HomeMy WebLinkAboutS-353601di
w
w
J
LL
T
LAKE WASHINGTON
g
g �
2
�rrE
v�
2u
m
s
m
CITY OF RENTON
WESTVIEW LIFT STATION UPGRADES
3
0
N6
,
�0 Gnaver Hif0m A
t4 1M, 51
�Y ShilJ3plRp CUt21
4
y
0
REFERENCE: 2009GOOGLE MAP
VICINITY MAP
NO SCALE
NE in St
.v =e�ir
n
NE
PROJECT SITE
MONTEREY AVE NE
RENTON, WA 98056
REFERENCE: 2007 GOGGLE EARTH
C AG E
LOCATION MAP
NO SCALE
WESTVIEW LIFT STATION
CONTRACT DRAWINGS
PROJECT NO. WWP -27 -3536
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, WA 98057
The undersigned has approved this
document for and on behalf
of Carollo Eningi eers, P.C.
Partner
OCTOBER 2010
CONTACT PERSONNEL
JOHN HOBSON PROJECT MANAGER (425) 430 -7279
DAVE CHRISTENSEN WASTEWATER UTILITY SUPERVISOR (425) 430 -7212
DRAWING LIST
SHEET NO. DRAWING NO. DESCRIPTION
od�6
1
G -01
COVER SHEET
2
G -02
GENERAL NOTES, ABBREVIATIONS, SYMBOLS AND DESIGN CRITERIA
3
C -01
SITE AND YARD PIPING PLAN
4
M -01
PLAN
5
M -02
SECTION
6
GE -01
SYMBOLS LEGEND
7
GE -02
ABBREVIATIONS
8
E -01
LIFT STATION POWER PLAN
9
E -02
LIFT STATION ONE -LINE DIAGRAM AND SCHEMATICS
5- 353601