ADAPTER SKIRT
(FOR A PERFECT FIT)
GEOTEXTILE
FABRIC
STRAP
OVERFLOW (TO
BYPASS PEAK
STORM VOLUMES)
24"
EXISTING
CATCH BASIN
#3003 SEDIMENT ONLY SEDIMENT ACCUMULATION
PROVIDE CATCH BASIN SEDIMENT PROTECTION WITH
STREAMGUARD BASIN INSERT #3003, FROM
BOWHEAD ENVIRONMENTAL & SAFETY, LLC
P.O. BOX 375
PRESTON, WA 98050
PHONE: 1-800 -909 -3677
INLET PROTECTION NOTES:
1. FILTERS SHALL BE REMOVED AND CLEANED OR REPLACED
AFTER EACH STORM EVENT.
R= 25'MIN
i
r
ICI
P \SVs
L11
/ROCK MUST COMPLETELY COVER THE
BOTTOM AND SIDES OF THE DITCH
SECTION
2:1 SLOPES
N.
- /TOP OF DITCH
�� -�" 2 " -0" ROCK
AA
L = THE DISTANCE SUCH THAT
POINTS A AND B ARE OF EQUAL
ELEVATION
PLAN
,VEL CHECK DAM
AS PER CITY OF RENTON ROAD STANDARDS,
DRIVEWAYS SHALL BE PAVED TO THE EDGE
S OF R -O -W PRIOR TO INSTALLATION OF THE HYDROSEED SWALE A MIN OF V
CONSTRUCTION ENTRANCE TO AVOID BEYOND EDGE OF SWALE
DAMAGING OF THE ROADWAY
_ IT IS RECOMMENDED THAT THE
.��0 0 0 \ ENTRANCE BE CROWNED SO THAT V MIN LEVEL BOTTOM
O 00 0 O RUNOFF DRAINS OFF THE PAD
00 00 moo
00 0 0O 0Q �2 - 7=_7771 �=
p
00
oo
INSTALL DRIVEWAY CULVERT IF 000 O 00 0 2'M
THERE IS A ROADSIDE DITCH 0 00 000
p O
PRESENT, AS PER CITY OF O 000 O
RENTON ROAD STANDARDS 00 0 O(DO
0
4 "-8" QUARRY SPALLS 0 00 0 O O
p
iA TEMPORARY I
GEOTEXTILE 000 \ , LL ...,_ �.. ..,..,
CHECK DAY SPACING
DITCH SLOPE
%
CHECK DAM
SPACING (FT.)
1
100
2
50
4
25
5
20
6
15
10
10
20
5
12N]IIPiYN:11y
2:1 MAX SLOPE
12' MIN THICKNESS PROVIDE FULL WIDTH
OF INGRESS /EGRESS
AREA
YANITENANCE STANDARDS
1. QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN
ACCORDANCE WITH THE SPECIFICATIONS.
2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO
PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT
SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS
OF THE ENTRANCE, OR THE INSTALLATION OF A WHEEL WASH. IF WASHING IS USED, IT
SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASH WATER SHALL
DRAIN TO A SEDIMENT TRAP OR POND.
3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY
SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED
ON-SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET,
EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBLIC SAFETY. IF
IT IS NECESSARY TO WASH THE STREETS, THE CONSTRUCTION OF A SMALL SUMP SHALL
BE CONSIDERED. THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP.
4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE
ROADWAY SHALL BE REMOVED IMMEDIATELY.
5. IF VEHICLES ARE ENTERING OR EXITING THE SITE AT POINTS OTHER THAN THE
CONSTRUCTION ENTRANCE(S), FENCING (SEE SECTION 3.4.1) SHALL BE INSTALLED TO
CONTROL TRAFFIC.
Know what's below.
0811 before you dig.
E
n n
I I I I
N
RCEPTOR DITCH
n
2 "x4" BY 14 Ga. WIRE
OR EQUIVALENT, IF
STANDARD
STRENGTH FABRIC
USED
FILTER FABRIC
6' MAX.
I MIN. 4 "x4" TRENCH -�'
U
BACKFILL TRENCH WITH
NATIVE SOIL OR 3/4"-
POST SPACING MAY BE
1 -1 /2' WASHED GRAVEL
INCREASED TO 8' IF WIRE
BACKING IS USED
2 "x4" WOOD POSTS,
STEEL FENCE POSTS,
NOTE: FILTER FABRIC FENCES SHALL
REBAR, OR EQUIVALENT
BE INSTALLED ALONG CONTOUR
ACB
WHENEVER POSSIBLE
WJF
SILT FENCE
ADDENDUM NO. 3
NU 1 I U 30ALL
z
N
s
EROSION CONTROL NOTES:
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY,
WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE - CONSTRUCTION MEETING MUST BE
HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON
THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO
CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND OBSERVED
DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING
LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT /ESC
SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND
MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL
WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND
TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION /EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION
PRIOR TO LAND CLEARING AND /OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE
WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE
MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND /OR CONSTRUCTION IS
COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE,
REPLACEMENT AND ADDITIONS TO EROSION /SEDIMENTATION CONTROL SYSTEMS SHALL BE THE
RESPONSIBILITY OF THE PERMITEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE
MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND
UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT MORE EROSION
AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL
ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND
RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE
ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE
NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION /SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN
APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR
RETENTION FACILITIES.
8. ANYAREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR
TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH MARCH 30TH) OR SEVEN DAYS DURING THE
DRY SEASON (APRIL 1ST THROUGH SEPTEMBER 30) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED
ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION
SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE
CITY THROUGH AN ADJUSTMENT PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN
MANUAL.
11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN
SEVEN(7)DAYS.
12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH
OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH
BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING
OPERATION SHALL NOT FLUSH SEDIMENT - LADEN WATER INTO THE DOWNSTREAM SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 18T THROUGH MARCH 30TH, ALL PROJECT DISTRIBUTED SOIL AREAS
GREATER, THAT ARE TO BE LEFT UN- WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH,
SODDING OR PLASTIC COVERING.
15. ANY PERMANENT RETENTION /DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE
MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE
CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE
TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET
ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO
IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE
SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE
SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR
REVIEW.
GENERAL NOTES
1. CONTRACTOR SHALL PERFORM ADDITIONAL CLEARING TO CONSTRUCT ONSITE AND OFFSITE IMPROVEMENTS
IF NECESSARY.
2. GENERAL CONTRACTOR SHALL PROVIDE AN ESC SUPERVISOR WHO IS A CERTIFIED EROSION AND SEDIMENT
CONTROLLEAD.
3. CONTRACTOR SHALL CONFORM TO ALL REQUIREMENTS OF THE NPDES UNDER THE DOE'S GENERAL PERMIT
FOR STORMWATER DISCHARGE FROM CONSTRUCTION ACTIVITIES AND THE SWPPP. CONTRACTOR IS
RESPONSIBLE FOR MAINTAINING ALL REQUIRED RECORDS.
4. SEE LANDSCAPE PLANS FOR FINAL VEGETATED SURFACING.
5. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS
CHANGE THE EROSION CONTROL IS ALWAYS IN ACCORDANCE WITH THE MINIMUM CITY OF RENTON TESC
REQUIREMENTS.
6. CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF TESC FACILITIES. CONTRACTOR IS RESPONSIBLE FOR
CONSTRUCTION OF ADDITIONAL FACILITIES INCLUDING BUT NOT LIMITED TO FILTER FENCE, CATCH BASIN
PROTECTION, SWALES, MULCHING AND SEEDING.
7. CONTRACTOR SHALL INCLUDE IN BID REMOVAL OF ALL TESC MEASURES AT COMPLETION OF PROJECT.
INSPECTION SCHEDULE
1. ALL ESC MEASURES SHALL BE MAINTAINED AND REVIEWED ON A REGULAR
BASIS.
2. THE ESC SUPERVISOR SHALL REVIEW THE SITE AT LEAST TWICE A MONTH
DURING THE DRY SEASON, WEEKLY DURING THE WET SEASON AND WITHIN
24 HOURS OF SIGNIFICANT STORMS. A SIGNIFICANT STORM IS ONE WITH
MORE THAN 0.5 INCHES OF RAIN IN 24 HOURS OR LESS.
3. THE CITY MAY REQUIRE THAT A WRITTEN RECORD OF THESE REVIEWS BE
KEPT ON SITE WITH COPIES SUBMITTED TO THE CITY WITHIN 48 HOURS.
HYDROSEEDING NOTES
1. HYDROSEEDING SHALL BE APPLIED TO ALL AREAS DISTURBED BY
CONSTRUCTION ACTIVITIES UNLESS OTHERWISE NOTED.
2. HYDROSEEDING TO BE AS SPECIFIED IN LANDSCAPE SPECIFICATIONS.
3. APPLICATION TO BE 100 LBS /ACRE.
4. 500 LBS /ACRE 10 -20-20 FERTILIZER, 2000 LBS/ACRE MULCH AND 40 LBS/ACRE
SOIL STABILIZER TO BE APPLIED WITH SEED MIXTURE.
5. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL REQUIRE
IRRIGATION AND OTHER MAINTENANCE AS NECESSARY TO FOSTER AND
PROTECT THE ROOT STRUCTURE. CONTRACTOR SHALL ENSURE PROPER
ROOT GROWTH REGARDLESS OF PLANTING SCHEDULE.
6. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30, ARMORING
OF THE SEED WILL BE NECESSARY. (EG, GEOTEXTILES, JUTE MAT, CLEAR
PLASTIC COVERING.)
7. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES
SUCH AS GRADIENT TERRACES, INTERCEPTOR DIKES, SWALES, LEVEL
SPREADERS AND SEDIMENT BASINS.
8. THE SEEDBED SHALL BE FIRM WITH A FAIRLY FINE SURFACE, FOLLOWING
SURFACE ROUGHENING. PERFORM ALL OPERATIONS ACROSS OR AT RIGHT
ANGLES TO THE SLOPE.
9. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS
RECOMMENDATIONS. AMOUNTS USED SHOULD BE MINIMIZED, ESPECIALLY
ADJACENT TO WATER BODIES AND WETLANDS.
10. SEE SPECIFICATIONS FOR HYDROSEED MIXTURES.
MULCHING NOTES:
1. MULCH MATERIALS USED SHALL BE HAY OR STRAW, AND SHALL BE APPLIED
AT THE RATE OF 2 TONS /ACRE.
2. MULCHES SHALL BE APPLIED IN ALL AREAS WITH EXPOSED SLOPES GREATER
THAN 2:1.
3. MULCHING SHALL BE USED IMMEDIATELY AFTER SEEDING OR IN AREAS
WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON.
4. ALL AREAS NEEDING MULCH SHALL BE COVERED BY NOVEMBER 1. Z
O
z _1
= a
a t7
m y a 46
w 0
L7
2.
r" VNi
o z
C7 r
� V1
z
9
Rm371506
8. REMOVE EXISTING SOD AND TOPSOIL AS NECESSARY TO PROVIDE IMPROVEMENTS. CONTRACTOR SHALL
DISPOSE OF EXCESS SOD OFFSITE. �. c,0
9. SEDIMENTS TRACKED ONTO PAVED SURFACES SHALL BE REMOVED BY SWEEPING. SEDIMENTS SHALL NOT BE
WASHED DOWNSTREAM. SPRAY EXPOSED SOILS WITH WATER TO PREVENT DUST. RUNOFF SHALL NOT BE 0Re r�
CREATED BY SPRAYING. EROSION CONTROL MEASURES SHALL BE PROVIDED THROUGHOUT CONSTRUCTION.
a ked for Com lance to City Standards 'b,y 8�p 0
7 �370NAL ��Il
Nona= T A C 0 M A • SEATTLE • SPOKANE • TRI- CITIES
PERMIT SET
NTh➢AttM 6 S6 [O]r6119WL NNME M
ImE�1V1 YN M09lNLE R6GH16
2215 North 30th Street, Suite 300 Tacoma,WA9840:
OMRiP WIIS N M1 ➢601]IFMf 6 W IS
01M1O�vrwa�° N �a 253.383.2422 TEL 253.383.2572 FAx wwwahN.com wE6
.mow m wa Niom w,m xnara Nosy.
oae
RENTON ACADEMY AT SPRING GLEN ELEMENTARY 31 MARCH 2O1,
SITE IMPROVEMENTS `
RENTON SCHOOL DISTRICT wY�I Nw
TESC AND DEMOLITION NOTES AND DETAILS
AS NOTED
1°m°'o""n ,°" , °,
DATUM
.L � CITY OF
.0 RENTON
Planning /Building /Public Works Dept.
,Ifm@
ABRAUN
ADDENDUM NO. 4
ACB
1/28/14
WJF
ADDENDUM NO. 3
ACB
I 24 14
WJF
°fl"" F. KAroru
,wc No,
ADDENDUM N0. 1
ACB
1 1714
WJF
w RTo
wtN,L>as
s Nm we wcN
NO.
REVISION
BY
DATE
APPR
S. COMFORT
NTh➢AttM 6 S6 [O]r6119WL NNME M
ImE�1V1 YN M09lNLE R6GH16
2215 North 30th Street, Suite 300 Tacoma,WA9840:
OMRiP WIIS N M1 ➢601]IFMf 6 W IS
01M1O�vrwa�° N �a 253.383.2422 TEL 253.383.2572 FAx wwwahN.com wE6
.mow m wa Niom w,m xnara Nosy.
oae
RENTON ACADEMY AT SPRING GLEN ELEMENTARY 31 MARCH 2O1,
SITE IMPROVEMENTS `
RENTON SCHOOL DISTRICT wY�I Nw
TESC AND DEMOLITION NOTES AND DETAILS