Loading...
HomeMy WebLinkAboutR-370202Scale: 1 " =20' C III III 40' 11).. 4 00 III INLET PROTECTION {I III I (TYPICAL) 111 o I .III I I I -� i III IIII I IIII I III I SILT FENCE I III 1 ° IIII � I III PARCEL # 3123059096 III so' SABHA GURUDWARA SINGH 3 00 1 A CP III ^Q, �s I NIL. D I e bl r L>, IIII � REMOVE EX. CULVERT ro _ 0 ro I III A II ° l A I III m III I i SILT FENCE III I 00 2 III I '3a J PARCEL # 3123059075 GURUDWARA SINGH SABHA III II I° III I 1 III I� W y W W y W W W W W W y, \ IIII 'I e�yWWWyWWWWWWWWWWWWWW`� \ I III II L' W W W W W W W LL' W W W W W V\ W 11 ✓' W\. Y I W W W W W ✓' W W W W `Y W W W W W W W W 4' WW III Qe. W W W W W W w y W W W W W W I III �W y W W y W� yWW y R� W W i III 1 00 II I III III III I III II l i III II II 285 27 0TRCT p I III II se PLAT OF GENEVA COURT II I IIII PI II I D.8.2 STANDARD ESC PLAN NOTES The standard ESC plan notes must be included on all ESC plans. At the applicant's discretion, notes that in no way apply to the project may be omitted; however, the remaining notes must not be renumbered. For example, if ESC Note #3 were omitted, the remaining notes should be numbered 1, 2, 4, 5, 6, etc. 1. Approval of this erosion and sedimentation control (ESC) plan does not constitute an approval of permanent road or drainage design (e.g., size and location of roads, pipes, restrictors, channels, retention facilities, utilities, etc.). 2. The implementation of these ESC plans and the construction, maintenance, replacement, and upgrading of these ESC facilities is the responsibility of the applicantESC supervisor until all construction is approved. 3. The boundaries of the clearing limits shown on this plan shall be clearly flagged by survey tape or fencing, if required, prior to construction (SWDM Appendix D). During the construction period, no disturbance beyond the clearing limits shall be permitted. The clearing limits shall be maintained by the applicanUESC supervisor for the duration of construction. 4. Stabilized construction entrances shall be installed at the beginning of construction and maintained for the duration of the project. Additional measures, such as constructed wheel wash systems or wash pads, may be required It ensure that all paved areas are kept clean and track out to road right of way does not occur for the duration of the project. 5. The ESC facilities shown on this plan must be constructed prior to or in conjunction with all clearing and grading so as to ensure that the transport of sediment to surface waters, drainage systems, and adjacent properties is minimized. 6. The ESC facilities shown on this plan are the minimum requirements for anticipated site conditions. During the construction period, these ESC facilities shall be upgraded as needed for unexpected storm events and modified to account for changing site conditions (e.g. additional cover measures, additional sump pumps, relocation of ditches and silt fences, perimeter protection etc.) as directed by - King County. 7. The ESC facilities shall be inspected daily by the applicant/ESC supervisor and maintained to ensure continued proper functioning. Written records shall be kept of weekly reviews of the ESC facilities. 8. Any areas of exposed soils, including roadway embankments, that will not be disturbed for two " consecutive days during the wet season or seven days during the dry season shall be immediately stabilized with the approved ESC methods (e.g., seeding, mulching, plastic covering, etc.). 9. Any area needing ESC measures that do not require immediate attention shall be addressed within seven (7) days. 10. The ESC facilities on inactive sites shall be inspected and maintained a minimum of once a month during the dry season, bi- monthly during the wet season, or within twenty four (24) hours following a storm event. 11. At no time shall more than one (1) foot of sediment be allowed to accumulate within a catch basin. All catch basins and conveyance lines shall be cleaned prior to paving. The cleaning operation shall not flush sediment -laden water into the downstream system. 12. Any permanent retention /detention facility used as a temporary settling basin shall be modified with the necessary erosion control measures and shall provide adequate storage capacity. If the facility Is to function ultimately as an infiltration system, the temporary facility must be rough graded so that the bottom and sides are at least three feet above the final grade of the permanent facility. 13. Cover measures will be applied in conformance with Appendix D of the Surface Water Design Manual D.8.2 STANDARD ESC PLAN NOTES 2009 Surface Water Design Manual - Appendix D 1/9/2009 D -99 14. Prior to the beginning of the wet season (Oct. 1), all disturbed areas shall be reviewed to identify which ones can be seeded in preparation for the winter rains. Disturbed areas shall be seeded within one week of the beginning of the coat season. A sketch map of those areas to be seeded and those areas to remain uncovered shall be submitted to the DDES inspector. R- 3 7 0202 IIrLr r�r�!iLei�L�r+r�FL��II.�.IOII�A�r Isnus.. �� uINGW iAa.'TKNgi � % IJ BAC(RLLTPCICrnMBI / IfIJII W BE e F IS ,L0 E h NATA 5Al. WICACN `F MDE�C / rL 55>cELFPN2 " PoS}5 PE➢M Cq EGUVIEFNf NOTES 1. CONBITKINOFUSE 6t SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS. 1' SILT FENCE IS NOT INTENDED TO TREAT GIXICENFRATED FLOWS NOR IS INTENDED TO LREAT SUBSTANTIAL AMWMB OF c ERUNO FTOK ?NY C0.NCENTMTEO FLOW MOST 6E CgYVEYEC THRDUGX THE DRAINAGE SYSTEFN 10 r\ SEJIMEMTRAPOR PIX1O. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1 THE GEOTCM4E USED MOCT MEI HESTANDAND I 1 OY LLCrW ACOPY OFTHE MANUP.CTUPLATS GABRIC SPECIF.CC11I NOG76E AYAIUELE ON SIT I ISj E SML% Q F F Ta S nY IFAP@ NA L.V a_ Oq °NWE4Ra1E _. L 1 uai 3 N 5 N4M5 R.fnC. w crurerw x A pARAFHSTUISI W A%M N CV Q 0W 4➢WFNLNOCF111B ovEmaowmvAa E- �< Z D . D fF1P/(eAEi fA,IE OEVCE W m 0 Q 0 wnTFn _U W m O • D • D W 0 6ECIIL NEN ORAXAE:A \iE rn -gECiµf11 V(IGMiEYAIrN gERiCYN.BYTiEL (LYP.I Z 0 O E C \ -0 9ELOw IN \EI�FAIEEfN OV<gFIW/BIPASS,TN) W ISOMETRIC NIEY1 NOTES 1. fiFe the Be YNn G,u lkrr MIGG, I:. Ut M- v.HtcaWwe 11 wL avNCG 2 TM BIDS Itsn a s.er.'hrtiox torEMEn lov¢80x hyP -1 3. T,. .ti l"Be 1a1 3Cw'lemovvltilro BOD uiUal. 6'1 DyygM mNs l 0 J. PeRC,nmJV<.u,sEalrc. ".:e °Th SIayEJ$ecFraua."1:N BL ASx o\ 1 M. PLAN 21690 PUBLIC RUN .9 CATCH BASIN FILTER DEPARTMENT /) MARCH 2008 0202 IIrLr r�r�!iLei�L�r+r�FL��II.�.IOII�A�r Isnus.. �� uINGW iAa.'TKNgi � % IJ BAC(RLLTPCICrnMBI / IfIJII W BE e F IS ,L0 E h NATA 5Al. WICACN `F MDE�C / rL 55>cELFPN2 " PoS}5 PE➢M Cq EGUVIEFNf NOTES 1. CONBITKINOFUSE 6t SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS. 1' SILT FENCE IS NOT INTENDED TO TREAT GIXICENFRATED FLOWS NOR IS INTENDED TO LREAT SUBSTANTIAL AMWMB OF c ERUNO FTOK ?NY C0.NCENTMTEO FLOW MOST 6E CgYVEYEC THRDUGX THE DRAINAGE SYSTEFN 10 r\ SEJIMEMTRAPOR PIX1O. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1 THE GEOTCM4E USED MOCT MEI HESTANDAND I 1 OY LLCrW ACOPY OFTHE MANUP.CTUPLATS GABRIC SPECIF.CC11I NOG76E AYAIUELE ON SIT I ISj E Iq 4 � fil Q F F Ta S nY IFAP@ NA L.V a_ L 1 uai N 5 N4M5 R.fnC. w A pARAFHSTUISI W A%M 2.2 STANDARD 57RENGTH FPBRIC REOJIRES WIRE BACNWG TO INCREASE THE STRENGTH OFTHE FENCE VANE BACKING OR UOSER POST 9ACING MAY BE REWIRED FOR E.iRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE. 2J WHERE THE FENCE IS INSTALLED THE SLOPE SLWLL NOT BE STEEPER THAN 2HN I ' 2.4 .F ATYPICALSILT PENCE Is USED TiE 6TANCARO �X<TPENCH MA'! NOT 8E REDUCED AS LONG AS THE BOTTOM B INCV£5 CF TIE 50.1 F@1! S WELL BURIED ANDSECURE IN A TRENCH THAT STAMUDIES THE 'ELI AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE :. J.. MAINTENANCE STANDARDS ".1 NIYOAAAGE SHPIL BE REPAIR IMMEDIATELY ' 3.2 IF CONCRNTRATEED FLOES ARE "DEW UPHILL 00 THE FENCE THEY MUST BE INTERCEPTED AND COfbEYEO TO A SEOPEtR TRAP OR PON 13 IT IS IMPORTNiT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING As A EAWEEF TO FLQV NA THEN CADS ING CQVN{NELUA710N OE FLOWS PARALLEL TO THE FENCE IF THIS OCCURS REPLACE THE FENCE OR RENOIFD THE TRAP SEDIMENT. 3.4 MUIME14T MOST BE REMOVED WHEN SEDIMENT 150INCHES HIGH 3.5 IF THE FILTER FABRIC TGEOTEMIUB HAS DETERIORATED DUE TO ULTRAVIOU'_69EMbOWN, R $HALL 6E aEFYAC£O. u W11 Poet 214 .cD W , s I, PUBLIC p'ORKS SILT FENCE EyTO� MARCH 2OCO q4� 04 w -J Z IL Q W W a_ a Y_ w 0 N W Z � w Z X _ W W ,zn v Z LI ZZ Z Z d Z Z W I� W ¢ Z W Ld 7 O a I1 PROJECT NUMBER 2012 -002 SHEET NO 2 4 OF TOTAL W a M N CV Q 0W E- H Z Z W m 0 Q 0 _U W m O W 0 u- rn Z 0 O E M: -0 W Z 0 W Z � w Z X _ W W ,zn v Z LI ZZ Z Z d Z Z W I� W ¢ Z W Ld 7 O a I1 PROJECT NUMBER 2012 -002 SHEET NO 2 4 OF TOTAL