HomeMy WebLinkAboutR-337233REVISIONS:
L9
a
<
CL
Q
�W
ILI
Q
D (�I
�
�
Lei
i
Z
a
J
0
a
Z
Q
Q
It
4
LL Z
00
U¢
%11
a
0
n
q= �
Lu
12007
DRAWN BY:
VK
if68
&>
Z.
O
07/19/2012
Z
ASV
z�<
a
Q
Q
0
+q
OI
N
W
C
dlz
PORTION OF THE S.E. 114, S.E. 114, SECTION 4, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
SURFACE WATER DRAINAGE NOTES AND
SPECIFICATIONS
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE - CONSTRUCTION MEETING MUST
BE HELD WITH THE CITY OF RENTON PLAN REVIEWER.
2 - ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 1996 STANDARD SPECIFICATIONS FOR ROAD,
BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS.
ASSOCIATION (APWA), AS AMENDED BY THE CITY OF RENTON PUBLIC WORKS DEPARTMENT.
3. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED.
PLANS WHICH ARE ON FILE IN THE PUBLIC WORKS DEPARTMENT. ANY DEVIATION FROM THE APPROVED
RENTON PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF PUBLIC WORKS DEPARTMENT
SURFACE WATER UTILITY SECTION.
4. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN
PROGRESS.
5. DATUM SHALL BE NAVD 88 UNLESS OTHERWISE APPROVED BY THE CITY OF RENTON PUBLIC WORKS
DEPARTMENT. REFERENCE BENCHMARK AND ELEVATIONS ARE NOTED ON THE PLANS..
6. ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING
CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED
AND THE POTENTIAL FOR ON -SI7E EROSION HAS PASSED.
7. ALL RETENTION/DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN
CONJUNCTION WITH ALL CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE PUBLIC
WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION.
B. GRASS SEED MAY BE APPLIED BY HYDROSEEDING. THE GRASS SEED MIXTURE OTHER THAN CITY OF
RENTON APPROVED STANDARD MIXES, SHALL BE SUBMITTED BY A LANDSCAPE ARCHITECT AND
APPROVED BY THE PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION.
9. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN
-
ACCORDANCE WITH SECTION 7-02.3(l) OF THE CURRENT STATE OF WASHINGTON STANDARD
SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF
THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND
COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF
THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. ALL PIPE BEDDING SHALL
BE APWA CLASS "C ", WITH THE EXCEPTION OF PVC PIPE. ALL TRENCH BACKFILL SHALL BE
COMPACTED TO MINIMUM 959 FOR PAVEMENT AND STRUCTURAL FILL AND 90% OTHERWISE PER ASTM
D- 1557 -70. PEA GRAVEL BEDDING SHALL BE 6 INCHES OVER AND UNDER PVC PIPE.
MAkVM OPEMIa OF
GAZE
HANDLE MIN LOCK PIN
AGBSTABIE LOCK HOOK
LFr HAMO E SHALL BE ATTACHED PER MIN LOCO SCREW
MAN FACIUiERS REOOMWOVA17ONS
I' ROD OR TtMa
YARIABIE IF1fm1
LIFT HANDLE
EDL EL EN SPACED HOLES FOR BC.TNa
ED ALZ dNNEDMN
o
I \
I
� t>rva uxE 1
\ 0
C� \�
FRONT SIDE
NOTES :
1. Shear got& shall be aluminum alloy par ASIM B- 26- ZG -32a or cast Iron ASTM
A48 pass 309 os required.
2 Got@ shall be 8' diameter far pipe 12 Inches ar lees in diameter, 12' diameter far
pipes greater than 12'
1 Gate shot) be Joined to tee Section by boiling through flange.
4. Oft Rod: As specified by mfr. with handle extending to within one of cover and
adlLstable hook lock fastened to frame or upper handhold
5. Gate shall not open beyond the dear opening by limited hinge movement, stop
tab, a some other device.
6. Neoprene rubber gasket requred between riser mounting flange and gate flange.
7. Mating surfaces of lid and body to be machined for proper Bt.
B. Flange mounting baits shall be 3/8" diameter stalaless steel.
9. Alternate shear gates to the design shown are acceptable, provided they meet the
material specifications Cbova
ADOPTED
8 CTFY OF RENTON
Standard plans
IST DATE: 8/97
PIVOTING FROP -T SHEAR GATE DETAIL
DWG. NAME : BRO5
r
'SP PAGE : B033
SPIGOT END
10. GALVANIZED STEEL PIPE AND ALUMINIZED STEEL PIPE FOR ALL DRAINAGE FACIU77ES SHALL HAVE
ASPHALT TREATMENT #1 OR BETTER INSIDE AND OUTSIDE.
11. STRUCTURES SHALL NOT BE PERMITTED WITHIN 10 FEET OF THE SPRING LINE OF ANY STORM DRAINAGE
PIPE, OR 15 FEET FROM THE TOP OF ANY CHANNEL BANK.
12. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL.
13. OPEN CUT ROAD CROSSINGS THROUGH EXISTING PUBLIC RIGHT OF WAY WILL NOT BE ALLOWED UNLESS
SPECIFICALLY APPROVED BY CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS ADMINISTRATOR.
14.. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND
QUARRY ROCK PLACED TO A DEPTH OF ONE (1) FOOT AND MUST MEET THE FOLLOWING
SPECIFICATIONS: 4 - 8 INCH ROCK / 40 - 709 PASSING; 2 - 4 INCH ROCK / 30 - 409 PASSING;
AND LESS THAN 2 INCH ROCK / 10 - 209 PASSING.
15. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE
SYSTEM, UNLESS APPROVED BY THE CITY PLAN REVIEWER OR SURFACE WATER UTILITY SECTION. AN
ACCURATELY DIMENSIONED, CERTIFIED AS -BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE
SUBMITTED TO THE CITY UPON COMPLETION.
16. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON DOES NOT RELIEVE
THE OWNER OF THE CONTINUING LEGAL OBLIGATION AND /OR LIABILITY CONNECTED WITH STORM
SURFACE WATER DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY OBLIGATION
FOR THE PROPER FUNC770NING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING CONSTRUCTION.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES,
PROTECTIVE EQUIPMENT, FLAGGERS AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH,
AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF
WORK COVERED BY THE CONTRACT. ANY WORK WITHIN THE TRAVELED RIGHT OF WAY THAT MAY
INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVE BY THE
PUBLIC WORKS DEPARTMENT, TRANSPORTATION SYSTEMS DIVISION. ALL SECTIONS OF THE WSDOT
STANDARD SPECIFICATIONS 1 -07 -23 TRAFFIC CONTROL SHALL APPLY.
16. SPECIAL DRAINAGE MEASURES WILL BE REQUIRED IF THE PROJECT LOCATION IS WITHIN THE AQUIFER
PROTECTION AREA (APA).
19. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE - CONSTRUCTION MEETING
MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
20. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S)
SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING CONSTRUCTION.
FLANGED END
A
NOTES:
1. All deanouts shall be Inland Foundry Co. Inc. No. 247.
2 IN unimproved areae, pour a 1' -0" thick, 2'-0' square
concrete, dose 3000 pad around the ring and cover.
J. In asphalt roadways, restore around deanout ring and cover as
required by standard detail drawing 9R36.
PIPE MATERIAL AS
SPECIFIED BY THE
ENGINEER
CPLUG TO BE SEALS
IN SAME MANNER AS
�- MAIN SEKER JOINTS:
ADOPTED
®� CITY OF RENTON
Standard plane
HST DATE: 8076
6 INCH OR 8 INCH CLEANO UT
DWG. NAME : 0412003
SP PAGE : BW18B
21. ALL REQUIRED SEDIMENTATION /EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN
OPERATION PRIOR TO LAND CLEARING AND /OR CONSTRUCTION TO ENSURE THAT SEDIMENT LADEN
WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT FACILITIES
SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND /OR
CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE
IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION /SEDIMENTATION CONTROL
SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE
22. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO
BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES
AND UNEXPECTED. OR SEASONAL CONDITIONS DICTATE THE PERMITEE SHALL ANTICIPATE THAT MORE
EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE
SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE
THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY
BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL. FACILITIES, OVER AND ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE
RECEIVING DRAINAGE SYSTEM.
23. APPROVAL OF THIS PLAN IS FOR EROSION /SEDIMENTATION CONTROL ONLY IT DOES NOT CONSTITUTE
AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS,
OR RETENTION FACILITIES.
24. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH APRIL 30TH, ALL PROJECT DISTRIBUTED SOIL
AREAS GREATER THAN 5,000 SQUARE FEET, THAT ARE TO BE LEFT UN- WORKED FOR MORE THAN 12
HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING.
25. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS
ANTICIPATED FOR A PERIOD 30 DAYS OR MORE, ALL DISTURBED AREAS MUST BE IMMEDIATELY
STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER. APPROVED EROSION CONTROL TREATMENT
APPLICABLE TO THE TIME OF YEAR. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE
MONTHS OF APRIL THROUGH SEPTEMBER, INCLUSIVE. SEEDING MAY PROCEED, HOWEVER, WHENEVER IT
IS IN THE INTEREST OF THE PERMITEE BUT MUST BE AUGMENTED WITH MULCHING, NETTING OR OTHER
TREATMENT APPROVED BY THE CITY OF RENTON, OUTSIDE THE SPECIFIED TIME PERIOD.
26. FOR ALL EROSIONISEDIMENTA77ON CONTROL PONDS WHERE THE DEAD STORAGE DEPTH EXCEEDS 6
INCHES, A FENCE IS REQUIRED WITH A MINIMUM HEIGHT OF THREE (3) FEET, 3.'1 SIDE SLOPES.
27. A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE, 24 FEET X 50 FEET X 8 INCHES OF 4 TO 6 INCH
QUARRY SPALLS SHALL BE LOCATED AT ALL POINTS OF VEHICULAR INGRESS AND EGRESS TO THE
CONSTRUCTION SITE.
PLAN VIEW
4' RIGID OR 6' FLEXIBLE
NTS C PERFORATED PIPE
DRAIN
SUMP WITH
........................ SOLID LID
INFILTRATION TRENCH ,
PLAN VIEW OVERFL
NTS 4' RIGID OR 6' FLEXIBLE SPLAS
`PERFORATED PIPE BLOCK
....... 4 . ...............................
+c =:Y!�, KLICK ,0' MIN CB SUMP W/
VARIES SOLID LID
FILTER FABRIC
COMPACTED
BA KFILL
24' 6' PERF PIPE
12 le - i,
24' I WASHED ROCK
SECTION A
NTS
from roof
grass filter sin
grass 5' min
fi" min overflow
erflow -6 "min
driveway
over_ rflow � .� �
f
washed rock 18" min NOTE: Same len tin " -1" 18" min
9 NOTE: Same length
I dimensions and site washed rock
_1 dimensions and site
limitations as typical limitations as typical
system system
2' min C15' min 4« 2' min
CHECKED FOR COMPLIANCE RECOMMENDED
R=337233 TO CITY STANDDARDS FOR APPROVAL
BY:
15 Date BY:
a6'. R- 337x33
(n
as °
03 and c0 p
a: Lj I
�J cN
'Z ^� "1fflkWa
(0 0- . I.L.
to V
t•i
.b
C
U to
c�. .
LID
P-I to o
Gi �U
C U
3
r
Q ro
J N
Z X
Q F 0LL�
_ dWNN
�ODIm
Q p¢3G'i
W o(ODu;
W pp H
PROJECT NO.:
12007
DRAWN BY:
VK
ISSUE DATE:
12/05/06
SHEET REV.:
07/19/2012
STORM
DRA 4AOE
DETA -8 AND
NOTES
06085DT03- C15.DNG
C15
SHEET 15 OF 29
N
�m
fax
� Q
to
wzy W
y W
N