Loading...
HomeMy WebLinkAboutD-349708r` rn Nt cy) N U) PIPE INLET IE =121.1 est ALAI t I:UVtzKINU U V VLK HALF OF INLET 1611 CMP 36" CMP INLET IN BASIN NTS LOG DROPS - 91 V -5" BOX CULVERT OVERFLOW CROSS - SECTION (As Measured) NTS ' O I ` V \ APP, .­ EL 113 _y ACCESS BASIN DOWN\ THIS SIDE ONLY \\ W / \ % 24 "CMP BYPASS PIPE LOCATION NOT VERIFIED \ I 120 - �� HYDROSEED AND STRAW MULCH DISTURBED SLOPE AND ACCESS ROAD AFTER BASIN CLEANING N 24 "CMP BY ASS PIPE LOCATION OT VERIFIED OR TO HAND [ i DO NO- r USE SI I i SEDIME i I i SEDIME I I 1 1 I I N = 1 1 I I � I I r 1 r 1 0 (I� I II V I I 7t)0 0 < mD7 r x I X I I it y 12'x3' CONS. BOX CULVEROVERFLOW SPILLWAY IE = 117.86 'I I / 1 �: r I 36" CMP INLET IF = 115.81 i i HYDROSEED AREA (approx) - REVIEW EXTENT WITH CITY BEFORE APPLYING i CROSS - SECTION A -A SEDIMENT BASIN (Typical) NTS CROSS - SECTION B -B TEMPORARY DIVERSION DAM UPSTREAM OF SEDIMENT BASIN OHW DEPTH APPROX 2TO4INCHES SANDBAGS TO SEAL EDGES AND ANCHOR PLASTIC FLOW CHANNEL PLASTIC SHEETING BOTTOM TO SEAL DAM -2' f / 1 �2' T❑ 3' CONCRETE BLOCKS, MEDIA BAGS, OR OTHER MATERIAL TO FORM EXISTING INLET BYPASS DAM AND BYPASS PIPE (IN FOREGROUND) SECTION - TEMPORARY BYPASS DAM (Typical) NTS D- 349108 vENnrsi xnw lsae CITY OF MORIZO NN 19IONIC 1 1 RECOMMENDED ,c�A I P o¢I�NEm AS NOTED �p �=- FOR APPROVAL `S3 LENN DC 7�LATTOT�T By Daniel Carey 6/10/13 g /P:1V RENT ON DC I __ ONE INC�N w13 CNECKEODC / R5 >*I N1�5 DATUM Planning /Building /Public Works Dept. BY �P IF .ccoaolxeHr N0. REVISION BY DATE APPR RS 2013 Cleaning MADSEN CREEK SEDIMENT BASIN CLEANING PROJECT DETAILS GQ; J] - 34 -`? ?o NNI0NE1 PILE: 6/10/13 2 I EAST ACCESS ROAD WEST SIDE APEX EL 122 126 — —126 124— ACCUMULATED SEDIMENT —124 DEPTH VARIES 122 — / �iv —122 120 — 2H Typ. —120 118— —118 116 — �f —116 114— 24" CMP J —114 112— BYPASS PIPE Loc uNK RIP —RAP LAYER —112 �1 —FOOT THICK 110— 3' — 1 1 0 BASIN BOTTOM APPX EL 113 CROSS - SECTION A -A SEDIMENT BASIN (Typical) NTS CROSS - SECTION B -B TEMPORARY DIVERSION DAM UPSTREAM OF SEDIMENT BASIN OHW DEPTH APPROX 2TO4INCHES SANDBAGS TO SEAL EDGES AND ANCHOR PLASTIC FLOW CHANNEL PLASTIC SHEETING BOTTOM TO SEAL DAM -2' f / 1 �2' T❑ 3' CONCRETE BLOCKS, MEDIA BAGS, OR OTHER MATERIAL TO FORM EXISTING INLET BYPASS DAM AND BYPASS PIPE (IN FOREGROUND) SECTION - TEMPORARY BYPASS DAM (Typical) NTS D- 349108 vENnrsi xnw lsae CITY OF MORIZO NN 19IONIC 1 1 RECOMMENDED ,c�A I P o¢I�NEm AS NOTED �p �=- FOR APPROVAL `S3 LENN DC 7�LATTOT�T By Daniel Carey 6/10/13 g /P:1V RENT ON DC I __ ONE INC�N w13 CNECKEODC / R5 >*I N1�5 DATUM Planning /Building /Public Works Dept. BY �P IF .ccoaolxeHr N0. REVISION BY DATE APPR RS 2013 Cleaning MADSEN CREEK SEDIMENT BASIN CLEANING PROJECT DETAILS GQ; J] - 34 -`? ?o NNI0NE1 PILE: 6/10/13 2 I