Loading...
HomeMy WebLinkAboutS-361520N, C7 I n N D_ w z � as w as 7 i 0 D_ a C N E 0) U cz.. Q 0) 0) 41 c 0 rn c c0 W I PAY LIMIT TRENCH BACKFILL 6' ° ° a SEE DETAIL FOR STREET RESTORATION REQUIREMENTS BACKFILL MATERIAL SHALL BE 100% SELECT IMPORTED BACKFILL PER SECTION 9 -03.19 (SELECT BACKFILL) OF THE SPECIAL PROVISIONS n - a a e a 12"& 8"SDIT35-fVC SEWER PIPES TYPICAL TRENCH BEDDING AND BACKFILL PIPE ZONE MATERIAL PER SECTION 9- 03:12(4) GRAVEL BACKFILL FOR DRAINS OR PEA GRAVEL. EXCAVATION OF UNSUITABLE SOIL AND BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY) DEPTH AS APPROVED BY ENGINEER. MATERIAL SHALL MEET SECTION 9- 03.9(1) BALLAST NOTES` 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT PIPE ZONE MATERIAL TO 90% MINIMUM DENSITY EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE HAND TAMP ONLY. 4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW LINE IS MAINTAINED_ 5. ALL EXCAVATION AND BEDDING AND BACKFILL MATERIALS BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN THE TRENCH EXCAVATION SAFETY SYSTEMS BID ITEM. SAWCUT FINAL JOINT TYP. EACH SIDE 12" TYP TRENCH FPAYTIMIT EE DETAILS) ) OF TRENCH AS- BUILT NOTE: ALL REPLACEMENT SEWER MAINS WERE INSTALLED USING HDPE PIPE WITH THE PIPE- BURSTING METHOD.. PAYMENT LIMIT OF PATCH ASPHALT CONCRETE PAVEMENT RESTORATION DETAIL CONSTRUCTION NOTES 1. HORIZONTAL DATUM IS BASED ON MONUMENTATION AS SHOWN ON THE RESPECTIVE PLAN SHEETS. VERTICAL DATUM IS NAVD'88 BASED ON CITY OF RENTON CONTROL POINTS AS SHOWN ON THE RESPECTIVE PLAN SHEETS. 2. UTILITY CROSSING LOCATIONS AND ELEVATIONS SHALL BE DETERMINED BY THE CONTRACTOR IN ADVANCE OF ANY CONSTRUCTION ACTIVITIES. 3. EXISTING PRIVATE IMPROVEMENTS SHALL BE TEMPORARILY RELOCATED AND PERMANENTLY REPLACED TO ACCOMMODATE SERVICE CONSTRUCTION. 4. PROVIDE AS -BUILT INFORMATION SHOWING ALL INVERT AND RIM ELEVATIONS OF MANHOLE AND SIDE SEWER VERTICAL AND HORIZONTAL LOCATIONS. 5. INSTALL SEWER MAIN AND SERVICES A MINIMUM 2' FROM PARALLEL GAS LINES WHERE CONFLICT. OCCURS. 6. WHERE UTILITY PIPE LINE VERTICAL SEPARATION IS LESS THAN (1) ONE FOOT; INSERT ETHAFOAM HS 600 PLANK -FOAM BOARD OR EQUAL AS CLEARANCE SEPARATION. 7. A TRAFFIC CONTROL PLAN SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO BEGINNING CONSTRUCTION. MANHOLE FRAME AND COVER PER DRAWING 401. TO MA SECTI( ALIGN REUSE EXISTING FRAME & COVER EXISTING PORTION OF MANHOLE SECTIONS TO BE REMOVED REMAINED OF i�FR�OF LOWER STING MANHOLE. =R RUNGS WITH I SECTI AS -BUILT NOTE UNABLE TO ADD NEW SECTIONS TO MANHOLE DUE TO EXISTING WATER MAIN CONFLICT. REMOVE UPPER PORTION OF EXISTING OUTSIDE DROP AND INSTALL NEW INSIDE DROP PER STD PLAN 402.2 ABANDON EXISTING OUTSIDE DROP BY FILLING WITH CDF OR PEA GRAVEL RINGS S E "CRETEX PR " PROVED E L. (SEE E NOT 6' 4" MIN. TO AS -BUILT NOTE: 12" MAX. "CRETEX PRO -RING" ADJUSTMENT 24" PLUG LOWER PORTION O RING REQUIREMENT WAS DELETED EXISTING OUTSIDE DROP FROM THE CONTRACT. CONCRETE- 12„ WITH CONCRETE ADJUSTMENT RINGS WERE INSTALLED. EXIST. ASPH. CONC. PAVEMENT. TYP. 6" OF CLASS B ASPHALT CONCRETE PATCH PAVING SHALL BE DONE IN 2 - 3" LIFTS 6" CRUSHED SURFACING TOP COURSE BACKFILL (SEE BEDDING /BACKFILL DETAIL) NOTES: 1. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKFILLED AND PATCHED PER SPECIAL PROVISION 5 -06.1 AT END OF EACH WORK DAY. THIS WORK IS INCIDENTAL TO ALL TRENCH RESTORATION WORK. 2. THE FINAL SAWCUT JOINT SHALL BE A MINIMUM OF 1' BEYOND THE UNDISTURBED EDGE OF THE TRENCH. 3. ALL ASPHALT PATCH AREA OUTSIDE OF PAY LIMIT SHOWN SHALL BE CONSIDERED INCIDENTAL TO OTHER ITEMS OF WORK. 4. ALL TEMPORARY PATCHES ON TRENCHES SHALL BE PERMANENTLY PATCHED WITHIN (2) WEEKS OF COMPLETION OF WORK WITHIN THE ROADWAY AREA UNLESS APPROVED BY THE ENGINEER. U 4" 54" 1% ° ° v oa °. v 16" ° v ° mm. 54" SANITARY MANHOLE 1. STEPS TO BE POLYPROPYLENE SAFETY STEPS. 2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTIONS ARE INSTALLED. 3. CASTING SHALL BE PER STD. PLAN 401. 4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE. 5. ALL MANHOLES SHALL HAVE FLAT TOPS (NO CONES). 6. ISTMENT GFTI IE GMT-IN G TO GRADE n, I n rGeMPI ,PI IEBI UTILIZING "GRETEX PRe RING" MAINII Iel E B a S:F r \IT RINGS e_n PPRevrn EQ Ie1 uSTn1 I 1`19NI 61 I PER M FAIS RERS Ilrl.OIl MEINIB T191416 7. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING, COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING; WASSER MC- AROSHIELD OR APPROVED EQUAL; COLOR OF COATING SHALL BE WHITE. 8. RUBBER GASKETED JOINTS SHALL BE IN CONFORMANCE WITH ASTM C443. 9. CHANNEL HEIGHT SHALL BE A MINIMUM OF 3/4 THE INSIDE DIAMETER OF THE LARGEST PIPE. 10. CONNECTIONS TO MANHOLE SHALL BE MADE USING GPK ADAPTOR, KOR -N -SEAL BOOTS OR APPROVED EQUAL. 11. IN UNIMPROVED AREAS, MANHOLES SHALL EXTEND A MINIMUM OF 6" AND A MAXIMUM OF 12" ABOVE FINISHED GRADE OR MUST HAVE A MINIMUM 2' DIAMETER CONCRETE RINGS POURED AT GRADE. IN PAVED AREAS, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. 7:5't EX. 36" y IE = 189.72 (AS- BUILT) - EX. 60" OR 54" DIA. CONTRACTOR TO VERIFY PRIOR TO CONSTRUCTION IE = 179.54 (AS- BUILT) MANHOLE MODIFICATION INTERSECTION OF BAGLEY PL SW AND LANGSTON PL SW AS -BUILT SANITARY SEWER CONNETION NOTES 1. WITHIN THE REPLACEMENT PORTION OF THE PROJECT, SIDE SEWER RECONNECTIONS WERE ACCOMPLISHED USING WELDED "TEES" TO THE NEW HDPE SEWER MAINS. 2. THE "CIPP FOR SEWER MAIN TO LATERAL REHABILITATION" PORTION OF THE PROJECT WAS DELETED FROM THE CONTRACT. 3. CONNECTIONS OF NEW SANITARY SEWERS TO EXISTING MANHOLES WERE ACCOMPLISHED USING SAND - COLLARS AND NON SHRINK EPDXY GROUT OR APPROVED EQUAL. 5- 361520 PACE N/A wercu: N.w IN. NCR6gR.V. NPU 1961II991 C ., ,� CITY O RENTON Planning /Building /Public Works Dept. EARLINGTON SEWER REPLACEMENT Phase II APR 2012 JDH JDH o "I EixCx� m N0. o EDDMC OTO IF xoI Dxe ucx r P ONDI NGr NO. REVISION BY DATE APPR -,I LH F. 10 10 5- 36152C