HomeMy WebLinkAboutR-361461u:
IN
- INLET SHAPING
BY THE CONTRACTOR
i
— REFERENCE STATION /OFFSET
AND FLOW LINE ELEVATION
CURB BY THE
CONTRACTOR
SDR-35 PVC COUPLING
CAST INTO PRECAST BOX WALL
(OUTLET PIPE LOCATION VARIES)
PLAN VIEW (6' X 4' UNIT]
CLEANOUT COVER
CAST IN TOP SLAB
TREE FRAME & GRATE
CAST IN TOP SLAB
8" TOP SLAB
INTERLOCKING JOINT (TYP)
a
6" 4' 6"
LET SHAPING
Y THE CONTRACTOR
REFERENCE STATION /OFFSET
AND FLOW LINE ELEVATION
CURB BY
THE CONTRACTOR
COUPLING CAST
INTO PRECAST WALL BOX
(OUTLET PIPE LOCATION VARIES)
PLAN VIEW (4' X 4' UNIT)
PLANT SUPPLIED
FILTERRA CONSTRUCTION NOTES
1. IF THE FILTERRA IS STORED BEFORE INSTALLATION, THE TOP SLAB MUST BE PLACED ON THE
BOX USING THE 2X4 WOOD PROVIDED, TO PREVENT ANY CONTAMINATION FROM THE SITE. ALL
INTERNAL FITTINGS SUPPLIED (IF ANY), MUST BE LEFT IN PLACE AS PER THE DELIVERY.
2. THE UNIT SHALL BE PLACED ON A COMPACTED SUBGRADE WITH A MINIMUM 6 -INCH GRAVEL
BASE SUCH THAT THE UNIT AND TOP SLAB MATCH THE GRADE OF THE CURB IN THE AREA OF
THE UNIT. COMPACT UNDISTURBED SUBGRADE MATERIALS TO 95% OF OF MAXIMUM DENSITY AT
+1 -2% OF OPTIMUM MOISTURE. UNSUITABLE MATERIAL BELOW SUBGRADE SHALL BE REPLACED
TO THE ENGINEER'S APPROVAL
3. OUTLET CONNECTIONS SHALL BE ALIGNED AND SEALED TO MEET THE PLANS WITH MODIFICATIONS
NECESSARY TO MEET SITE CONDITIONS AND LOCAL REGULATIONS.
4. ONCE THE UNIT IS SET, THE INTERNAL WOODEN FORMS AND PROTECTIVE MESH COVER MUST BE
LEFT INTACT. REMOVE ONLY THE TEMPORARY WOODEN SHIPPING BLOCKS BETWEEN THE BOX
AND TOP SLAB. THE TOP LID SHOULD BE SEALED ONTO THE BOX SECTION BEFORE BACKFIWNG,
USING A NON- SHRINK GROUT, BUTYL RUBBER OR SIMILAR WATERPROOF SEAL. THE BOARDS ON
TOP OF THE LID AND BOARDS SEALED IN THE UNIT'S THROAT MUST NOT BE REMOVED. THE
SUPPLIER (AMERICAST OR ITS AUTHORIZED DEALER) WILL REMOVE THESE SECTIONS AT THE TIME
OF ACTIVATION. BACKFILLING SHOULD BE PERFORMED IN A CAREFUL MANNER, BRINGING THE
APPROPRIATE FILL MATERIAL UP IN 6" LIFTS ON ALL SIDES. PRECAST SECTIONS SHALL BE SET
IN A MANNER THAT WILL RESULT IN A WATERTIGHT JOINT.
5. THE CONTRACTOR IS RESPONSIBLE FOR INLET PROTECTION /SEDIMENT CONTROL AND CLEANING
AROUND EACH FILTERRA UNIT.
6. CURB AND GUTTER CONSTRUCTION SHALL ENSURE THAT THE FLOW LINE OF THE FILTERRA UNITS
IS AT A GREATER ELEVATION THAN THE FLOW LINE OF THE BYPASS STRUCTURE.
7. ACTIVATION OF THE FILTERRA UNIT IS PERFORMED ONLY BY THE SUPPLIER. PURCHASER IS
RESPONSIBLE FOR FILTERRA INLET PROTECTION AND SUBSEQUENT CLEAN OUT COST. THIS
PROCESS WILL COMMENCE WHEN PROJECT SITE IS FULLY STABILIZED AND CLEANED (FULL
LANDSCAPING, GRASS COVER, FINAL PAVING AND STREET SWEEPING COMPLETED). CARE SHALL
BE TAKEN DURING CONSTRUCTION NOT TO DAMAGE THE PROTECTIVE THROAT AND TOP PLATES.
BY AMERICAST
(NOT SHOWN GALVANIZED a d
FOR CLARITY) ANGLE NOSING
CURB & GUTTER °
BY THE CONTRACTOR
d° 4 °'
STREET
JI—JI =IL J1— 61 JC`]I Il 1 DOWEL
L IL= L =11=JL JL— IL =J1=1L 1
JL=1h JL =JL=. JL=11: JI.= .fi._I D
L= JL= 11 =11� JL= JI.= JI.=JL
L IL =JJL JL IL= JL;.B;JL -7 7
BY AMERICAST
MULCH PROVIDED BY AMERICAST PERFORATED UNDERDRAIN
UNDERDRAIN STONE PROVIDED BY AMERICAST SYSTEM BY AMERICAST
SECTION A -A
PRECAST FILTERRA UNIT CONFIGURATION
NTS
CAST-IN-PLACE
DEPRESSED GUTTER
AND THROAT OPENING
(BY CONTRACTOR)
PRECAST
STANDARD 90' NOSING ° TOP SLAB
d d
a
° d
• 4 -6" CLEAR
THROAT OPENING
d
a
°
d d
° 4
°
a °
a
d °
a °
d d
12- D.C. BY AMERICAST
0 BE BENT AAS ®CESSA Y BY CONTRACTOR $ II
PRIOR TO INSTALLATION OF FIELD POURED GUTTER I ° THROAT PROTECTION DEVICE
DO NOT REMOVE - LEAVE
U a ° IN PLACE UNTIL SITE IS
PRECAST BOX WALL ° STABILIZED AND FILTERRA
IS ACTIVATED
FILTERRA THROAT OPENING AND GUTTER DETAIL
NTS
R-361461 CALL 3 WORKING DAYS
BEFORE YOU DIG:
811
REVISED TO CONFORM TO CONSTRUCTION RECORDS. NO REVISIONS VS HJT 07 2014 SURVEYED: KPG p
THIS SHEET. �1P D BOB RECORD �h } CITY OF RENTON SOUTH LAKE WASHINGTON DRAWING NO. S
9� DRAWN BY ODB
` Public Works Department ROADWAY IMPROVEMENTS PROJECT NO. 11156
_ DESIGN Y: ODD 15affle, 9 Tworna, WA DRAWINGS FED AID NO.
u CHECK BY: NJD Sealtla,WA98109 Tacoma, WA 98402
°F ae�srg�FO �Fwa \'v�` PROJ MGR: NJD (206)28 &1640 (2 531 821 -072 0 PREPARED BY KPG, JULY 2014 APPROVED FOR CONSTRUCTION STORM DRAINAGE DETAILS DATE: FEB 2012
�ONgL ENV` \yo WyM• BASED ON CONSTRUCTION RECORDS
NUMBER REVISION DESCRIPTION BY APP. DATE 0�1 FILE: 08046DET02.dwg BY: DATE: SHEET NO. 8 OF 53
t
0
c
r
I i
u
A
F
a�z
Q
�0
a>
o
I I
3
I I I
I I
0
�+
I I I
46
z
- INLET SHAPING
BY THE CONTRACTOR
i
— REFERENCE STATION /OFFSET
AND FLOW LINE ELEVATION
CURB BY THE
CONTRACTOR
SDR-35 PVC COUPLING
CAST INTO PRECAST BOX WALL
(OUTLET PIPE LOCATION VARIES)
PLAN VIEW (6' X 4' UNIT]
CLEANOUT COVER
CAST IN TOP SLAB
TREE FRAME & GRATE
CAST IN TOP SLAB
8" TOP SLAB
INTERLOCKING JOINT (TYP)
a
6" 4' 6"
LET SHAPING
Y THE CONTRACTOR
REFERENCE STATION /OFFSET
AND FLOW LINE ELEVATION
CURB BY
THE CONTRACTOR
COUPLING CAST
INTO PRECAST WALL BOX
(OUTLET PIPE LOCATION VARIES)
PLAN VIEW (4' X 4' UNIT)
PLANT SUPPLIED
FILTERRA CONSTRUCTION NOTES
1. IF THE FILTERRA IS STORED BEFORE INSTALLATION, THE TOP SLAB MUST BE PLACED ON THE
BOX USING THE 2X4 WOOD PROVIDED, TO PREVENT ANY CONTAMINATION FROM THE SITE. ALL
INTERNAL FITTINGS SUPPLIED (IF ANY), MUST BE LEFT IN PLACE AS PER THE DELIVERY.
2. THE UNIT SHALL BE PLACED ON A COMPACTED SUBGRADE WITH A MINIMUM 6 -INCH GRAVEL
BASE SUCH THAT THE UNIT AND TOP SLAB MATCH THE GRADE OF THE CURB IN THE AREA OF
THE UNIT. COMPACT UNDISTURBED SUBGRADE MATERIALS TO 95% OF OF MAXIMUM DENSITY AT
+1 -2% OF OPTIMUM MOISTURE. UNSUITABLE MATERIAL BELOW SUBGRADE SHALL BE REPLACED
TO THE ENGINEER'S APPROVAL
3. OUTLET CONNECTIONS SHALL BE ALIGNED AND SEALED TO MEET THE PLANS WITH MODIFICATIONS
NECESSARY TO MEET SITE CONDITIONS AND LOCAL REGULATIONS.
4. ONCE THE UNIT IS SET, THE INTERNAL WOODEN FORMS AND PROTECTIVE MESH COVER MUST BE
LEFT INTACT. REMOVE ONLY THE TEMPORARY WOODEN SHIPPING BLOCKS BETWEEN THE BOX
AND TOP SLAB. THE TOP LID SHOULD BE SEALED ONTO THE BOX SECTION BEFORE BACKFIWNG,
USING A NON- SHRINK GROUT, BUTYL RUBBER OR SIMILAR WATERPROOF SEAL. THE BOARDS ON
TOP OF THE LID AND BOARDS SEALED IN THE UNIT'S THROAT MUST NOT BE REMOVED. THE
SUPPLIER (AMERICAST OR ITS AUTHORIZED DEALER) WILL REMOVE THESE SECTIONS AT THE TIME
OF ACTIVATION. BACKFILLING SHOULD BE PERFORMED IN A CAREFUL MANNER, BRINGING THE
APPROPRIATE FILL MATERIAL UP IN 6" LIFTS ON ALL SIDES. PRECAST SECTIONS SHALL BE SET
IN A MANNER THAT WILL RESULT IN A WATERTIGHT JOINT.
5. THE CONTRACTOR IS RESPONSIBLE FOR INLET PROTECTION /SEDIMENT CONTROL AND CLEANING
AROUND EACH FILTERRA UNIT.
6. CURB AND GUTTER CONSTRUCTION SHALL ENSURE THAT THE FLOW LINE OF THE FILTERRA UNITS
IS AT A GREATER ELEVATION THAN THE FLOW LINE OF THE BYPASS STRUCTURE.
7. ACTIVATION OF THE FILTERRA UNIT IS PERFORMED ONLY BY THE SUPPLIER. PURCHASER IS
RESPONSIBLE FOR FILTERRA INLET PROTECTION AND SUBSEQUENT CLEAN OUT COST. THIS
PROCESS WILL COMMENCE WHEN PROJECT SITE IS FULLY STABILIZED AND CLEANED (FULL
LANDSCAPING, GRASS COVER, FINAL PAVING AND STREET SWEEPING COMPLETED). CARE SHALL
BE TAKEN DURING CONSTRUCTION NOT TO DAMAGE THE PROTECTIVE THROAT AND TOP PLATES.
BY AMERICAST
(NOT SHOWN GALVANIZED a d
FOR CLARITY) ANGLE NOSING
CURB & GUTTER °
BY THE CONTRACTOR
d° 4 °'
STREET
JI—JI =IL J1— 61 JC`]I Il 1 DOWEL
L IL= L =11=JL JL— IL =J1=1L 1
JL=1h JL =JL=. JL=11: JI.= .fi._I D
L= JL= 11 =11� JL= JI.= JI.=JL
L IL =JJL JL IL= JL;.B;JL -7 7
BY AMERICAST
MULCH PROVIDED BY AMERICAST PERFORATED UNDERDRAIN
UNDERDRAIN STONE PROVIDED BY AMERICAST SYSTEM BY AMERICAST
SECTION A -A
PRECAST FILTERRA UNIT CONFIGURATION
NTS
CAST-IN-PLACE
DEPRESSED GUTTER
AND THROAT OPENING
(BY CONTRACTOR)
PRECAST
STANDARD 90' NOSING ° TOP SLAB
d d
a
° d
• 4 -6" CLEAR
THROAT OPENING
d
a
°
d d
° 4
°
a °
a
d °
a °
d d
12- D.C. BY AMERICAST
0 BE BENT AAS ®CESSA Y BY CONTRACTOR $ II
PRIOR TO INSTALLATION OF FIELD POURED GUTTER I ° THROAT PROTECTION DEVICE
DO NOT REMOVE - LEAVE
U a ° IN PLACE UNTIL SITE IS
PRECAST BOX WALL ° STABILIZED AND FILTERRA
IS ACTIVATED
FILTERRA THROAT OPENING AND GUTTER DETAIL
NTS
R-361461 CALL 3 WORKING DAYS
BEFORE YOU DIG:
811
REVISED TO CONFORM TO CONSTRUCTION RECORDS. NO REVISIONS VS HJT 07 2014 SURVEYED: KPG p
THIS SHEET. �1P D BOB RECORD �h } CITY OF RENTON SOUTH LAKE WASHINGTON DRAWING NO. S
9� DRAWN BY ODB
` Public Works Department ROADWAY IMPROVEMENTS PROJECT NO. 11156
_ DESIGN Y: ODD 15affle, 9 Tworna, WA DRAWINGS FED AID NO.
u CHECK BY: NJD Sealtla,WA98109 Tacoma, WA 98402
°F ae�srg�FO �Fwa \'v�` PROJ MGR: NJD (206)28 &1640 (2 531 821 -072 0 PREPARED BY KPG, JULY 2014 APPROVED FOR CONSTRUCTION STORM DRAINAGE DETAILS DATE: FEB 2012
�ONgL ENV` \yo WyM• BASED ON CONSTRUCTION RECORDS
NUMBER REVISION DESCRIPTION BY APP. DATE 0�1 FILE: 08046DET02.dwg BY: DATE: SHEET NO. 8 OF 53
t
0
c
>;
u
m
6
>z
L)
o
a�z
Q
�0
a>
o
1
w
3
0
�+
n
3
46
z