LO EROSION CONTROL NOTES:
1 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
IN- N PRE - CONSTRUCTION CONFERENCE MUST BE HELD WITH THE CITY OF RENTON,
0.. PUBLIC WORKS DESIGN ENGINEER.
2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS
PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED IN THE FIELD AND
OBSERVED DURING CONSTRUCTION.
7. TEMPORARY STOCKPILES OF NON- CONTAMINATED SOIL ARE TO BE REMOVED BY
THE END OF EACH WORKING DAY UNLESS OTHERWISE ALLOWED BY THE CITY.
PROVIDE DUST PALLIATIVE AS REQUIRED. IF TEMPORARY STOCKPILES ARE ALLOWED
BY THE CITY TO REMAIN BEYOND THE END OF THE WORK DAY, PROVIDE
TEMPORARY COVER MEASURES, SUCH AS PLASTIC COVERING, AND TRIANGULAR
SILT DIKE ALONG TOE OF TEMPORARY STOCKPILE IN ACCORDANCE WITH CITY
REQUIREMENTS.
EROSION CONTROL CONSTRUCTION SEQUENCE:
1. HOLD THE PRE - CONSTRUCTION CONFERENCE.
2. INSTALL PERIMETER PROTECTION AROUND EXCAVATIONS TESC BMPS BASED ON
CONSTRUCTION SEQUENCING.
3. PROVIDE, INSTALL, MAINTAIN, AND INSPECT EROSION CONTROL MEASURES IN
ACCORDANCE WITH CITY OF RENTON STANDARDS, MANUFACTURER'S
RECOMMENDATIONS, AND SPECIFICATIONS.
4. RELOCATE SURFACE WATER CONTROLS OR EROSION CONTROL MEASURES, OR
INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE, THE EROSION
AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY OF RENTON
EROSION AND SEDIMENT CONTROL STANDARDS.
5. COVER ALL AREAS THAT WILL BE UNWORKED AS REQUIRED WITH STRAW, WOOD
FIBER MULCH, COMPOST, PLASTIC SHEETING, OR EQUIVALENT.
6. STABILIZE ALL AREAS WITHIN (7) DAYS OF REACHING FINAL GRADE.
7. UPON COMPLETION OF THE PROJECT, STABILIZE ALL DISTURBED AREAS AND
REMOVE TESC BMPS. DISTURBED AREAS SHALL BE STABILIZED TO MATCH THE
TYPE OF SURFACING THAT EXISTED PRIOR TO PROJECT CONSTRUCTION.
OF
r
1018 39TH AVENUE SE, SURE 100
PUYAILUP, WASHINGTON 383 >t
7.253.604.6600 F. 263.601.8]99
Ww.Pwme06cmm
WET SEASON REQUIREMENTS (OCTOBER 1 TO APRIL 30):
1. THE ALLOWED TIME THAT A DISTURBED AREA MAY REMAIN UNWORKED WITHOUT
COVER MEASURES IS REDUCED TO TWO CONSECUTIVE WORKING DAYS, RATHER
THAN SEVEN.
2. STOCKPILES AND STEEP CUT AND FILL SLOPES ARE TO BE PROTECTED IF
UNWORKED FOR MORE THAN 12 HOURS.
3. COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE
STOCKPILED ON SITE.
4. ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON SHALL BE
SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
5. MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS.
6. FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY STAKES) PER ACRE OF
DISTURBANCE MUST BE STOCKPILED ON SITE.
7. CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL
SITES UNLESS THE SITE IS UNDERLAIN BY COARSE- GRAINED SOIL.
8. SEDIMENT RETENTION IS REQUIRED UNLESS NO OFFSITE DISCHARGE IS
ANTICIPATED FOR THE SPECIFIED DESIGN FLOW.
9. SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFFSITE DISCHARGE IS
ANTICIPATED FOR THE SPECIFIED DESIGN FLOW.
10.PHASING AND MORE CONSERVATIVE BMPS MUST BE EVALUATED FOR
CONSTRUCTION ACTIVITY NEAR SURFACE WATERS.
11. ANY RUNOFF GENERATED BY DEWATERING WILL BE REQUIRED TO DISCHARGE TO
THE SANITARY SEWER (WITH APPROPRIATE DISCHARGE AUTHORIZATION), PORTABLE
SAND FILTER SYSTEMS, OR HOLDING TANKS.
12.THE FREQUENCY OF MAINTENANCE REVIEW INCREASES FROM MONTHLY TO WEEKLY.
MODEL TOXICS CONTROL ACT NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL PLAN AND
SPECIFICATION PROVISIONS RELATED TO MODEL TOXICS CONTROL ACT COMPLIANCE
REGARDING HANDLING AND DISPOSAL OF CONTAMINATED MATERIALS (INCLUDING
SOIL AND GROUNDWATER) ENCOUNTERED DURING CONSTRUCTION ON THE PROJECT
SITE. ALL HANDLING AND DISPOSAL OF CONTAMINATED MATERIALS SHALL BE IN
ACCORDANCE WITH SPECIFICATIONS. APPROVAL OF ANY STORAGE OR DISPOSAL OF
SOIL OR GROUNDWATER ON THE SITE SHALL BE PROVIDED SOLELY BY THE CITY.
2, THE CONTRACTOR SHALL PROVIDE SPECIFIC HANDLING AND DISPOSAL PLANS FOR
CONTAMINATED SOILS AND GROUNDWATER CONSISTENT WITH BID SPECIFICATIONS
TO THE CITY OF RENTON CONSTRUCTION MANAGER AT LEAST TEN DAYS PRIOR TO
CONSTRUCTION.
D- 352904
GENERAL CONSTRUCTION SEQUENCING:
1. INSTALL TESC BMPS INCLUDING FENCING, BARRIERS, DELINEATION OF STAGING AREAS,
SAW CUTTING, TEMPORARY SILT DIKES, AND INLET PROTECTION. TESC BMPS TO BE
INSTALLED AT THE BEGINNING OF EACH PHASE. REMOVE TESC BMPS AT THE COMPLETION
OF EACH PHASE IF NO LONGER NEEDED.
PHASE 1A, 1 B AND 1C
2. INSTALL DEWATERING SYSTEMS FOR JACKING FROM JACKING PIT 1 TO RECEIVING PIT 1.
DISCHARGE DEWATERING WATER TO TEMPORARY STORAGE AND /OR TREATMENT UNITS IN
STAGING AREA FOR TESTING PRIOR TO DISCHARGE TO SANITARY SEWER. REMOVE
TEMPORARY FENCING AND BARRICADES WHERE INDICATED ON PLANS THAT ARE REQUIRED
FOR INSTALLATION OF DEWATERING SYSTEM.
3. CONSTRUCT JACKING PIT 1 AND RECEIVING PIT 1, INSTALL CASING FROM JACKING PIT 1
TO RECEIVING PIT 1.
4. RESTORE SITE TRAFFIC CIRCULATION OVER CASING IN ACCORDANCE WITH CONSTRUCTION
EASEMENT REQUIREMENTS. MAINTAIN DEWATERING SYSTEM FOR JACKING PIT 1 AND
RECEIVING PIT 1 AS NEEDED. INSTALL OPEN CUT PORTIONS OF STORM DRAIN FOR
PHASES 1B AND 1C IN ACCORDANCE WITH GENERAL SEQUENCING ON SHEET C5.
5. INSTALL AND RELOCATE TEMPORARY CONSTRUCTION FENCING, SIGNING AND RESTORATION
IN ACCORDANCE WITH SHEETS C4 AND C5.
PHASE 2
6. INSTALL DEWATERING SYSTEMS FOR JACKING PIT 1 TO JACKING PIT 2. DISCHARGE
DEWATERING WATER TO TEMPORARY STORAGE AND /OR TREATMENT UNITS IN STAGING AREA
FOR TESTING PRIOR TO DISCHARGE TO SANITARY SEWER. REMOVE TEMPORARY FENCING
AND BARRICADES WHERE INDICATED ON PLANS THAT ARE REQUIRED FOR INSTALLATION OF
DEWATERING SYSTEM.
7. CONSTRUCT JACKING PIT 2 AND INSTALL CASING FROM JACKING PIT 1 TO JACKING PIT 2.
8. RESTORE SITE TRAFFIC CIRCULATION OVER CASING IN ACCORDANCE WITH CONSTRUCTION
EASEMENT REQUIREMENTS. MAINTAIN DEWATERING SYSTEM FOR JACKING PITS 1 AND 2 AS
NEEDED.
9. INSTALL AND RELOCATE TEMPORARY CONSTRUCTION FENCING AND SIGNING IN
ACCORDANCE WITH SHEETS C4 AND C5.
PHASE 3
10.INSTALL DEWATERING SYSTEMS FOR JACKING FROM JACKING PIT 2 TO RECEIVING PIT 2.
DISCHARGE DEWATERING WATER TO TEMPORARY STORAGE AND /OR TREATMENT UNITS IN
STAGING AREA FOR TESTING PRIOR TO DISCHARGE TO SANITARY SEWER. REMOVE
TEMPORARY FENCING AND BARRICADES WHERE INDICATED ON PLANS THAT ARE REQUIRED
FOR INSTALLATION OF DEWATERING SYSTEM.
1 1 . CONSTRUCT RECEIVING PIT 2 AND INSTALL CASING FROM JACKING PIT 2 TO RECEIVING
PIT 2.
12. RESTORE SITE TRAFFIC CIRCULATION OVER CASING IN ACCORDANCE WITH CONSTRUCTION
EASEMENT REQUIREMENTS. MAINTAIN DEWATERING SYSTEM FOR JACKING PIT 2 AND
RECEIVING PIT 2 AS NEEDED.
13.INSTALL AND RELOCATE TEMPORARY CONSTRUCTION FENCING AND SIGNING IN
ACCORDANCE WITH SHEET C4.
PHASE 4
14ANSTALL CARRIER PIPE FROM JACKING PIT 1 THROUGH RECEIVING PIT 2.
PHASE 5
15.INSTALL TEMPORARY BYPASS PUMPING SYSTEM IN VICINITY OF CB -8.
16. CONSTRUCT TEMPORARY WATER SERVICE IN VICINITY OF STA 15 +10.
17. CONSTRUCT DRAINAGE SYSTEM FROM CB -6 TO CB -8 (UPSTREAM OF RECEIVING PIT 2).
18. CONSTRUCT WATER LINE RELOCATION.
19.COMPLETE ALL TESTING, PLUG /ABANDON STORM DRAINS WHERE SHOWN, AND REMOVE
TEMPORARY BYPASS PUMPING SYSTEM.
20. REMOVE OR ABANDON ALL SHORING IN ACCORDANCE WITH THE SHORING PLAN.
21.BACKFILL REMAINING EXCAVATIONS, RESTORE SITE, REMOVE TESC BMPS, REMOVE
DEWATERING SYSTEM AND DEMOBILIZE FROM SITE.
22.WORK SEQUENCING IN PHASES 2 THROUGH 5 MAY OVERLAP AS NEEDED BASED ON
REQUIRED PROJECT COMPLETION PROVIDED THAT THE SYSTEM IS INSTALLED TO THE
SATISFACTION OF THE CITY.
suNwrm: sPiic:
�Tnncu: rww �9P8
AS SHOWN 4941 CITY OF
D6vcnm: Nowzoxr9l, wD 963/96, 4941 1
J. COOP RENTON
DRAWN:
K. TAYLOR oNi 6 wGN DATUM
°1E der N- u- saic --) Planning/Building/Public Works Dept.
6 NJi ONE 4VCN
NO. REVISION BY DATE APPR .wPRam: s AC0R01NL"
LAKE AVE S / RAINIER AVE S
STORM SYSTEM
EROSION CONTROL, EROSION CONTROL SEQUENCE,
WET SEASON REQUIREMENTS, MODEL TOXICS CONTROL ACT
NOTES, AND POSSIBLE CONSTRUCTION SEQUENCE 4 11
D- 352904
JUNE 2011
PAGE
M. NO,
G4
sti. or:
3.
ALL REQUIRED SEDIMENTATION /EROSION CONTROL FACILITIES MUST BE
CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND /OR
CONSTRUCTION TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE
NATURAL DRAINAGE SYSTEM, JACKING PITS OR RECEIVING PITS. ALL EROSION AND
SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL
LLI
SUCH TIME THAT CLEARING AND /OR CONSTRUCTION IS COMPLETE AND POTENTIAL
FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE,
}
REPLACEMENT AND ADDITIONS TO EROSION /SEDIMENTATION CONTROL SYSTEMS
U)
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
2
4.
THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED IN THESE
O
DRAWINGS ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED
0
SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR
CO
SEASONAL CONDITIONS DICTATE, THE CONTRACTOR SHALL ANTICIPATE THAT MORE
EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO
CO
ENSURE COMPLETE SILTATION CONTROL ON THE PROJECT SITE. DURING THE
W
COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY
OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED
Q
BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE
al�
MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES
w_
AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
Z
Q
5.
DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH APRIL 30TH, ALL PROJECT
DISTURBED SOIL AREAS GREATER THAN 5,000 SQUARE FEET, THAT ARE TO BE
LEFT UN- WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH,
U)
SODDING OR PLASTIC COVERING.
6.
IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO
QU1
FURTHER WORK IS ANTICIPATED FOR A PERIOD 30 DAYS OR MORE, ALL
w
DISTURBED AREAS MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS
Y
PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO
Q
THE TIME OF YEAR. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING
J
THE MONTHS OF APRIL THROUGH SEPTEMBER, INCLUSIVE.
7. TEMPORARY STOCKPILES OF NON- CONTAMINATED SOIL ARE TO BE REMOVED BY
THE END OF EACH WORKING DAY UNLESS OTHERWISE ALLOWED BY THE CITY.
PROVIDE DUST PALLIATIVE AS REQUIRED. IF TEMPORARY STOCKPILES ARE ALLOWED
BY THE CITY TO REMAIN BEYOND THE END OF THE WORK DAY, PROVIDE
TEMPORARY COVER MEASURES, SUCH AS PLASTIC COVERING, AND TRIANGULAR
SILT DIKE ALONG TOE OF TEMPORARY STOCKPILE IN ACCORDANCE WITH CITY
REQUIREMENTS.
EROSION CONTROL CONSTRUCTION SEQUENCE:
1. HOLD THE PRE - CONSTRUCTION CONFERENCE.
2. INSTALL PERIMETER PROTECTION AROUND EXCAVATIONS TESC BMPS BASED ON
CONSTRUCTION SEQUENCING.
3. PROVIDE, INSTALL, MAINTAIN, AND INSPECT EROSION CONTROL MEASURES IN
ACCORDANCE WITH CITY OF RENTON STANDARDS, MANUFACTURER'S
RECOMMENDATIONS, AND SPECIFICATIONS.
4. RELOCATE SURFACE WATER CONTROLS OR EROSION CONTROL MEASURES, OR
INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE, THE EROSION
AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY OF RENTON
EROSION AND SEDIMENT CONTROL STANDARDS.
5. COVER ALL AREAS THAT WILL BE UNWORKED AS REQUIRED WITH STRAW, WOOD
FIBER MULCH, COMPOST, PLASTIC SHEETING, OR EQUIVALENT.
6. STABILIZE ALL AREAS WITHIN (7) DAYS OF REACHING FINAL GRADE.
7. UPON COMPLETION OF THE PROJECT, STABILIZE ALL DISTURBED AREAS AND
REMOVE TESC BMPS. DISTURBED AREAS SHALL BE STABILIZED TO MATCH THE
TYPE OF SURFACING THAT EXISTED PRIOR TO PROJECT CONSTRUCTION.
OF
r
1018 39TH AVENUE SE, SURE 100
PUYAILUP, WASHINGTON 383 >t
7.253.604.6600 F. 263.601.8]99
Ww.Pwme06cmm
WET SEASON REQUIREMENTS (OCTOBER 1 TO APRIL 30):
1. THE ALLOWED TIME THAT A DISTURBED AREA MAY REMAIN UNWORKED WITHOUT
COVER MEASURES IS REDUCED TO TWO CONSECUTIVE WORKING DAYS, RATHER
THAN SEVEN.
2. STOCKPILES AND STEEP CUT AND FILL SLOPES ARE TO BE PROTECTED IF
UNWORKED FOR MORE THAN 12 HOURS.
3. COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE
STOCKPILED ON SITE.
4. ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON SHALL BE
SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
5. MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS.
6. FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY STAKES) PER ACRE OF
DISTURBANCE MUST BE STOCKPILED ON SITE.
7. CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL
SITES UNLESS THE SITE IS UNDERLAIN BY COARSE- GRAINED SOIL.
8. SEDIMENT RETENTION IS REQUIRED UNLESS NO OFFSITE DISCHARGE IS
ANTICIPATED FOR THE SPECIFIED DESIGN FLOW.
9. SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFFSITE DISCHARGE IS
ANTICIPATED FOR THE SPECIFIED DESIGN FLOW.
10.PHASING AND MORE CONSERVATIVE BMPS MUST BE EVALUATED FOR
CONSTRUCTION ACTIVITY NEAR SURFACE WATERS.
11. ANY RUNOFF GENERATED BY DEWATERING WILL BE REQUIRED TO DISCHARGE TO
THE SANITARY SEWER (WITH APPROPRIATE DISCHARGE AUTHORIZATION), PORTABLE
SAND FILTER SYSTEMS, OR HOLDING TANKS.
12.THE FREQUENCY OF MAINTENANCE REVIEW INCREASES FROM MONTHLY TO WEEKLY.
MODEL TOXICS CONTROL ACT NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL PLAN AND
SPECIFICATION PROVISIONS RELATED TO MODEL TOXICS CONTROL ACT COMPLIANCE
REGARDING HANDLING AND DISPOSAL OF CONTAMINATED MATERIALS (INCLUDING
SOIL AND GROUNDWATER) ENCOUNTERED DURING CONSTRUCTION ON THE PROJECT
SITE. ALL HANDLING AND DISPOSAL OF CONTAMINATED MATERIALS SHALL BE IN
ACCORDANCE WITH SPECIFICATIONS. APPROVAL OF ANY STORAGE OR DISPOSAL OF
SOIL OR GROUNDWATER ON THE SITE SHALL BE PROVIDED SOLELY BY THE CITY.
2, THE CONTRACTOR SHALL PROVIDE SPECIFIC HANDLING AND DISPOSAL PLANS FOR
CONTAMINATED SOILS AND GROUNDWATER CONSISTENT WITH BID SPECIFICATIONS
TO THE CITY OF RENTON CONSTRUCTION MANAGER AT LEAST TEN DAYS PRIOR TO
CONSTRUCTION.
D- 352904
GENERAL CONSTRUCTION SEQUENCING:
1. INSTALL TESC BMPS INCLUDING FENCING, BARRIERS, DELINEATION OF STAGING AREAS,
SAW CUTTING, TEMPORARY SILT DIKES, AND INLET PROTECTION. TESC BMPS TO BE
INSTALLED AT THE BEGINNING OF EACH PHASE. REMOVE TESC BMPS AT THE COMPLETION
OF EACH PHASE IF NO LONGER NEEDED.
PHASE 1A, 1 B AND 1C
2. INSTALL DEWATERING SYSTEMS FOR JACKING FROM JACKING PIT 1 TO RECEIVING PIT 1.
DISCHARGE DEWATERING WATER TO TEMPORARY STORAGE AND /OR TREATMENT UNITS IN
STAGING AREA FOR TESTING PRIOR TO DISCHARGE TO SANITARY SEWER. REMOVE
TEMPORARY FENCING AND BARRICADES WHERE INDICATED ON PLANS THAT ARE REQUIRED
FOR INSTALLATION OF DEWATERING SYSTEM.
3. CONSTRUCT JACKING PIT 1 AND RECEIVING PIT 1, INSTALL CASING FROM JACKING PIT 1
TO RECEIVING PIT 1.
4. RESTORE SITE TRAFFIC CIRCULATION OVER CASING IN ACCORDANCE WITH CONSTRUCTION
EASEMENT REQUIREMENTS. MAINTAIN DEWATERING SYSTEM FOR JACKING PIT 1 AND
RECEIVING PIT 1 AS NEEDED. INSTALL OPEN CUT PORTIONS OF STORM DRAIN FOR
PHASES 1B AND 1C IN ACCORDANCE WITH GENERAL SEQUENCING ON SHEET C5.
5. INSTALL AND RELOCATE TEMPORARY CONSTRUCTION FENCING, SIGNING AND RESTORATION
IN ACCORDANCE WITH SHEETS C4 AND C5.
PHASE 2
6. INSTALL DEWATERING SYSTEMS FOR JACKING PIT 1 TO JACKING PIT 2. DISCHARGE
DEWATERING WATER TO TEMPORARY STORAGE AND /OR TREATMENT UNITS IN STAGING AREA
FOR TESTING PRIOR TO DISCHARGE TO SANITARY SEWER. REMOVE TEMPORARY FENCING
AND BARRICADES WHERE INDICATED ON PLANS THAT ARE REQUIRED FOR INSTALLATION OF
DEWATERING SYSTEM.
7. CONSTRUCT JACKING PIT 2 AND INSTALL CASING FROM JACKING PIT 1 TO JACKING PIT 2.
8. RESTORE SITE TRAFFIC CIRCULATION OVER CASING IN ACCORDANCE WITH CONSTRUCTION
EASEMENT REQUIREMENTS. MAINTAIN DEWATERING SYSTEM FOR JACKING PITS 1 AND 2 AS
NEEDED.
9. INSTALL AND RELOCATE TEMPORARY CONSTRUCTION FENCING AND SIGNING IN
ACCORDANCE WITH SHEETS C4 AND C5.
PHASE 3
10.INSTALL DEWATERING SYSTEMS FOR JACKING FROM JACKING PIT 2 TO RECEIVING PIT 2.
DISCHARGE DEWATERING WATER TO TEMPORARY STORAGE AND /OR TREATMENT UNITS IN
STAGING AREA FOR TESTING PRIOR TO DISCHARGE TO SANITARY SEWER. REMOVE
TEMPORARY FENCING AND BARRICADES WHERE INDICATED ON PLANS THAT ARE REQUIRED
FOR INSTALLATION OF DEWATERING SYSTEM.
1 1 . CONSTRUCT RECEIVING PIT 2 AND INSTALL CASING FROM JACKING PIT 2 TO RECEIVING
PIT 2.
12. RESTORE SITE TRAFFIC CIRCULATION OVER CASING IN ACCORDANCE WITH CONSTRUCTION
EASEMENT REQUIREMENTS. MAINTAIN DEWATERING SYSTEM FOR JACKING PIT 2 AND
RECEIVING PIT 2 AS NEEDED.
13.INSTALL AND RELOCATE TEMPORARY CONSTRUCTION FENCING AND SIGNING IN
ACCORDANCE WITH SHEET C4.
PHASE 4
14ANSTALL CARRIER PIPE FROM JACKING PIT 1 THROUGH RECEIVING PIT 2.
PHASE 5
15.INSTALL TEMPORARY BYPASS PUMPING SYSTEM IN VICINITY OF CB -8.
16. CONSTRUCT TEMPORARY WATER SERVICE IN VICINITY OF STA 15 +10.
17. CONSTRUCT DRAINAGE SYSTEM FROM CB -6 TO CB -8 (UPSTREAM OF RECEIVING PIT 2).
18. CONSTRUCT WATER LINE RELOCATION.
19.COMPLETE ALL TESTING, PLUG /ABANDON STORM DRAINS WHERE SHOWN, AND REMOVE
TEMPORARY BYPASS PUMPING SYSTEM.
20. REMOVE OR ABANDON ALL SHORING IN ACCORDANCE WITH THE SHORING PLAN.
21.BACKFILL REMAINING EXCAVATIONS, RESTORE SITE, REMOVE TESC BMPS, REMOVE
DEWATERING SYSTEM AND DEMOBILIZE FROM SITE.
22.WORK SEQUENCING IN PHASES 2 THROUGH 5 MAY OVERLAP AS NEEDED BASED ON
REQUIRED PROJECT COMPLETION PROVIDED THAT THE SYSTEM IS INSTALLED TO THE
SATISFACTION OF THE CITY.
suNwrm: sPiic:
�Tnncu: rww �9P8
AS SHOWN 4941 CITY OF
D6vcnm: Nowzoxr9l, wD 963/96, 4941 1
J. COOP RENTON
DRAWN:
K. TAYLOR oNi 6 wGN DATUM
°1E der N- u- saic --) Planning/Building/Public Works Dept.
6 NJi ONE 4VCN
NO. REVISION BY DATE APPR .wPRam: s AC0R01NL"
LAKE AVE S / RAINIER AVE S
STORM SYSTEM
EROSION CONTROL, EROSION CONTROL SEQUENCE,
WET SEASON REQUIREMENTS, MODEL TOXICS CONTROL ACT
NOTES, AND POSSIBLE CONSTRUCTION SEQUENCE 4 11