Loading...
HomeMy WebLinkAboutR-369013Z F U Q a Y � Or�/ LL W W J Q N 3 ST ED a AP Ol RR RP IN m m REST 14N0 , IS N� BER. EB.WaWWIA4E0 ECONA ER, IF IREOR H.B.HH'AMRA ENGiH F1BPIC NI 1. CONDITION OF U&E BUT FENCE WYSE USED DOWNSLOPIE OFALL DISTURBED gREAS. 12 BUT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS. NOR IS INTENDED TO TREAT SUBSTANTIAL MOUNTS OF OVERLAND FLOW. HNYCCNCEMRATE0 HUMMOSTBE CQ`NEYEO THROUGH THE DRAINAGE SYSTEM TO A SEDIMENTTRAP OR POND. 2 DESIGN NIDWiALIAlION 8PEC61CATONS 21. THE GEOTEXRIE USEDMOSTMET THE STANDARD LISTED BELLOW.A WRI OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MOST BE LMINNnB _ nmSK +l Fw weroLSIESI Le MBINeu muslm,aNUUc mm,fBm,N,nax nxA,.x ....NOMBANDIDMIDIDIGHTFUND AMMARD 3,2 S STANDARD STRIslGMF SPACING NAY BE BEGIN 23. W WHOSE THE FENCE IS 3,2 S STANDARD STRIslGMF SPACING NAY BE BEGIN 23. W WHOSE THE FENCE IS 3 1 ORCLOSERPOST PUBLIC WORKS DEPARTMENT SILT FENCE SETD• PLAN - 214.00 MARCH 2008 .I BLOPEs NOTES 1. CONDRIONOFUSE 1.1. WERE CONCENTRATED RUNOFF FROM DISTURBED AREAS TO AND FROM PONDS OR TRAPS. 12, TO CONVEY RUNOFF WERCEPTED FROM UNDISTURBED AREAS AROUND THE SHE TO A NOWEROSIVE DISCHARGE POINT. 2 MAINTENANCE STANDARDS 2.1. ANY SEDIMENT DEPOSITION OF MORE THAN 0.5 FEET SHALL BE REMOVED SO THAT THE CHANNEL IS RESTORED TO ITS ORIGINAL DESIGN CAPACITY. 22. THE CHECK DAM55HALL BE EXAMINED FOR SIGNS OF SCOURING AND EROSION OF THE BED AND BANKS. IF SCOURING AND ERO: HAS OCCURRED, AFFECTED AREAS SHALL BE PROTECTED BY RIPRAP OR AN EROSION CONTROL BLANKET. PUBLIC WORKS CHECK DAMS SPACING AND DEPARTMENT CROSS SECTIONS IL� Cal 2 Workig Days Before You Dig UtUm Undergroun8 d dLocat on Center OD,MT,ND,OR,WA) STD. PLAN - 217.40 MARCH 2008 NE 114 SECTION 14, TOWNSHIP 23 N, RANGE 5 E, W.M.. SADDL EBROOK DI V. // OPNEWAVSBNVL IRSHOD REWPO'AE Np aFOwODER NaiuuTltMICFTE C0016aRULTW ENIPNYEmAwro exl�`NGRp / IN3pFTxEnN.nxAv rt NRECN4FMNTIUTiIE R•25'A N. EaiO'M @MTUT MINT 1OFA 3C FTIEPAB RED INS TALL ORIVEWA�RT IF THERE IS A ROW W I DE DITCH PRESE W. AS PE R CITY ROAD ETANWRCE R. A.ODAMY SPATHE GFOTEt, NIN. TwcxN.D. S �PIp.T55owFw NOTES W RCssECRE 1, CONDITION OF USE 1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVERTRAFFICWILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SIZE. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN ARES THAT WILL BON BE USED FOR PERMANENT BOMB. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR WAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. 22. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE. 2.3. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE. 3. MAINTENANCE STANDARDS 3.1. QUARRY SPILLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WIFE THE SPECIFICATIONS. 3.2 IF THE ENTRANCE IS NOT PREVENTING SEDIMENT BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT $HALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF ME ENTRANCE, OR ME INSTALLATION OF THE WHEEL WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASHED WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND. 3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBLIC SAFETY. IF IT NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONDUCTED. THE SEDIMENT WOULD THEN BE WASHED IWO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. 3A. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 3.6. IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE IF TO CONTROL TRAFFIC. � ®�Q STD. PLAN - 215.10 PUBLIC WORKS STABILIZED DEPARTMENT CONSTRUCTION ENTRANCE MARCH 2008 GMBRNSIIFSwEBNGTH A5TMG431 Hp P51 MIN. G0.4BRN]ILEELONGATON ASTM04G33 3P.E WO.. MUtLFN BU.¢STSTRFNGIH ABTMD3]Mr�4 4W P31 MN. AOS /SYNC %sl RR u.s.srANOAROSIEVES¢E EROS /ON CONTROL NOTES & SPECIFICA IONS 5'AIAL GRIMACE tlUIE TRIM bye' GMTEFRNIE� 6 �O sEBWERTAxB BEBR6 a • WERFLOW BYPASS •b •b BELOW INLEicMTE DEVICE FILTERED WATER e e SECTONNEW OPAWAGEGMTE - RECTANGIILMtlUIEBIWMI RETRIEVAL BVBIEM BYP. BFIOW INLETGIUTe- LE410E pyERFLOW BYPAA9ITYP.I ISOMETRIC VIEW NDTES 1. Blze Na BeM,Inbl See OeNm (BIGD)La On alam wetaralncNrell YAllmMte. 2, TM BIGD NnII New ebulttAn b {M1M1w RAW vyelem (me,lbv tryyaas} 3. TM reWewlayalan mull Bllpx renarelNUIe BIGD WYwvtapllll,q lM1eaYlepatl maleelal. C. Pe,lo,m maNlalance In a'm1Eer.'e With 3Mr0ad SPotllblbn 801.3D5). Y STD. PUBLIC WORKS CATCH BASIN FILTER PLAN - 210.90 DEPARTMENT MARCH 2008 1. APPROVAL OF THIS EROSION AND SEDIMENT CONTROL ESC PLAN DOES NOT CONS777U7E AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E. G, SIZE AND COCA RON OF ROADS PIPES, RESTRICTORS CHANNELS RETENTION FACILITIES, UTILITIES, , ETC.). 2. THE /MPLEMENTA RON OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACIL /TIES IS THE RESPONSIBILITY OF THE APPLICANT/ESC SUPERVISOR UNRL ALL CONSTRUCTION IS APPROVED. J. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED BY A CON77N000S LENGTH OF SURVEY TAPE (OR FENCING, IF REQUIRED) PRIOR TO CONS7RUC770N. DURING THE CONSTRUCTION PER /OD, NO DISTURBANCE BEYOND THE CLEARING C/M175 SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS, DRAINAGE SYSTEMS, AND ADJACENT PROPfRRES IS M /N /MIZED. 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANT/C/PATEO SITE CONDITIONS DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND M00 /PIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G., ADDITIONAL SUMP PUMPS, RELOCATION OF DITCHES AND SILT FENCES ETC.). 6. THE ESC FAC ILITIES SHALL BE INSPECTED GAILY BY THE APPLICANT/ESC SUPERNSOR AND MAINTAINED TO ENSURE CONRNUED PROPER FUNCTIONING WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE ESC FACILITES DURING THE WET SEASON (OCT. 1 TO APRIL 30) AND OF MONTHLY RENEWS DURING THE DRY SEASON (MAY 1 TO SEPT 30). 7. ANY AREAS OF EXPOSED SO /LS INCLUDING ROADWAY EMBANKMENTS THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC METHODS (f.G, SEEDING, MULCHING, PLASTIC COVERING, ETC.). 8. ANY AREA NEEDING ESC MEASURES NOT REQUIRING IMMEDIATE ATTENRON SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS. 9. THE ESC FACILITES ON INACRVE S /TES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN FORTY -EIGHT (48) HOURS FOLLOWING A STORM EVENT. 10. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE W17H /N A CATCH BASIN ALL CATCH BAS /NS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PA NNG. THE CLEANING OPERARON SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 11. STABILIZED CONSTRUCTION ENTRANCES AND ROADS SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURA RON OF THE PROJECT. ADDITIONAL MEASURES SUCH AS WASH PADS MAY BE RENT /RED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURARON OF THE PROJECT. 12. ANY PERMANENT FLOW CONTROL FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. lF THE FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEE T ABOVE THE L GRADE OF THE PERMANENT FACILITY. 13. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A MAN /MUM THICKNESS OF 2 TO 3 INCHES. 14. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE RENEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARARON FOR THE WINTER RAINS DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF ]HOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE DOES INSPECTOR. THE DOES INSPECTOR CAN REQUIRE SEEDING OF AODIRONAL AREAS IN ORDER TO PROTECT SURFACE WATERS ADJACENT PROPERTIES, OR DRAINAGE TREE PROTECTION MEASURES 1'MI� LEVEL BOIIOM III -III- � _ _m =111- II SWALE SPACING GEPENOB IXISLPPE4RMEM NOTES 1. CON GREEN OF USE I.E. REQUIRED AT: 1.1.1. THE TOP OF ALL SLOPES IN EXCESS OF 3N:IV AND WRN MORE MAN 20 FEET OF VERTICAL RELIEF. 1.1.2. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELLOW. S. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. FOR SLOPES STEEPER THAN 2HaV WITH MORE THAN IO FEET OF VERTICAL RELIEF, BENCHES MAY BE CONSTRUCTED OR CLOSER SPACED INTERCEPTOR SWALES MAYBE USED. THE DESIRE MEASURE MOST BE DESIGNED BY AN ENGINEERTO EFFECTNELY INTERCEPT THE HIGH VELOCITY RUNOFF TO A SEDIMENT PgJD OR1RAP. 22. CONSTRUCTION TRAFFIC OVER TEMPORARY SWALES SHALL BE MINIMIZED. 3. MAINTENANCE STANDARDS 3.1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVT 'SHALL BE REPAIRED IMMEDIATELY. 3.2, IF THE FACILITY DO NOT REGULARLY RETAIN STORM RUNOFF, THE CAPACIry ANDbR FREQUENCY OFTHE SWALES SHALL LINK FENCE SHALL BE IVA AVEPAGF SLOPF SLOPF PERCFNi F10WPAlX1EtIGTN 30H:1V 36% MEW 3UTO30 H:1V B1p36 30JFFEF (4 TO 1G H:3V 1635% 1W FEET I3T04 H:1V 25 57A SOFFEi BE INCREASED. STD. PLAN - 217.10 � � 4 PUBLIC WORKS INTERCEPTOR SWALE ,p- D DEPARTMENT MARCH 2008 o. CONSTRUCTION STORAGE PROHIBITED: THE APPLICANT MAY NOT FILL, EXCAVATE, STACK OR STORE ANY EQUIPMENT, DISPOSE OF ANY MATERIALS SUPPLIES OR FLU /OS OPERATE ANY EQUIPMENT, INSTALL IMPERVIOUS SURFACES OR COMPACT THE EARTH IN ANY WAY WITHIN THE AREA DEFINED BY THE GRIP LINE OF ANY TREE TO BE RETAINED. b. FENCED PROTECRON AREA REQUIRED: THE APPLICANT SHALL ERECT AND MAINTAIN SIX FOOT (B) HIGH CHAIN LINK TEMPORARY CONSTRUCTION FENCING AROUND THE GRIP LINES OF ALL RETAINED TREES OR ALONG THE PERIMETER OF A STAND OF RETAINED TREES. PLACARDS SHALL BE PLACED ON FENCING EVERY FIFTY FEET (BO) lNDlCA71NG THE WORDS, NO TRESPASSING - PROTECTED TREES" OR ON EACH SIDE OF THE FENCING IF LESS THAN FIFTY FEET (50). S /TE ACCESS TO INDIVIDUALLY PROTECTED TREES OR CROUPS OF ]BEES SHALL BE FENCED AND SIGNED. INDIVIDUAL TREES SHALL BE FENCED ON FOUR (4) SIDES. IN ADDITION, THE APPLICANT SHALL PROVIDE SUPERNSION WHENEVER EQUIPMENT OR TRUCKS ARE MOVING NEAR TREES. C. PROTECTION FROM GRADE CHANGES: F THE GRADE LEVEL ADJOINING TO A TREE TO BE RETAINED IS TO BE RAISED, THE APPLICANT SHALL CONSTRUCT A DRY ROCK WALL OR ROCK WELL AROUND THE TREE. THE DIAMETER OF THIS WALL OR WELL MUST BE EQUAL TO THE TREE'S GRIP LINE. d. IMPERVIOUS SURFACES PROHIBITED WITHIN THE GRIP LINE THE APPLICANT MAY NOT INSTALL IMPERVIOUS SURFACE MATERIAL WITHIN THE AREA DEFINED BY THE GRIP LINE OF ANY TREE TO BE RETAINED. e. RESTR/CRONS ON GRADING WITHIN THE DRIP LINES OF RETAINED ]BEES THE GRADE LEVEL AROUND ANY TREE TO BE RETAINED MAY NOT BE LOWERED WITHIN THE GREATER OF THE FOLLOWING AREAS: (l) THE AREA DEFINED BY THE GRIP LINE OF THE TREE, OR (11) AN AREA AROUND THE TREE EQUAL TO ONE AND ONE -HALF FEET (1 -1 12) IN DIAMETER FOR EACH ONE INCH OF TREE CALIPER. THE RENEWING OFFICIAL MAY REQUIRE A LARGER TREE PR07ECRON ZONE BASED ON TREE SIZE, SPECIES SOIL, OR OTHER CONDITIONS /. MULCH LAYER REQUIRED: ALL AREAS WITHIN THE REQUIRED FENCING SHALL BE COVERED COMPLETELY AND EVENLY WITH A MINIMUM OF THREE INCHES (3) OF BARK MULCH PRIOR 70 INSTALLATION OF THE PROTECTVE FENCING EXCEPRONS MAY BE APPROVED BY THE REVIEWING OFFICIAL IF THE MULCH WILL ADVERSELY AFFECT PROTECTED GROUND COVER PLANTS g. LION /TOR /NC REQUIRED DURING CONSTRUCTION: THE APPLICANT SHALL RETAIN A PROFESSIONAL ARBORIST OR OTHER QUALIFIED PROFESSIONAL TO PRUNE BRANCHES AND R00T5, FERRUZE, AND WATER AS APPROPRIATE FOR ANY ]BEES AND GROUND COVER WHICH ARE TO BE RETAINED. NO 1. 6 -FT. HIGH TEMPORARY CHAIN I ,. , .W:•, �. III _,. , -•, ��������� ',- •' i. , li;l' � „ '. i I I�, ,, 11II. oiiiii0ii4 TREE PROTECTION DETAIL AT Fuu saLE 0425821.3063 F425821.2423 TIM IwFEE�TUxaxpl�wrr N0. REVISION BY DATE APPR APP"�;,,, xTRncAl xro 19Be NORIEONLOIL Na➢ 198]/1991 Q� CITY OF D.R. STRONG D p S CONSULTING ENGINEERS BEHG „ED. AS NOTED ENGINEERS PLANNERS SURVEYORS DPAWH: CWA�620 7TH AVENUE KlRKL4N0, WA 98033 CHECKED, REN TON QATUM Planning /Building /Public Works Dept. R- 369013 RECOMME FORAPPOVAL BY Date: a a BY: Date: BY: Date: BY: Date: SADDLEBROOK DIY. II TESL NOTES AND DETAILS 08.08.13 RDCAYM(: PALE CB EROS /ON CONTROL NOTES & SPECIFICA IONS 5'AIAL GRIMACE tlUIE TRIM bye' GMTEFRNIE� 6 �O sEBWERTAxB BEBR6 a • WERFLOW BYPASS •b •b BELOW INLEicMTE DEVICE FILTERED WATER e e SECTONNEW OPAWAGEGMTE - RECTANGIILMtlUIEBIWMI RETRIEVAL BVBIEM BYP. BFIOW INLETGIUTe- LE410E pyERFLOW BYPAA9ITYP.I ISOMETRIC VIEW NDTES 1. Blze Na BeM,Inbl See OeNm (BIGD)La On alam wetaralncNrell YAllmMte. 2, TM BIGD NnII New ebulttAn b {M1M1w RAW vyelem (me,lbv tryyaas} 3. TM reWewlayalan mull Bllpx renarelNUIe BIGD WYwvtapllll,q lM1eaYlepatl maleelal. C. Pe,lo,m maNlalance In a'm1Eer.'e With 3Mr0ad SPotllblbn 801.3D5). Y STD. PUBLIC WORKS CATCH BASIN FILTER PLAN - 210.90 DEPARTMENT MARCH 2008 1. APPROVAL OF THIS EROSION AND SEDIMENT CONTROL ESC PLAN DOES NOT CONS777U7E AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E. G, SIZE AND COCA RON OF ROADS PIPES, RESTRICTORS CHANNELS RETENTION FACILITIES, UTILITIES, , ETC.). 2. THE /MPLEMENTA RON OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACIL /TIES IS THE RESPONSIBILITY OF THE APPLICANT/ESC SUPERVISOR UNRL ALL CONSTRUCTION IS APPROVED. J. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED BY A CON77N000S LENGTH OF SURVEY TAPE (OR FENCING, IF REQUIRED) PRIOR TO CONS7RUC770N. DURING THE CONSTRUCTION PER /OD, NO DISTURBANCE BEYOND THE CLEARING C/M175 SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS, DRAINAGE SYSTEMS, AND ADJACENT PROPfRRES IS M /N /MIZED. 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANT/C/PATEO SITE CONDITIONS DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND M00 /PIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G., ADDITIONAL SUMP PUMPS, RELOCATION OF DITCHES AND SILT FENCES ETC.). 6. THE ESC FAC ILITIES SHALL BE INSPECTED GAILY BY THE APPLICANT/ESC SUPERNSOR AND MAINTAINED TO ENSURE CONRNUED PROPER FUNCTIONING WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE ESC FACILITES DURING THE WET SEASON (OCT. 1 TO APRIL 30) AND OF MONTHLY RENEWS DURING THE DRY SEASON (MAY 1 TO SEPT 30). 7. ANY AREAS OF EXPOSED SO /LS INCLUDING ROADWAY EMBANKMENTS THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC METHODS (f.G, SEEDING, MULCHING, PLASTIC COVERING, ETC.). 8. ANY AREA NEEDING ESC MEASURES NOT REQUIRING IMMEDIATE ATTENRON SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS. 9. THE ESC FACILITES ON INACRVE S /TES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN FORTY -EIGHT (48) HOURS FOLLOWING A STORM EVENT. 10. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE W17H /N A CATCH BASIN ALL CATCH BAS /NS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PA NNG. THE CLEANING OPERARON SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 11. STABILIZED CONSTRUCTION ENTRANCES AND ROADS SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURA RON OF THE PROJECT. ADDITIONAL MEASURES SUCH AS WASH PADS MAY BE RENT /RED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURARON OF THE PROJECT. 12. ANY PERMANENT FLOW CONTROL FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. lF THE FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEE T ABOVE THE L GRADE OF THE PERMANENT FACILITY. 13. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A MAN /MUM THICKNESS OF 2 TO 3 INCHES. 14. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE RENEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARARON FOR THE WINTER RAINS DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF ]HOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE DOES INSPECTOR. THE DOES INSPECTOR CAN REQUIRE SEEDING OF AODIRONAL AREAS IN ORDER TO PROTECT SURFACE WATERS ADJACENT PROPERTIES, OR DRAINAGE TREE PROTECTION MEASURES 1'MI� LEVEL BOIIOM III -III- � _ _m =111- II SWALE SPACING GEPENOB IXISLPPE4RMEM NOTES 1. CON GREEN OF USE I.E. REQUIRED AT: 1.1.1. THE TOP OF ALL SLOPES IN EXCESS OF 3N:IV AND WRN MORE MAN 20 FEET OF VERTICAL RELIEF. 1.1.2. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELLOW. S. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. FOR SLOPES STEEPER THAN 2HaV WITH MORE THAN IO FEET OF VERTICAL RELIEF, BENCHES MAY BE CONSTRUCTED OR CLOSER SPACED INTERCEPTOR SWALES MAYBE USED. THE DESIRE MEASURE MOST BE DESIGNED BY AN ENGINEERTO EFFECTNELY INTERCEPT THE HIGH VELOCITY RUNOFF TO A SEDIMENT PgJD OR1RAP. 22. CONSTRUCTION TRAFFIC OVER TEMPORARY SWALES SHALL BE MINIMIZED. 3. MAINTENANCE STANDARDS 3.1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVT 'SHALL BE REPAIRED IMMEDIATELY. 3.2, IF THE FACILITY DO NOT REGULARLY RETAIN STORM RUNOFF, THE CAPACIry ANDbR FREQUENCY OFTHE SWALES SHALL LINK FENCE SHALL BE IVA AVEPAGF SLOPF SLOPF PERCFNi F10WPAlX1EtIGTN 30H:1V 36% MEW 3UTO30 H:1V B1p36 30JFFEF (4 TO 1G H:3V 1635% 1W FEET I3T04 H:1V 25 57A SOFFEi BE INCREASED. STD. PLAN - 217.10 � � 4 PUBLIC WORKS INTERCEPTOR SWALE ,p- D DEPARTMENT MARCH 2008 o. CONSTRUCTION STORAGE PROHIBITED: THE APPLICANT MAY NOT FILL, EXCAVATE, STACK OR STORE ANY EQUIPMENT, DISPOSE OF ANY MATERIALS SUPPLIES OR FLU /OS OPERATE ANY EQUIPMENT, INSTALL IMPERVIOUS SURFACES OR COMPACT THE EARTH IN ANY WAY WITHIN THE AREA DEFINED BY THE GRIP LINE OF ANY TREE TO BE RETAINED. b. FENCED PROTECRON AREA REQUIRED: THE APPLICANT SHALL ERECT AND MAINTAIN SIX FOOT (B) HIGH CHAIN LINK TEMPORARY CONSTRUCTION FENCING AROUND THE GRIP LINES OF ALL RETAINED TREES OR ALONG THE PERIMETER OF A STAND OF RETAINED TREES. PLACARDS SHALL BE PLACED ON FENCING EVERY FIFTY FEET (BO) lNDlCA71NG THE WORDS, NO TRESPASSING - PROTECTED TREES" OR ON EACH SIDE OF THE FENCING IF LESS THAN FIFTY FEET (50). S /TE ACCESS TO INDIVIDUALLY PROTECTED TREES OR CROUPS OF ]BEES SHALL BE FENCED AND SIGNED. INDIVIDUAL TREES SHALL BE FENCED ON FOUR (4) SIDES. IN ADDITION, THE APPLICANT SHALL PROVIDE SUPERNSION WHENEVER EQUIPMENT OR TRUCKS ARE MOVING NEAR TREES. C. PROTECTION FROM GRADE CHANGES: F THE GRADE LEVEL ADJOINING TO A TREE TO BE RETAINED IS TO BE RAISED, THE APPLICANT SHALL CONSTRUCT A DRY ROCK WALL OR ROCK WELL AROUND THE TREE. THE DIAMETER OF THIS WALL OR WELL MUST BE EQUAL TO THE TREE'S GRIP LINE. d. IMPERVIOUS SURFACES PROHIBITED WITHIN THE GRIP LINE THE APPLICANT MAY NOT INSTALL IMPERVIOUS SURFACE MATERIAL WITHIN THE AREA DEFINED BY THE GRIP LINE OF ANY TREE TO BE RETAINED. e. RESTR/CRONS ON GRADING WITHIN THE DRIP LINES OF RETAINED ]BEES THE GRADE LEVEL AROUND ANY TREE TO BE RETAINED MAY NOT BE LOWERED WITHIN THE GREATER OF THE FOLLOWING AREAS: (l) THE AREA DEFINED BY THE GRIP LINE OF THE TREE, OR (11) AN AREA AROUND THE TREE EQUAL TO ONE AND ONE -HALF FEET (1 -1 12) IN DIAMETER FOR EACH ONE INCH OF TREE CALIPER. THE RENEWING OFFICIAL MAY REQUIRE A LARGER TREE PR07ECRON ZONE BASED ON TREE SIZE, SPECIES SOIL, OR OTHER CONDITIONS /. MULCH LAYER REQUIRED: ALL AREAS WITHIN THE REQUIRED FENCING SHALL BE COVERED COMPLETELY AND EVENLY WITH A MINIMUM OF THREE INCHES (3) OF BARK MULCH PRIOR 70 INSTALLATION OF THE PROTECTVE FENCING EXCEPRONS MAY BE APPROVED BY THE REVIEWING OFFICIAL IF THE MULCH WILL ADVERSELY AFFECT PROTECTED GROUND COVER PLANTS g. LION /TOR /NC REQUIRED DURING CONSTRUCTION: THE APPLICANT SHALL RETAIN A PROFESSIONAL ARBORIST OR OTHER QUALIFIED PROFESSIONAL TO PRUNE BRANCHES AND R00T5, FERRUZE, AND WATER AS APPROPRIATE FOR ANY ]BEES AND GROUND COVER WHICH ARE TO BE RETAINED. NO 1. 6 -FT. HIGH TEMPORARY CHAIN I ,. , .W:•, �. III _,. , -•, ��������� ',- •' i. , li;l' � „ '. i I I�, ,, 11II. oiiiii0ii4 TREE PROTECTION DETAIL AT Fuu saLE 0425821.3063 F425821.2423 TIM IwFEE�TUxaxpl�wrr N0. REVISION BY DATE APPR APP"�;,,, xTRncAl xro 19Be NORIEONLOIL Na➢ 198]/1991 Q� CITY OF D.R. STRONG D p S CONSULTING ENGINEERS BEHG „ED. AS NOTED ENGINEERS PLANNERS SURVEYORS DPAWH: CWA�620 7TH AVENUE KlRKL4N0, WA 98033 CHECKED, REN TON QATUM Planning /Building /Public Works Dept. R- 369013 RECOMME FORAPPOVAL BY Date: a a BY: Date: BY: Date: BY: Date: SADDLEBROOK DIY. II TESL NOTES AND DETAILS 08.08.13 RDCAYM(: PALE CB BE INCREASED. STD. PLAN - 217.10 � � 4 PUBLIC WORKS INTERCEPTOR SWALE ,p- D DEPARTMENT MARCH 2008 o. CONSTRUCTION STORAGE PROHIBITED: THE APPLICANT MAY NOT FILL, EXCAVATE, STACK OR STORE ANY EQUIPMENT, DISPOSE OF ANY MATERIALS SUPPLIES OR FLU /OS OPERATE ANY EQUIPMENT, INSTALL IMPERVIOUS SURFACES OR COMPACT THE EARTH IN ANY WAY WITHIN THE AREA DEFINED BY THE GRIP LINE OF ANY TREE TO BE RETAINED. b. FENCED PROTECRON AREA REQUIRED: THE APPLICANT SHALL ERECT AND MAINTAIN SIX FOOT (B) HIGH CHAIN LINK TEMPORARY CONSTRUCTION FENCING AROUND THE GRIP LINES OF ALL RETAINED TREES OR ALONG THE PERIMETER OF A STAND OF RETAINED TREES. PLACARDS SHALL BE PLACED ON FENCING EVERY FIFTY FEET (BO) lNDlCA71NG THE WORDS, NO TRESPASSING - PROTECTED TREES" OR ON EACH SIDE OF THE FENCING IF LESS THAN FIFTY FEET (50). S /TE ACCESS TO INDIVIDUALLY PROTECTED TREES OR CROUPS OF ]BEES SHALL BE FENCED AND SIGNED. INDIVIDUAL TREES SHALL BE FENCED ON FOUR (4) SIDES. IN ADDITION, THE APPLICANT SHALL PROVIDE SUPERNSION WHENEVER EQUIPMENT OR TRUCKS ARE MOVING NEAR TREES. C. PROTECTION FROM GRADE CHANGES: F THE GRADE LEVEL ADJOINING TO A TREE TO BE RETAINED IS TO BE RAISED, THE APPLICANT SHALL CONSTRUCT A DRY ROCK WALL OR ROCK WELL AROUND THE TREE. THE DIAMETER OF THIS WALL OR WELL MUST BE EQUAL TO THE TREE'S GRIP LINE. d. IMPERVIOUS SURFACES PROHIBITED WITHIN THE GRIP LINE THE APPLICANT MAY NOT INSTALL IMPERVIOUS SURFACE MATERIAL WITHIN THE AREA DEFINED BY THE GRIP LINE OF ANY TREE TO BE RETAINED. e. RESTR/CRONS ON GRADING WITHIN THE DRIP LINES OF RETAINED ]BEES THE GRADE LEVEL AROUND ANY TREE TO BE RETAINED MAY NOT BE LOWERED WITHIN THE GREATER OF THE FOLLOWING AREAS: (l) THE AREA DEFINED BY THE GRIP LINE OF THE TREE, OR (11) AN AREA AROUND THE TREE EQUAL TO ONE AND ONE -HALF FEET (1 -1 12) IN DIAMETER FOR EACH ONE INCH OF TREE CALIPER. THE RENEWING OFFICIAL MAY REQUIRE A LARGER TREE PR07ECRON ZONE BASED ON TREE SIZE, SPECIES SOIL, OR OTHER CONDITIONS /. MULCH LAYER REQUIRED: ALL AREAS WITHIN THE REQUIRED FENCING SHALL BE COVERED COMPLETELY AND EVENLY WITH A MINIMUM OF THREE INCHES (3) OF BARK MULCH PRIOR 70 INSTALLATION OF THE PROTECTVE FENCING EXCEPRONS MAY BE APPROVED BY THE REVIEWING OFFICIAL IF THE MULCH WILL ADVERSELY AFFECT PROTECTED GROUND COVER PLANTS g. LION /TOR /NC REQUIRED DURING CONSTRUCTION: THE APPLICANT SHALL RETAIN A PROFESSIONAL ARBORIST OR OTHER QUALIFIED PROFESSIONAL TO PRUNE BRANCHES AND R00T5, FERRUZE, AND WATER AS APPROPRIATE FOR ANY ]BEES AND GROUND COVER WHICH ARE TO BE RETAINED. NO 1. 6 -FT. HIGH TEMPORARY CHAIN I ,. , .W:•, �. III _,. , -•, ��������� ',- •' i. , li;l' � „ '. i I I�, ,, 11II. oiiiii0ii4 TREE PROTECTION DETAIL AT Fuu saLE 0425821.3063 F425821.2423 TIM IwFEE�TUxaxpl�wrr N0. REVISION BY DATE APPR APP"�;,,, xTRncAl xro 19Be NORIEONLOIL Na➢ 198]/1991 Q� CITY OF D.R. STRONG D p S CONSULTING ENGINEERS BEHG „ED. AS NOTED ENGINEERS PLANNERS SURVEYORS DPAWH: CWA�620 7TH AVENUE KlRKL4N0, WA 98033 CHECKED, REN TON QATUM Planning /Building /Public Works Dept. R- 369013 RECOMME FORAPPOVAL BY Date: a a BY: Date: BY: Date: BY: Date: SADDLEBROOK DIY. II TESL NOTES AND DETAILS 08.08.13 RDCAYM(: PALE CB AT Fuu saLE 0425821.3063 F425821.2423 TIM IwFEE�TUxaxpl�wrr N0. REVISION BY DATE APPR APP"�;,,, xTRncAl xro 19Be NORIEONLOIL Na➢ 198]/1991 Q� CITY OF D.R. STRONG D p S CONSULTING ENGINEERS BEHG „ED. AS NOTED ENGINEERS PLANNERS SURVEYORS DPAWH: CWA�620 7TH AVENUE KlRKL4N0, WA 98033 CHECKED, REN TON QATUM Planning /Building /Public Works Dept. R- 369013 RECOMME FORAPPOVAL BY Date: a a BY: Date: BY: Date: BY: Date: SADDLEBROOK DIY. II TESL NOTES AND DETAILS 08.08.13 RDCAYM(: PALE CB SADDLEBROOK DIY. II TESL NOTES AND DETAILS 08.08.13 RDCAYM(: PALE CB