Loading...
HomeMy WebLinkAboutR-366520z 0 Z U O w O m J 0 a U1 s 0 a 4- LB PLAN VIEW _ 46595 AS SECTION A A LET x ET ER O 9' INLET PIPE JVERT --08091 - 4b6.12 AS SE 114 SE OF SECTION 32, TOWNSHIP 23N, RANGE 5E, W.M. SOLID TOP RIM = 496.68- IM-coA2 SOLID R TOP 6.00 q14-0548 WEIR CREST - i8B9i- 4 %%-B1A4 `'AS NOTE: THE BAYFILTER STORMWATER MANAGEMENT SYSTEM IS A BA *7L TER STORMWA TER 7R£A TMENT SYSTEM STORMWATER FILTRATION DEVICE DESIGNED TO REMOVE -# ORIFICE TO FINE SEDIMENTS HEAVY METALS, AND PHOSPHORUS. THE BA ML TER SYSTEM RELIES ON A SPIRAL WOUND FILTERS INVERT - NOTE.- INLET AND PROJECT 4&7-H" 46b'2bA8 OUTLET PIPE NOT OUTLET INV. SHOWN FOR ELEV. = CLARITY q$5.16 AE CARTRIDGES ARE HOUSED IN A CONCRETE STRUCTURE SECTION B B PRELIMINARY SIZING SUMMARY NOTE: THE BAYFILTER STORMWATER MANAGEMENT SYSTEM IS A BA *7L TER STORMWA TER 7R£A TMENT SYSTEM STORMWATER FILTRATION DEVICE DESIGNED TO REMOVE FINE SEDIMENTS HEAVY METALS, AND PHOSPHORUS. THE BA ML TER SYSTEM RELIES ON A SPIRAL WOUND PROJECT SADDLEBROOK MEDIA FILTER CARTRIDGE WITH APPROXIMATELY 43 SQUARE FEET OF FILTRATION AREA. THE FILTER LOCATION RENTON, WA CARTRIDGES ARE HOUSED IN A CONCRETE STRUCTURE THAT EVENLY DISTRIBUTES THE FLOW BETWEEN WATER QUALITY FLOW 0.072 CFS CARTRIDGES. THE SYSTEM IS OFFLINE M7H AN EXTERNAL BYPASS THAT ROUTES HIGH INTENSITY STORMS AROUND THE SYSTEM. THE FILTER CARTRIDGES REMOVE POLLUTANTS FROM RUNOFF BY FIL 7RA 77ON (INCEPTION /ATTACHMENT) AND ADSORPTION. DRAINAGE AREA _ CARTRIDGE DESIGN FLOW RATE 30 GPM / BAYF/L7ER CARTRIDGES 2 (BASED ON MASS LOADING) ADS BAYFILTER DETAILS, PER ADVANCED DRAINAGE SYSTEMS, INC. **RIP RAP PAD SPECIFICATIONS R/PRAP SHALL BE REASONABLY WELL GRADED WITH GRADATION AS STAGE STAGE LIVE STORAGE VOLUME CF FOLLOWS STORM Ef RFMIRM PROVIDED TOTAL 495.50 53,J82 56,377 MAXIMUM STONE SIZE: 24 INCHES (NOMINAL DIAMETER) 100 �EAR 495.50 53,383 56,377 MEDIAN STONE SIZE.- 16 INCHES 25 YEAR 495.12 48,858 51,688 MINIMUM STONE SIZE: 4 INCHES 10 YEAR 494.69 44,050 46,600 So. YU R/PRAP SIZING GOVERNED BY SIDE SLOPES ON OUTLET CHANNEL IS ASSUMED TO BE APPROXIMATELY 3: 1 DETENTJON SUMMARY SHEET DETENTJON POND PLAN WEW Cal 2 Working Days Before You Dig 1- 800 - 424 -5555 Utilities Underground Location Center (ID,MT.ND.ORWA) 6 NORTH GRAPHIC SCALE 0 15 3` 45 1 INCH = 30 FT. D.R. STRONG u w D CONSULTING ENGINEERS 2 NYLARS ENGINEERS PLANNERS SURVEYORS N3 10604NE38th PL,,#101 KIRKLAND, WA98033 0 425 827 3063 F4258272423 w.w+.datrongwm N0. SADDLEBROOK SECTION A —A 5101_- :.... - -._ PA NK FENCE _ EX GRADE 6' CH/ _ _ _ _ 6' CHAINLINK FENCE 5001... -- ... _... __- -.. - 4901 - - - -- _ 1I 0+20 0+40 0+60 0+80 a 1 +20 1 +40 GRAPHIC SCALE 0 510 15 1 INCH= 10 FT. HORIZONTAL 0 2h2wtm—.�5 1 INCH = 5 FT. VERTICAL SECTION B—B 0+00 0+20 0+40 0+60 0 +80 1 +00 1 +20 1 +40 1 +60 R=366520 2,44c_ BY: � Date: BY: Date: JANUARY 10, 2013 Y1P 01.241,13 MAJ W—D' vrnncu: xnw SeS mm SS «� °~ SADDLEBROOK t t -14-12 YLP 03.14.13 uAJ.W: AS NOTED c? ,} CITY OF MAJ R E N TO N DETENTION POND DETAILS MAJ • *l LL E Planning /Building /Public Works Dept. �, «,E ,�, C13 REVISION BY DATE APPR m � AC01m"w" S„m: . 13 17 R- 3GGS13 A- NNNNA�