Loading...
HomeMy WebLinkAboutzW-364801 SetG� s a 6 Z Z CONNECT NEW 1.5 -INCH HDPE PIPE TO N U _ , �, ^;, EXISTING CHLORINE BOOSTER PUMP. 11J CONNECT NEW 3141NCH HDPE PIPE TO 0 LL g as NEW RAW WATER SAMPLE TAP. 1 " > ,�','..+.: ,..: m Z y SEE BUILDING MECHANICAL PLANS FOR - '.. z° ,,,"rt- - `;- _, :4 Y f ADDITIONAL INFORMATION. rAt3 .,a.`•:'.SD_�`` x..��. >z a'... `'' 5 by t. • �� �t a i ~ Q m ' .. .. 4, �` R' SPRINGBROOK S' RINGS - 2 t 3 `a n r' y 'TREATMENT BUILDING -- - ''"'• - -- - 5 +'i` ` �- _ ti �: y INSTALL 770 FEET OF B-INCH PVC CONDUIT CONTAINING TWO 1.5 -INCH HDPE PIPES AND A h I" s" ` - ' ONE 314-INCH HDPE PIPE 1 �r I. PIPE TABLE SIZE (INCHES) MATERIAL CLASS 8 PVC SDR 35 1.5 HDPE DR 11 0.75 HDPE DR 11 = ``.>�` - �'t SPRINGBROOK SPRINGS > a a •. TRANSMISSION MAIN FROM _ - -. �,, �` R - p s`x� rLL �`ia �x t4 SOURCE 18 -INCH AND 20 -INCH IRON COD ' VJ -3 (P'J'Zo If LCROSS DUCTILE 0 CONSTRUCTION RECORDS LLC 9/23/1 TM oaartu T -M HRUS t REVISION BY CONSTRUCT MANHOLE AT 770 LINEAL FEETQr+k APPR �T.MALPHRUS - � - FROM CHLORINE BUILDING. INSTALL CHLORINE CARRIER WATER NJ C CONNECT TO NEW 1.5-INCH HDPE PIPE. � INSTALL SAMPLE TAP UPSTREAM OF ' :k ffi x '- CHLORINE INJECTOR. CONNECT TO NEW° PE PIPE 3 /41NCHHD _ �,� Y, �� 1;.• �-} y 1 N+ ng AA vf i, , , - Ow AW ffi Al ti a �' �� # V y °' . `, Y ,7 ^• � � r - �.���` y�isg _ {fit k .�s. y y 40 1 UPS, y ` 5'' RAW WATER SOURCE; - 1'JZ - '..t .`( '.1 P R t� It t � c RAW , _ a TER SOURCE rE ro$ SITE PLAN 1° = 60' REVISED TO CONFORM TO CONSTRUCTION RECORDS xx9/25/13 RH2ENGINEERING INC. DATE P W- 364801 w tom, �► CITY OF SPRINGBROOK SPRINGS N/A PRIMARY DISINFECTION rLL PROPOSED SITE PLAN DA7JJ ��T.MALPHRUS COD ' VJ -3 (P'J'Zo If LCROSS aE rrtw 0 CONSTRUCTION RECORDS LLC 9/23/1 TM oaartu T -M HRUS t REVISION BY DATE APPR �T.MALPHRUS W- 364801 w tom, �► CITY OF SPRINGBROOK SPRINGS REN TON PRIMARY DISINFECTION rLL PROPOSED SITE PLAN DA7JJ � Planning /Building /Public Works Dept. COD ' VJ -3 (P'J'Zo If W n¢ 2 m 0 CIO ch N Ii Z p z z F- U w o LL & Z zc� z a 0 N Q CL 24- DI MAIN 8- PVC CONDUIT PIPE, TERMINATE 6- PAST INTERIOR WALL OF METER PIT, SEE DETAILS THIS SHEET HOSE BIB AND RAW WATER J SAMPLE STATION 314- HDPE PIPE TO RAW WATER SAMPLE STATION 6 - - -- METER PIT m1.54NCH HDPE PIPE, RUN TO CHLORINE BOOSTER PUMP SATURATOR PIT CHLORINE ROOM ff_� PLAN VIEW SPRINGBROOK SPRINGS CHLORINE BUILDING SODIUM FLUORIDE CHLORINE COLD STORAGE I I STORAGE CARPORT -- - - - - - - - - - - - CHLORINE BOOSTER PUMP NON-SHRINK GROUT PROFILE VIEW SPRINGBROOK SPRINGS CHLORINE BUILDING REVISED TO CONFORM TO CONSTRUCTION RECORDS 6 9't 9/25/13 RH2 ENGINEERING INC. DATE N0. REVISION BY I DATE I APPR LCRO55 ac ¢a T.MALPHRUS 6" MIN. i J. ',1 COMPACT AROUND AND UNDER MAIN ' TO SPRINGLINE USING A MECHANICAL HAND COMPACTOR. HOE PACK MAY�•�>'- .'..,'•.!._'�, BE USED ABOVE SPRINGLINE. PROVIDE FOUNDATION 12" GRAVEL IF REQUIRED. MAX, PIPE OD+ 18" MIN PIPE OD + 24" MAX. 1/2" a V' 1 -112" MAX. 1/2' MIN. II II II 11 I II II II II I II IUM aF xw a ruu xue F NJf QE N]I SLUE ICIXWM0. TYPE 2 FOR EXISTING WALLS AND FLOORS SELECT BACKFILL OR NATIVE MATERIAL SUBJECT TO ENGINEER APPROVAL, COMPACTED IN 6" MAX. LIFTS PER WSDOT STANDARD 2- 09.3(1)E TO 95% DENSITY UNDER TRAVELED AREAS. 90% IN UNTRAVELED AREAS, EMBANKMENTS AND DITCHES. SAND BEDDING MATERIAL PER WSDOT SPEC 9 -03.13, COMPACTED TO 95% MDD PER ASTM D1557 MINIMUM DEPTH OF BEDDING UNDER ANY PORTION OF PIPE: 0" FOR STABLE SOIL 6" FOR ROCK EXCAVATION' 12" FOR CLAY, PEAT, OR OTHER UNSUITABLE MATERIAL TYPICAL TRENCH DETAIL NOT TO SCALE CORE DRILL HOLE THRU EXISTING WALL OR SLAB PROVIDE SEALANT AND BACKING ROD OR TAPE ON BOTH SIDES PIPE PENETRATION DETAIL CORE DRILL FOR 8" PVC CONDUIT PIPE, SEE DETAIL THIS SHEET 24" DI MI W- 364802 CITY OF RENTON Planning /Building /Public Works Dept. ANY ROCK OR GRANULAR MATERIAL OVER 3" DIAMETER 1.5' HOPE PIPE 1.5' HDPE PIPE 8 -INCH PVC CONDUIT PIPE ,& METER PIT - EAST WALL NOT TO SCALE SPRINGBROOK SPRINGS PRIMARY DISINFECTION DETAILS ABOVE 3 MAIN 8/3/2012 z 3 � C o� N �