HomeMy WebLinkAboutR-337222ncri.;iivk6.
Q
C W
Q
a
z
O
a(j)
2O
co Z
Z
Z J
O�
LC j
WO
O
Q
OU
0-
m
LL Z
00
/�, Z
u U
� 91
0
a
a
�3 0
J
DRAWN BY:
p
ISSUE DATE:
x
ZZ
y
Nz>
N
Z
Z
a
G
N
U
6I
z
a
*
U
g
a
5
rr
U
O
G 6
N
Q
C W
Q
a
z
O
a(j)
2O
co Z
Z
Z J
O�
LC j
WO
O
Q
OU
0-
m
LL Z
00
/�, Z
u U
� 91
0
a
a
�3 0
z
O
W
6
z
PORTION OF THE S 1/4, S 1/4, SECTION 4, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
TESCP NOTES
1. APPROVAL OF THIS EROSION / SEDIMENTATION CONTROL (ESC) PLAN
DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR
DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES,
RESTRICTORS CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.).
2 THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION,
MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC
FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT /CONTRACTOR
UNTIL ALL CONSTRUCTION IS APPROVED.
3. 774E BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN
SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION.
DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE
FLAGGED CLEARING. LIMITS SHALL BE PERMITTED. THE FLAGGING
SHALL BE MAINTAINED BY THE APPLICANT /CONTRACTOR FOR THE
DURATION OF THE CONSTRUCTION.
4. 774E ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN
CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN
SUCH A MANNER AS TO ENSURE THAT SEDIMENT LADEN WATER DOES
NOT ENTER THE DRAINAGE SYSTEM OR VIOLATE APPLICABLE WATER
STANDARDS.
5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM
REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE
CONSTRUCTION PERIOD, THESE ESC FACILITATES SHALL BE UPGRADED
(E.G. ADDITIONAL SUMPS, RELOCATION OF DITCHES AND SILT FENCES,
ETC.) AS NEEDED FOR UNEXPECTED STORM EVENTS.
6. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE
APPLICANT /CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE
THEIR. CONTINUED FUNCTIONING.
Z ANY AREA STRIPPED OF VEGETATION, INCLUDING ROADWAY
EMBANKMENTS WHERE NO FURTHER WORK IS ANTICIPATED FOR A
PERIOD OF 15 DAYS SHALL BE IMMEDIATELY STABILIZED WITH THE
APPROVED ESC METHODS (E.G. SEEDING, MULCHING, NETTING, EROSION
BLANKETS, ETC.- OCTOBER 1 THRU JUNE 1).
8. ANY AREA NEEDING ESC MEASURE, NOT REQUIRING IMMEDIATE
ATTENTION, SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS.
9. THE ESC FACILITIES ON INACTIVE S17ES SHALL BE INSPECTED AND
MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 48 HOURS
FOLLOWING A STORM EVENT.
10. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED
TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND
CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE
CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO
THE DOWNSTREAM SYSTEM.
11. STABILIZED CONSTRUC71ON ENTRANCES AND WASH PADS SHALL BE
INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR
THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR
THE DURATION OF THE PROJECT (RCW 46.61.665).
12. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH MARCH 31, ALL
PROJECT DISTURBED AREAS GREATER THAN 5,000 SQUARE FEET THAT
ARE TO BE LEFT UNWORKED FOR MORE THAN 12 HOURS SHALL BE
COVERED BY ONE OF THE FOLLOWING MEASURES, MULCH, SODDING, OR
PLASTIC COVERING.
13. ANY PERMANENT RETENTION /DETENTION FACILITY USED AS A
TEMPORARY SETTLING BASIN SHALL BE MODIFIED W17H THE NECESSARY
EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE
STORAGE CAPACITY.
14. WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REQUIRED,
FAST GROWING GRASSES SHALL BE APPLIED AT AN APPROPRIATE
RATE (E.G. ANNUAL OR PERENNIAL RYE APPLIED AT APPROXIMATELY
80 POUNDS PER ACRE).
15. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS
REQUIRED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF TWO
INCHES.
CONSTRUCTION SEQUENCE
1. ARRANGE AND ATTEND PRE - CONSTRUCTION MEETING WITH THE CITY OF RENTON.
2. FLAG THE LIMITS OF CLEARING AND BOUNDARY LINES.
J. CONSTRUCT TEMPORARY, ROCKED, CONSTRUCTION ENTRANCE. MAINTAIN
THROUGHOUT CONSTRUCTION AS DIRECTED BY THE INSPECTOR.
4. INSTALL SILT FENCING, ROCK CHECK DAMS V- DITCHES AND TEMPORARY
SEDIMENT TRAP. DEMOLISH EXISTING STRUCTURES, CLEAR AND GRUB SITE.
5. ROUGH GRADE SITE
6. INSTALL PERMANENT DETENTION POND AND OUTFALL.
Z CONSTRUCT SANITARY SEWER SYSTEM.
8. INSTALL REMAINDER OF STORM DRAINAGE SYSTEM. PROVIDE INTERIM SEDIMENT
FOR NEW CATCHSASINS.
9. CONSTRUCT WATER SYSTEM AND NEW SERVICES
10. INSTALL REMAINDER OF UTILITIES STREET LIGHTING, POWER, GAS, CABLE, ETC.
11. FINAL GRADE ROADWAY AND LOTS.
INSTALL CURBS AND GUTTERS WITH DRIVEWAY CUTS.
12. PAVE ROADWAY.
13. INSTALL REMAINDER CEMENT CONCRETE SIDEWALKS WITH DRIVEWAY APRONS.
14. REMOVE TEMPORARY EROSION CONTROL POND AND V- DITCHES. HYDROSEED SITE.
15. MAINTAIN SILT FENCING AND INTERIM SEDIMENT PROTECTION FOR NEW
CATCH BASINS UNTIL ALL RISK OF EROSION/ SEDIMENTATION HAS PASSED.
16. CLEAN STORM DRAINAGE SYSTEM. REMOVE REMAINING TEMPORARY EROSION
CONTROL MEASURES AFTER PROVIDING A THOROUGH CLEANING OF PAVED
SURFACES AND THE INSPECTOR HAS APPROVED THE STORM DRAINAGE SYSTEM.
CALL 48 HOURS
BEFORE YOU DIG
1- 800 - 424 -5555
R=337222
c/3 IQ-337
RECOMMENDED
FOR APPROVAL
BY.
BY:
(0 92
DD
uj �3
0 0 p
cIN r U
�WWV OcoZ co
10<0wU
W
r(j)LVLiC'l3al
0
W
U
3
Z
r
^a ED
0.
Z x
Q F LL
= o o�
1 (91
�WQ�
W oO)DW
Oz
I� p� 41 op
LL HI—IL
PROJECT NO.:
J
DRAWN BY:
p
ISSUE DATE:
x
ZZ
y
Nz>
Z
Z
y=6
G
N
6I
z
O
W
6
z
PORTION OF THE S 1/4, S 1/4, SECTION 4, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
TESCP NOTES
1. APPROVAL OF THIS EROSION / SEDIMENTATION CONTROL (ESC) PLAN
DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR
DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES,
RESTRICTORS CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.).
2 THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION,
MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC
FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT /CONTRACTOR
UNTIL ALL CONSTRUCTION IS APPROVED.
3. 774E BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN
SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION.
DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE
FLAGGED CLEARING. LIMITS SHALL BE PERMITTED. THE FLAGGING
SHALL BE MAINTAINED BY THE APPLICANT /CONTRACTOR FOR THE
DURATION OF THE CONSTRUCTION.
4. 774E ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN
CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN
SUCH A MANNER AS TO ENSURE THAT SEDIMENT LADEN WATER DOES
NOT ENTER THE DRAINAGE SYSTEM OR VIOLATE APPLICABLE WATER
STANDARDS.
5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM
REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE
CONSTRUCTION PERIOD, THESE ESC FACILITATES SHALL BE UPGRADED
(E.G. ADDITIONAL SUMPS, RELOCATION OF DITCHES AND SILT FENCES,
ETC.) AS NEEDED FOR UNEXPECTED STORM EVENTS.
6. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE
APPLICANT /CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE
THEIR. CONTINUED FUNCTIONING.
Z ANY AREA STRIPPED OF VEGETATION, INCLUDING ROADWAY
EMBANKMENTS WHERE NO FURTHER WORK IS ANTICIPATED FOR A
PERIOD OF 15 DAYS SHALL BE IMMEDIATELY STABILIZED WITH THE
APPROVED ESC METHODS (E.G. SEEDING, MULCHING, NETTING, EROSION
BLANKETS, ETC.- OCTOBER 1 THRU JUNE 1).
8. ANY AREA NEEDING ESC MEASURE, NOT REQUIRING IMMEDIATE
ATTENTION, SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS.
9. THE ESC FACILITIES ON INACTIVE S17ES SHALL BE INSPECTED AND
MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 48 HOURS
FOLLOWING A STORM EVENT.
10. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED
TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND
CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE
CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO
THE DOWNSTREAM SYSTEM.
11. STABILIZED CONSTRUC71ON ENTRANCES AND WASH PADS SHALL BE
INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR
THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR
THE DURATION OF THE PROJECT (RCW 46.61.665).
12. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH MARCH 31, ALL
PROJECT DISTURBED AREAS GREATER THAN 5,000 SQUARE FEET THAT
ARE TO BE LEFT UNWORKED FOR MORE THAN 12 HOURS SHALL BE
COVERED BY ONE OF THE FOLLOWING MEASURES, MULCH, SODDING, OR
PLASTIC COVERING.
13. ANY PERMANENT RETENTION /DETENTION FACILITY USED AS A
TEMPORARY SETTLING BASIN SHALL BE MODIFIED W17H THE NECESSARY
EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE
STORAGE CAPACITY.
14. WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REQUIRED,
FAST GROWING GRASSES SHALL BE APPLIED AT AN APPROPRIATE
RATE (E.G. ANNUAL OR PERENNIAL RYE APPLIED AT APPROXIMATELY
80 POUNDS PER ACRE).
15. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS
REQUIRED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF TWO
INCHES.
CONSTRUCTION SEQUENCE
1. ARRANGE AND ATTEND PRE - CONSTRUCTION MEETING WITH THE CITY OF RENTON.
2. FLAG THE LIMITS OF CLEARING AND BOUNDARY LINES.
J. CONSTRUCT TEMPORARY, ROCKED, CONSTRUCTION ENTRANCE. MAINTAIN
THROUGHOUT CONSTRUCTION AS DIRECTED BY THE INSPECTOR.
4. INSTALL SILT FENCING, ROCK CHECK DAMS V- DITCHES AND TEMPORARY
SEDIMENT TRAP. DEMOLISH EXISTING STRUCTURES, CLEAR AND GRUB SITE.
5. ROUGH GRADE SITE
6. INSTALL PERMANENT DETENTION POND AND OUTFALL.
Z CONSTRUCT SANITARY SEWER SYSTEM.
8. INSTALL REMAINDER OF STORM DRAINAGE SYSTEM. PROVIDE INTERIM SEDIMENT
FOR NEW CATCHSASINS.
9. CONSTRUCT WATER SYSTEM AND NEW SERVICES
10. INSTALL REMAINDER OF UTILITIES STREET LIGHTING, POWER, GAS, CABLE, ETC.
11. FINAL GRADE ROADWAY AND LOTS.
INSTALL CURBS AND GUTTERS WITH DRIVEWAY CUTS.
12. PAVE ROADWAY.
13. INSTALL REMAINDER CEMENT CONCRETE SIDEWALKS WITH DRIVEWAY APRONS.
14. REMOVE TEMPORARY EROSION CONTROL POND AND V- DITCHES. HYDROSEED SITE.
15. MAINTAIN SILT FENCING AND INTERIM SEDIMENT PROTECTION FOR NEW
CATCH BASINS UNTIL ALL RISK OF EROSION/ SEDIMENTATION HAS PASSED.
16. CLEAN STORM DRAINAGE SYSTEM. REMOVE REMAINING TEMPORARY EROSION
CONTROL MEASURES AFTER PROVIDING A THOROUGH CLEANING OF PAVED
SURFACES AND THE INSPECTOR HAS APPROVED THE STORM DRAINAGE SYSTEM.
CALL 48 HOURS
BEFORE YOU DIG
1- 800 - 424 -5555
R=337222
c/3 IQ-337
RECOMMENDED
FOR APPROVAL
BY.
BY:
(0 92
DD
uj �3
0 0 p
cIN r U
�WWV OcoZ co
10<0wU
W
r(j)LVLiC'l3al
0
W
U
3
Z
r
^a ED
0.
Z x
Q F LL
= o o�
1 (91
�WQ�
W oO)DW
Oz
I� p� 41 op
LL HI—IL
PROJECT NO.:
J
DRAWN BY:
�
ISSUE DATE:
12/05/06
SHEET REV.:
y
Nz>
J
>
C7
N
g
5
a
a
a
�
0
m
z
O
W
6
z
PORTION OF THE S 1/4, S 1/4, SECTION 4, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
TESCP NOTES
1. APPROVAL OF THIS EROSION / SEDIMENTATION CONTROL (ESC) PLAN
DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR
DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES,
RESTRICTORS CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.).
2 THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION,
MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC
FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT /CONTRACTOR
UNTIL ALL CONSTRUCTION IS APPROVED.
3. 774E BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN
SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION.
DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE
FLAGGED CLEARING. LIMITS SHALL BE PERMITTED. THE FLAGGING
SHALL BE MAINTAINED BY THE APPLICANT /CONTRACTOR FOR THE
DURATION OF THE CONSTRUCTION.
4. 774E ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN
CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN
SUCH A MANNER AS TO ENSURE THAT SEDIMENT LADEN WATER DOES
NOT ENTER THE DRAINAGE SYSTEM OR VIOLATE APPLICABLE WATER
STANDARDS.
5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM
REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE
CONSTRUCTION PERIOD, THESE ESC FACILITATES SHALL BE UPGRADED
(E.G. ADDITIONAL SUMPS, RELOCATION OF DITCHES AND SILT FENCES,
ETC.) AS NEEDED FOR UNEXPECTED STORM EVENTS.
6. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE
APPLICANT /CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE
THEIR. CONTINUED FUNCTIONING.
Z ANY AREA STRIPPED OF VEGETATION, INCLUDING ROADWAY
EMBANKMENTS WHERE NO FURTHER WORK IS ANTICIPATED FOR A
PERIOD OF 15 DAYS SHALL BE IMMEDIATELY STABILIZED WITH THE
APPROVED ESC METHODS (E.G. SEEDING, MULCHING, NETTING, EROSION
BLANKETS, ETC.- OCTOBER 1 THRU JUNE 1).
8. ANY AREA NEEDING ESC MEASURE, NOT REQUIRING IMMEDIATE
ATTENTION, SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS.
9. THE ESC FACILITIES ON INACTIVE S17ES SHALL BE INSPECTED AND
MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 48 HOURS
FOLLOWING A STORM EVENT.
10. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED
TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND
CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE
CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO
THE DOWNSTREAM SYSTEM.
11. STABILIZED CONSTRUC71ON ENTRANCES AND WASH PADS SHALL BE
INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR
THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR
THE DURATION OF THE PROJECT (RCW 46.61.665).
12. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH MARCH 31, ALL
PROJECT DISTURBED AREAS GREATER THAN 5,000 SQUARE FEET THAT
ARE TO BE LEFT UNWORKED FOR MORE THAN 12 HOURS SHALL BE
COVERED BY ONE OF THE FOLLOWING MEASURES, MULCH, SODDING, OR
PLASTIC COVERING.
13. ANY PERMANENT RETENTION /DETENTION FACILITY USED AS A
TEMPORARY SETTLING BASIN SHALL BE MODIFIED W17H THE NECESSARY
EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE
STORAGE CAPACITY.
14. WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REQUIRED,
FAST GROWING GRASSES SHALL BE APPLIED AT AN APPROPRIATE
RATE (E.G. ANNUAL OR PERENNIAL RYE APPLIED AT APPROXIMATELY
80 POUNDS PER ACRE).
15. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS
REQUIRED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF TWO
INCHES.
CONSTRUCTION SEQUENCE
1. ARRANGE AND ATTEND PRE - CONSTRUCTION MEETING WITH THE CITY OF RENTON.
2. FLAG THE LIMITS OF CLEARING AND BOUNDARY LINES.
J. CONSTRUCT TEMPORARY, ROCKED, CONSTRUCTION ENTRANCE. MAINTAIN
THROUGHOUT CONSTRUCTION AS DIRECTED BY THE INSPECTOR.
4. INSTALL SILT FENCING, ROCK CHECK DAMS V- DITCHES AND TEMPORARY
SEDIMENT TRAP. DEMOLISH EXISTING STRUCTURES, CLEAR AND GRUB SITE.
5. ROUGH GRADE SITE
6. INSTALL PERMANENT DETENTION POND AND OUTFALL.
Z CONSTRUCT SANITARY SEWER SYSTEM.
8. INSTALL REMAINDER OF STORM DRAINAGE SYSTEM. PROVIDE INTERIM SEDIMENT
FOR NEW CATCHSASINS.
9. CONSTRUCT WATER SYSTEM AND NEW SERVICES
10. INSTALL REMAINDER OF UTILITIES STREET LIGHTING, POWER, GAS, CABLE, ETC.
11. FINAL GRADE ROADWAY AND LOTS.
INSTALL CURBS AND GUTTERS WITH DRIVEWAY CUTS.
12. PAVE ROADWAY.
13. INSTALL REMAINDER CEMENT CONCRETE SIDEWALKS WITH DRIVEWAY APRONS.
14. REMOVE TEMPORARY EROSION CONTROL POND AND V- DITCHES. HYDROSEED SITE.
15. MAINTAIN SILT FENCING AND INTERIM SEDIMENT PROTECTION FOR NEW
CATCH BASINS UNTIL ALL RISK OF EROSION/ SEDIMENTATION HAS PASSED.
16. CLEAN STORM DRAINAGE SYSTEM. REMOVE REMAINING TEMPORARY EROSION
CONTROL MEASURES AFTER PROVIDING A THOROUGH CLEANING OF PAVED
SURFACES AND THE INSPECTOR HAS APPROVED THE STORM DRAINAGE SYSTEM.
CALL 48 HOURS
BEFORE YOU DIG
1- 800 - 424 -5555
R=337222
c/3 IQ-337
RECOMMENDED
FOR APPROVAL
BY.
BY:
(0 92
DD
uj �3
0 0 p
cIN r U
�WWV OcoZ co
10<0wU
W
r(j)LVLiC'l3al
0
W
U
3
Z
r
^a ED
0.
Z x
Q F LL
= o o�
1 (91
�WQ�
W oO)DW
Oz
I� p� 41 op
LL HI—IL
PROJECT NO.:
12007
DRAWN BY:
VK
ISSUE DATE:
12/05/06
SHEET REV.:
07/19/2012
08085TE02- 0D4.DWG
(q04
4 OF 29
j�
Nz>
N