Loading...
HomeMy WebLinkAboutR-370008w zz U w a. a m � � �s 10 LF OF 12' DIA. HOPE PIPE 0 1.0 %:) 1 Sim- =L__ =• - \ ` 1rjICULVERT "c--- = SEWER MANHOLE 1 1= 359.359. 39 �- = 350.14(8'PVC E) 411 = 350.04(8"PVC W) )DER (S) 12' CULVERT END Ex. e SAINT SECTION WTfH PoPRAP, IE= 370.70 MM = J /J.15V 12' E IE= 370.90 12' W IE= 370.80 _ SEE STD. PLANS 200.00, 126 LF OF 12' DIA. Nc 203.00 HDPE PIPE 0 4.0% PS �31 LF OF B' DA. HDPE STORM PIPE 10 4.7% 11 SANITARY SEWER MANHOLE / RIM = 373.54 LE =365.39(6'PVC NE) i ? 4, I.E =365.44(NO PIPE E) LE =365.32(TPV- "" /CAP , RIM = 377.46 8' E IE= 374.56 9158" 8' S IE= 374.46 SEE STD. PLANS 200.00, I ire 203.00 E L:382,18.27 EL:38254 10' POWER EASEMENT AFN 5664146 t � RIM = 37521 I .� 8' N IE= 372.4eo 'i 8' E IE= 372.4� V �' 12' S IE= 37 2.35EE SIT). PLANS 201.0 ^ \ 204.4. . J o I 23 LF OF 12' DII °� HDPE STORM PIP0 1.0I Pi � SEE L FOUND REBAR /CAP CAP UNREADABLE 7 -20 -12 HIM = J / /.UU tY E LE= 370.18 ---- F- - - - - -- - - - -- TN. EASEMENT FOR PARKING, I M CIRCULATION, AND LANDSCAPING AFN 9009170446 25' GAS EASEMENT UNDERGROUND DETENTION SYSTEM SHALL BE CONTECH CMP AFN 9501250239 (REFER TO CONTECH PLANS & DETAILS SHEETS C1.9 & C1.9A) -VOL PROVIDED= 48,957 CFF - OUTLET ELEV. = 370.12 -TOP ELEV. = 374.62 -SYSTEM IE= 369.62, 6' PARCEL "C" REFER TO CONTECH DETAILS ON PLANS 20' SEWER EASEMENT----4- - COORDINATE WITH ISLAND UG14T POLE LOCATIONS AFN 9009170444�_ -SHOP DRAWINGS SHALL BE SUBMITTED TO ENGINEER: "B" 5' INGRESS, EGRESS EASEMENT AFN 9009170443 KIM = J /4.150 - 8' W IE (EX.)= 372.26 "RIGHT it SEE STD. PLANS 201.00. HDPE STORM PIPE 203.00 E IE= 370.65 (EX) PAR L A 0 1.5% = 369.70 RIM = 378.31 SHEI. IEK ,,,,;NAL 12' N IE= 370.10 "BUS �� 12' W IE= 370.00 L -� SEE STD. PLANS 201.00, SECTION (8.70.60.00) 204.50 AND DETAIL ST4 TOLE 74 LF OF 12' DIA HDPE RIM= 370.63 -m-9- �) I.E.= 362.23(6'DI NE) _ LE =361.03(8'PVC E) NUMBERED NOTATION LE.= 360.53(ff PVC S) - \ RIM - 376.00 _ -- ✓i-W -C SR)tBARLTER SRRUCTURE ` WITH CSF MEDIA 4 SEE STD. PLANS RIM = 377.5 \ WITH ZPG MEDIA 1Y E IE= 368.08 NCREFE DRIVEWAY �d1 12' SW IE= 366.28 CULVERT 12' E IE= 369.98 1E =36736(1YCONC E) - - -'- FLARED END SECTION _ 3% IE= 21 LF OF 12' DIA RCP 52 LF OF 12' DIA HOPE PIPE 0 0.5% FniiND �- SCRIBED "X" ` N:165421.12 \ E:1302592.35-- - J�o _ - ___--- -- -- -- EL:375.52 FOUND TACK IN FACE OF CURB 8 -01 -12 i A 1 i I RIM = 379.37 12' E IE= 376.37 ALL PAVING ENCH RESTORATION 12" W IE= 375.94 SHALL COMPLY THE CITY OF SEE STD. PLANS 200.00, i yam-- 203.00 RENTON STAND S E' 152 LF OF 12' DIA. 12' W IE= 388.10 (� . . " .. \ ' 83 LF OF 6" RIM - 390.36 ; UN DERORAIN 0 5.33% HDPE PIPE 1 8% 12' E IE= 388.25 (EX) SEE STD PLANS 2 TWIST CATCH BASIN TOP _ ' r 6" IE= 380.40 TTrr \ RIM = = 37 6' E IE= 376.50 8' W IE= 376.01 SEE STD. PLANS 200.00, 203.00 FUTUM RETAL 1.1 Ac. 185 LF OF 8' DIA HDPE STORM PIPE 0 0.7% FUTURE ROOF DRAIN 8" IE= 377.33, PLACE CAP AT END 113 LF OF 8' DIA HDPE STORM PIPE 0 3.2% 12' IE= 372.09 12' IE= 370.12 i • • I ACCESS MANHOLE TYP. • _(REFER TO CONTECH • DETAILS) 12' IE= 372.11 -12' IE= 370.12 DAYLIGHT INTO _ RIPRAP, 6' IE= I:Cea go go 9- qTl r" 2 DROPS 62 LF OF 8' DIA. HOPE STORM PIPE 0 1.0% RIM = 380.96 6' S IE= 377.71 8' E IE= 376.18 8' N IE= 376.71 8' W IE= 376.08 SEE STD. PLANS 200.30, 203.00 71 LF OF 6' DIA HDPE STORM PIPE 0 3.8% / 122 LF OF 8' DW. HOPE STORM PIPE 0 1.0% ED 203.00 INTO NEW CURBUNE 1 237 LF OF 6' \ \ PERFORATED 4 #2 ELEV 400.69 ,,°,,v UNDERDRAN O .4% RIM = 393.64 SPIKE IIA. o U.I. n R 12'E IE= 391.59 Tor - _ SEE STD. PLANS 201.00, 204.40, 260.10 33 LF OF 8' DIA. DUCTILE \IRON PIPE 0 0.5% \\ \ \ . e" .I. WA �Qo,\ CONNECT TO DC \ CATCH BASIN, ASSUMED IE= 391.42 CID 5 o I �c \ RIM = 380.40 6' IE= 381.30 8' SE IE= 377.50 \ 8' W IE= 377.40 SEE STD. PLANS \ 201.00, 204.40 \ 96 LF OF 6' PERFORATED UNDERDRAIN 0 0.5% X 97 LF OF 8' DIA HDPE STORM PIPE 1 0 2.6% 1 1 11 1 ® ` 1 5LFOF6' UNDERDRAIN THRU ROOF DRAIN CONNECTION 6' IE= 380.40 PROPOSED TIETAL 16,270 sf ZONED: WAM& ARMW (CA) PARKING REQUIRED: 41 PARKING PROVIDED: 69 FFE • 384.40 v nu 2921058125 25 LF OF 6' SOLID 175 LF OF 6' UNDERDRAIN O 0.25% `PERFORATED 6' IE= 382.40 / UNDERDRAIN 0 0.25% WALL 0 5.0% 1 1 II _ 6' IE= 380.75 RIM = 383.00 I 6' E IE= 380.50 I 8' NW IE= 380.00 SEE STD. PLANS 200.30, 203.00 II 1 X. I 41 SE11ER I +I I 113 LF OF 6' PERFORATED UNDERDRAIN 0 1.8% I Ia Iz IRECT NAT I I NLY SEWER MANHOLE r9 4(B"PVC E) 9(8 "PVC S) FOUND REBAR /CAP PACE ITS #11691 d� ACE S 11691 -01 -12 U PROPER RTY I IM 4 . LE #73 -2 1 1 X. A .4 I1E. 3B Ot 8'PVC N) EX. 8" SAN LE =389. ( 'PVC SW) LADDER (S I SEWER 12" CULVERT END SECTION 4-` /¢' i - _r ! FOUND REBAR /CTP C '2 DROPS, 1 LUMI PACE LS 11691 ` 28 LF OF 12" DIA IE= 380.00) WITH RIPRAP, \ °� # -' w ` 'IE= 383.00 �� i l a 8 -01 -12 -� HDPE STORM PIPE \ � ..: I:: -� 0 1.8% \ AGL P _NC FOUND BRASSIwrx" NIT DW O4 7 -1s -1z £� RENTON ST DARDS EX. MANHOLE #13 -1 n EX. MANHOLE #7252 -2 -". - B8.6B 25,837 ADT (2012 = 397.78 TC'388.68(8 PVC NE) 88.13(8'PVC E) "^ ^ER (S) I.E =388.08(8"PVC SE) EX. ✓i' SEWER IN I.E.= 387.78(8"PVC W) LADDER (S) SnTS AND HILL eoNt Y4A� "MO1 ITON CONSTRUCTION PLAN REVIEW RESUBMIRAL JEV 08/14/13 vi� 1 " =30' ITON CONSTRUCTION PLAN RENEW RESUBMITTAL JEV 08/05/13 ET um ITON CONSTRUCTION PLAN RENEW RESUBMITTAL JEV 06/20/13 °W1h EF KERN OCONNELL ITON CONSTRUCTION PLAN RENEW SUBMITTAL ET 04/29/13 a� ,., 1 gym' DATUM 1501 41h Ave. Su"o 1400 KO *%j 'Q� Sea1Na, WA 98101 -3655 • MW OIC e101 (206) 438 -2700 REVISION BY DATE APPR °0"`"0Eq°°' AiPIP @1FV SITE UTILITIES 26 LF OF 8' DIAL "RIGHT it �' nla HDPE STORM PIPE ONLY' , / R E IE= 370.65 (EX) PAR L A 0 1.5% = 369.70 US ST SHEI. IEK ,,,,;NAL iuSIGNSS "BUS �� 12' CULVERT END L -� 12' SECTION (8.70.60.00) / ` "STOP" 74 LF OF 12' DIA HDPE RIPRAP, IE= 382.50 T -- -m-9- 'STORM PIPE 0 0.5% _ NUMBERED NOTATION O - \ RIM - 376.00 _ -- ✓i-W -C - 8' N IE= 372.5 \ STORMFI STRUCTURE 4 SEE STD. PLANS ` - \ WITH ZPG MEDIA �O 201.00, 204.40 NCREFE DRIVEWAY �d1 RIM = 378.00 ENTRANCE \ s 12' E IE= 369.98 - ,, 12' W IE= 368.18 52 LF OF 12' DIA HOPE FniiND �- STORM PIPE 0 0.5% uN� = Ls #11691 I:Cea go go 9- qTl r" 2 DROPS 62 LF OF 8' DIA. HOPE STORM PIPE 0 1.0% RIM = 380.96 6' S IE= 377.71 8' E IE= 376.18 8' N IE= 376.71 8' W IE= 376.08 SEE STD. PLANS 200.30, 203.00 71 LF OF 6' DIA HDPE STORM PIPE 0 3.8% / 122 LF OF 8' DW. HOPE STORM PIPE 0 1.0% ED 203.00 INTO NEW CURBUNE 1 237 LF OF 6' \ \ PERFORATED 4 #2 ELEV 400.69 ,,°,,v UNDERDRAN O .4% RIM = 393.64 SPIKE IIA. o U.I. n R 12'E IE= 391.59 Tor - _ SEE STD. PLANS 201.00, 204.40, 260.10 33 LF OF 8' DIA. DUCTILE \IRON PIPE 0 0.5% \\ \ \ . e" .I. WA �Qo,\ CONNECT TO DC \ CATCH BASIN, ASSUMED IE= 391.42 CID 5 o I �c \ RIM = 380.40 6' IE= 381.30 8' SE IE= 377.50 \ 8' W IE= 377.40 SEE STD. PLANS \ 201.00, 204.40 \ 96 LF OF 6' PERFORATED UNDERDRAIN 0 0.5% X 97 LF OF 8' DIA HDPE STORM PIPE 1 0 2.6% 1 1 11 1 ® ` 1 5LFOF6' UNDERDRAIN THRU ROOF DRAIN CONNECTION 6' IE= 380.40 PROPOSED TIETAL 16,270 sf ZONED: WAM& ARMW (CA) PARKING REQUIRED: 41 PARKING PROVIDED: 69 FFE • 384.40 v nu 2921058125 25 LF OF 6' SOLID 175 LF OF 6' UNDERDRAIN O 0.25% `PERFORATED 6' IE= 382.40 / UNDERDRAIN 0 0.25% WALL 0 5.0% 1 1 II _ 6' IE= 380.75 RIM = 383.00 I 6' E IE= 380.50 I 8' NW IE= 380.00 SEE STD. PLANS 200.30, 203.00 II 1 X. I 41 SE11ER I +I I 113 LF OF 6' PERFORATED UNDERDRAIN 0 1.8% I Ia Iz IRECT NAT I I NLY SEWER MANHOLE r9 4(B"PVC E) 9(8 "PVC S) FOUND REBAR /CAP PACE ITS #11691 d� ACE S 11691 -01 -12 U PROPER RTY I IM 4 . LE #73 -2 1 1 X. A .4 I1E. 3B Ot 8'PVC N) EX. 8" SAN LE =389. ( 'PVC SW) LADDER (S I SEWER 12" CULVERT END SECTION 4-` /¢' i - _r ! FOUND REBAR /CTP C '2 DROPS, 1 LUMI PACE LS 11691 ` 28 LF OF 12" DIA IE= 380.00) WITH RIPRAP, \ °� # -' w ` 'IE= 383.00 �� i l a 8 -01 -12 -� HDPE STORM PIPE \ � ..: I:: -� 0 1.8% \ AGL P _NC FOUND BRASSIwrx" NIT DW O4 7 -1s -1z £� RENTON ST DARDS EX. MANHOLE #13 -1 n EX. MANHOLE #7252 -2 -". - B8.6B 25,837 ADT (2012 = 397.78 TC'388.68(8 PVC NE) 88.13(8'PVC E) "^ ^ER (S) I.E =388.08(8"PVC SE) EX. ✓i' SEWER IN I.E.= 387.78(8"PVC W) LADDER (S) SnTS AND HILL eoNt Y4A� "MO1 ITON CONSTRUCTION PLAN REVIEW RESUBMIRAL JEV 08/14/13 vi� 1 " =30' ITON CONSTRUCTION PLAN RENEW RESUBMITTAL JEV 08/05/13 ET um ITON CONSTRUCTION PLAN RENEW RESUBMITTAL JEV 06/20/13 °W1h EF KERN OCONNELL ITON CONSTRUCTION PLAN RENEW SUBMITTAL ET 04/29/13 a� ,., 1 gym' DATUM 1501 41h Ave. Su"o 1400 KO *%j 'Q� Sea1Na, WA 98101 -3655 • MW OIC e101 (206) 438 -2700 REVISION BY DATE APPR °0"`"0Eq°°' AiPIP @1FV SITE UTILITIES RM CATCH BRIM = 375.20 (SOLID COVER) �' nla CR 1F RIM -37 .38 12' E IE= 370.65 (EX) PAR L A RIM = 369.70 .. =373.40(12"(12' NE IE= 365.97 9104 1602 12' E IE= 365.61 - t2 "(12' W 12' W IE= 365.51 SEE FIRE HYDRANT ASSEMBLY T row UTILITY CROSSING WA.- I:Cea go go 9- qTl r" 2 DROPS 62 LF OF 8' DIA. HOPE STORM PIPE 0 1.0% RIM = 380.96 6' S IE= 377.71 8' E IE= 376.18 8' N IE= 376.71 8' W IE= 376.08 SEE STD. PLANS 200.30, 203.00 71 LF OF 6' DIA HDPE STORM PIPE 0 3.8% / 122 LF OF 8' DW. HOPE STORM PIPE 0 1.0% ED 203.00 INTO NEW CURBUNE 1 237 LF OF 6' \ \ PERFORATED 4 #2 ELEV 400.69 ,,°,,v UNDERDRAN O .4% RIM = 393.64 SPIKE IIA. o U.I. n R 12'E IE= 391.59 Tor - _ SEE STD. PLANS 201.00, 204.40, 260.10 33 LF OF 8' DIA. DUCTILE \IRON PIPE 0 0.5% \\ \ \ . e" .I. WA �Qo,\ CONNECT TO DC \ CATCH BASIN, ASSUMED IE= 391.42 CID 5 o I �c \ RIM = 380.40 6' IE= 381.30 8' SE IE= 377.50 \ 8' W IE= 377.40 SEE STD. PLANS \ 201.00, 204.40 \ 96 LF OF 6' PERFORATED UNDERDRAIN 0 0.5% X 97 LF OF 8' DIA HDPE STORM PIPE 1 0 2.6% 1 1 11 1 ® ` 1 5LFOF6' UNDERDRAIN THRU ROOF DRAIN CONNECTION 6' IE= 380.40 PROPOSED TIETAL 16,270 sf ZONED: WAM& ARMW (CA) PARKING REQUIRED: 41 PARKING PROVIDED: 69 FFE • 384.40 v nu 2921058125 25 LF OF 6' SOLID 175 LF OF 6' UNDERDRAIN O 0.25% `PERFORATED 6' IE= 382.40 / UNDERDRAIN 0 0.25% WALL 0 5.0% 1 1 II _ 6' IE= 380.75 RIM = 383.00 I 6' E IE= 380.50 I 8' NW IE= 380.00 SEE STD. PLANS 200.30, 203.00 II 1 X. I 41 SE11ER I +I I 113 LF OF 6' PERFORATED UNDERDRAIN 0 1.8% I Ia Iz IRECT NAT I I NLY SEWER MANHOLE r9 4(B"PVC E) 9(8 "PVC S) FOUND REBAR /CAP PACE ITS #11691 d� ACE S 11691 -01 -12 U PROPER RTY I IM 4 . LE #73 -2 1 1 X. A .4 I1E. 3B Ot 8'PVC N) EX. 8" SAN LE =389. ( 'PVC SW) LADDER (S I SEWER 12" CULVERT END SECTION 4-` /¢' i - _r ! FOUND REBAR /CTP C '2 DROPS, 1 LUMI PACE LS 11691 ` 28 LF OF 12" DIA IE= 380.00) WITH RIPRAP, \ °� # -' w ` 'IE= 383.00 �� i l a 8 -01 -12 -� HDPE STORM PIPE \ � ..: I:: -� 0 1.8% \ AGL P _NC FOUND BRASSIwrx" NIT DW O4 7 -1s -1z £� RENTON ST DARDS EX. MANHOLE #13 -1 n EX. MANHOLE #7252 -2 -". - B8.6B 25,837 ADT (2012 = 397.78 TC'388.68(8 PVC NE) 88.13(8'PVC E) "^ ^ER (S) I.E =388.08(8"PVC SE) EX. ✓i' SEWER IN I.E.= 387.78(8"PVC W) LADDER (S) SnTS AND HILL eoNt Y4A� "MO1 ITON CONSTRUCTION PLAN REVIEW RESUBMIRAL JEV 08/14/13 vi� 1 " =30' ITON CONSTRUCTION PLAN RENEW RESUBMITTAL JEV 08/05/13 ET um ITON CONSTRUCTION PLAN RENEW RESUBMITTAL JEV 06/20/13 °W1h EF KERN OCONNELL ITON CONSTRUCTION PLAN RENEW SUBMITTAL ET 04/29/13 a� ,., 1 gym' DATUM 1501 41h Ave. Su"o 1400 KO *%j 'Q� Sea1Na, WA 98101 -3655 • MW OIC e101 (206) 438 -2700 REVISION BY DATE APPR °0"`"0Eq°°' AiPIP @1FV 1. ALL TEXT & FEATURES SHOWN SCREENED ARE EXISTING. ALL STRUCTURES SHALL BE LOCATED IN RELATION TO THE PROPOSED IMPROVEMENTS 2. UTILITIES SHOWN WERE EITHER FIELD LOCATED, OR TAKEN FROM EXISTING RECORD /DESIGN DRAWINGS & ARE SHOWN ACCORDINGLY, THE CONTRACTOR SHALL EXERCISE CAUTION & FIELD VERIFY REQUIRED LOCATIONS PRIOR TO EXCAVATION & CONSTRUCTION. SURVEY BY. S= & RGL ENGOVAER 'G IXC 4616 CSNZER SYR66T TACOMA IA 96409 7678 (266) 474 -9449 FAX (253) 474 -0165 BRNCmuxa All elevations are based on NAVE) 88 datum. BM (f1) Elevation: 400.968' KC BM 'F8A (350' SE OF INTERSECTION - COORDINATES: N:165206.4, E:1303281.4) TBM (j2) Elevation: 400.69' Railroad Spike. FFE = 100.00 (ARCFL) m 384.40 (CIVL) DURING CONSTRUCTION, A CONTECH REPRESENTATIVE MUST BE ON -SITE AND PROVIDE A FINAL INSPECTION OF THE DETENTION SYSTEM AND FILTRATION UNITS IN COMPLIANCE WITH CITY OF RENTON STANDARDS B : Date:�/� BY Dab:y Dab: BY: Date: R- 310008 VELMEIR RETAIL PHARMACY UTILITY PLAN -SITE (-_1 J� I �- 370CC )g- 03/28/13 ae® C1.3 am 8 M SITE UTILITIES LEGEND C�JOG°�4C] MANHOLE • GRAPHIC SCALE CATCH BASIN 30 0 15 30 CLEANOUT❑ VALVE (WATER) FIRE HYDRANT ASSEMBLY T row UTILITY CROSSING NUMBERED NOTATION O WATER MAIN W SANITARY SEWER SIN UNDERDRAIN -uD UD- STORM SEWER 1. ALL TEXT & FEATURES SHOWN SCREENED ARE EXISTING. ALL STRUCTURES SHALL BE LOCATED IN RELATION TO THE PROPOSED IMPROVEMENTS 2. UTILITIES SHOWN WERE EITHER FIELD LOCATED, OR TAKEN FROM EXISTING RECORD /DESIGN DRAWINGS & ARE SHOWN ACCORDINGLY, THE CONTRACTOR SHALL EXERCISE CAUTION & FIELD VERIFY REQUIRED LOCATIONS PRIOR TO EXCAVATION & CONSTRUCTION. SURVEY BY. S= & RGL ENGOVAER 'G IXC 4616 CSNZER SYR66T TACOMA IA 96409 7678 (266) 474 -9449 FAX (253) 474 -0165 BRNCmuxa All elevations are based on NAVE) 88 datum. BM (f1) Elevation: 400.968' KC BM 'F8A (350' SE OF INTERSECTION - COORDINATES: N:165206.4, E:1303281.4) TBM (j2) Elevation: 400.69' Railroad Spike. FFE = 100.00 (ARCFL) m 384.40 (CIVL) DURING CONSTRUCTION, A CONTECH REPRESENTATIVE MUST BE ON -SITE AND PROVIDE A FINAL INSPECTION OF THE DETENTION SYSTEM AND FILTRATION UNITS IN COMPLIANCE WITH CITY OF RENTON STANDARDS B : Date:�/� BY Dab:y Dab: BY: Date: R- 310008 VELMEIR RETAIL PHARMACY UTILITY PLAN -SITE (-_1 J� I �- 370CC )g- 03/28/13 ae® C1.3 am 8 M