TEMPORARY EROSION CONTROL CONSTRUCTION NOTES:
AINSTALL TESC TRIANGULAR SILT DIKES AND OTHER APPROVED MEASURES ALONG
PERIMETER OF SAW CUT LIMITS PRIOR TO BEGINNING OF EXCAVATION OF JACKING
PITS, RECEIVING PITS, AND OPEN CUT EXCAVATIONS.
ADO NOT DAMAGE EXISTING VEGETATION WITHIN CURBED AREAS. DAMAGED
VEGETATION SHALL BE REMOVED AND REPLACED WITH SIMILAR VEGETATION AT NO
ADDITIONAL COST TO THE CITY.
ADISCHARGE LOCATIONS FOR DEWATERING WELL POINTS INTO THE EXISTING
SANITARY SEWER SYSTEM. SEE PROJECT SPECIFICATIONS FOR REQUIREMENTS
RELATED TO WELL POINT DISCHARGES.
TEMPORARY EROSION CONTROL CONSTRUCTION NOTES (CONTINU
AUSE OF CONSTRUCTION STAGING AREAS INCLUDES: WELL POINTS AND DISCHARGE
PIPING TO THE SANITARY SEWER, TEMPORARY WAITING LOCATIONS FOR TRUCKS
WITH EXCAVATED MATERIAL FOR TESTING PRIOR TO LEAVING SITE, TEMPORARY
STOCKPILE OF NON— CONTAMINATED SOILS, STORAGE OF PROJECT — RELATED
MATERIALS, STORAGE AND / OR TREATMENT TANKS FOR DEWATERING WATER FOR
TESTING AND ANY REQUIRED TREATMENT PRIOR TO DISPOSAL. THE CITY AND
PROJECT DESIGN TEAM SHALL ALSO HAVE ACCESS TO THE CONSTRUCTION
STAGING AREAS.
APROVIDE STREET SWEEPING AT CONSTRUCTION ACCESS LOCATIONS AND ALONG
CONSTRUCTION ROUTES AT THE END OF EACH WORKING DAY THAT COULD RESULT
IN THE TRANSPORT OF SEDIMENT FROM CONSTRUCTION VEHICLES ONTO PRIVATE
PARKING LOTS, PRIVATE OR PUBLIC EASEMENTS, OR CITY RIGHT —OF —WAY.
PROVIDE STREET SWEEPING IN AREAS OF TEMPORARY STOCKPILES AFTER
TEMPORARY STOCKPILES HAVE BEEN REMOVED.
D- 352901
RFC1IkIm NDFD FnR APPROVAl 1" =30, HG�oww�'99pm' 6� >� CITY OF LAKE AVE S / RAINIER AVE S
fi w 9:
BYI________________ Datel -____ J. COOP .0 STORM SYSTEM
DY,--- --- -- -- - --- Dnt el....._ ---- 6ruwx: R E N I O I V
K. TAYLOR �j— �EWq1 �I
_______ TAT RI DATUM Planning /Building /Public Woks Dept. TEMPORARY EROSION AND SEDIMENTATION CONTROL PLAN
NOT ONE INCH
DYI —_.... _�... DOt EI g1EIXE0:
BY,________________ Date 1., 13.— NNGGLLT
N0. REVISION BY DATE APPR ��
�c�; D -352
PH
JUNE 2011
C3
7 X11