR ALLOWABLE BACKFILL MATERIALS. AND DETAILS. CONSTRUCTION SEQUENCE 1. ARRANGE AND ATTEND PRE - CONSTRUCTION MEETING WITH CITY OF RENTON, OWNER, CONTRACTOR, ESC LEAD, AND ENGINEER. STAKE CLEARING LIMITS PRIOR TO THIS MEETING. 2. POST NOTICE OF CONSTRUCTION ACTIVITY SIGN WITH NAME AND PHONE NUMBER OF ESC LEAD. 3. FENCE CLEARING LIMITS AND TREE PROTECTION AREAS. 4. INSTALL CATCH BASIN SEDIMENT PROTECTION. 5. INSTALL PERIMETER PROTECTION (SILT FENCE, OR OTHER MEASURES) WHERE SPECIFIED ON THE ESC PLAN AND /OR REQUIRED BY THE CITY INSPECTOR. 6. GRADE AND STABILIZE CONSTRUCTION ENTRANCE(S). 7. GRADE AND STABILIZE CONSTRUCTION ROAD(S). 8. CLEAR AND GRUB WITHIN CONSTRUCTION LIMITS. 9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR SWALES, CHECK DAMS, TEMPORARY SEDIMENT POND, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. 10. PROVIDE PLASTIC COVERING ON ALL EXPOSED SLOPES 5H:1 V OR GREATER. ALL FILLS MUST BE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER. 11. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF RENTON STANDARDS, NPDES PERMIT AND EROSION AND SEDIMENT CONTROL REPORT. 12. RELOCATE SURFACE WATER CONTROLS AND EROSION CONTROL MEASURES OR INSTALL NEW MEASURES, SO THAT, AS SITE CONDITIONS CHANGE, THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY OF RENTON EROSION AND SEDIMENT CONTROL REQUIREMENTS. 13. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCT 1 TO APR 30) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1 TO SEPT 30) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC MEASURES. 14. ROUGH GRADE SITE. 15. CONSTRUCT NEW PORTABLE CLASSROOMS PER SHEET C2.4. 16. CONSTRUCT PERMANENT STORMWATER FACILITIES. 17. CONSTRUCT ALL OTHER SITE IMPROVEMENTS. 18. SEED OR SOD ANY AREA TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 19. UPON SUBSTANTIAL COMPLETION, ALL DISTURBED AREAS MUST BE STABILIZED. EROSION AND SEDIMENT CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL APRROVAL IS OBTAINED FROM THE CITY OR RENTON. *AHBLB 5 R- 311502 Checked for Cqtnpliance to City Standards PERMIT SET :Ie _ AS NOTED 1tl�01f - MAT,", CITY OF RENTON O1�'O1 DATUM anusru Planning /Building /Public Works Dept. . xor ac .Nx acvE �tmwnr SIONAL io I ,! NOTICE T A C O M A - SEATTLE • SPOKANE •TRI- CITIES xmuno� v ac 000�en wu Nm�a x NtlLS9NIL N%L MN NiYLE N9�1Y V •N 2215 North 30th Street, Suite 300 Tacoma, WA 98403 OLY fA M AOQ! 011dm N lE 9m'. N06WIfmS:HDIW IWMt NNmW 253.353.2422 TEL 253.3832572 FAx wwA'.ahN.can x7:B mou m TM� NOFLI a ra wraoa NY6C uae RENTON ACADEMY AT SPRING GLEN ELEMENTARY 31 MIAKH 2014 SITE IMPROVEMENTS NaB�m RENTON SCHOOL DISTRICT ANN OVERALL TESC AND DEMOLITION PLAN C1'0 am 2 X35 A- NNNNAA z 0 �z ,9 a M d o � n l J { Hy 1 N0 O L7 n 8z d y m "z IaInn 9 �C