Loading...
HomeMy WebLinkAboutR-371822,.. 00 n 0 0 N Z Z H 0 W 7 O a 0 U Y �0�/ /LL W 0 I W to a Posse nu HY l Vp n BM I OGP9 Fpi 12 HEIGHT RECTANOULAR ADJUSTMENT SECTION n BUV EAmcwxx@ IPUW Posse 110•F PRECAST BASE SECTION PIPE ALLOWANCES q• 481nch Diemeler Varies MAXIMVM PIPE MATERIAL INSIDE IFnri. OIAMBTER REINFORCED OR ix. RAIN CONCRETE DRY WELL SECTION ALLMETALPIPE He CPfi6Pi am PEG. POS.m) 1,1. SOLIC sTD.SPELLVJC Y (6TD.6PEC.4a5.ix(1)) 1S PROFILE W0.LPVC 0.10 (siD.6RED. OVD6,t (xfl 15 * C NTLENE 6TORMSENERPIPE NOTES 1. A. ..,table alt.rHOOea to Member shown In the PRECAST BASE SECTION, Obem(placed 0INAngtothe Starlmd Spedfloatlonak Cr MINE mesh heWoft a minlmum area of 0.12 square Inches per foot shall be used with the minimum requlmd rebar shown In the ALTERNATIVE PRECAST BASE BECTON. Wire mesh shall not be placed In the knockouts. 2. The knockout diameter shall =star greater Nan 20'. Knockouts shall have a well thickness of 2' minlmum to 2.5' maximum. Provide a 1.5" minimum gap between vie knockout wall and the outside of the pipe. After the pipe Is hnstalied, M the gap with joint motler In amoNance with Standard Spedflcallon 9-04.3. 3. The maximum depth from the finished grade to the lowest pipe Invert shaft be T. 4. The frame and gate must be Installed with the flange down. 5. The Precest Base Section may have a rounded floor, and the walls may M sloped at a to of 1:24 or steeper. 6. The opening shell be measured at the top of the precast base section. T. All pickup hobs shall be grouted NII alter the basin has been placed. a. All grade rings and castogs shall be set In mortar In HD CRIance with Standard Specification 9 -04.3. SEE NONE ALTERNATIVE PRECAST BASE SECTION STD. PUBLIC WORKS CATCH BASIN TYPE 1 PLAN - 200.00 DEPARTMENT MARCH 2008 C.32 FULL INFILTRATION FIGURE C.2.2.0 TYPICAL DRYWELL INFILTRATION SYSTEM �ROOi Downspout House U If] DRY WELL PLAN VIEW NITS Itr Roof Downspout Mark Cantor dHole House t)rerAaw withM Capped PVC Ol Other means , _.._,__..,,_.,. n,,,.,al_ F Fm6n wun Surface F.* Flee Mae 20K9Slufaa W9HDai®r M=ind -Appm ixC CJ] Call 2 Work -ng Days Before You Dig Uti3tiee Underground Center (ID,MT,ND,ORWA) INna09 NW 1/4, SE 114, SECTION 29, TOWNSHIP 23 N. RANGE 5 E, W.M. FIELDBROOK COMMONS CF6T- IWPUCE PRECAST WITH NNER T= r Rr cnaesoelu SEPARATE BASE PRECI rafimmMLZW.DBI CATCH BASIN DIMENSIONS q• 481nch Diemeler Varies Sides of Hole Uned with Filter Fab I. Hole Filled with t 1112- T washed 3 4 D_in Rock Mp 1. aHasaDCOUT IFnri. ,rR a �aR,• 9 @NUTEBA6E IMECRd_. Min. 1' above Seasonal DRY WELL SECTION High Groundwater Table NITS C 20K9Slufaa W9HDai®r M=ind -Appm ixC CJ] Call 2 Work -ng Days Before You Dig Uti3tiee Underground Center (ID,MT,ND,ORWA) INna09 NW 1/4, SE 114, SECTION 29, TOWNSHIP 23 N. RANGE 5 E, W.M. FIELDBROOK COMMONS CF6T- IWPUCE PRECAST WITH NNER T= r Rr cnaesoelu SEPARATE BASE PRECI rafimmMLZW.DBI CATCH BASIN DIMENSIONS CATCH DIAMETER w, THICKNESS BKE IMCNNF36 Mp 1. aHasaDCOUT MINIMUM BERYEEN IMOLxWT$ BASEREWFONCWOSTEEL 1^a'iL IN EACH W11EClICW 9 @NUTEBA6E IMECRd_. 'B• f Y x C am due 54' IS Y IY C 0.10 0.10 m' S' r 4C B- o]B 0x5 R' 6• C EP 12 035 03d Ba- C 12 ]Y 1Y QJ9 030 or 9• 12 2-]9 D.m NOTES L No steps are required when height is 4•or less. 2. The bottom of the precest catch basin may be sloped to faditate tleaning. 3. The rectangular frame and grate must be installed with the flange down. The frame may be cast Into Ole adjustment section. 4. Knockouts snail have Ewell thickness DIY minimum to 2.5'madmum. Provide a 1.5" minimum gap between the knockout well and the wlsida of the pipe. After the pipe Is installed 011 the gap Wlih joint mortarin amordanne with Blended SpeDIOOaWn 9 -04.3. 5. All grade Into, risers, and Coatings shell beset in mortar in amoldance with PIPE ALLOWANCES CATCH PIPE LN]EHIALlN1N MA%INVM W6NEDNMEIEIT BASIN OWkTER O.CRETE AU METAL CaPoO 50.10 PVC® PROFILE PVC0 dC x E, z2-• 2r an, M• an 36' JO' W 34 EF J6' 42 So JP SY 72 dY G' dY JC 98' BI' U• an N' 38' PT Or ]Y em Standard Speclflwtlon 0 -04.3. DnnyeW PdwualR.s1«m s..•.reP. (sB spec Pascal e Isla s°r` Poa1z1S1 pec.Pas133)1 UO PUBLIC WORKS CATCH BASIN TYPE 2 STD. PLAN - 201.00 DEPARTMENT MARCH 2008 d S I me Do, r, one op «quE no.ma.wm dean eNUryelmmpp yno.ev nolvM1V! min B' PortmW Fee Wf BWMtl pare Wek Zrc F.0 o.c, npelce RNda-(aaaNt A A WIDE I 50' L ❑ ❑ weetlm..r OvuxO.BCFBprwsso dn.n«n wa.ne„Ppe BouboYU 0­1 ANF- PUN IR9 Paivarha Bak /pke o.o. �� «a.wra C \ rmea. min a'wrtmkd gpet.laml t t- i.sxfn.l I'- 3'walwlmd, x ' eupgn b� \ x mm,Nw SECTION AA ITS •taw ma.lorr�owwmrw.areraaBy Banm.nw won «.ea. NOTES: 1. THK trench Shell be wmlrvGed Bo as to prwent ON detlaga erWw mwHx,. 2. Trenches maybe placed, ckser then 50 feat m.. em'her.(1O3(WWord 11aw9rel 3. TrenchaN,HNI,o.d.RAbelwel. A 1,Hlosaw¢Nmmdds. 4. 6upPOn pxt apedrg ea required by all mlltlonE toeremegnd6 CwrE remBlmkval. o� D R ®� PUBLIC WORKS 50 FOOT DISPERSION TRENCH STD. PLAN - 224.00 DEPARTMENT WITH NOTCHED BOARD MARCH 2006 D.R. STRONG z I PINR`KLIFINJN' D O CONSUL7/NG ENGINEERS 3 CITY COMMENTS ENGINEERS PLANNERS SURVEYORS 4 did COMMENTS 6207TH AVENUE KIRKLAND, WA 98033 0425.827.3063 F425,827.2423 FunKorstrong.com Nil. REVISION {3� tl NOTES 1. 1 BASE SECTION 2. SHIMS SHALL NOT BE USED TO SET FRAME TO GRADE. THE USE OF SHIMS IS PROHIBITED. 3. MORTAR SHALL BE PLACED BETWEEN ADJUSTMENT RINGS AND BRICKS PRIOR TO PLACEMENT. 4. THE USE OF BRICKS IS PERMITTED WHERE THE BRICKS ARE STAGGERED TO CREATE A RUNNING BOND OR Yx BOND. SEE N07 E 4 PUBLIC WORKS CATCH BASIN INSTALLATION STD. PLAN - 202.00 DEPARTMENT MARCH 2008 o wxc QHH 03.21.14 MAJ YLP 04.03.14 MAJ orate: YLF HECN@ MAJ BY DATE APPR - FROvl. i L I HC FEE or I zYwN. DETAIL SECTION O __ GTCq. -x MAaESIceI Gil]IeA4NTTE1 \ I V cdP(MEE 6R£) �4/ '�urg19ALNTYPE IL itch .. HomI wEW BECTON O ,NAME DETAIL NOTES 1. Theasymmetryofiha CombinoWnlNetshallbemnslderadwhen OW.WBg the offset distance far the Balch basin. Bea SECTION A. 2. ThedlmenNOnsoflheFremeandHoOdmayVary sAghOyamongdg- ferent manufacturers. The Frame may have Cast features Intended F.R. ON Be ANO aunaa to support a grata guard. Hood units shall mount outside of the TOP Fram: ThenretladsforfwteNWIlM fey Barl fie Guard ROd T to the Flond may very. The Hind may lrrlude Castlng lugs. Thetop of the Hood may be cast with a pelt.. 3. Antadl the Hand to the Same with two 314' x T hes, head DOW. ends, erldavemlaewashers Thewaathrsshallhevedlemetere adequate 91FEOTVI6APIOE6nRGGnO t. HE.re IBM bearklg Xf.. fhe slots. xV W VcvEo waif 4. Wean losEdown gates am specified In the centred. prevde RFNa Wes In the lrema Net are vertl ®Gy Mgned Well gn grew Sbls. Tap each We to accept a 5l8- x -11 NC x T elan heed Cap slew. Locallan of bObdown hdes yard's among dRerent menufadurds. Sea BOLT -DOWN DETAIL 5. Only dudle Iron Venal Grates shall be used. 6. RIN plan is Intended to show tlN Instafiallon details ofamaDufaC- Whadl product. II la rot Ina Intent of Ws plan to ahoy the spedflc wo.ETE'o',, Ishii. necessary, to fabdBate the Basags shown on Ws drawing. 2Y D PUBLIC WORKS OPEN CURB FACE STD. PLAN - 203.00 N ' DEPARTMENT FRAME AND ORATE INSTALLATION DETAIL MARCH 2008 Lunrx; xAVO lase CITY 01 AS NDTC/A NOPo Gomm W➢ 19'See CA ILV RENTON iDxE INGN I ��M ATAT ip Planning /Building /Public Works Dept. IF NOT ONE INCH swE XCORDwSLY R- 311822 r RECOMMO {y J FOR APPOVAL ElYaLftl Date: !Y O BY: Date: r y N C1 Nail BY: Date: m o mO BY: Date: 11 j FIELDBROOK COMMONS STORM DRAINAGE DETAILS 17040 108TH AVENUE SE RENTON, WA c� JA -IN 04.03.14 RRDB]JIC PADi 'T1 {y J L O do0 P GO r y N C1 Nail O m o mO CIE, CO CO 00