HomeMy WebLinkAboutR-372103CV OPRE- CT7 EROSION CONTROL NOTES 1. THESE NOTES SHALL APPEAR FOR PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS: 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER. 3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX "D" OF THE SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMTS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT /ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. ") FROM U) 4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINING OF CONSTRUCTION LJ_I AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR < FOR THE DURATION OF THE PROJECT. U) 5. ALL REQUIRED SEDIMENTATION /EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN W OPERATION PRIOR TO LAND CLEARING AND /OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME W THAT CLEARING AND /OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/ SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE. Z O 6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS 0 CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE Z NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPSED SITE. DURING THE = COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE W TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO 3: PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECIEVING DRAINAGE SYSTEM. 7. APPROVAL OF THIS PLAN IS FOR EROSION /SEDIMENTATION CONTROL ONLY. IT DOES NOT W CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, Y CHANNELS, OR RETENTION FACILITIES. Q 8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE J DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST - MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST - SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ERC COVER METHODS (e.g. SEEDING, MULCHING, PLASTIC COVERING, ETC.). 9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES CLEARING BEWTEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS. 10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX "D" OF THE SURFACE WATER DESIGN MANUAL. 11. ANY AREA NEEDING ERC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 12. THE ERC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. 13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 14. DURING THE TIME PERIOD OF OCTOBER 1ST - MARCH 30TH ALL PROJECT DISTURBED SOIL AREAS THAT ARE TO BE LEFT UN- WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING, OR PLASTIC COVERING. 15. ANY PERMANENT RETENTION DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW. I WIN LOTi0 rc w alw LOT TOP OF WALL ELEV. (TW) n.m 1 12' MIN. THICKNESS f 2' -4' QUARRY SPALLS x GRAVEL HACKFILL m FOR DRAINS a BOTTOM OF WALL I - ELEV. (BW) I �KEYWA I PERFORATED PIPE 4' MIN. FILTER FABRIC TYPICAL ROCKERY PROPERTY LINE DETAIL N.T.S. OFFE ENGINEERS �~� :.,`F� 13932 SOUTHEAST 159TH PLACE - RENTON, WASHINGTON 98058 _ PHONE: 425 - 260 3412 Pow Q/STER: *" CONTACT: DARRELL OFFE, P.E. FSlou'ei i do M 7st . / / / / IRd r / 4 / p' i TW -38: r.....o_i/ �. DI �L.gB � DIRT737`O,�y( , Q o. 1 4- 1, S/W =40.0 48 XAY 1 , /i/ /// O 0A 1 I TW =36.6 \ DIRT--34.0 SOUTH EDGE OF MAY CREEK 7.3 1.5 1059 CFS FLOODPLAIN ` \ -� \ � _.,,• °` �o'ry. // /'7 � is 0 3rii oo \ 1 \\ o' Co O p AD A �3' \ _ -``51P. _ 5 DIRT Al— ,�rp 111 I,s� 51 I i\ i w R- 312103 ** -WALLS SHOWN OBTAIN SEPARATE IN EXCESS OF 4'(48 BUILDING PERMIT ") FROM HIEGHT ARE RERQUIRED TO THE CITY OF RENTON I , 50 �7J i i .II ti it , \21 \ 1 NOTE EXISTING UTILITY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND UTILIITES PRIOR TO COMMENCING CONSTRUCTION. NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES ARE SHOWN HEREON. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES NOT SHOWN IN THEIR PROPER LOCATION. CALL BEFORE YOU DIG- 1- 800 - 424 -5555 a II /i Oq- _ I 1 4p 'W •• WALL BLOCI fmtirf REQTD �e \ (TYPICAL ON WALLS OVER 4' (48 ") IN HI s LEGEND TW= ELEVATION AT TOP OF WALL DIRT= ELEVATION AT DIRT GRADE (TOP OR BOTTOM) S /W= ELEVATION OF BACK OF SIDEWALK 44 FINISHED PAD ELEVATION ❑ PROPOSED LOT NUMBER SURVEYED ""w' CITY OF SCALE "mom°, ""` ""°'°m�%'°°' E�9 D.L. OFFE, P.E. RENTON ore D.L OFFE, P.E. f� ala v<x � DATUM °�X6P AIMM Planning /Building /Public Works Dept. FwwN REVISION BY DATE APPR y GRAPHIC SCALE 0 15 30 60 1 inch = 30 feet R COMMENDED FOR APPROVAL By ➢nte Date- By, Date, Byi Date, LAKE WASHINGTON VIEW ESTATES GREG FAWCETT GRADING PLAN _I 10/15/201 ° 3 - 1313 1 II VIA > �] a I•�I W 0 1 -q .p� O oz < 1 m w �i yN m �N