HomeMy WebLinkAboutR-361466GENERAL NOTES
AN EROSION CONTROL SYSTEM USING THE MINIMUM BMP'S IS TO BE INSTALLED PRIOR TO ANY
CLEARING OR GRADING. ADDITIONAL EROSION CONTROLS MAY BE REQUIRED BY THE ENGINEER
AS WEATHER AND FIELD CONDITIONS DICTATE.
LOCATIONS FOR STOCKPILED MATERIAL MUST BE APPROVED BY THE ENGINEER /PROJECT
MANAGER AT LEAST 24 HOURS IN ADVANCE OF ANY DUMPING. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR FULL COMPLIANCE WITH THE WASHINGTON STATE "DROPPING LOAD OR OTHER
MATERIALS - COVERING" (RCW 46.61.655.3/4) AND KING COUNTY CODE "UNSECURED LOADS"
(KCC 10.12.0408).
ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE
PLAN(S) SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING CONSTRUCTION.
APPROVAL OF THIS PLAN IS FOR EROSION /SEDIMENTATION CONTROL ONLY. IT DOES NOT
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,
RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
TESC PLAN & WRITTEN CONSTRUCTION SEQUENCE
A TEMPORARY EROSION & CONTROL PLAN AND WRITTEN CONSTRUCTION SEQUENCE DESCRIBING
HOW CONSTRUCTION AND EROSION CONTROL WILL PROGRESS, RESTORATION BY SECTION, AND
PROTECTION OF STOCKPILE AREAS IS REQUIRED. THE CONSTRUCTION SEQUENCE WILL BE
REVIEWED WITH THE ENGINEER AT THE PRECONSTRUC110N MEETING. THE CONTRACTOR SHALL
ALSO DEVELOP A 'SPILL RESPONSE" PLAN AND IDENTIFY PERSON(S) RESPONSIBLE FOR
IMPLEMENTING THE PLAN IF A SPILL OF A DANGEROUS OR HAZARDOUS WASTE SHOULD OCCUR.
ALL REQUIRED SEDIMENTATION /EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN
OPERATION PRIOR TO LAND CLEARING AND /OR CONSTRUCTION TO ENSURE THAT SEDIMENT
LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND
SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME
THAT CLEARING AND /OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION
HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO
EROSION /SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE.
THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES
WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE.
DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF
THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACIIVTIES
AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY
BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING
DRAINAGE SYSTEM.
TEMPORARY EROSION CONTROL
EXPOSED SOIL MUST BE COVERED AT THE END OF THE CONSTRUCTION WEEK AND ALSO AT THE
POSSIBLE THREAT OF RAIN. THE CONTRACTOR MUST HAVE A SUFFICIENT AMOUNT OF MATERIALS
FOR PLASTIC COVERING TO PROVIDE EROSION CONTROL FOR THE SITE AND EMERGENCY
PURPOSES.
DURING THE TIME
PERIOD OF
OCTOBER 1ST
THROUGH APRIL 30TH, ALL PROJECT DISTRIBUTED SOIL
AREAS GREATER THAN 5,000
SQUARE FEET,
THAT ARE TO BE LEFT UNWORKED FOR MORE THAN
12 HOURS, SHALL
BE COVERED BY MULCH,
SODDING OR PLASTIC COVERING.
IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS
ANTICIPATED FOR A PERIOD 30 DAYS OR MORE, ALL DISTURBED AREAS MUST BE IMMEDIATELY
STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL
TREATMENT APPLICABLE TO THE TIME OF YEAR. GRASS SEEDING ALONE WILL BE ACCEPTABLE
ONLY DURING THE MONTHS OF APRIL THROUGH SEPTEMBER, INCLUSIVE. SEEDING MAY PROCEED,
HOWEVER, WHENEVER IT IS IN THE INTEREST OF THE PERMITEE, BUT MUST BE AUGMENTED WITH
MULCHING, NETTING OR OTHER TREATMENT APPROVED BY THE CITY OF RENTON, OUTSIDE THE
SPECIFIED TIME PERIOD.
SEDIMENT TRAPPING
DEWATERING DEVICE, IF NEEDED, SHALL BE DISCHARGED WHERE SEDIMENT, AND /OR OTHER
POLLUTANTS, WILL NOT ENTER THE DRAINAGE SYSTEM. PER DEPARTMENT OF ECOLOGY
GUIDELINES, WASTEWATER FROM PORTLAND CEMENT CONCRETE, MASONRY, AND ASPHALT
CONCRETE CUTTING OPERATIONS SHALL NOT BE DISCHARGED TO STORM DRAINAGE SYSTEMS OR
SURFACE WATERS. SEDIMENT AND GRIT CONTAMINATION FROM CUTTING OPERATIONS SHALL BE
PREVENTED FROM ENTERING THE STORM DRAINAGE SYSTEM OR SURFACE WATERS.
BMP MAINTENANCE
ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENTATION BMP'S SHALL BE INSPECTED
DAILY AND SUBSEQUENTLY MAINTAINED PER THE WASHINGTON STATE STORMWATER
MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN AND THE DEVELOPMENT STANDARDS SO
THAT THEY FUNCTION AS INTENDED UNTIL THE SITE HAS BEEN PERMANENTLY STABILIZED, AND
THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. AT NO TIME SHALL MORE THAN 0.5
FEET OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS
AND CONVEYANCE LINES SHALL BE CLEANED JUST PRIOR TO FINAL INSPECTION APPROVAL.
THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM
SYSTEM.
c
I
c
I
NOTES
1. PLACE AT DOWN GRADIENT EDGE OF
AREAS TO BE CLEARED TO PROTECT
STREAM & WETLANDS OUTSIDE OF GRADING
LIMITS,
2. CONTRACTOR SHALL REMOVE
ACCUMULATED SEDIMENT FROM FENCE
WHEN IT REACHES Y3 OF FENCE HEIGHT.
6' MAX
8" MIN.
FILTER FABRIC MATERIAL
PROVIDE 3/4" TO
11/2" GRAVEL BACKFILL
GRUB SURFACE
FOR TIGHT SEAL
ALTERNATE:
STEEL FENCE POSTS
ELEVATION
SILT FENCE
NTS
DUST CONTROL
SECTION
FILTER FABRIC MATERIAL
36" WIDE ROLLS
USE STAPLES OR WIRE RINGS
TO ATTACH FABRIC TO POST
SEAL FILTER MATERIAL
AGAINST GROUND SURFACE
PREVENTATIVE MEASURES TO MINIMIZE THE WIND TRANSPORT OF SOIL SHALL BE TAKEN WHEN ADAPTOR SKIRT
A TRAFFIC HAZARD MAY BE CREATED OR WHEN SEDIMENT TRANSPORTED BY THE WIND IS WITHIN 3" TO 5"
LIKELY TO BE DEPOSITED IN DRAINAGE WAYS OR WATER RESOURCES. WHEN USING WATER FOR
DUST CONTROL, SPRAY UNTIL SOIL IS WET BUT RUNOFF IS NOT INITIATED. PAVED STREETS
SHALL BE SWEPT DAILY FOLLOWING CONSTRUCTION ACTIVITIES. GEOTEXTILE FA[
PERMANENT EROSION CONTROL
ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED BY LANDSCAPING AND
REVEGETATION (SEE PLANS).
UNDERGROUND UTILITY LINES
WHEN CONSTRUCTING UNDERGROUND UTILITY LINES, NO MORE TRENCH SHALL BE OPENED THAN
CAN BE CLOSED IN A SINGLE DAY, OR MORE THAN 500 FEET, WHICHEVER IS LESS. EXCAVATED
MATERIAL SHALL BE PLACED ON THE DOWNHILL SIDE OF THE TRENCH WHERE CONSISTENT WITH
THE SAFETY AND SPACE CONSIDERATIONS. TEMPORARY TRENCH DEWATERING DEVICES SHALL
NOT BE DISCHARGED INTO SURFACE WATERS OR TO THE STORM DRAIN SYSTEM WITHOUT PRIOR
TREATMENT. FOR UTILITY TRENCHING AND OTHER CLEARING AND GRADING WORK IN STREET
RIGHTS -OF -WAY, EROSION AND SEDIMENTATION CONTROL BMP'S, PER THE STORMWATER
MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN, AND STANDARD DETAILS SHALL BE
USED. THE BMP'S SHALL BE MAINTAINED DAILY.
EASEMENTS
ALL PUBLIC AND PRIVATE EASEMENTS SHALL BE PROTECTED, AND ALL EASEMENT RIGHTS
MAINTAINED.
NOTES
TOE IN SHEETING IN 4" X 6" TRENCH A 1. TIRES, SANDBAGS, OR EQUIVALENT MAY
MIN OF 8' SETBACK FROM TOP OF SLOPE. BE USED TO WEIGHT PLASTIC SHEETING.
BACKFILL WITH WASHED ROCK
2. SEAMS BETWEEN SHEETS MUST
CONVEY RUNOFF TO OVERLAP A MINIMUM OF 12" AND BE
APPROVED LOCATION WEIGHTED OR TAPED.
10'
MAX 3. PLASTIC SHEETING SHALL HAVE A
MINIMUM THICKNESS OF 6 MIL
4. DUE TO RAPID RUNOFF CAUSED BY
PLASTIC SHEETING, THIS METHOD SHALL
NOT BE USED UPSLOPE OF AREAS
THAT MIGHT BE ADVERSELY IMPACTED
BY CONCENTRATED RUNOFF.
\/ 5. BERM OR SWALE AT TOP OF SLOPE AS
DIRECTED BY CITY CLEARING AND
GRADING INSPECTOR.
6. DITCH AT BASE OF SLOPE AS REQUIRED
TERMINATE AT BY CITY CLEARING AND GRADING
LEVEL AREA. FOLD PROVIDE ENERGY 3' MIN INSPECTOR. DISCHARGE TO APPROVED
UNDER 4" & STAPLE DISSIPATION AT TOE y LOCATION.
AT 12" INTERVALS WHEN NEEDED
PLASTIC COVERING
NTS
0=11711AI STRAP
ACCUMULATION
CATCH BASIN INLET PROTECTION INSERT
NTS
NOTES:
1. INSERT SHALL BE INSTALLED PRIOR TO CLEARING AND GRADING
ACTIVITY. OR UPON PLACEMENT OF A NEW CATCH BASIN.
2. SEDIMENT SHALL BE REMOVED FROM THE UNIT WHEN IT
BECOMES HALF FULL.
3. SEDIMENT REMOVAL SHALL BE ACCOMPLISHED BY REMOVING
THE INSERT, EMPTYING, AND RE- INSERTING IT INTO THE CATCH
BASIN.
4. CATCH BASIN INSERTS SHALL BE USED FOR TEMPORARY
STORMWATER TREATMENT DURING CONSTRUCTION. EXISTING
CATCH BASINS MAY BE EQUIPPED WITH INSERTS FOR SEDIMENT
CONTROL DURING CONSTRUCTION AND RECONFIGURED IN NEWLY
INSTALLED CATCH BASINS AS THE WORK PROGRESSES. EACH
INSERT MAY BE REMOVED AND RE- INSTALLED ONLY ONCE, AND
ONLY IF THE INSERT REMAINS INTACT AND IN FULL WORKING
CONDITION, SUBJECT TO THE APPROVAL OF THE ENGINEER,
AND IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS. CATCH BASIN INSERTS REQUIRE AT LEAST
WEEKLY INSPECTION, AND MAINTENANCE IF NEEDED.
5. CATCH BASIN INSERTS DO NOT MEET SPILL CONTAINMENT
REQUIREMENTS AND CANNOT BE USED AS SUCH. METHODS OF
POTENTIAL SPILL- CONTAINMENT SHALL BE ADDRESSED IN A
TEMPORARY WATER POLLUTION /EROSION CONTROL PLAN.
6. "WATER POLLUTION /EROSION CONTROL PLAN" IS TO BE
PREPARED BY THE CONTRACTOR PER THE SPECIAL PROVISIONS.
R- 361466
CALL 3 WORKING DAYS
BEFORE YOU DIG:
811
t
00
nLvIJL.0 IV VvnrVnm
IV 1iVIW
IRUVIIVIY
a=
RG1iVRUJ.
Ivu RCYIJI
1
VIYJ
vJ
nJl
vi LVIY
o
oeMV' Tso
�. o, was„ R
"Io
_ _ z
SURVEYED: KEG
DRAWN BY: HUT
DESIGN BV: HJT
CHECK BY: NJD
3K3P�
753 9th Ave N 2502Je8ersonAve
Suffle,WA98109 Tam, WA 98402
z
�� ;
CITY OF RENTON
Public Works Department
SOUTH LAKE WASHINGTON
ROADWAY IMPROVEMENTS
q
DRAWING NO. 13
PROJECT NO. 11156
FED AID NO.
THIS SHEET.
RECORD
DRAWINGS
? 5506 w� \k
rin�o
PROJ MGR: NJD
1253)627 -0720
PREPARED BY KPG, JULY 2014
APPROVED FOR CONSTRUCTION
SITE PREPARATION & TESC DETAILS
DATE: FEB 2012
VIAL aN�� `,
0A
FILE: 08046TESCDET01.dwg
www.l86.1640
xwrr.l�g.com
BASED ON CONSTRUCTION RECORDS