HomeMy WebLinkAboutR-369906LEGEND
ROADWAY CENTERLINE
PROPERTY / LOT LINE
RIGHT -OF -WAY
BOUNDARY LINE
EASEMENT LINE
BUILDING SETBACK LINE
ROLLED CURB AND GUTTER
VERTICAL CURB AND GUTTER
AERIAL CONTOUR
CONTOUR
SPOT ELEVATION
STREAM WITH BUFFER
>40% EXISTING STEEP SLOPE
EXISTING
OHW /
PROPOSED
EXISTING
ANCHOR
POWER POLE
STREET LIGHT
POWER VAULT
TELE. VAULT
FENCE
SIGN
MAILBOX
BARRICADE
TELE. MANHOLE
GAS VALVE
GAS METER
JOINT UTILITY TRENCH
T.E.S.C.P.
E
F 7P
* x-
b
0
�VnVnVnV
TOP OF SLOPE
- .._ " - --
CUT OFF SWALE
• • • • • •
• BASIN BOUNDARY
PROPOSED SIDEWALK
CLEARING LIMITS
- - - -
EXISTING CLEARING LIMITS
dM
PROPOSED S.D. DITCH f
-3
RIP RAP PAD
FILTER FENCE
- x- x ---tt-
PROPOSED GRASSCREIE....
-.
TYPE
III BARRICADE
STORMWATER CONVEYANCE CHANNEL
CATCH BASIN TYPE 1 W /GRATE
0
IDS°-\►
CATCH BASIN TYPE 1 W /SOLID LID
•
■
-- EXISTING CONTOUR
-- -- --- ---- - -- - --
CATCH BASIN TYPE 2 W /GRATE
a
. Nom(( KS'/ /�•.•�f
CATCH BASIN TYPE 2 W /SOLID LID
OO
O
QQ
STORM DRAIN CLEANOUT
o
O
YARD DRAIN
O
0
W
W ®
SO SERVICE 6" CPEP WITH
c `
66.0
99
INVERT 0 CLEAN OUT
0
Zo
ROOF DRAIN DISPERSION
- c `
- - - - -
�
- �' 866.0
o
ROOF LEVEL SPREADER
€�
E
F03
SPLASH BLOCK
■
■
t3
°
zom 5
STORM DRAIN PIPE
Uma
tp
UNREINFORCED ROCKERY:�'27
m
O U,
0.
3 �
3 °o�
GEOGRID REINFORCED ROCKERY
CD _
�
w
BLOCK WALL
�n
ba'
U ?
Q O
SANITARY SEWER MANHOLE
r3
ZO
00
SANITARY SEWER CLEANOUT
O
O
3
SANITARY SEWER CAP
L
C
SANITARY SEWER PIPE
v�
O
s
Jo
SANITARY SEWER FORCE MAIN
FM
J0
W
RI
6" DIA DOUBLE SANITARY SIDE SEWER
QZF
Z
0+33 (STATION ALONG MAINLINE)
_
0 +33
p Y
21 LF. (STUB LENGTH FROM MAIN TO CLEANOUT)
O
v/ 0
VJ Ld
21 L.F.
J
866.0 (I.E. AT CLEANOUT)
866.0
W
6" DIA SINGLE SANITARY SIDE SEWER
WW
> a
0 +33 (STATION ALONG MAINLINE)
LLI
r o
0 +33
Z
21 LF. (STUB LENGTH FROM MAIN TO CLEANOUT)
C
X21
L.F.
N
866.0 (I.E. AT CLEANOUT)
Q W
U)
866.0
FIRE HYDRANT (3 PORT)
QN
U"
W
FIRE HYDRANT (2 PORT),
U�oi
Z
GATE VALVE
►e
N
O
BUTTERFLY VALVE
N
✓•
CONCRETE BLOCKING
v'
0
DWG. NAME: NT -01
DESIGNED BY:
WATER CAP
n
n
CHECKED
BY:
DOMESTIC / IRRIGATION METER
DATE:
0
DATE OF
PRINT:
BLOWOFF ASSEMBLY
1
1
6 OF 1 7
AIR -VAC ASSEMBLY
1�
REDUCER
v
•
DETECTOR CHECK VALVE
K
Z
o
r
Z o
CROSS
a�
=2,
o
TEE
.
�
....
i
g
90' BEND
-ti
I
0
111
B
WATER PIPE
�•
m
GUARD POST (BOLLARD)
°
COUPLING
�$
s n
to
I
n
TOWER
E
TRANSFORMER PAD
0
°
TELE. RISER
"
i 6
EXISTING
ANCHOR
POWER POLE
STREET LIGHT
POWER VAULT
TELE. VAULT
FENCE
SIGN
MAILBOX
BARRICADE
TELE. MANHOLE
GAS VALVE
GAS METER
JOINT UTILITY TRENCH
T.E.S.C.P.
E
F 7P
* x-
b
0
�VnVnVnV
CONSTRUCTION ENTRANCE
-
CUT OFF SWALE
• • • • • •
• BASIN BOUNDARY
®
CLEARING LIMITS
- - - -
EXISTING CLEARING LIMITS
dM
N.G.P.E. FENCE
-3
RIP RAP PAD
FILTER FENCE
- x- x ---tt-
LEFT TURN ARROW
ORANGE FILTER FABRIC FENCE
TYPE
III BARRICADE
STORMWATER CONVEYANCE CHANNEL
-� --
(SCC)
IDS°-\►
°-
INTERCEPTOR DIKE /SWALE
�--
-- EXISTING CONTOUR
-- -- --- ---- - -- - --
GRADE BREAK LINE
TRAFFIC
PROPOSED
�>F
O . .
�i
............
-826- PROPOSED CONTOUR
WETLAND BOUNDARY AND BUFFER
PROPOSED STORM DRAINAGE
SURVEY
■ SET HUB AND TACK
0 FOUND HUB AND TACK
• SET REBAR AND CAP
O FOUND REBAR AND CAP
SET PK -DRILL HOLE
FOUND PK -DRILL HOLE
CALC CLOSING CORNER
FOUND CLOSING CORNER
lll�Mc FOUND MEANDER CORNER
I---Mc CALC MEANDER CORNER
O PROPOSED MONUMENT IN CASE
® FOUND MONUMENT IN CASE
B PROPOSED MONUMENT IN CASE
9 FOUND SURFACE MONUMENT
® PROPOSED SURFACE MONUMENT
® CALC SECTION CORNER
+ FOUND SECTION CORNER
DOC*4111 FOUND QUARTER CORNER
COQ CALC QUARTER CORNER
OCENTER SECTION
OTAX LOT
'WC FOUND WITNESS CORNER
0 w CALC WITNESS CORNER
i ALDER
CONSTRUCTION ENTRANCE
f*
ROCK CHECK DAM
TURN ARROW
SEDIMENT BARRIER
®
STRAW BALE
f4°oo
GRAVEL CONE
dM
HANDICAP PARKING
sa .
RIP RAP PAD
SURVEY
■ SET HUB AND TACK
0 FOUND HUB AND TACK
• SET REBAR AND CAP
O FOUND REBAR AND CAP
SET PK -DRILL HOLE
FOUND PK -DRILL HOLE
CALC CLOSING CORNER
FOUND CLOSING CORNER
lll�Mc FOUND MEANDER CORNER
I---Mc CALC MEANDER CORNER
O PROPOSED MONUMENT IN CASE
® FOUND MONUMENT IN CASE
B PROPOSED MONUMENT IN CASE
9 FOUND SURFACE MONUMENT
® PROPOSED SURFACE MONUMENT
® CALC SECTION CORNER
+ FOUND SECTION CORNER
DOC*4111 FOUND QUARTER CORNER
COQ CALC QUARTER CORNER
OCENTER SECTION
OTAX LOT
'WC FOUND WITNESS CORNER
0 w CALC WITNESS CORNER
i ALDER
STRAIGHT /RIGHT TURN ARROW
f*
RIGHT
TURN ARROW
POPLAR
ONLY
Cfo
BIKE
LANE
dM
HANDICAP PARKING
.k,
STOP
BAR
MADRONA
LEFT TURN ARROW
R
TYPE
III BARRICADE
SURVEY
■ SET HUB AND TACK
0 FOUND HUB AND TACK
• SET REBAR AND CAP
O FOUND REBAR AND CAP
SET PK -DRILL HOLE
FOUND PK -DRILL HOLE
CALC CLOSING CORNER
FOUND CLOSING CORNER
lll�Mc FOUND MEANDER CORNER
I---Mc CALC MEANDER CORNER
O PROPOSED MONUMENT IN CASE
® FOUND MONUMENT IN CASE
B PROPOSED MONUMENT IN CASE
9 FOUND SURFACE MONUMENT
® PROPOSED SURFACE MONUMENT
® CALC SECTION CORNER
+ FOUND SECTION CORNER
DOC*4111 FOUND QUARTER CORNER
COQ CALC QUARTER CORNER
OCENTER SECTION
OTAX LOT
'WC FOUND WITNESS CORNER
0 w CALC WITNESS CORNER
i ALDER
L
CEDAR
a
COTTONWOOD
(R)
POPLAR
,Le
APPLE
S.S.E.
FIR
dM
WILLOW
.k,
SPRUCE
0
MADRONA
e
OAK
0
HEMLOCK
0
MAPLE
PINE
L
ARC LENGTH
a
DELTA
(R)
RADIAL BEARING < >
(NR)
NON- RADIAL BEARING
S.S.E.
SANITARY SEWER EASEMENT
P.S.D.E.
PRIVATE STORM DRAINAGE EASEMENT
FF
ELEVATION OF MINIMUM BASEMENT
FINISH FLOOR
S.D.E.
STORM DRAINAGE EASEMENT
CONSTRUCTION SEQUENCE
1. PRE - CONSTRUCTION MEETING.
2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE
CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN).
3. FLAG OR FENCE CLEARING LIMITS.
4. INSTALL PERIMETER PROTECTION, SUCH AS FILTER FABRIC FENCE, WHERE
INDICATED.
5. GRADE AND INSTALL ROCK -LINED CONSTRUCTION ENTRANCE(S).
6. INSTALL SEDIMENT BARRIERS OVER EXISTING CATCH BASINS.
7. CLEAR TO LIMITS SHOWN ON PLANS AND INSTALL INTERCEPTOR DITCHES.
8. CONSTRUCT SEDIMENT TRAP.
9. ROUGH GRADE PARKING AREA.
10. INSTALL SANITARY SEWER SYSTEM.
11. INSTALL STORM DRAINAGE SYSTEM AND STORMWATER VAULT.
12. INSTALL DOMESTIC WATER SYSTEM.
13. INSTALL SEDIMENT BARRIERS OVER CATCH BASINS.
14. FINE GRADE FOR CURB AND GUTTER, SIDEWALK, PAVEMENT, AND
LANDSCAPING.
15. INSTALL CURB, GUTTER, AND SIDEWALK.
16. PAVE PARKING AREA.
17. REMOVE SEDIMENT BARRIERS.
18. COMPLETE LANDSCAPING.
19. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF
RENTON STANDARDS AND MANUFACTURERS RECOMMENDATIONS.
20. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO
THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL
IS ALWAYS IN ACCORDANCE WITH CITY OF RENTON STANDARDS.
21. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS
DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH
STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT.
22. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
23. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30
DAYS.
24. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE
STABILIZED AND BMPS REMOVED IF APPROPRIATE.
R- 369906
CHECKED FOR COMPLIANCE
TO CITY STANDARDS
Date
Date
Date
REVISIONS
NO.
DfSLPoPIpN
h
BY
J.
. Nom(( KS'/ /�•.•�f
C%GIIAS L
f•c•TS
QQ
g`
0
W
W ®
a
°u
e
z
99
0
Zo
WNM
mO
o
�m
zN,
a
°w
;c
E
F03
J<m
O xT;
t3
°
zom 5
O a^
- ss
'>
Uma
E
m
O U,
3 �
3 °o�
c0
PTA
w
u
�n
ba'
U ?
Q O
Z
r3
ZO
00
Z
N
0
3
Z
Z
v�
O
Jo
J0
W
QZF
Z
_
p Y
Z
N
v/ 0
VJ Ld
LQ
Lu
J
rrr^
VJ to
W
WW
> a
\ W
/ U)
LLI
r o
O
Z
Z
Ix n
cr
N
Q W
U)
W b
QN
U"
W
U�oi
Z
w
K
O
U
JOB NO.:
1320 - 005 -008
DWG. NAME: NT -01
DESIGNED BY:
LOB
DRAWN BY:
JJH
CHECKED
BY:
DATE:
09 /06/2013
DATE OF
PRINT:
NT -01
6 OF 1 7