Loading...
HomeMy WebLinkAboutS-361519C7 CV d- z U co 0 �^^ a �- () E ca Q_ a) cc N vJ C O y.. C (z LLI 0036 A 221 34 PA 0' ASp\ -SD .09 1ST FL. 15.6icNT ✓ 'J VASE #�5p8 .._..225. N� 6 OOMENi / I II ca+c. 00.1`1E I HSE F��OR EI - =2230 / NO BASEMENT I 6' FENCE � I I 2x2 BRICK POST (TYP1 1YP) III / / /r / /%g CONG. BLOCK MALL 1 GONG. III/ I II?�II >Y. DRIVE �f�/ MH #6 G - 8• SPRUCE 0g RIM =21vo. IE 6" W= 210? IE 210.3 12• DEgO. W V_1. w 0 "m oEgD. W 1. CON, WALK ROADWAY \ SS opt \ ?20 0g \e 0 \ co "c. FAIW `CPC n FFSy, TgJ WAS \ CGNC 1' /P CAS \ WACK SO � 1-SDMH RIM °__2207 7 \ 1 E. 12. W 207? RIM =210 45 \ LE. 12 E.= 08 N _207 B LE.6 0M 6E �y2�J,IC BRASB PIN \ ED1296219.92 EL. =20922 8 I.f 11J7rJ HSE # 516 EL.= 211.9. WI BASEMENT 1IT FLOG EL. 212.2 I SSMH HSE # 522 EL =21999 , I z "SE # 514 RIM 196.29 179.49' 1ST FLOOR I sp SEM � � NO BASEMEN / IE e "' 10 NO BASEMENT EL.= I HSE # 424 EL. =1929 HSE # 504 EL. =203.6 W B SEMENT OF, IS gpSEMENT GONG. A' FENCE DRIVE GONG' � DRIVE ASPHALT \ -JI GONG w DRIVE I DRFVE V � � � ASPHALT W S76 22 28 E w w zas.00 w w ASPHALT W / CONCRETE L G �''' � G G 2• PE IF) yH C 9H I e'O" µALL J n RECONNECTALL /STING ri 0060 SW LANGSTON PL IVESIDESEWERS 13 I SEE SEWER CONNECTION _- NOTES ON SHEET 10 (TYP.) CONG. ST FL. I 7� 0058 I 71 0056 HSE #Z�5.4 W /BASEMENT I I'S BASE ENt EL.c19g 50 7 I 6T ASOMENT 1989 3 3 RIM 206 61' I I NI . 08 C NW IE 4 CO CON N 204.3 IE "" CON S 202.6 n I N rc y LANDSCAPE µ� s 188.78 RIM CON SE 186.5 - -- LANOSCgpE IF 6 wAU (TYP) cGNC. 6 W I cO2E 0 89 ON W $ DRI \ w. G. / \ CONCRETE OHP \ $5 9 \ � N CURSCUT \o£ p1 w 3 SEE SHEET 4 CLAY w C SS c 2'9wIP 169.51' c \ cal I �. W G 5• FENCE HSE # OOR Ek,,- I ST gpSEMENT I I - REPLACE EX /STING BROKEN SIDE SEWER TEE WITH NEgV PVC TEE I ® I F CB RIM 154 W 182? r IF 12" 00" E 1821 83.0 IF. 6" -0N N 1PL00 N .. I _w 7.29 I -� REINSTATE ALL EXISTING LIVE SIDE SEWERS AND INSTALL R M 185,94 CIPP SEWER MAIN TO LATERAL REHABl�ITAT /ON AT EACH. HSE FLOOR 02. EL. =1798 SEE SEWER CONNECTION 11 NOTES ON SHEET 10 T T BASEMEN //� (TYP.) J Cg 61M 185W2180.3 I yiy L.A�HAi LE N 5 110.I ILLJ . =186 8 L Li T _ / WATER VT05E RIM IE 4' PVC Cg RIM E3'I�60,1 420 173.3 I CON # OE 1"CON SW 159 B I 1ST gpSEMENT W/ P�q 13 HALT OHP� w w - EX. SSMH CONCRETE)' - - - 220 ............... N nas23.aa REPLACE EXISTING BROKEN SVI/ LANGSTOIV PL E 1296450.76 RIM= 196..29 SIDE SEWER TEE WITH NEW PVC EX. ROAD ABOVE SEWER : : : : IE 8" S = 179.49 _ : TEE IE8 "E 179.59 ............. ....... ..... ........... ..................... ........ IE 8" W = 189:89 489.72 WITH WITH ....... z10 INSIDE DROP /E 8" _ 17J.69- 179.54: LOCATE AND REMOVE EMH 178705.25 178697.25� #6 REM (STD. PLAN 402.2) EX. /BURIED C.O. ,z96117-,82 ... . ....4.... OVEEXS "CLAYSE MANHOLE TO BE:MODIFIED 200 RAND PER DETAIL ON SHEET 10 REMOVE EXISTING CO AND ...... ........ fi'EPL gCEW17H REPLACE WITH NEW 54" MH R/M- -22134 220.04 3071 -F HDP EX. ROAD ABOVE SEWER 1E8 "SE= 2f4.92 212.04 E@7.27% 190 ...... ............................... _ ............. ............................... ................... 132 6 ": INSTALL 444LF OF,8" CIPP EX. 8" CLAY SAN. SEWER SW SSMN: _ .............. .. BAGLEY PL S N 178477.47 E 1296413;76 PROPOSED MH #7 DELETED AND NEW C.O. / RIM = 186:76 INSTALLED DUE TO OTHER UTILITY CONFLICTS - - IE 8" SE = 176.2 . IE 8" NW 176.3 : N 178593.71 . ...: ...EX.. ROAD ABOVE SEWER ..... .IE 8" N :176.2.....:....... ....... ............... E 1296580.82 ....:. .....:.. ..� RIM= 184.84 N IE 8" W= MATCH EXISTING E ...... .......... ........:.. . /A P�D CIPP /NSTA R S=361 5 19 l$ ALL MATCH EX. AL BOF INSTALL 151:LFOF8 "CIPP 180 170 .60 _ 1659. ± 4 NE. "MH : 160 185.10: ..................... W = MATCH EXl NG APR 2012 EARLINGTON SEWER REPLACEMENT P.A Phase II °�s 9 9 OF 10 5 -36151 AS- BUILT DECEMBER 12, 2012 W AS -BUILT INFORMATION PROVIDED BY RAM SURVEYING &MAPPING, LLC 9UNYEYE9 PACE =zo` �'�` NA. ' °°° ql =oX w 191 /. " CITY 0 F SIDE SEWER CONNECTIONS ARE P JDH .0 R E N TO N SHOWN IN THEIR AS -BUILT LOCATIONS )AA.: JDH q1E IXCN BASED ON POST - INSTALLATION VIDEO INSPECTION. `NECKED C A�� Plan ning/Building/Pu bl ic works Dept. IF NOT ONE NOM NO. REVISION BY DATE APPR A°PX- 9GIF ALCONMN6 LH 180 170 .60 _ 1659. ± 4 NE. "MH : 160 185.10: ..................... W = MATCH EXl NG APR 2012 EARLINGTON SEWER REPLACEMENT P.A Phase II °�s 9 9 OF 10 5 -36151