Loading...
HomeMy WebLinkAboutR-274507oruntrone - - - C6n4r for 'Designed • ., . - `/3bufinenf_ Traffic Cover Plales 5!3 405:... - c •• rOL/f.fdltl1 i7 void spaces behind shoring roof Nozzles a Confrockr ` i Oeeigned Shoring - for Trench 11 J - - _ L- da#e Avezive_ M I SH' 5a DETAIL FOR STEP 1 ins Col :. Excavate trench, sh6re, and install traffic cover olafe: _ at night). 5b Underground SR 40! Lifilii/ss ° -_ y SECTION 5a Excavate Oakesdale roadway and install.undergroynd ' I utilities (sewer, water, and drainage lines). 5b Backfill excavated utility trenches in Oakesdaie roadway an--d Place roadway subgrade'and pavement 5c install lighting, channelizrltion, signing, and striping and open Oakesdale to traffic e y DETAIL FOR 'STEPS -1 a 2 LCL PSF /FT LOAD DIAGRAM FOF ZING OF TRENCH lase as req'd. for I. Equipment Loads) V $TEP rJ_ (BY OTHERS) p - -( -n- - - Install Oakesdale Utilities and Pave Roadway Dave _ ilea and iace pile caps t ight): Pile Cap a r.- silo Abu>menf .104', AC Class 8 25 AC Wearin Course Temporary Ah r SR 405 Tapp1n9 D� s Approach Siab,Typ .25 AC Levelinn. - Course C 6� end Block I i 6b 6b Compacted I Should r 6C Gal /as� tve'CaJ - File. - DETAIL FOR STEP 3 Oakesda /e Avenue /y/ / / Bridge 7 Aping Zia Shift uglf treatfic to south bounctlotfdway (STAQE 7 traffic i ate So 405 r q dway. olace girders. nave AC j transitions ve g ular backfill weld diaphragms. / ESOALE AVENUE, fib Extend fill slope and widen SR 405 to the limits shown, weld, deck ties, f $iIP shea "r blocks: "and sirout backfili behind and around fhe wingwalis constructed in OAK STEP 3. keyways, (over woe ends hownsi - - - -- - - - - -- fic Remove the temporary traffic bOri4r from the edge and Abu finenf median of existing SR 405, afld scarify, off the 0.104 -foot Sid Approach Slab Drainage temporary AC pavetrtie I topping along with Y4 -inch of 6 Trough concrete from thetop flange of the bulb tee., 6 # Cr yp) 6d Remove the existing SR 405 pavement and subgrade to below the approach slab. T So Install the CIP concrete apprb6*,slatYtb the limits shown End Block ° 6e and place the CIP concrete traffic barrier adjacent to the °moo approach slab edge. Compocfed °` / 6f Place onto ttae scarified top flangla of the bulb tees a 11/2-inch Shoulder r_ 6I1 . latex_modtW poncrete (t.tu)O) oyertay. tag Place the draina" trough beh%Id .tt a sotdiar pile wail; I &h Shift alt t#affic to tdrthbo4nd roadway (STAGtd 9 traffic sequence). , -. _ r; f Cti (repeat steps 6 ttxot ti 6g for'. h0 remarning half of SR 405. "Pile. Cap Pile si Open 4com6la1ii4 SR 4?15.to ffl' K, , PLAN, DETAIL FOR STEP 6 STEP 6 Slit - ra id to ci "'Siti..roa d _- . an - ' _t :Traffic_to Widen SR 405 and -Ptai lace LMC,an rofth -_ s proach Slab I a 4 N ®® �t rk.� �1',. 'ter r� .�• i DIST. ADM.. DOT FORM 221-011 Rewind 9/92 /� v - /n1ermediafe Diaphrdgms eAR Yck bulb Tee rrder IP Shear Block I%2 "Min. L.M.G. Overlay Over %4" --ceri fie. d Concreie Surface C/P Shear 5 /oc% W d ,. . i I i